HomeMy WebLinkAboutContract 38806-CO3DISTRIBUTION : WHITE-FILE CAN ARY -CONSTRUCTION FILE PfNK -PROJECT MANAGER GOL DENROD-CONTRACTOR CHANGE ORDER~N O . THREE r DATE : Nov . 2 , 2010 CITY OF FORT WORTH CHANGE ORDER REQUEST D.O .E . NO. (NIA) PROJECT NO. 00456 PROJECT DESCRIPTION : WESTSIDE WATER TREATMENT PLANT PROJECT CITY SECRETARY CONTRACT NO. 38806 ORIGINAL CONTRACT AMOUNT.. ..................................................... $ 47 044 014.00 EXTRAS TO DAT E ................................................. $ ""39~16,_,4"".6"-7 _____ _ Job#2012 NOV O 3 2010 CREDITS TO DA TE ........... . .................................. $ =0.=00~------ CONTRACT COST TO DATE ...................................................................................................................................................................................... $ 47 083 178.67 AMOUNT OF PROPOSED CHANGE ORDER .. . ........................................................................................................................... $ 19 447 .00 REV ISED CONTRACT AMOUNT.. .......................................... . .. ........................................................................................................................ $ 47,102,655 .67 ORIGINAL FUNDS AV AJLABLE FOR CHANGE ORDERS ..................................................................................................................................... $ """0.""00"'---- ADDITIONAL FUNDING (IF NECESSARY) .......................................................................................................................................................... $ 19 447 .00 REMAINING FUNDS AV AJLABLE FOR CHANGE ORDER ................................................................................................................................. $ =0.=00'---- IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/c hange the contract as shown below to provide a complete, functional , and operational plant. These changes are as listed below. Further descriptions and cost breakdowns are attached . Change Order No. 3 to the Westside Water Treatment Plant Project consists of miscellaneous items identified during the course of construction by the Engineer, Construction Manager, and Contractor requiring modification . Proposed changes include the following additions to the scope of work . I . CPR-I 5, Deletion of power monitoring and UPS equipment (CREDIT) .................................................................................................................... $2 ,997.00 2 . CPR-I 7, Electrical Building Plumbing Modifications (COST) .................................................................................................................................. $16 ,755 .00 3 . CPR-21 , Miscellaneou s electrical modifications (COST) ........................................................................................................................................... $4,652 .00 4 . CPR-23, Manhole Modifications (COST) ................................................................................................................................................................... $7 ,365 .00 5. CPR-27, Electrical Duct Bank Backfill Revision (CREDIT) ...................................................................................................................................... $7 ,891 .00 6 . CPR -32, Backwash Suction Line Valve Revision (CREDIT) ..................................................................................................................................... $4 ,350.00 7 . CPR-34, Diaphragm Seal Changes for Lime Transfer Pumps (COST) ....................................................................................................................... $2 , 715 .00 8 . CPR-36, Additional Stainless Steel Filter Sleeves (COST) ........................................................................................................................................ $3 , 198 .00 NET CHANGE ORDER AMOUNT ............................................................................................................................................................................. $19,447.00 Staff has rev iewed this change order and is in agreement with the scope of work and the costs associated with the work. Documentation providing additional information for each itemized change is attached to and made part of this change order. It is understood and agreed that th e acceptance of thi s Change Order by the contractor constitutes an accord and satisfaction an d represents paymen t in full (both in time and money) for all costs arising out of the Change Order. ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE None DA rn1,; 1 , /Jo DATY/ /alto DATE CITY MANAGER DATE <;i .... :4a. APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE TO DA TE ORDER 0 Calendar Da s PROJECT MANAGER /il DATE /{ DIRECTOR/MANAGING DEPT. DATE CITY ATTORNEY DATE COUNCIL ACTION (IF REQUIRED): DATE D APPROVED D DISAPPROVED D OTHER OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX /,;) August 12, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. Jolm Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-15, Deletion of Power Monitoring and UPS Equipment Dear Mr. Boss: The contract documents included two redundant power quality monitoring units for the medium voltage switchgear that, upon review, are not considered to be necessary. In addition, six 100 VA uninterruptible power supplies (UPS) are to be deleted and replaced with 120 V power circuits. The Contractor has provided the City with a price proposal to delete the above referenced equipment and install the additional circuits. The total credit for this work is $2,997.00 The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. Total credit to the Fort Worth Water Department for the proposed change amounts to $2,997.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P.E., CDM Project File WATER DEPARTMENT PRODUCTION DIVISION THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102 (817) 871-8258 * FAX (817) 871-8410 0 Printed on recycled paper '\ ·1.r~ BLACK & VEATCH . Building a world of difference: July 21, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 ATTN: Mr. Chris Harder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No. P262-607540045683 CPR #15 Transmitted herewith please find three copies of McCarthy's change proposal request for the referenced extra work. Black & Veatch has recommended the total change order credit amount of $2,997.00 be approved. Please review the request, and ifit is acceptable, have it executed. Sncerely, ~ WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com MAILING ADDRESS : P. 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560-3727 July 20, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn: Mr. John Boss Re: Change Proposal Request # 15 Westside Water Treatment Plant P262-607540045683 Mr. Boss, Please find attached CPR #15 revised pricing for changes made to the project due to the field directive memo from CDM dated 2/1/201 O(REV 0), 5/10/201 O(REV 1 ), and 5/11/2010 (REV 2). Please do not hesitate to contact me with any questions or concerns. John Frazier Project Manager McCarthy Building Companies, Inc. CC: Paul Laufer -Project Manager Steve Gotschall -Project Director Jerry Mayer-Project Director File ENC: CPR #15 Revised Pricing CDM dated 2/l/2010(REV 0), 5/10/2010(REV 1), and 5/11/2010 (REV 2) r ·--- J 1 Change Proposal Request CPR# 0015 Date: 07/20/2010 Project Name: Westside Water Treatment Plant Project No. : 002012.000 Architect's Project No.: Cost Issue Ref # : 28 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein . This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies, Inc . will be reimbursed monthly for the cost of this work as completed , whether or not the Change Order has been fully executed. DESCRIPTION OF THE PROPOSED CHANGE: Power Monitoring & UPS Power Changes SCOPE: Changes in scope of work to FSG Electric due to a CDM Memo dated 2/1/2010, Revision 1 to CDM Memo dated 5/10/201 O, and Revision #2 dated 5/11/201 O concerning changes to the project Power Monitoring & UPS Power. DIRECTIVE: COM Memo dated 2/1/2010 COM Rev 1 Memo dated 5/10/2010 COM Rev 2 Memo dated 5/11/2010 REFERENCE: Pricing Details Company Name Facility Solutions Group McCarthy Building Companies, Inc. Description Power Monitoring/ UPS Changes Subcontractor Bond General Liability Builders Risk Project Bond CO Fee {Sub Work) CO Fee {McCarthy Work) Net Amount of This Proposed Change Amount ·2,997 .00 0.00 0.00 0.00 0.00 0.00 0.00 ·2,997 .00 Net Change in Calendar Days Due to This Proposed Change [] Schedule impact to be evaluated at a later date . 