HomeMy WebLinkAboutContract 38806-CO2DISTRIBUTION:
WHITE • FILE •
CANARY· CONSTRUCTION FILE
PINK· PROJECT MA NAGER
CITY OF FORT WORTH
CHANGE ORDER REQUEST
CITY SE CRETARY
CONTRACT NO . J~O~-C..S}. :J.
GOLDENROD • CONTRA<!roR
CHANGE <JR.DER NO. TWO DATE : August 12 , 2010 D.O .E. NO . (N I A) PROJECT NO . 00456
PROJECT DESCRIPTION: WESTSIDE WATER TREATMENT PLANT PROJECT CITY SECRETARY CONTRACT NO .
38806
ORJGINAL CONTRACT AMOUNT ....................................................... $ 47 044 014 .00
EXTRAS TO DATE ........................................................ $ ~I 5"'-"-64'""9.,_,.6"-7 _____ _
CREDITS TO DATE ....................................................... $ =0.=00~------
CONTRACT COST TO DA TE ........................................................................................................................................................................ $ 47,059 663 .67
AMOUNT OF PROPOSED CHANGE ORDER ............................................................................................................................................................ $ 23 5 15.00
REV ISED CONTRACT AMOUNT ............................................................................................................................................................................... $ 47 ,083 ,178 .67
ORJGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ...................................................................................................................................... $ =0.=00.__ __ _
ADDITIONAL FUNDING (IF NECESSARY) ............................................................................................................................................................... $ 23,515 .00
REMAINING FUNDS AV AI LAB LE FOR CHANGE ORDER ...................................................................................................................................... $ =0 .=00.__ __ _
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional , and
operational plant. These changes are as listed below. Furth e r descriptions and cost breakdowns are attached .
Change Order No. 2 to the Westside Water Treatment Plant Project consists of miscellaneous items identified during the course of construction by the Engineer, Construction
Manager, and Contractor requiring modification . Proposed changes include the fo ll owi ng additions to the scope of work .
I. CPR-14, Chemical and Ozone Building Guardrail/Handrail Modifications -increase length of guardrails/handrails by 155 LF (COST) ................ $14,452.00
2 . CPR-18, Lighting Fixtu re Revisions-revised light fixtures for building canopy lighting ........................ . ............................................... $1 ,0 12.00
2 . CPR-I 9, Light Pole Support Revisions -Addit ional reinforcement and formwo rk requ ired to strengthen light pole supports (COST) .................... $4 , 763 .00
3 . CPR-22, Utility Water Piping Conflict -Additional labor and materials to route 4" pipe around structural beams (COST) ..................................... $3.288 .00
NET CHANGE ORDER AMOUNT ............................................................................................................................................................................. ($23,515.00)
Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work . Documentation providing additional information for
each itemized change is attached to and made part of this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs arising out of the Change Order.
ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE
CITY MANAGER
0FF1 rA f:iR~e~
CITY SECRETARY
FT. WORTH, TX
None
DATE
lQUIRED
APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE
TO DA TE ORDER
1,095 Calend ar Da s 0 Calendar Da s
ROJECT MANAGER a ,-1 ~ DATE .a l I
a l'l.. '"
DIRECTOR/MANAGING DEPT. DATE
COUNCIL ACTION (IF REQUIRED): DATE
D APPROVED D DISAPPROVED D OTHER
08 -30 -10 P02 :58
..
July 16, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
fORTWORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-14, Chemical and Ozone Building Guardrail/Handrail Modifications
Dear Mr. Boss:
I have reviewed CPR-14, consisting of the labor and materials necessary to revise the
layout of guardrails/handrails in the chemical and ozone buildings. As part of this work,
the Contractor will delete identified fiberglass guardrail/handrail, and install additional
aluminum guardrail/handrail. There is a net 155 linear feet increase in guardrail/handrail
included in this change request.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$14,452.00 with no additional time requested. This change will be incorporated into
Change Order #2 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P .E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DIVISION
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
THE CITY OF FORT WOR'llt * 1511 11TH AVENUI * FORT WORTH, T£xAs 76102
(817) 871-8258 * FAX (817) 871-8410
O Printed on~ pa,-
April 6, 2010
WESl5IDI: WA'IB\ TREATMENT Pl.ANT 12200 <lD WEAlJEIFORD RllA[t RE WORn( ~ 71i1lil www.mcc:arll&',com
MAIUNG ADDRESS; P. o: ~ 122419 FORTWORl'.H, ~16'121 ett(Jt£(a,n 560,374() FAX(B1TI seo-am
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request #14
Westside Water Tre!lhnentPlant
P262~60754004568l
Mr. Boss,
Please find attached CPR #14 pricing for changes made to the project due to the field
directive memo from CDM dated 2/10/2010.
Please d.o nothesitate to contact me with any·qu.estio.ns or con¢errts.
~~
Jolin Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Paul Laufer -Project Manager
Steve Gotschall-ProjectDirector
Jerry Mayer -Project Director
File
ENC :. CPR#l4 Pricing
·-·----· ··-·-···-·~--····· ·---·. --
Change Proposal Request
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
CPR#OCl14
Date: 06/29/2010
Architect's Project No.:
Co.st. Issue Ref t : 24
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This
document, when fl.illy executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, this work may be performed prior to approvai of the formal Change Order. The Owner agrees that McCarthy
Building Compan~s. Inc. wrll be reimbursed monthly for the cost of this work as completed, whether or not ttie Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Chemical and Ozone Buirding -Gurdrail Modifica1ions
SCOPE:
Guardrail / Handrail Modifications
Sheet SE-2 -Add FRP guardrail/handrail for the ~rway associated with .the Sodium Hypochlorite storage area
Sheet SE~3 -Add alumin""" guardrail and handrail as applicable at the two stairways assocla:ted with the Chemical Sterage
Area Add aiuminum guardrail with1oe-board along the top of the retaining wall.
Sheet SE-4 -Delete the FRP guardrail/handrail associated with the entire LOX Storage.
Add aluminum guardraiVhandrail for the ~airs: Add aluminum guardrail with toe-board along the top of the retaining wall.
REFERENCE:
COM Memorandum 62142
Pricing Details
Company Name
Delta Composites LLC
Rocky Mountain Railings LLC
McCarthy Building Companies, Inc.
McCarthy Building Companies, Inc.
Description
Delete FRP Handrail
. Add Alum Guardrail/Handrail
Alum Handrail
Alum Handrail
Subcontractor Bond
General Uabitrty
Builders Risk
Project Bond
CO Fee (SLib Work)
CO Fee (McCarthy Work)
Net Amount of Thls Proposed Change
Nat Change in Calendar Days Due io This Proposed Change
[! SObec3\l.le Impact to be evaluated .at a later date.
Printed On : 06/29/2010 09:22:19 AM Page:
Amount
-700.00
5,954.00
5,995.00
1,078.00
0.00
109.00
42.00
125;()()
0.()0
1.,849.00
14,452.00
1 C1f 2
McCarthy Building Companies, Inc.
Project Name: Westside Water Treatment Plant
project No. : 002012.000
McCarthy Building Companies, Inc.
...
Accept
Do Not Accept
Change Proposal Request
CPR #0014
Date: 06129/201 o
Architect's Project No.:
Cost Issue Raf I : 24
City of Fort Worth Water Department
Accept
Do Not Accept
BY· .. . ... __ _ _ BY· --··-------·-··-····--·. BY· _ ---. _ .... . -·-···-···· ____ ?./?&f2..mt2 -··--·. Date: Date: _ --------_. .
Printed On: 0&'29/2010 09:22:19 AM Page: 2 ot 2
=~R_TH __ Y_·------1---+---1----•_·· ·-.. · .... ==JE~ ~11u~:.::__._:+--· -----·-···--·--··
~ ----·--··-·---~~--------,.:_-----= ~.:...--:--· ·------·--:::= ;: 1 ----~=~'°~~r=---· r---:-·-----_____ :.. ::..:..-==--= ··---·--
.;:; • I ' • ~ -~~ .... ~~-~ ~~= ~~ ~ =-~·-·. ~~~~l >--=· ·-=: -···-·-·--.. --··-· ___ !L_ ___ : -1:-.. -.. -.. -.. :~
aa-· -· .. ·.-·-... • --~ ... -·1l}L.::.:=:=·.-----·--·--:7--~----:· :·1-:r;~--="I
iiiiii': =··-1 ~ r ii ··-·-··17,-... ...... -··--·-··-·--·· .. ·•· ... ·-_·_-_-_·-_.,.rn....,i;.;· ... -_··_-::::_-:J.:::_-_-::_-::::.r ... -_-::::::::::::::_-J,-iTr·-------,-4':....,,~~j
~--• ....,. ,, • .~ _2CM --~1 .. .00· , ·--·-·111 ·-D ·-· ---·--···---·· --·-·-m -• . s -m. ·-------·-,-..1----t------,1-----t-r-----'
ii.N·-Hr ··---· ·-s ·-···-h' ,.:..._ -····· ------: ·--~-. ui
1.... ,. .1 IU $ SOU . . • • ,., !. ··-frl r·----. --f----•·1-----i: ·-----· : ~ .. _ .. :. -·-··-.. ·d-·-···----------_-_._ .. _ .. _. ·---------... ·---+-·-•--·-~------~ ·----· -·-· ... -........ ===-~=:~~= ·=====· ~::::..::_-__ --· ----·······-·--···-....... -:: : .. -.. ; t--t----------------····-4----+-·-t---~----+--n.a----+----f-------1------1----.....::..i.--.....::+-:-----·! _____ ,:. r ---= -:.::::-.. _, ___ --------· ~-~= ===~~--:~:J!=.=-~~=---=-==-===:;= ... __ : ---·-:-r ~--== t==-:·.::.:..;
____ .. ·-·----.------.,----·-· '·.· 0.11 . . .. ·'-·----+----_.-i-------l ~.~~~~=:~~1~~~-:~-0~~~1-_:_~_-·_··_·~-?-~ ... r_·_·_···_·_-_-_··_··_·~-t-::::·_._-:·:·:::i:~ri~r·---~-~---::-~:~:;
• _ __ ~ ·--~----·-_______ ,.",. "'·'" --:-r-c,-s ...JT-----.U:ir !~;~&1 -ic' •.---'·=A-~'·:a:.in!-i1 :;..;•:.··· .... =-='"i.;!.--= ~=••;.i-;:..----'--fi".---.:';::.241=1 ::'.: ===-=--.:-------=:f .:1"" ~ --;=~-~ ·---;tl,'1-: -· • • • w ---------.. ·-·-----~ ~-· ~ -ci-i ,-· -i~ta ---·-Cl'-w.-,--l',.-~--'1~-~::.iH;;-.., .... ,i1.n;'H:.----=--+;:....--~-=--1-,;---.J~.;·-:·•n -· ,_;.-·-·····-· ------. --:. ~-:-----:::.• • ~[ .. t:r: :.~ ;-·· • ;:..: : ~ • t~::::::·~l~J.~!IO~~I :t::l~lil-;H~t-t:::::~=~~!t::::::::t•t:::::::,:~~--,-==~~=:.-···-.. . -=i --.. ----·-_! ._!1¥>_ -~! S -~·-·· -~=~:-I : • : D : : 1 ~• = -=---..... _,_ ... ____ ----:: ,--....... ------·-... r. ~ .. ___ .: __ :-:-: =1~~ ~ : --·· . a . "
··--·--------· ·-----r--.• --.. -----· --,--E'-··l+---_;.:...11-,,.-..a..--+~-;....-+;_;!----'-+:.-----
.. ,.. ··~· ·-----... M ~ .. --~----· -1---· ----, --~---·-· --·-·a=1 -+ot'lif.. ·· ! ........ • 1 ••-· • 1 •• ne
·--~-----------·--·---· ~r ~ • S a ---·-· -----··--·-·· ----------·------···-~-::-: ... : . : : :
a-----····---· ·--·-• ... --· • •------. • ••·--·-M4fiMii,iDi,ii,: -~-S. H,41 'Ii ~ • $ 1n
--· .......... ·--i=:-... . . F
··-_ -···· -· ··--· -----~-...... · --~ •· · -··.--·.· ---·• ··-··: · · ··· ··. ·· • .!.O!•I '"1
1'----';.;.·o;i,1_.:·;;.;"'+:a'...;:•.11=•.a=!"'''---'11=U;;.;..+l_.J...,T=-o=TA-:-l:-+·~=---:-1~-':,~":.4~'=::=--I
~
ROCKY MOUNTAIN RAILINGS
ST 11839 E. 51 · . Avenue
Denver, CO. 80239
Phone: 303-432-0003
Fax:· 303-432-2038
CHANGE ORDER N0.1
R.M.R. #R1374
Location: Westside Water Treatment Plant -Fort Worth, TX.
To: McCarthy Buildi·ng Companies
Date: 02-18-1 O
Attn: Gisel V~ De La Orta
From; Scot Hooper
Request for Cha·nge Order, Your Project No.2012
Please adjust the above referenced Purchase Order-to reflect the
following. changes:
Add: 203 L.F.
Rocky Mountain Railings
Scot Hooper
@ .$29.33 Avg. par Ft. = $5;954.00
Accepted ______ _
Date ---------
OelaOrta Gisef
.from:
ant
ro:
Scot Hooper [shooper@rockymountainrailings.com]
Tuesday, March 02, 2010 7:50 AM
DelaOrta, Gisel
Subject RE: RFP 24 -Chemical and Ozone Building Guardrail Modifications ·
Gisel)
This rs side mounted and base mounted with all mounting brackets and fasteners included.
Scot
From: Del.aorta, G'isel [mailto:GDeLaOrta@Mccarthy.com)
Sent: Mcmday, March 01, .2010 3:39 PM
To: Scot Hooper
Subject: RE: RFP 24 -Chemical and Ozone Building Guardrail Modifications
Importance: High
Scott,
Could you pleas~ clarify if this quote includes anchor bolts and/or adh. anchors. How is this going to be mounted {side
mounted, top mounted .. ).
·ease clarify and add desc r iption on your quote to .proce~ cost issue.
Gisel V. De La Orta
P roj ect ;:n ginMr
r!:cCartrw Builtiln~ C::>mpanies . Inc.
122 fJ O Old Weatherford Rd i='ort \N orth . TX7&'!0i
PO B~;.: 1::24~£i
:>fh:::s : 8'i7·55£1 ,Z,74(l
Fa ~: f:17-560-3727.
Mot>Hs : 2ol 4-S30-420 ~
~c:CARTHY . OUR DIFFERENCE IS BUILDING ..
Leaving GrHn Footprints. Thinl< bsfon ygu print.
From: Scot Hooper [,:nallto:shooper@rockymountalnralllngs.com]
Sent: Thursday, Febl"Uary 18, 2010 .3;26 PM
To: Oel.aOrbt, Gisel
Subject: RE~ RFP .24 -Chemical and Ozone Building Guardrail .Modifications
Gisel,
,'\ttached is change order.
l
Request tor Proposal
Date: 02/1512010
Project Name : Westside Water Treatment Plant
Project No: 002012.000
1 o : Delta Composites LLC
Date Quote Dua:02/22/2010
Architect's Project No:
Cost Issue Ref# 24
CPR No
Please submit an Itemized quotation for changes in your subcontract sum and/or time. on subject project as descrtbed herein. This
doa.iment, when fully executed, as accepted, .shaD constitute authorization to proceed with the work described herein.
DESCRIPTION OF PROPOSED CHANGE:
SCOPE:
Guardrail I Handrail Modffltations
Sheet SE-2 -Add FRP guardralVhandraU for the stairway associated with the Sodium Hypochlorite stoi'age area.
Sheet SE-4 -Delete the FRP guardraJUhandrall associated with the entire LOX Sforage
REFER.ENCE:
Net amount ofTois Proposed Change: (ADD)(DEDUCT)(NO CHANGE) $ -------------
l'let change in Calendar days .of this Proposed Change: (ADD.)(DEDUCT)(NO CHANGE) Days
• Attach .Detailed Cost Breakdown
Delta Composites LLC
By: ....
McCarthy Building Companies, Inc.
(Prior .to Archlt9ct/Owner :review)
__ Recommend Acceptan~
__ Do Not R$C.Ommend ~ptance
Date:
McCarthy Building CompanlN, Inc.
{After Arch~Owner review}
__ Accept
_ No Recommendation -Price Marginal __ Do .Not Accept
By: By; ___ .
Data: Date ·:
Printed on: 02/15/2010 02:59:51 PM Page: 1
'DeLaOrta, Gisel
From:
\ant:
ro:
Moosa Raza [mraza@deltacomposites.com]
Thursday, February 18, 201 O 1 :34 PM
DelaOrta, Gisel
Subject: Re: RFP 24-Chemical and Ozone Building Guardrail Modifications (SO#: 10689).
Dear Gisel,
We are adding 20 LF and deleting 68 LF. The net credit for 48 LF of handrail is $700.00. Please update the PO
and send me a revised copy with the updated amount.
Should i revise the drawings reflecting this change ? Let me know.
Thanlcs
Moosa Raza
Senior Project Manager
Delta Composit~ LLC
TEL: 281-907-06i9
FAX: 281-907-0323 ·
EMAJL: mram@deltacnmposifes.com
On Feb 17, 2010, at 1 :47 PM, DeLaOrta, Gise] wrote:
Moosa,
I just talked to the CM and he confirmed . that they want to delete all FRP .guardralls at the platform on SE-4.
Thank you
Gisel Y. De La Orta
F-roJ~ci ::.rigirr9er
McCarthy Suild:ng Companies, irr:;..
1ZZOO Oict Waatharrord Rrl :=ort Worth. 1X 761-08
PO so.r. 1~z41:s
Offi;:e ; ·r.11-5SCl-37 4Cl
!=a,::: 817-5~727
Moblle: 21t.-e3~2.oi
McCARlHY. OUR DIFFERENCE 19 BUILDING.
-·'"'··--------·----···-······-··•-:•·.,~·-------... --.. -.. ··-------... -·-··------, .. -·,···-··•-·v •••••• .. ---·-· -.-~···--· .. ---· ... ·-• ... -···
1
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) (;/;
CDM (F-3043)
Febniary 10, 2010
Subject: Westside WTP Project
Chemical and Ozone Building -Guardrail Modifications
Attached are drawing mark-ups to reflect locations of ~drail/~ndtail modifications
required at the Ozone and Chemical Building. In summal'yt the following modifications
shall be ruseuss1!d with the Contractor.
Sheet SE-2 -Add FRP guardrail/handrail for the stairway associated with the Sodium
Hypocl:tlorite storage area as shown.
Sheet SE-3 -Add c'lluminum ~ardrail and handrail as applicable at the two stairways
associated with the ChemicalStorage Area. Adq aluminum guardrail with
toe-board along the top of the retaining wall as shown.