0 City of Fort Worth Water Department Accept Do Not Accept BY : Date: Printed On: 07/20/2010 03:56:45 PM Page: 1 of 1 •••••• 1•»'8electric 2525 Walnut Hin Lana Suite 100 Dallas , TX 75229 (214)-357-5697 (TECL# 17904) 06/11/10 John Frazier McCarthy 12001 N. Central EXPWf., Suite 400 Dallas Texas 75243 Subject: Power Monitoring and UPS Power John, Change Order Proposal No. 126710 Date:f 06/11/10 Project: Westside Water Treatment Plant Job NO.: 30J1613 Drawing No: Spec Section:, We are pleased to offer the following Change Order Proposal for your consideration. The price includes labor and material to install additional circuits to replace deleted UPS power per Memorandum dated 5-10-10. GE is not offering a credit on the deleted UPS's due to the deletion of the 100 VA UPS's required re-design of the switchgear. See attached pricing sheets for price breakdown and attached Memorandum for scope of work.The price to perform this work is a credit of $2,997 .00. Sincerely, FSG ELECTRIC Jerry Bevers Project Manager ?f~ •••••• 1· ht · I t I I ·····-,g mg> e ec .r co > energy • • ••• technology> s,gns FACILITY SOLUTIONS GROUP RECAP SHEET C.O. #4-UPS CHANGES RATE HOURS LABOR· (ELECTRICAL) FOREMAN STRAIGHT TIME $30 .00 4.00 $ FOREMAN OVER TIME $45.00 $ JOURNEYMAN STRAIGHT TIME $25.00 $ 21.00 $ JOURNEYMAN OVER TIME $34.50 HELPER STRAIGHT TIME $17 .00 21.00 $ HELPER OVER TIME $25 .50 $ $ $ $ LABOR TOTAL-$ MATERIAL TOTAL $ BURDENS· 6% OF MATERIAL $ GE CREDIT FOR PQM $ BURDENS-(42% OF LABOR) $ SUBTOTAL-$ TOTAL-$ TOTAL 120.00 . 525.00 357.00 . - - - 1,002.00 547.00 32.82 (5,000.00) 420.84 (2,997.34) (2 997.34) •••••• 1· ht · I t . I ....... 1g mg> e ec _nca > energy • • ••• technology> signs FACILITY SOLUTIONS GROUP C.0.#4 PRICING SHEET UC~v. IQUAN. 1MAI UNII MATt:AI. :!...."WI'·=-UNI L•un,~CAI, 3/4" ALUM. CONDUIT 60 $ 1.25 $ 75.00 0.10 6.00 3/4" LB 4 $ 12.00 $ 48.00 1.00 4 .00 CONDUIT SUPPORTS 6 $ 5.00 $ 30 .00 0.25 1.50 3/4 " PVC CONDUIT 100 $ 0.20 $ 20 .00 0 .06 6 .00 PVC CONDUIT SUPPORTS 20 $ 1.00 $ 20.00 0.25 5.00 3/4" PVC COATED 90 2 $ 15.00 $ 30.00 1.00 2.00 3/4" HUBS 7 $ 7 .00 $ 49.00 0 .25 1.75 3/4" GRDING BUSHINGS 1 $ 6.00 $ 6.00 0.15 0.15 3/C#12 400 $ 0.50 $ 200 .00 0 .025 10.00 #12THHN 300 $ 0.20 $ 60.00 0.009 2 .70 TERMINATE #12 18 $ 0.50 $ 9.00 0.15 2 .70 $ -0.00 $ . 0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 TOTAL-$ 547.00 41.80 CDNI Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff (TX PE #91688) /?J.. COM (F-3043) UV February 1, 2010 Subject: Westside WTP Project Power Monitoring and UPS Power As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power monitoring (PM) equipment is to be provided for the medium voltage switchboards (MVSWBs), low voltage switchboards (L VSWBs), and motor control centers (MCCs), respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as listed below, is noted to be furnished with the switchboards and MCCs. SWB/MCC MVSG-HS MVSG-HS MVSG-HS MVSG-HS SWB-OZ SWB-OZ SWB-FLT SWB-FLT MCC-FLTA MCC-FLTB MCC-OB MCC-HS MCC-HS PM Tag MVSG-PM-A MVSG-MR-A MVSG-PM-B MVSG-MR-B PQMSWBOZM-A PQMSWBOZM-B SWBFLT-PM-A SWBFLT-PM-B MCFLTA-PM-A MCFLTB-PM-B PQMCOB-M MCHS-PM-A MCHS-PM-B PM Equipment Multilin PQM (1) Multilin 750 (1) Multilin PQM (1) Multilin 750 (1) PQM (1) PQM (1) EPM (1) EPM (1) EPM EPM PQM PQM PQM (1) 100 VA Uninterruptible Power Supply (UPS} to be provided internal to gear per specifica tion . As per the response to RFI-038, two pieces of PM equipment were proposed for deletion