SheetSE-4 -Oele~ the FRP gt,iardrail/handrail aS$0clated with the entire WX Storage
Area platform. Refer to response comments associated with submittal SD-
06615-01. Add aluminum guardrailfhandtail for. the stairs .as shown. Add
aluminum guardrail with toe-board along the to.p of the retaining wall as ·
shown.
cc: Chris Harder (FWWD)
Josh Tric;e (B~V}
Steve Tiberg (Komatsu)
Bow Lin (CDM)
Danny Shannon (COM)
F~ 62142 -9.04
62142 -50-06615-01
.
I
• !
I
l
I . •
• I
" • t ':
.
\ D ..
t
I ~ ~
!2!'.
.. -...
,. n . •
-----~ -·· -~~-~--~----~ ... -=-'-·-=-=" -=-=-·---·--···-------1
-
atntE NII 1HM1CAt. rrm lllaJIIIIGS !I 1:1. a.oo
Pf.AN
·iii•',. r ...
CJnCIFFllllT--
WE8T8101! WAT!R T~TMl!lilt Pl.ANT PROJECT
-i:.==m-~ .. ---··a..·------
'll=-="'
--·. u I
t
......
::-.r,r.,i ... -----
f
' l
~
ft
II
' y
' J
I
f
I
f ::
j
~ .... --...... ..
•
----------------~'"-""f'! --~·----· ------~----""t"---'"""'--'l"'f"~
r-r
.,,_,.
-_. ...... ~
_.,....,..JUI! !.."I.W!!I!.!'
-... ™~·-
""''\,.--·---'tl"-' .... "'---J __ ,_..__._ ..... __ _
·, •Al.i{ff tNUJif
11.,,,.,.,,,.,,...,(_
WES'TSIOE WATER TREATMENT Pl.ANT PROJ&CT
· Acu.llf1Kftf
. ,,,,._,,,.,..,,_
~---~~~
-
..
{
(
( It l .
t
ft
I ' (..
I -· I· / I .1r,11ru.,11w1,-l
I ··. I~ lf/:n,."l',~ r1.
(
' I
!
I
'·
........
....
r··· ....... .
_____ .!!.:!..._ ___ _
-
. w4' . .,....fllrA.· -··---
........
.·-UC
·1 r-------, -~---····· · ·
I I
.!.._
.,,_ ..
UOUIDOIC'lml~lf
Pl.AN Vi'-......
CffVC.FCIIT-t-·
WEfJTSIDE WATER TREATMENT Fl~ PROJECT OZ<!NATIOH ~ t;tt1!M10AL l'M:IUTIE8
llQUIO ~EN FACIUTll!8 PW1
-• __ .. , __
•
July 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-18 (REVISED), Lighting Fixture Revisions
Dear Mr. Boss:
On June 23, 2010 the Fort Worth Warer Department approved CPR-18-Lighting Fixture
Revisions, which included revisions to both the building canopy lights, as well as the at
grade lights in the entrance stairwell designed to illwninate the proposed public art
mosaic. After recent discussions with the commissioned artist for the project, it was
decided that the proposed mosaic lights will need to be revisited. Therefore, revised
CPR-18 covers only the revisions to the building canopy lighting.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost to the Fort Worth Water Department for
the proposed change amounts to $1,012.00 with no additional time requested. 1bis
change will be incorporated into Change Order #2 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P .E., COM
Project File
WATER DEPARTMENT
PRODUCTION DMslON
THI CITY cw FOR'r Woll'nf * 1511 l lnt AV!NUI * FORT WORTH, TEXAS -76102
(817) 871-8258 * FAX (817) 871-8410
L=itll BLACK & VEATCH Building a world of differenci
July 7, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATIN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#l8
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order amount of
$1,012.00 be approved. Please review the request, and if it is acceptable, have it executed.
ly,&
John Boss
WESTSIDE WATER TREATMENT Pl.ANT 12200 OLD WEATtERFORD ROAD FORT WORTH, TEXAS 75108 www.mccarthy.com
MAILING ADDRESS: P. 0. BOX 122419 FORT WORTH, TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560·3727
June 29, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request # 18
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #18 pricing for changes made to the project due to the :field
directive memo from CDM dated 2/2/2010 and email from Black and Veatch dated
6/28/2010.
Please do not hesitate to contact me with any questions or concerns.
Jo n Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Paul Laufer -Project Manager
Steve Gotschall -Project Director
Jerry Mayer-Project Director
File
ENC: CPR #18 Pricing
CDM Memo dated 2/2/2010 and email from Black and Veatch dated 6/28/2010
•
--····· ---. .. . . .... -· ---.. ··-·--
Change Proposal Request
CPR#0018
Date: 06/29/201 O
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Architect's Project No.:
Cost Issue Ref# : 31
Attached is an itemized quotation for changes in the Contract sum and/or t ime on subject Project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, th is work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Lighting Fixture Changes and Additions
SCOPE:
Lighting fixture changes and additions due to CDM Submittal Comments SD-16500-01 & COM Memo dated 2/2/2010.
Email dated 6/28/2010 from Black and Veatch requesting new pricing to only include change from fixture type V to V1 and not to
include fixture types BB until further coordination between COM and the City of Fort Worth. Fixture types BB will be priced under
a seperate CPR.
REFERENCE:
Pricing Details
Company Name
Facility Solutions Group
McCarthy Building Companies, Inc.
Description
Light Fixtures
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
Amount
893.00
10.00
8.00
3.00
9.00
89.00
0.00 ···----------
1,012.00
Nat Change in Calendar Days Due to This Proposed Change
lJ Schedule impact to be evaluated at a later date.
Accept
Do Not Accept
BY :-·
Date: .
Printed On : 06/2912010 08:18 :22 AM
City of Fort Worth Water Department
Accept
Do Not Accept
BY:
Date:
Page: 1 of 1
-Pndng ~~.~_RT!f!. _ --·--· -----~----l-i---·1~-=-l.. 1 ---+-------~-------=±==±--· -·-\--···----+ --· --·-· z ! · ---:~-= _::-:~' := ~j-~::=+~:~~~J:-·::~-::::~.d~--=-,~~~~;;~~~:t=-~~~F ~~ j Mor,Jloo,~ I u~cos11 L ro1.icoot, ~1 ~ --• .a.-a1y JUOIIJ. ~., I· r;.:1 +u;-·I···· u;r1 -· I -E9jti>-F '':' ---F. 4t'__ l ~rt-··F·~--+ --•:"---) --i.:.":i , .oo . . 1.5 · ___ 0.001 ffi~~~g, ~~~ ··-· -~ ' ' ,.-. ' --.. --' -:: :t-=·~ ~ . ' -4 -~-::~:1t~-~~:~·-~t f-·~~-. .. -···· ··-----------+ .F&C-f=~~::~~-.:_ ·-····-·1 .. -· -: .. -·-·-···-···-··-· .. ··-·---·--· --.L-_ +-1ro111HRSI o.oo) I I. -,IUBTOTAL U j! I' !' 11a1.oop m , , FUEL,OIL,£PARTS: 0.001' OF $ S __ ~E~ . ~ I S S · J ··--· ........ --··------=c -uJIMEFACTOR: 10.00-. OF S S OFLBR I S S S S __ I.-······--.. ------·-·-----I I.AIIORMW>EH: 55.00-. OF $ $ OFUIR $ I S S S ' 7.001' OF S S OFMAT S s ~ S S -~·· ........ -_ .----·---···.· _______ =f=-~~ ~~ ~.:! p~~ s O !~ : : : : ,_ ___ ; __ ·---·-·-·-··-___ ··---···-· _ . --'---1 TAX: UH, OF S S OFMTUFUEL $ $ S S -; -... -c:::--~~=-~~~~~=J=~-~~~~-l l i ~ l ----··--·· ··-·-• --··-~-· '··---1--.-l----j---.....1------lluldenRlskl 0.31DO!I, s s s 3.10 s .. _ .......... __ ··-· ·-=t' ·--··· ..·--· I···----~-_Adclllonll=Bondf'rlfflllln 0.91-S S S S 9.13 S ·-. ..... --· -----. ----,--~--•-·----=---~--· I -··-----..... ·-·-· ............. -·-------, -·-----~-1--!-·-i i --i-----t I TOlal s 11 s S T0~~.2t ~ eii3 .If 88l To "i 3 i 1,012 1,012
··1, 1• electric
2525 Walnut HIii Lane Sulla 100 Dallas, 'T)( 75229 (214)-357-5697 (TECL#
17904)
06/28110
Nick Pepping
McCarthy
12200 Old Weatherford Rd.
Fort Worth Tx. 761 OS
Subject: Revised Pricing for Light Fixture
Changes
Dear: Nick
Change Order
Proposal
No. 126897
Date: 06/28/10
Project Westside Water Treatment Plant
Job NO.: 30J1613
Drawing No:
Spec Section:
We are pleased to offer the following Change Order Proposal for your consideration. Toe price indudes changing
4-Type V fixtures to V1 fixtures.
The Lighting Alliance Quote-$777 .00
FSG Eledric Markup-$116.00
Total Price-$893.00
Sincerely,
FSG ELECTRIC
Jerry Bevers
Project Manager
-~
Pepping, Nick
From:
Sent:
To:
Trice, Josh R [TrlceJT@bv.com]
Monday, June 28, 2010 8:42 AM
Laufer, Paul; Frazier, John
Cc:
Subject:
Boss, John F.; Pepping, Nick; DelaOrta, Gisel
FW: Weekly Meeting Minutes 6/23/10
As noted by CDM below, please have FSG hold on the referenced four lights designated in CPR 18. Further clarification
and revision maybe needed.