from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent functions. In addition to the PQM units, the associated 100V A UPS should be deleted also. ~ v swes and UPS Power .doc Boss, Jolm February 1, 2010 Page2 In effort to provide continuity between City equipment installations, it is proposed that the EPM units specified for the following be replaced with PQM units similar to the other installations listed. SWBFLT-PM-A MCFLT A-PM-A SWBFLT-PM-B MCFLTB-PM-B To minimize the number of UPS that are installed and associated maintenance, it is proposed that each lOOVA UPS associated with the following be deleted from the project scope. MVSG-MR-A SWBFLT-PM-A PQMSWBOZM-A MVSG-MR-B SWBFLT-PM-B PQMSWBOZM-B The UPS power to each of these units shall be replaced with a 120V /1 ph power circuit (conduit, wire and terminations) as described below: Sheet EE-3 -Chemical Building Panel Schedules 1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet EE-1. 2. Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and PQMSWBOZM-B", Load KVA to "0.5''. Route 2#12, #12EGC, 3/ 4"C to PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1 Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram 1. Panel Board "LUIT" -Change existing 20A/1P Circuit No. 23 from "Spare" to "SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLT shown on ED-2. Sheet EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details" 1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to "MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to MVSG-PM-A and MVSG-PM-B in Medium Voltage Switchboard MVSG-HS shown on EF-2. cc: Chris Harder (FWWD) Josh Trice (B&V) VK Gupta (GAI) Tim Mueck (GAI) Ernie Clement (COM) Danny Shannon (COM) File: 62142 -9.04 LV SWBs and UPS Power.doc Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff (TX PE #91688) /JJ.. COM (F-3043) UV May 10, 2010 Subject: Westside WTP Project Power Monitoring and UPS Power-REV-1 As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power monitoring (PM) equipment is to be provided for the medium voltage switchboards (MVSWBs), low voltage switchboards (LVSWBs), and motor control centers (MCCs), respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as listed below, is noted to be furnished with the switchboards and MCCs. SWB/MCC PM Tag PM Equipment MVSG-HS MVSG-PM-A Multilin PQM (1) MVSG-HS MVSG-MR-A Multilin 750 (1) MVSG-HS MVSG-PM-B Multilin PQM (1) MVSG-HS MVSG-MR-B M ul tilin 750 (1) SWB-OZ PQMSWBOZM-A PQM (1) SWB-OZ PQMSWBOZM-B PQM (1) SWB-FLT SWBFLT-PM-A EPM (1) SWB-FLT SWBFLT-PM-B EPM (1) MCC-FLTA MCFLT A-PM-A EPM MCC-FLTB MCFLTB-PM-B EPM MCC-OB PQMCOB-M PQM MCC-HS MCHS-PM-A PQM MCC-HS MCHS-PM-B PQM (1) 100 VA Uninterruptible Power Supply (UPS) to be provided internal to gear per specification. As per the response to RFI-038, two pieces of PM equipment were proposed for deletion from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent functions. In addition to the PQM units, the associated 100V A UPS should be deleted also. LV SWBs and UPS Power,REV1 .doc Boss, John May 10, 2010 Page2 In effort to prov ide continuity between City equipment installations, it is proposed that the EPM units specified for the following be replaced with PQM units s imilar to the other installations listed . SWBFLT-PM-A MCFLTA-PM-A SWBFLT-PM-B MCFLTB -PM-B To minimize the number of UPS that are installed and associated maintenance, it is proposed that each lOOVA UPS associated with the following be deleted from the project scope . MVSG-MR-A SWBFLT-PM-A PQMSWBOZM-A MVSG-MR-B SWBFLT-PM-B PQMSWBOZM-B The UPS power to each of these units shall be replaced with a 120V /1 ph power circuit (conduit, wire and terminations) as described below. Sheet EE-3 -Chemical Building Panel Schedules 1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet EE-1 . 2 . Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and PQMSWBOZM-B", Load KV A to "0.5''. Route 2#12, #12EGC, 3/4"C to PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1 . Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram 1. Panel Board "~" "LUFLT" -Change existing 20A/1P Circuit No.