CPR 18 can either be held until all referenced lighting fixture is resolved or revised to excluded the lights in question.
Thanks,
Josh Trice
JQ Infrastructure
Construction Services
12200 Old Weatherford Road
Fort Worth, TX 76108
w. (817) 560-3999
C. (817) 897-1484
From: Bartruff, Chad [BartruffCD@cdm.com]
Sent: Monday, June 28, 2010 8:24 AM
To: Trice, Josh R
Cc: Boss, John F.; Harder, Christopher
Subject: RE: Weekly Meeting Minutes 6/23/10
Josh,
Only the four lights in front of the tile mosaic area are in question. Depending on what FSG indicates are the
implications of having to send .back for restock if a modification of the selection is required would be a main
factor. I assume those are ordered units for which my understanding is that many times restock is not an
option. With regard to a cost increase in late June for those four lights, I am sure that the material increase is
less than what might have to be 'eaten' if they won't take them back due to revised selection.
So, as mentioned below, I would recommend pulling only those four lights from the order and adjusting the
CPR cost accordingly.
Thanks,
Chad D. Bartruff, P.E.
CDM (TX #F-3043) I 777 Taylor Street, Suite 1050 I Fort Worth, TX 76102
Ph: (817) 332-8727 I Fx: (817) 332-6870 I www.cdm.com
n Please consider the environment before printing this email.
---Original Message--
From: Trice, Josh R (mailto:TrlceJT@bv.com]
Sent: Friday, June 25, 2010 8:36 AM
To: Bartruff, Chad
Cc: Boss, John F.; Harder, Christopher
Subject: RE: Weekly Meeting Minutes 6/23/10
Chad,
1
·We ha'7e already received an approval letter from Chris for CPR 18. As far as the Contractor knows, they are
Rroceeding with the lighting changes. It's all material cost. We can have them hold on the CPR until further
clarification, but FSG has noted that the material cost will rise late June/ early July. Please advise.
Thanks,
Josh Trice
JQ Infrastructure
Construction Services
12200 Old Weatherford Road
Fort Worth~ TX 76108
w. (817) 560-3999
C. (817) 897-1484
From: Bartruff, Chad [BartruffCD@cdm.com]
Sent: Thursday, June 24, 2010 4:45 PM
To: Trice, Josh R
Cc: Boss, John F.; Harder, Christopher
Subject: RE: Weekly Meeting Minutes 6/23/10
Josh,
In regard to the CPR log, I would recommend that lighting modifications associated with the mosaic area at
the Adm in entry be pulled from that CPR . It is my understanding that those fixtures are the bulk of the
additional cost in that CPR.
The lighting for the tile mosaic may be up in the air depending on coordination of the Public Art Group's
requirements. We have clarified a few items for them, but need to discuss further. Chris may have
comments regarding this, but I do not feel that the lighting at that location has been resolved as of yet. We
may just have a positioning issue, but the dispersion of the light from the selected bulbs will affect illumination
also.
Let me know if you have any questions.
Thanks,
Chad D. Bartruff, P.E.
CDM (TX #F-3043) I 777 Taylor Street, Suite 1050 I Fort Worth, TX 76102
Ph: (817) 332-8727 I Fx: (817} 332-6870 I www.cdm.com
n Please consider the environment before printing this email.
----Original Message----
From: Trice, Josh R [mailto:TriceJT@bv.com1
Sent: Thursday, June 24, 2010 4:11 PM
To: Bartruff, Chad
Subject: FW: Weekly Meeting Minutes 6/23/10
Chad, attached are the weekly minutes with the CPR log.
Josh Trice
JQ Infrastructure
Construction Services
12200 Old Weatherford Road
Fort Worth, TX 76108
2
·w. (81-7) 560-3999
C. (817) 897-1484 .
From: Frazier, John [JFrazier@McCarthy.com]
Sent: Thursday, June 24, 2010 3:25 PM
To: Trice, Josh R
Cc: Frazier, John; Boss, John F.
Subject: FW: Weekly Meeting Minutes 6/23/10
My addition -only a comment about AT&T easement.
John Frazier
Project Manager
McCarthy Building Companies, Inc
Westside Water Treatment Plant
PO Box 122419
Fort Worth, Texas 76121
Phone: (817) 560 -3740
Fax: (817) 560 -3727
Cell: (210) 336 -5949
Nextel: 142•20164*108
McCARTHY-OUR DIFFERENCE IS BUILDING.
Leaving Green Footprints. Think before you print.
---Original Message--
From: tricejr@bv.com [mailto:tricejr@bv.com]
Sent: Thursday, June 24, 2010 2:54 PM
To: Frazier, John; Laufer, Paul; tricejr@bv.com; Wigness, Mike; bossjf@bv.com
Subject: Weekly Meeting Minutes 6/23/10
Please find attached minutes and CPR log. Respond with comments/corrections if needed.
Thanks.
You can view this document in Contract Manager by clicking the following link (you will need an Contract
Manager User Name and Password):
https://ew19.myloadspring.com:443/exponline/documentrequestforward.do ?redirect.rd=true&masterkey=OO
0ErLXFK1828700000000LOAD&basesysitemtype=MTG&projectname=164160&groupname=8158GS3W
•••
This electronic mail message, including attachments, is intended only for the person or entity to which it is
addressed and may contain confidential and/or privileged material. Any unauthorized use, review, disclosure,
distribution, or actions taken in reliance on the contents of this information, is prohibited. If you received this
e-mail in error and are not the intended recipient, please notify me immediately by telephone or reply e-mail
and destroy all copies of the original message .
•••
3
•
•
Quote: TLA08-21015-6 Quote
The Ughting Alliance
PO BOX 613079 Page 1/1
Dallas TX 75261
Data: Mar 26, 2010
Project WESTSIDE wrP CITY' OF FORT WORTH
Location Fort Worth TX .
Phone: (972) 456-9800 ·
Fax: (972) 4S&-9801
From: Joe Briggs [(972) 456-9800x8825l
Quote TLA08-21015-6
Tc: Brandon castro
Reynolds Co DFW
2861 Merrell Rd
Dallas TX 75229
Phone: (214) 560-262$
Fax: (214) 560-5348
For
Bid Date Apr 30, 2009
Expires Jun 29, 2009
.ArchltBct: Komatsu Architecture
Engineer: Gupta & Associates
EMall: btcastro@reynco.com
QTY Type MFG Part
CHANGE V TO V"i
-4 V DOWN Ar\/ 26TRT 8AR MVOLT G::810 WlP
4 V1 DOWN CF111fSTRT BAR MVOtT G:B10 OB'. WLP .~ t I~':~
i otal for: CHANGE V TO V'i /,.Jf:,.,. =e
S I as I Ok IIGUIOCE l1Hllfl
C t+r , trs::a 8b Qj:·. 'if Wtiio.:a 'it iii .. _ :a a b 1 ~ .. .,_ ··-· '°' iii IE 115 & II Fl I 11111 17 17 -
_. &db z F[ BJ T L C ii
Gr ru· • t'dss 2
.Notes:
Approved package
Lamps lncludecf .
Tenn& and condltfons of sala: . -on site system commissioning or startup is not lnduded for sensors, c:ontrois or
dimming systems unless spedftcaJly noted in 1he quotation above.
-sensor count& quotad are l:iasad on ccntraclDr counts suppllea ana are subject to
cta,ge & raquole once drawings a,a raceived for sansor layouts. · ·
. -V~ quotad wll l» suppled u nollld on each llam. The dialr.lbu1Dr' ia ,espoilStie
for cocdlamallon d voltage on each Item. · ·
-Lanps .,. nol lnciuded unless speclfical)t. naiad. .
·-Pre-shipment of anchor bob requires adclllonal frei9ht charpas from those showr,.
-Manufacturmw' wrrill.and condJtiona of sale apply. Fr.ight t8rml val')' by manufacturer,
and ant applied lnclvldualy.
-Arry devlallon ID quantities, pricing. or d88Cl'iption of Iha listed bill of material voids this
quote.
-Prices inn for order within 60 days of the Issuance of thia quol8 unleaa superceded by E
manufacturer's annoLf1C8d prlce-tnaaase.. -
:·''S'f·~ *·· a
. ~
cPttCi u 1.
.•
• • Date: May 6, 201 O
Job Name
The Lighting Alliance
PO BOX 613079
Dallas TX 75261
Phone: (972) 456-9800
Fax: (972) 456-9801
WESTSIDE WTP CITY OF FORT WORTH
Fort Worth TX
Bid Date
Apr30,200S
Submittal Date
May 3, 2010
· Architect:
Komatsu Architecture
550 Bailey Ave, #102
Fort Worth TX 76107-
Engineer:
Gupta & Associates
5430 Alpha Rd
Dallas TX 75240-4 506
. .
•
Date: Mav. 6, 2010
.
Project
Location
To
WESTSIDE WTP CITY OF FORT WORTH
Fort Worth TX
Reynolds Co DFW
2861 Merrell Rd
Dallas TX 75229
Contact: Brandon Castro
Transmitta!
The Lighting Alliance
PO BOX 613079
Dallas TX 75261
Phone: (972) 456-9800
From: Joe Briggs
ATTACHED WE ARE SENDING YOU 1 COPIES OF THE FOLLOWING ITEMS:
D Drawings D Specifications Other:
D Prints D Information
D Plans jg! Submittals
THESE ARE TRANSMITTED FOR:
D Prior Approval D Resubmittal for Approval
!Kl Approval D Corrections
D Approval as Submitted B Your Use D Approval as Noted Review and Comment
MFG Part
D Record
Bids due or.:
Other:
Type
V1 Lithonia-Downlighting CF111/26TRT SAR MVOLT GEB10 DBL
WLP
BE.
FF00009
Hydrel M9420 SS 35CMT4 120 WWD FLCAS
12S LSF LP
Item Note: STR & DNA NIA on SS trim
Page 1/1
Paae 1/1
.•
... s ... ub_m_llled ____ bv._T_h_•-=U;,;'ol h"'ti"'"'no .._Al""""-lia.,.....nce ____________ catalog NL,!mber: Type: e Job Name: GF11 1/26TRT SAR MVOL T
· . WESTSIOEWTPClTYOFFORT GEB10 DBL WLP
· ••• 1 ~~ Komatsu Architecture Notes: ·
Enolneer : Gull!a & Associates
V1
TLA0&-21015
I
FEATURES
REFLECTOR
lypo CIIAlognumber
• Self-flanged, specular clear , semi-diffuse or highly
specular reflector.
HOUSING
• Aluminum housing with top revaal for floating luminaire
appearance. Provided with safety chain between re-
veal and housing on surface and pendant units for
hands free wiring connections. Matte white texwred
polyester powder paint finish standard.
Fluorescent Surface Down lights
MOUNTING
• Standard ceiling mount provided with mounting pat-
tam for direct insullatlon to 3· 1/4' and 4' octagonal or
4' square junction box.
• Optional wall mount provided with mounting pattern far
direct installation to 4' square or octagonal junction
box.
--r
11" CF
Cylinders
Horizontal Lemp
Tri-Tube
• Optional pendant mounting entry provided for 3M' Na-
tional Pipe Thread stem. Mounting accessories avail-
able (see optlonsl .
ELECTRICAL SYSTEM ~' ~,.:_ !.J/8 /'"'"119~ . \ 123.BI
• Hor izontally-mounted, positive latch thermoplastic
socket.
• Class P IGEB1Dl, tharmafly-protectad, high power tu-
tor electronic ballast .
LISTING
• Fixtures are UL Listed for damp locations . Listed and
labeled to comply with Canadian STandards .
I ~ \ { \ l
Refltc1or Aperture: 8 (Z0.3)
HotaingD!am-r. 10-3/4 r27.3l
All dimon11ont. arw
inch1s l"ndme1ersi .
A • 4·5/8 !11 ,7)
6 • 5-5/16113.S)
(; • 3-1/4 (L3)
[l. 14135,61
Wall Mount Dimen-
sions
Tr--n r. J_ 9-1/~ . I 123.~I
LiL___J1 bt=~_JJ
ORDERING INFORMATION 8mmple : CF!~ ZliTllTBAI? !20 GEBlDWLPDWHc
Choo•nhe bold!Kocatalog nom1nclalur11h8t best suita
your nNd11ndwrl11 konthe •-late line .
CF11 1/26TRT SAR MVOLT GEBlO ~--I I I ~!11 I I
I Reflectorcolor I I Finish I I Ballast•
Cfll I BAR Cltar I lb(ankl Specular 121) GEB10 Elec·
8PR Pewter low m tron ic
8WT1I Whul iridtscenl 347 balltst.
LO S.rni-diffun IMVOLT! •aa1111
8UBR U11ber low mull bl
BCR' Ch1mp1gn1 iriduc1nt spec:ifl1d .
I Wattage/lamp I gold LS Highly
11Tl1T One lM lri-BGR' Gold sp1cular
tuba
2ITllT °"' 2llWtri· I NOTES: lYhl
3ZTRT Ont 'J'l!Ntri-1 Nol l'KClmmendecl for u• wltll co.._i 11-.-111 lamps,
tu~• COMUlt faclory.
m,n Ona 4'Nt t,i. 2 P.....,.mount unal.engt11Df....,muo1bell*ifiedllromr
to 4r in r incremenlal. CellinO-..-tor lntarior u•. tube Coneult faclory tor •XM<ior ute. Stam end C'llind9r color wtl
rnaldl,.._or*racl •DP11oft.Slemwillblbllc:lrltordarldu
•-••line it-.
3 Addkionel arc:hl_,,.lcolor, oval!-; pleae He brocltvre
714.J.
gotham~@ IITNMI AKHffUtvaa&. OOWNUOHTIII;
A DMIOI OIi acun, LDHTIIG auv,. UC.
MOO i--'-''-lOOU
• ICIO J1t •-, 770 -112' Au I ""-'
--J)I &,.~
DBL WLP
I ! I Options
GMf Single slow· 1<rchitectar1I Colorr
blow fuse lp-...,,j
WM Wd mounl Sl111111111 1:1111111
PM P1ndant 3/r OWHG Malle wh ita
thrud lst1nd1rdl
mount DDB Dark bronu
j DBL Black I ~ia11.111. .ilaa· rum DWR Gloss wnilt:
CYS1 311· ltffl ~11a i:1111t1
1"6 canopy DM8 Maclin bnlnze widl,.
'hang CHA Natural
straight' 1luininu111
swivel DSS S1nds1Dn1
CIIS' 3/r 11111 DBC CharCOIII pray
and canopy OTB Tennis grnn
widt 45" DBR Br~t red m!l!II
I WlP Wilh 351( I DSB $teat blue
laa10.
CF 11 TRT SCF-140
' ...
Type: j.!S~u:::bmi:.!!.!!"tted~~T:.:!he:.!Li:!I:" !!!htinQ=.!l!..!::A:::.:llla:;:n:::::ce:....._ ___________ -l Catalog Number:
Job Name: CF11 1 /26TRT BAR MVOL T
WESTSIDEWTPCITYOFFORT GEB10 DBL WLP V1 WORTH
Archit•ct: Komatsu An:hitecture Noles :
En inaer: Gu a & Associates TUOB-21015
11· CF Open Cylinder, Gotham Series
Distnllution curve Distnbution data Output data Coefficiantol utilization Single luminaire data 30· above floor
CF11 1/lBTRT BAR, (11 PL· T 18W/35/4P lamp, 1.5 s/mh, 1200 rated lumens, test no. 2196100301
r' 31!1
~-~ homl' '!· Luman, Zona Lunoau """"' ~c 111% lQII 5111 o· 446 0"·30" 366 30.5 pw 5111 :Ill. !IJ'l!J't, S)'l;R
llrilial le 50 429 41 0"-40" 653 54.5 1 76 74 74 73 71 70 Mount llkum 15• 384 11~ o•.50• 818 68 .2 2 711 68 69 61 67 65 h1ipbt comer H: 464 21 0"-90" 819 68.3 3 65 61 64 61 62 a,
47! 288 90"-180" 0 0.0 4 60 56 60 56 58 55 8' 14 .8 45• 17 150 0"-180" 819 611.3' 5 56 51 55 51 54 50 10· 7.9 55•
8
16 'Efficiancy 6 5l 47 51 47 50 48 12· 4.9 65" 1 7 47 43 47 43 46 42 14' l4
HID 75• 1 8 (3 39 43 39 42 38 Iii 2.4 es· 0 1 9 I~ 39 35 38 34 O" 90" 0 10 311 31 35 31
CFll 1/26TRT BAR, (1) PL-T 26W/30/4P lamp, 1.4 s/mh, 1800 rated lumens, test no. 2198092501
pl 211',;
Fromll" ce. LllfflfllS Zone Lumans %lamp pc au,. M 511'.i o• 711 0"-30" 568 31.6 rw, 50'll,3J'll m~ nm. l11 iu.l tc 5• &!11 Iii o•-40• 979 54.4 1 74 72 72 71 70 68 aAoUAt It IIEUh 15° ~ 181 0"·60" 1197 00.5 2 1B Iii ~! ~I hol9h1 center 25 • 322 0"-90" 1197 66.S 3 64 8)
35• 688 412 90"· 180" 0 0.0 4 !i9 56 59 55 57 54 8' 23.5 45• 225 200 0"·180° 1197 66 .5" s 55 51 54 !i) ~I 10' 12.7 55• 10 19 'Efflcioncy 6 51 47 50 .u; 12' 7.9 65 ° 0 1 7 47 43 47 43 45 42 1-4' 5.~ 75" 0 1 8 43 39 43 39 42 :II 16' 3.9 85° 0 1 9 '1() 35 39 35 39 JS 90• 0 10 36 32 3!! 32 35 31
CFll 1/32THT BAR. Ill PL-T 'J2W/30/4P lamp, 1.5 s/mh , 24DD rated lumens, test no. 21951!12502
pl 20'.l hoonll" '2 · llamcns Zona LumHs '411mp re m 70',l ~
~ 876 o•.30• 75!1 31.7 I!!! 50'il311% 50'.l:lif. ~JJ!(. lniliol re 2m I l6 0"-40" 1292 53.9 1 73 71 72 70 69 68 Moun\ 1t bl11n
GI 15° 253 0"-~· 1581 65.9 2 68 Iii 67 64 65 63 he l ~ht center
2r ~ 424 o•-• 1582 65.9 3 63 m 62 !i9 61 58
600
3 • 533 90" · 180" 0 0.0 4 !i9 55 58 55 57 54 f)" 29.0 45• 29) "ilf/ 0"·180" 1582 65.9' 5 S5 51 54 SO 53 49 10' iu 55• 9 ~ 'Efflcltncy 6 51 47 50 ~ 49 46 12" IO) S!i" 0 1 7 47 42 4S 42 45 42 14' 6.6 75• 0 I I 43 39 42 38 42 3B 16" 4.8 es• 0 1 39 35 39 35 38 35 90" 0 10 :ii 32 36 32 35 31
Cfl 1 1/42TRT BAR, 111 PL-T 42W/30/4P lamp, 1.6 s/mh, 3200 rated lumens, test no. 2196100101
.r 2lllo honoO' co . Lum ... Zane Lumor<: 1'ilmp p t .,., 1ll"t,
o• 735 0"-30" 720 200 s• n2 74 0"-40" 1251
15• 835 236 0"-60" 1576 400 25• 8!12 412 O"·!IO· 1576 35• 873 531 90"-180" 0 600 4s-356 'B7 0"-180° 1576
55• 16 'B •Effic:ifflcy ID) 65° 0 1 75• 0 1 as· 0 1
90° 0
NOTES:
I , For eloctrical chancteriltlca conaull technical d1t1 tab.