~ 15 from "Spare" to "SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLT shown on ED-2 . Shee t EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details 1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to "MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to MVSG-PM-A and MVSG-PM-B in Medium Voltage Switchboard MVSG-HS shown on EF-2 . For PQM devices for vvhich circuits are not identified, those shall be powered from the internal control power transformers of the respective gear line-up . cc: Chris Harder (FWWD) VK Gupta (GAi) Ernie Clement (COM) File: 62142 -9.04 LV SWBs and UPS Powe r-REV1 .doc Josh Trice (B&V) Tim Mueck (GAi) Danny Shannon (CDM) Sh op D rawmg R ev1ew C t ommen s TO : BLACK & VEATCH INC . FROM : CAMP DRESSER & McKEE INC . 12200 OLD WEATHERFORD ROAD 777 TAYLOR STREET, SUITE 1050 FORT WORTH TX 76108 FORT WORTH TX 76 102 TEL. NO . {8 17 ) 429-7558 TEL. NO . (8 17) 332-8727 COM PROJECT NO .: 0515 -62142 PROJEC T: WESTSIDE WATER TREATMENT PLANT PROJECT OWNER : CITY OF FORT WORTH PROJECT NO .: P262-607540045683 CONTRACTOR: McCARTHY BUILDING COMPAN IES INC PROJECT NO .: 002012 TRANSMITIING HEREWITH : DESCRIPTION : Low-Voltage Dist ri bution Switchboards-Resubmillal SUB NO .: SD-16425-01-1 {REV-1) FEDEX : PRIORITY OTHER : DISTRIBUTION : B&V ME I STANDARD ECONOMY MAI L: EXPRESS PRIORITY REGULAR ""' COM-DAL ""' APA! CP&Y --OTHER -- --GAi ""' CDM -FTW yl KOMATSU --JO --· SHOP DRAWING REVIEW ENGINEER'S REVIEW RESPONSE REQUIRED OF CONTRACTOR a Approved v Comments a Confirm v Approved as Noted Attached a Not Approved a Resubm it o Receipt Acknowledged (Not Subject to Eng ineer's Review or Approval) The Eng inee r's review of this shop drawing is limited to the review of di mensions , equipment and materials as presented i n the Contract plans, specificati ons , and for design concept. Th is review does not relieve the Contractor from errors or omissions in the submittal or from the Contractor's responsibil ity of add ress i ng any deviations from the Contract Documents. The Contractor is responsible for the details and d imensions of fab rication and manufacture, the means, methods , techn iques , sequences or procedu res of const ruction and perform ing his work in a safe manner. CIJfJI By Chad Bartruff PE Date 5-11-2010 REMARKS NONE! 1 SEE BELOW Iv 1 SEE ATIACHED SHEET [ 1 COMMENT REVIEW NUMBER BY 1 SK 2 CBfTM 3 TM S D-16425-01-1_REV1 .d oc REVIEW COMMENTS Review performed by GAi and COM electrical , comments are included herein . Paragraph 1.07 requires a 3-year war ranty from time of final acceptance by Owner. GE submitted 3-years from Ume of installation/ 3.5 years from time of shipment. Contractor is responsible for provision of warranty as specified . SUBMIT wha t is proposed as a substitution for the 316 SS screws required in paragraph 2.03.A.2 PAGE _1 _OF _2 _ PAGES BY •. CB PROJECT : WESTSIDE WATER TREATMENT PLANT PROJECT. PROJECT NO.: OWNER : CITY OF FORT WORTH OWNER : P262--607540045683 ENGINEER: CAMP DRESSER & McKEE INC. ENGINEER: 0515-62142 CONTRACTOR: McCARTHY BUILDING COMPANIES INC CONTRACTOR : 002012 DESCRIPTION : Low-Voltage Distribution Switchboards -Resubmittal SUB NO .: SD-16425-01-1 COMMENT REVIEW REVIEW COMMENTS NUMBER BY It is understood that the submitted Spectra Programmable devices require TVPBP battery packs for programming 4 TM/CB but these are not permanent installation; rather portable for programming purposes only. And, the devices used for this oroiect will be turned over to the Owner at oroiect completion . 5 CB Submittal included a section for the Mobile Generator Quick-Connect panel (SWB-GEN). This section was not reviewed as ii was resubmitted under separate cover SD-16428-01-1. As applicable, electrical gear shall not be released for production until resolution of pending PQM modifications . 6 CB PQM modifications are pending receipt and review of the associated proposal. Contractor shall coordinate . Refer to attached memorandum. S0.16425-01 -1_REV1 .doc PAGE _2 _0F _2 _ PAGES BY CB Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff (TX PE #91688) 11P.. COM (F-3043) v4J May 11, 2010 Subject: Westside WTP Project Power Monitoring and UPS Power-REV-2 Following further coordination with the engineers and electrical supplier regarding equipment to be supplied and the associated design elements, the following modifications to the power monitoring system are proposed. To further clarify, attached to this memo are revised submittal comments pertaining to SD-16480-01 and SD-16425-01-1 . As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power monitoring (PM) equipment is to be provided for the medium voltage switchboards (MVSWBs), low voltage switchboards (LVSWBs), and motor control centers (MCCs), respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as listed below, is noted to be furnished with the switchboards and MCCs. SWB/MCC MVSG-HS MVSG-HS MVSG-HS MVSG-HS SWB-OZ SWB-OZ SWB-FLT SWB-FLT .MCC-FLTA MCC-FLTB MCC-OB MCC-HS MCC-HS MVSG-PM-A MVSG-MR-A MVSG-PM-B MVSG-MR-B PQMSWBOZM-A PQMSWBOZM-B SWBFLT-PM-A SWBFLT-PM-B MCFLTA-PM-A MCFLTB-PM-B PQMCOB-M MCHS-PM-A MCHS-PM-B PM Equipment Multilin PQM (1) Multilin 750 (1) Multilin PQM (1) Multilin 750 (1) PQM (1) PQM (1) EPM (1) EPM (1) EPM EPM PQM PQM PQM (1) 100 VA Uninterruptible Power Supply (UPS) to be provided internal to gear per specification. LV swss and UPS Power-REV2.doc Boss, John May 11, 2010 Page 2 As per the response to RFI-038, two pieces of PM equipment were proposed for deletion from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent functions. In addition to the PQM units, the associated 100V A UPS should be deleted also. In effort to provide continuity between City equipment installations, it is proposed that the EPM units specified for the following be replaced with PQM units similar to the other installations listed. SWBFLT-PM-A MCFLTA-PM-A SWBFLT-PM-B MCFLTB-PM-B To minimize the number of UPS that are installed and associated maintenance, it is proposed that each 100V A UPS associated with the following be deleted from the project scope . MVSG-MR-A SWBFLT-PM-A PQMSWBOZM-A MVSG-MR-B SWBFLT-PM-B PQMSWBOZM-B Power to each installed PQM unit shall be provided with a 120V /1 ph power circuit (conduit, wire and terminations) as described below. Sheet EB-13 -Ozone Contactor Area Panel Schedules 1 . Panel UL-OB, change existing 20A/1P Circuit No. 10 from "SPARE" to "PQMCOB- M", Load KVA to "0.3". Route 2#12, #12G, 3/4"C to PQMCOB-M in MCC-OB shown on EB-15. Sheet EE-3 -Chemical Building Panel Schedules 1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet EE-1 . 2. Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and PQMSWBOZM-B", Load KVA to "0.5''. Route 2#12, #12G, 3/4"C to PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1. Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram 1. Panel Board "M,1,1+" "LUFLT" -Change existing 20A/1P Circuit No.~ 15 from "Spare" to "SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/ 4"C. Route the circuit to SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLTshown onED-2. 2. Panel Board "LUFLT" -Change existing 20A/1P Circuit No. 17 from "Spare" to "MCFLTA-PM-A". Use 2#12, #12G, 3/4"C. Route the circuit to MCFLTA-PM-A in MCC-FLTA shown on ED-32 . LV SWBs and UPS Power-REV2 .doc Boss,John May 11, 2010 Page3 3. Panel Board ''LUFLT" -Change existing 20A/1P Circuit No. 19 from "Spare" to "MCFLTA-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to MCFLTA-PM-B in MCC-FLTB shown on ED-32. Sheet EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details 1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to "MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to MVSG-MR-A and MVSG-MR-B in Medium Voltage Switchboard MVSG-HS shown on EF-2. 2. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 16 from Spare to "MCHS-PM-A and MCHS-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to MCHS-PM -A and MCHS-PM-B in MCC-HS shown on EF-5. cc: Chris Harder (FWWD) VK Gupta (GAI) Ernie Clement (CDM) File: 62142 -9.04 LV SWBs and UPS Power-REV2 .doc Josh Trice (B&V) Tim Mueck (GAi) Danny Shannon (CDM) September 15, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-17 -Electrical Building Plumbing Modifications Dear Mr. Boss: CPR-17 consists of modifications to the electrical building plumbing plan. Construction plan sheet AH-1.01 shows four roof drains and four overflow drains , designed to convey rain water off the electrical building roof. However, plans were not included in the contract documents for the internal piping within the building, connecting these roof drains to exterior building downspouts. Construction plan sheet PH-I shows a l' service water line with RPZ to serve the electrical building. CPR-17 includes the additional internal building piping necessary to connect the roof drains to external downspouts at the electrical building , as shown in a plan developed in the March 16 , 2010 memo from CDM, which is attached to this CPR. In addition, CPR- 17 includes the deletion of the 1" potable water service to the electrical building. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification . Total cost for the proposed change amounts to $16,755.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P.E., CDM Project File WATER DEPARTMENT PRODUCTION DNISION THE CITY Of FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102 (817) 871-8258 * FAX (817) 871-8410 0 Printed on recycled paper r;;'1I BLACK & VEATCH 1111.:.1 . Building a world of difference~ August 19, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 ATTN: Mr. Chris H!!rder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No. P262-607540045683 CPR #17 Transmitted herewith please find three copies of McCarthy's change proposal request for the referenced extra work. Black & Veatch has recommended the total change order amount of $16, 755;00 be approved. Please review the·request, and jf it is acceptable, have jt executed. John Boss :::..-.' '._: :. MC 1111 RT.'HY ?~; -~ IJ August 18, 2010 WESTSIDE WATB! TREATMENT Pl.ANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com MAILING ADDRESS : P. 0. BOX 122419 FORT WORTH, TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560·3727 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn: Mr. John Boss Re: Change Proposal Request # 17 -Revised Pricing Westside Water Treatment Plant P262-607540045683 Mr. Boss, Please find attached revised CPR #17 pricing for changes made to the project due to the field directive memo from CDM dated 3/16/2010. The revised pricing has been amended per our previous conversations, and does not include any provisions to insulate the drain piping per CDM's clarification, or install splash blocks outside of the structure. Please do not hesitate to contact me with any questions or concerns. John Frazier Project Manager McCarthy Building Companies, Inc. CC: Paul Laufer -Project Manager Steve Gotschall -Project Director Jerry Mayer -Project Director File ENC: CPR #17 Pricing CDM Memo dated 3/16/2010 Change Proposal Request CPR# 0017 Project Name: Westside Water Treatment Plant Project No. : 002012.000 Date: 08/18/2010 Architect's P_roject No.: Cost Issue Ref # : 30 Attached is an itemized quotation for changes in th _e Contract sum and/or time on subject Project as described here i n. This document, when fully executed , as accepted, shall constitute authorization to proceed with the work described herein . Due to schedu le impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Build lng Companies, Inc. will be reimbursed monthly for the cost of th is work as completed , whether o r not the Change Order has been fully executed. DESCRIPTION OF THE PROPOSED CHANGE: Added Plumbing drawings at HS Elec Bldg per COM Memo dated 3/16/201 O SCOPE: Added plumbing drawings at HS Elec Bldg . -Delete- 1" PW line 1 -RPZ backflow preventer 2-Freeze proof hose connections -Add - 4 -Roof Drains and associated piping 4 -.Overflow Dra ins and associat ed piping DIRECTIVE: CDM Memo Dated 3/16/2010 REFERENCE: B&V Transmittal# 402 CDM Memo Dated 3/16/2010 Pricing Details Company Name McCarthy Build ing Companies , Inc . McCarthy Build ing Compan ies, Inc . Description Added roof drains