2. l OIUld 10 eunen1 IES and NEMA 111nd1rdl under stabllind
labomory -ioM. Verlou1 opm-11ing factors can cause
difll,..-bllwNnl1bonlo,ydll1endeaualfoeldm-•-
rne111LDitnansions1ncl apecilicltlonl.,. based on the moll
eu,ren1-aabledalallnder.llUl>ilcl10c:hengawilhoulnotice,
SCF-1-40
C2003 Godllm. l\ev. 01/03
S0:-140.1'91
30.0 PW 50!, m 5J'II JJ%
52.1 I 73 71 71 70 65.7 2 68 65
ff I 65.7 3 62 !!I 0.0 4 58 54 65.7· 5 54 !ii
6 !ii 46 49 45 7 ~ 41 45 41
8 42 38 41 '!1
9 ,~ 38 34
10 35 31
gotham ... __
5ll'il
50',Ul'I, lniU1f tc 69 ~ Mount a bean
II htiph• e..,,.,
o· 24.3 10· 13.1 45 12' 8.2 44 41 u· 5.6 41 '!1 16' 4.0 :J7 33
34 30
5ft 111'1
kHOI 1r,ola 74.5" bclm 1nple 92.7'
le II tc 11
Beam blam 811111 b11m
dilnotter •Ila• d11mttr tdae
M 7.4 11 .5' 1.5
11 .4' 4.0 15.7" 0.8
14.4' 2.5 19.9' ~ 17.5' 1.7 24 .1'
20.5' 1.2 28.3 ' 0.2
w.. ICW.
bHmonqle7U• NI .. tn!le 11 .1•
1c Di tc at
Beam b11• Bea• bH'"
di1me10, ••20 di1mator 1d1e
0.0' 11.8 11.?' 2.4 10.9" 63 15.3' 1.3
13.8 " 3.9 19.4" 0.8
16.7" 2.7 23.4' 0.5 19.6" 2.0 27.5 ' 0.4
5r.\ 10'.'..
hea11 1nale 72.r.i' beam 1nafr IU1
le II le al
Beam ba1111 1,..,. Nam
di1mt1or edpe diameter tdo ..
8.1" 14.5 11.3 · 2.9
11 .1' 7.C 15A' 1.6 14.0' 4.9 19.5' 1.0
17.0" 3.3 23.E ' O.i 20 .0· 2.4 7:1 .T 0.5
50'. tin
btlll!I anqle ns-b11n, "!!fie M.O•
le II le"
B-bum Buan ~um
diameter edgo di1m1t1tr edoc
8.1:" 122 11.D ' 2.4
12.1' 6.5 16.1' 0.8 15.3' 4.1 20.f 0.8 18.5' 2..0 24.7 ' 0.6 21.7 ' 2.0 28 .9' 0.4
GO'fNMI MC*TICJUIIM. .... ....,._
a OfflllCMI ,w ACun, UGMtec:i "°"'· ...
MOO l.nl-.r -c...,... 0-,., 30012
P 800 llG •981 r 770 lliO ;,12:, ___ ,_.,.. .....
July 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-19, Light Pole Support Revisions
Dear Mr. Boss:
I have reviewed CPR-19, consisting of the installation of light pole supports at the lime
storage facility, ozonation and chemical feed facilities, and high service pump station, in
accordance with the structural details included in the April 4th memo by CDM to Black &
Veatch. The revised structural details will require additional reinforcement and
fonnwork by the contractor.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$4,763.00 with no additional time requested. 1bis change will be incorporated into
Change Order #2 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DF.PAKl'MENT
PRooucnoN 0MSION
TH& Crrv o, FORT WORTH * 1511 11TH AVINUI * FORT WORTH, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
Fil. BLACK & VEATCH Building a world of differenci
June 14, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#19
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order amount of
$4,763.00 be approved. Please review the request, and if it is acceptable, have it executed.
WESTSIDE WATER TREATM:NT PlANT 12200 OlD WEATHBFORO ROAD FORf WOfml, TEXAS 76108 www.inccarthy.com
MAILING ADDRESS: P. 0. BOX 122419 FORT WORTH. TEXAS 76121 PHONE (817) 580-3740 FAX (817) 560-3727
June 8, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request #19
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #lp pricing for changes made to the project due to the field
directive memo from , CDM dated 4/4/2010.
Please do not hesitate to contact me with any questions or concerns.
CC: Paul Laufer -Project Manager
Steve Gotschall ...:... Project Director
Jerry Mayer -Project Director
File
ENC: CPR #19 Pricing
CDM Memo dated 4/4/2010
Change Proposal Request
CPR#0019
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Date: 06/14/2010
Architect's Project No.:
Cost Issue Ref# : 37
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has
been fully executed .
DESCRIPTION OF THE PROPOSED CHANGE:
Wall-Mounted Light Poles (Concrete Supports)
SCOPE:
Wall-mounted light poles scheduled for installation at the Lime and Ozone & Chemical
Storage areas and the High Service Pump Station require modification of the respective
walls to provide the required anchorage base.
REFERENCE:
Pricing Details
Company Name
Fraires Rebar Inc
United Forming Inc
McCarthy Building Companies, Inc.
McCarthy Building Companies, Inc.
Description
ne Rebar
Formwork
FRP Light Pole Supports
FRP Light Pole Supports
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
Amount
197.00
1,802.00
286.00
1,844.00
22.00
37.00
14.00
42.00
200.00
319.00
4,763.00
Net Change in Calendar Days Due to This Proposed Change
D Schedule impact to be evaluated at a later date.
McCarthy Building Companies, Inc.
BY: ----------
Date:
Accept
Do Not Accept
BY:
Date:
Printed On: 0611412010 12:54:00 PM
City of Fort Worth Water Department
Accept
Do Not Accept
BY:
Date:
Page: 1 of 1
-
McCARTHY ,)
Job: W.lsld• WTI' Dncrtntton: CPR 111 -W•I Mounted Light Poles• Concrew Supports ~ Ol/24/10
I
I
Man Hours Unit Coats TotalCoats ... Quanlllv UOM MHI Unltsl Total Labor Mir! Eaula Sub Labor Mtrl En• .... &ub Una
Unit MH MH $ s s s s s s • Total
0 .00 ----s -
MCC Albar -...... ,fs;,7.A 1.00 LS 0.00 1437.8 -1437.8 -. $ 1Q7.6
0.00 -. . . s .
FR ITlafleb..-1.00 LS 0 .00 $ 197.52 . -. 1118 s 11111
0 .00 . . . . s -
UF -1.00 LS 0.00 ' 1802.00 -. . 1.802 $ 1,802
0 .00 . . . . s .
MCC eoncr.. 2.85 CV 0.00 83.25 . 212 . . s 212
0 .00 . . . -I .
MCC ,,_. Concnle. Lebor 3.00 hr 3.00 19.8 511 . . . $ 58 MCC _ ........... Lebor 118.00 If 0 .01 1.15 18.11 23 -. I 23
MCC ·F-',...._,.--1.00 hr 1.00 25 25 . . . s 28
0.00 . . . . s .
MCC Generalar 3.00 Hr 0.00 s 8.24 . . 19 . s 19
MCC Forllll • UNoed Ribar 1.00 Hr 3.00 19.8 s lj(l.82 59 . 51 . $ 110
0 .00 . . . . s .
0.00 . . . -s
0.00 -. -. $ -
0.00 . -. . I -
0.00 . . . . s -
0 .00 . . . . s .
0.00 . . . . s -
0 .00 -. . • .S .
0 .00 -. -. s -
0.00 -. . -$ .
0.00 . . . . s .
0.00 . . . -s .
0 .00 . . -• Is .
0 .00 . . . -$ .
0.00 . . . -s .
0 .00 -. -. s -
0.00 -. . . .
Total HRS 8 .15 SUBTOTAL s 165.14 IS 1, ..... Q.89 S 11AM $ 1,1189.62 3,884
R)EI 0 1-IPARTS: 0.00% OF S s 69.54 OFEQM -s -s -$ . s . -
OVERTIM: FACTOR: 10.00% OF S s 1115.14 OFU!R s 18.51 s . I . I -17
LABOR BURDEN: 55.00% OF S IS 181.85 OFU!R s 98.91 s . s . s . 100
CONSUMABLES 7 .00% OF$ $ 1,&49.39 OF MAT s -s 115.49 s . I . 115
SAFETY S0 .50 PER HOUR 8 ollahnr s 4.00 s . s -s . 4
SMALL TOOLS 3.00% OF S s 281.56 OFLBR s -s !I.~ s -s . II
TAX: 8.7~ OF S 's . OF MffiJFUEL s . s -s C s . s -
SUBTOTAL s 285.158 ~ 1.m.e3 s 1111.54 S 1,""<l.&2 s 4.128
J
GC 15.00% I .. ., ... s .,..,.n, s 10."3 -I 319
SUb1 10.00.. s ---s 1119.Slll s 200
Mile 0.00% I . I . s -I . i .
SUBTOTAL s 328.311 s 2,038.IIO s 79.91 s 2,189.47 4.-
SUbcontnictor Bond 1.0000% . . . s 21.1111 22
ln1urance 0.8000% s 2.83 I 18.32 s -s 17.77 37
Builders Risk 0.3100% s 1.03 s 11.37 s -s 8.IM 14
Addllionel Bond Premium 0.9108% s 3.02 s 18.78 $ -s 20.45 s 42
Total s 336.07 s 2 081.38 s 711.117 s 2,288.83 $ 4,763
TOTAL $ 4.763
. '
Project Value
Adjustment Request
4,)allnlllllaaJ11111S¥
Industry Leading Fabricator and Distributor of
Concrete Reinforcin Steel and Related Products
Dayton Location:
95000 W. Highway 90
P.O. Box279
Dayton, Texas 77535
Phone 936•258•8221
Fax 936•258•9637
Tuesday, May 11, 2010
Re: Westside Water Treatment Plant
Nufab Rebar Project #05509013
Waxahachie Location:
1535 W Highway 287 Bypass
Suite A
Waxahachie, TX 75165
Phone972•923•2636
Fax 972•923•2771
Longview Location:
806 Jordan Valley Road
Longview, TX 75604
Phone 903•297•7477
Fax 903•297•7446
Thank you for selecting Nufab Rebar, LLC as the concrete reinforcing steel and related products material
supplier for the project referenced. We are requesting review and acceptance of the following extra(s).
Item Desaiption Item Weight Amount
Additional light pole bases at the Lime
Storage Facility, Ozone/Chemical
Facilities, High Service Pump Station
as per drawing SZ7-A. 2,469 lbs. $1,437.60
Fraire' s Rebar may issue a Olange Order or sign and return the Project Value Adjustment request It is
our goal to make this project a successful partnership for Fraire's Rebar and Nufab Rebar, LLC
This Project Value Adjustment Request is accepted and incorporated into Westside Water Treatment
Plant project.
Fraire' s Rebar
Authorized Signature
Date
Nufab Rebar, LLC.
A Harris Rebar Company
Paplofl
--------···--· ---.
TO: McCanhy Buldlng C01111*11n
12200 Old Wulherfonl Rd.
Fort'Mxth, T.-7t10I
~TTN: John Frazier
PH : 817.580.3740 FX: 817.680.3727
CHANGE & COST BREAKDOWN -WNl8lde Wmr Tr.atment Plant
: RFP COit a.-Raf 137 Wal-Mounted Lloht Pole Concme Su"""""
ITEM
NO. DATI: DESCRIPTION QTY UNIT
1 06.18.10 Rl'P llafA7
,_ Foomwalc tar wall fflOU"lled laN _,_
Line8•,.....,..F_..... 4 EA s
OzanaUon & Ct.n F--. 4 EA s
Him SeMce p....., 8lllllon 3 EA s
Qual. P""*"'baledon111otal 1-...-1iases.
LABOR
110.00 s
110.00 s
110.00 s
no-. Plln ,,..-...... of.-....._ lo be -lded """'lo flnal exec:ullan of cha.-Older.
Qual u..iu1 ID lie nllltlllllwd from , ~ -¥ ldad 3 dfmenllan IM>LflllM&.
,.._,uTALB
SALES TAX I 8.25%1
....... I I :IJI s I'll, OF LABUK)
.I.UBI ur l..JuK..JK... and T
AMT
440.00
440.00
330.00
1 210.00
.
ACCEPTED BY: SUBCONTRACTOR'S OVERHEAD
NAME:. ____________ _ Tl'TlE:. ____________ _
ACCEPTED BY: Unlllld Forming, Inc:.
NAME: Bmt p PIJZMl
TITLE: f'IRltcl NMlelc
SUBCONTRACTOR'S FEE
CHANGE ORDER REQUEST#
DATE : 05.18.10 •-Aid bv: Brett O Brown
I
MATERIAL EQUI PMENT SUBCONTRACT
AMT EA AMT AMT
$ 30.00 1120.00
S 30.00 $120.00
$ 30.00 S!I0.00
330.00 . .
27.00 .
( 15% ) •.....................................
0% ) ..................................... .
TOTAL FOR COR #3 ADD
Note: TIiis change adds soope to our Subconnct. Al terms and condlllona rt the original Subconlrad shd apply to these changes .
PINN luue us a Change Order In the anount cl $ 1,802
If you haw any qUMllons or comments, please canted Luke Zoeller Ill 713-875-0222
UallN l'omllng. Inc. Conlldentlal 512612010
3
s
$
s
Is
TOTAL
680.00
580.00
420.00
1 540.JIO
27.00 .
1 .587.UI.
235.0~
1.802.05
0.00
1,802 !
Page 1
. .
CDM
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) r),
CDM (F-3043)
April 4, 2010
Subject: Westside WTP Project
Wall-Mounted Light Poles -Concrete Supports
Wall-mounted light poles scheduled for installation at the Llme and Ozone &: Otemical
Storage areas and the High Service Pump Station require modification of the respective
walls to provide the required anchorage base.
Refer to the attached Figure No. 527-A and Detail F. Llght poles noted for installation as
wall-mounted units in the scheduled areas shall be installed accordingly.
Llght poles shown to be installed atop the Basin and Filter areas shall be installed directly
centered over the wall where they are located. At one location in these areas, a corbel
below the slab is shown to be provided for pole installation (SB-3).
Note, the wall mounted pole shown on Sheet EA-1 atop the wall between the stairways (1)
shall be relocated for installation on the wall directly over the sump. The adjacent light
pole (2) shall be similarly relocated directly opposite.
Please discuss with McCarthy and advise of any comments.
cc: Ouis Harder (FWWD)
Ollis Story OQ)
John Mischkot OQ)
Bow Lin (CDM)
Ernie Oement (CDM)
Danny Shannon (CDM)
) KM 62142 -9.04
SD-16500-001
0
~ I
J<
ti .. :>
E
0
" 'c1 , ......... ...
8 N
ri
0
u
~
i .. ., .....
:>
Iii
w !!..!!..!!!... ..... ____ ...,
..J --0 --0..
!r r~
3
/ PLAN .!!
0 -a.
SECTION ED m
1:
uc"r POU: suPPOIIT
2
0 y ~ETAIL ED
0 :::>
"' Iii
/ ~ • 0
I
i
N ...
;:::; ...
0
~
I
"'
8
cii
-
~~r#CUT -·-,_
-=.~
CDNI
-·-_.,_ _., _ _ ., ..
D. .... ... ._ ·-• ... _ ... _.. ...... • ........ n. ....... ,.._,. •
CITY Of' FORT WORTH , TEXAS
WESTSIDE WATER TREATMENT PlANT PROJECT
0..te
DECEMBU 2. 2009
Sheet No
SZ-7
Figure No
SZ7-A
July 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-22 -4" Utility Water Piping Conflict-Flocculation Basins
Dear Mr. Boss:
I have reviewed CPR-22, consisting of installation of additional fittings as required to
route the 4" utility water piping around structural beams between the ozone basins and
flocculation basins.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$3,288.00 with no additional time requested. This change will be incorporated into
Change Order #2 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DEPARTMENT
PRODUCTION OMslON
THI Cm OP FORT WORTH * 1511 11TH AVENUI * FORT WORTH. TExAs 76102
(811) 871-8258 * FAX (811) 871-8410
. -U.I. BLACK & VEATCH
Building a world of difference:
June 18, 2010
City of Fort Worth
Water Engineering Department
151111th Avenue
Fort Worth, TX 76102
AITN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#22
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order amount of
$3,288.00 be approved. Please review the request, and ifit is acceptable, have it executed.
• '. ..
June 10, 2010
WESTSICE WATER TR£ATMEHT PlAHT 12200 OLD WEATHERFORD ROAD FORT WORTli, TEXAS 761ml www.ma:arthy.com
MAILING ADDRESS: P. 0. BOX 122419 FORT WORTH, TEXAS 76121 PHONE (81n 560-37-40 FAX (817) 560-3n7
Black & Veatch Corporation
12200 Old Weatheeford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request #22
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #22 pricing for changes made to the project due to RFI #129
Response dated 5/25/2010.
Please do not hesitate to contact me with any questions or concerns.
Sincere(~
J~
Project Manager
McCarthy Building Companies, Inc.
CC: Paul Laufer -Project Manager
Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #22 Pricing
RPI #129 Response dated 5/25/2010
Change Proposal Request
CPR#0022
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Date: 06/09/201 O
Architect's Project No.:
Cost Issue Ref# : 44
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, this work may be perfonned prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
RFI 129 Resonse 4" UW conflict in elevation
SCOPE:
Add
10-4" DI 22.5 degree bends
1-4" DI tee
12 -4" BN&G Kits
1 -4" DI Blind Flange
1 -4" x 4'-3" DI FL x FL spool
Delete 1 -4" DI 90
REFERENCE:
Pricing Details
Company Name
Universal Painting Corp
McCarthy Building Companies, Inc.
McCarthy Building Companies, Inc.
Description
Additional Painting of fittings
Change in Elevation of 4" UW@ Floe
Change in Elevation of 4" UW @ Floe
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
Amount
250.00
1,568.00
994.00
3.00
25.00
10.00
29.00
25.00
384.00
3,288.00
Net Change In Calendar Days Due to This Proposed Change
D Schedule Impact to be evaluated at a later date.
McCarthy Building Companies, Inc.
BY: ------------
Date:
Accept
Do Not Accept
BY:
Date:
Printed On: 08/0912010 01:15:19 PM
City of Fort Worth Water Department
Accept
Do Not Accept
BY:
Date:
Page: 1 of 1
llcCARTHY •>
I I ----Wll' ~oa: CPR f U .. UW. Flocl 0.0..e --"· I I
I I
MMH-UnllCOlb Talal •-• ---UOII --·--D ... UIHW ~ ---I.Jae , .... 11H MH I I I I I s I .. ·--Add nff . . $ -·u.:n:1.---10.00 .. 2.11 21 .111: ta 11.17 4211 8211 -• II 1.D48 .. -.. nm -0 OJX 3U4 411 --I 418
.. DIIN t.CIO " 3.41 3.41 1U 81.18 17 II -• II ,., .. DI--1.1111 " 1.115 UIII 11.1 2'.18 21 25 --I 41
1--... .--rDI-1.00 .. UI 3.31 111.1 2IIUII .. 2111 --s 352
~~.!!!.~ .. 1.00 UI 0 on: s 250,00 . -. 2liO I 250 -~-~-:-==~-==~--1.00 Ir 1 1 nr tu . s tel.Ill 20 17 . I 35
8.00 Ir 0 QrY I 5.111 -41 I 41 om --' -. -· to.1e ----· 0.00 ---s ~--~.1!!9911!!!!'.!leN__ -1.00 "" 2.27 -2.27 19.8 -" {14 ·~· -I
~--0.00 --' 0.00 --s
0.00 -s
0.00 --I
n ----s -
0. ----' 0. --I -
0. ---. .. -0. -. s .
D --. -s -n ---- -
ll --. -
n . . --
0. -. -
ll -. -.
0. -. s
f--0 . -. . ' -· --------0 --• II
·------u . . -I -
D . -
~i=-· ·---IUIITOTAL ~01 ' 1~.48 s 6U4 I 250.00 2.271
~•-• t1 n~ OF S I 14.24 -. I
OF I I -01 OFUR 55.80 . . I -...
I.AIIOR OP $ I 81:U1 ,..,_ 337_., I . 331
OF s s ,~-41 OFMAT -lll3a -s • -~ 21 ollabor 14.00 . I . 14
3~ OF I I ,..,.41 ,_ --I s 211 ·~· 8.7ft OF S I •:11 OFMTUFUEL - -
s
SUBTOTAL 11113.115 I 1""'.87 64.24 I 250.00 2.112
J
GC 16.00!I, •--I ----111.001' . . -I 25.00 2!!I -0.-. I . • . • .
SUB10TAL 1,143.04 I 17211.45 s 73.11 I 275.00 3,221 ,~ ·~---. . s 2.75 • -0....,,. .. 8.14 I 13.14 I . ' '" 25
--,.RIii< 0.3100!I, s 3.57 • 5.40 .. . s 0.17 10
Adcllanll~~ n••~ I 10.U I 15.92 s . s 2.IMI 29
Tola! ' 1,1811.28 s 1.714.11 • 73 .11 s 283.40 s J.71111
TOTAL $ 3.288
.. ,,
Peeeing, Nick .
From:
Sent
To:
Cc:
Subject:
Nick,
Robert.Parris@Ferguson.com
Tuesday, June 08, 2010 6:58 PM
Pepping, Nick
lfischeraggie@aol.com
Revised Quote--4" 22 .5° Bends & Tee
Here is the revised quote on the material you requested. The only item I would be concerned about holding pricing on for
3-4 months is the 316SS bolt set. SS can really fluctuate over a quarter, and I would imagine it would go up by
September/October. Beyond that, everything else should be good barring some sort of disaster (natural or man-made)
which would affect raw material pricing.
Please call with any questions .
Thanks,
Robert Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA
T: (210) 662 4902 C: (972) 670 5500 F: (210) 662 4825
E: robert. parris@ferguson.com
www.ferguson.com
Bid No ••• "'.: B157S83
Bid Date,-: 06/04/10
Quoted By: RCP
Price Quotation# B157583
Ferguson Waterworks #788
2650 S Pipeline Road
Euless, TX 76040
Phone: 817-267-3900
Fax : 817-267-3912
Cust Phone: 972-991-SSOO
Terms ...... -: NET 10TH PROX
Customer.: MCCARfflYBUILDING COMPANIES
WESTSIDE WATER TREATMENT
Shlp To-.... : MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
12200 OLD WEATHERFORD ROAD
FORT WORTH, TX 76108
PO BOX 122419
FORT WORTH, TX 76121
Cut PO#-: 4" 21.5 & TEE Job Name.: WESTSIDE WATER TREATMENT
Item ·---·--····-IDescrlptlon _ ......... ·-·-------f Quantlty INetPrtce IUM ·Total ____ :
F2P 14 m 12S#c110 FLG 22-112 BEND 1 --···-----.. ··i·oT-~ilo1ia\--··-·;-·---619~'° 1
rfP ...... ·-·-.. ·· ····-;4 Dl125# CJI OFLG TEE ··-·--···-·( ··· ··---·Ir--98.8901 1::A ---·:· ··· -98.89 i
I ' 'I ! ,-----·---··· ... ------·-·····--·-·-----····--·-·--·--·-·----·-·----------·-···-T .. -··-··· ··--·-.. r-.. ·-· . _ .. _ . -------
F8SS l6SP ---------·-----14 ss 316 FLO BOLT SET _ _ i --·----··· n j _ 21.a.so EA ____ ! _____ 640.5.5 I
1
. . . .
~
..
> r ., •
.--------·----· .. ······.--···· .. ---·-"· ··--·-·-·-----·····-·-------1-··----··-· ~--.-·····--· .. ---
: NFFG1ooi10 ! 4 FF CI FLG GSKT 23 1 6.790 EA i 156.17 !
,BFP ~ --j4 DI 125# Cl 10 BLIND FLG -·--··-···-··--1·1 25 .160 EA-T ........ 2ii'6l
.-----· ·-·-··----····-··-·-----. -··---···-------·-·· ------···--··-··-··-----·--······· --·--·-T--------------··--,·-------· r----·-,-----------.
. S~-D040403FFCE -· ........ ....! 4 X 4'-3 _ FXF DIP CJL FJC -·-------I I _ 285 .260 _ EA __ J ... ·-· 285 .26 j
Net Total:
Tu:
Total:
1825.73
0.00
1825.73
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48
HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not
responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State
and Federal laws 1overning type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this
document, or on the web at http://wobelevna.com/terms conditionsSale.html. Govt Buyers: All item. quoted are open market
unless noted otherwise.
2
i
Westside WTP
Project# 002012
12200 Old Weatherford Rd
Fort Worth, TX 76108
Submitted To
Black & Veatch International
John Boss
100 E 15th St.
Suite 600
Fort Worth, TX 76102
Request For Information
PROJ RFI #: 0129-0
Date Created: 05/21/2010
Priority: Critical
Tel: 817-560-3740 Fax: 817-580-3727
Answer Required By: 05/28/2010
Submitted By
McCarthy Building Companies, Inc.
Nick Pepping
12200 Old Weatherford Rd
Fort Worth, TX 76108
Subject: 4" UW in Floe and Ozone Elevation conflict with beam
Discipline:
Category:
Reason:
Question
Field Condition
Initiated By: McCarthy -Nick Pepping
RefRFI:
Please reference sheet MB-9, MB-5 Section 4, MB-11, and SB;-8.
Sheet SB-8 shows the top of the deck at an elevation of 873.00'. The beams are shown to be 2•-0• below
the top of deck at an elevation of 871.00.
Sheet MB-9 shows the 4• UW water running from the Ozone Basins tt'!rough the Flocculated Water
Channel and into the Flocculation Basins for the spray nozzles. Sheet MB-5 Section 4 shows the 4" UW to
be running at an elevation of 871.00'. Sheet MB-11 Section 1 shows the UW running above the 1' x s•
openings in the Flocculaton basin channel which had an invert elevation of 870.00' before being deleted.
The 4 • UW inside of the Flocculation Basins is in conflict with the beams. McCarthy has already installed 3
wall pipes at the 871.00' elevation (1) in the divider wal between Floe Basin 1 and 2 and (1} in the divider
wall between Floe Basin 2 and 3 and (1) in the divider wall between the Tunnel B and the Floe Water
Channel.
Suggestion
McCarthy proposes dropping the last sleeve between the Flocculated Water Channel and Floe Basin 1 to a
CL elevation of 869.92'. We would then use back to back 90's at both sides of the wal pipes already
Installed in the Floe Basins to get the pipe to run below the beams. This would allow us to utilize the
sleeves already poured in place.
Please advise If this is acceptable.
Answer Date Answered:
lnstaD the ,t• UW-01 at CL elevation of appro>elmately 870.75, providing minimum clearance under the strucb.nl beams. Off-6et the
pipe at the formed wall penetrations (CL EL 871.00) using (2) 22.5-deg bends to route across the Flocculation Baaina at CL EL
870.75. Flange installation shal be coordinated with the structural beam locatlona. lnstal the wall penetration between F1occ Basin
No. 1 and the Flocculated Water Channel at elevatlon to match the routing In the Basin.
Archltect/Englneer Signature
By: Chad Blrtruff, P.E.
CoMultant:
PrlrMd On: 5121/2010 Page 1 Clf1