at HSEB Added roof drains at HSEB Subcontractor Bond General Liability Bu ilders Risk Project Bond CO Fee (Sub Work) CO Fee (McCarthy Work) Net Amount of This Proposed Change Net Change in Calendar Days Due to This Proposed Change . [$l.. Schedule Impact to be evaluated at a later date. Amount 7 ,732.00 6,548.00 0 .00 131 .00 51 .00 151 .00 0.00 2,142.00 16,755.00 Printed On : 08/18/2010 04:48:24 PM Page : 1 of 2 McCar hy Building Companies, Inc. .. Project Name: Westside Water Trea1men1 Plant Project No. : 002012 .000 McCarthy Building Companies, Inc. Accept Do Not Accept Change Proposal Request CPR #0017 Date: 08/18/201 O Architect's Project No.: Cost Issue Ref # : 30 City of Fort Worth Water Department Accept Do Not Accept BY: Date: Printed On: 08/18/2010 04:48:24 PM Page : 2 of 2 REVIS ED ltemlud Pricing " McCARTHY I I Job: Wcstah:MWTP O.ScrloUon:: CPR• 17 HSPS EJeo Bl'dg Plumbing changes Date: 0611<1/10 I tAan Hours UrlitCotts Total Costs tttm Oescriotlon ~ UOM MHI Unl1sl Total labor Mlrl Eoulo .... Labo< Mtrl e=n Sub Uni Uolt MH MH s $ s s s s s $ Total Delete s 1•eoa--1•2.00 ft o.oa -11 .36 19.6 2 .008 (22J 1285 s <~M 1·r-eouolina -8.00 ea 0 .65 .520 19.6 0.969 1102 re s 111 0 1· r90 -8.00 •• 0.83 •5.!M 19.6 1.761 -11, $ {113 -~ .. -1.00 •• 0 .92 -0.92 19.6 4.072 !1S: (4 s 122 . -1.00 .. -1.3,C •1.34 19.6 176.36 1261 !1 76 . $ r,03 -·-·15.00 •• 1 -15.00 19.8 0.534 "'"' 8 $ •= I-1"FPWH .2.00 •• 1.05 -2.10 19.8 12 (41 124 $ '"" 0.00 s Add 0.00 . s ... Roo!Or.afnAssemon,wf {)od( d..-na andf'OCOM:r 0 •• 0 0.00 19.6 102.0 s ... 00 Root Or.lo auemblvw/ deck cl amo rrd f9Nivor 0 .. 0 0.00 19.6 123.-4@ . $ 4• No hub w/ SST bSl'lm roer 15-430 2.048) .... 0 0.00 19.15 HS 290 • I s 290 ,. No hub45 dea bends 811 a.a MO 19.6 11.18 125 •• s 215 ,·-~·l:~ 24 u 0.8J 19.92 19.8 15.24 390 366 y $ 756 • a•• 2.03 2 1.04 19.6 106.53 41 2 852 s 1~ -e-30 .. 2 60.00 19.8 5.2. 1178 157 s 1333 -izedunirtul 200 ft 0 0.00 19.6 1.2305 246 . s 246 I-3.2 t3 2 6<1 .00 19.6 2.75 1.25-4 88 s 13'2 210 n 0.24 8'.80 19.6 G.279 1~70 16!15 . s 21166 -od 110 n 0.00 0.93 102 s 102 -.... 2"5ea 0.00 02""'1 . 711 s 711 .... 2e6 •• 0.00 0.1 855 . '9 . s •• !II" SS Tru8oll wodat •nchors 61!1H 0.00 4.9094 . 33' s 334 6"' cores ,nrnul'lti CMO wail (ConcrefG Ctll by PVll"EI a .. 0.00 65 520 . . s 520 . s Manlltl 2 wks 0.00 $ 200.00 . . 400 $ 400 ,~1or 75 hrs 0 .00 s 5.96 . 447 $ 447 1 ............ 8 E• 1 8.00 19.5 118.49 157 948 $ 1105 0.00 . . $ 0.00 . . $ . 0.00 . s 0.00 . s T01alHRS 20320 SUBTOTAL s 3.992.72 $ 5.297.25 $ 847.00 $ . $ 10.1 27 FUE OI &PARTS: a.cos OF s s 847.00 O F EOM s s $ $ s . OVERTIME FACTOR: 20.00% OF s s ,-1 OFlBR s 796.54 $ s $ s 797 lABOR BURDEN: 55.00S OF s $ • OFLBR $ 2 6 28.59 • $ $ s 2629 CONSUMABLES 7.oo,i, OF S $ $297~ OF MAT s $ 370.8 1 s s s 371 SAFETY S0.50 PER HOUR oflabor $ 101.50 s . s s s 102 SMAl.l TOOLS 3.00% OF $ s 7407. OFLBR s 222.2< ' $ s ' 222 TAX: 8.75% O F S s 370.81 Of MTUFUB. s s 32.4S $ s $ 32 SUBTOTAL $ 7 731 .58 s 5.700.51 $ 847.00 $ $ 1'.279 ! GC 15.00S $ 1 159.74 $ 855.08 s 127.o:i s 2142 i Su~s 10.001' s . s s 1,1;.e 0.00!. s s . s . s s . S UBTOTAL s 8,891.33 • 6 555.56 s 974.05 $ . s 16.421 S~orBond 1.0000% $ . s lns1.n1nco o.8000,, $ 71.13 $ 52.4' s 7.79 s $ 131 Builders RI«< 0.3100% s 27.78 s 20 .,s s 3.0, s . s 51 AckO<loooll!ondPro""'-"' 0 .9106';0 s 81.87 s 60.36 s 8.97 $ . $ 151 I Total $ 9 ,072.11 s 6 ,688.87 $ 993.65 s . $ 16,755 TOTAL $ 16,755 · Frazier, John From: Sent: To: Cc: Subject: John, Robert. Parris@Ferguson .com Tuesday, August 03, 2010 11 :15 AM Frazier , John Pepping, Nick; larry.fischer@ferguson.com Westside WTP -Revised Quote , Plumbing Revisions Below is th rev ised quote r the plumbing revisions we discussed yesterday . Please review and contact me with any questions . Regards, Robert Parris Plant Sales Ferguson, a Wolseley company, 8007 NE Loop 410 , San Antonio , TX, 78219, USA T : (210) 662 4902 C : (972) 670 5500 F: (210) 662 4825 E: robert.oarris@ferguson.com www.ferguson .com Bid No ....... : 8158257 Bid Date ... : 06/15/10 Quoted By : RCP Price Quotation# 9158257 Ferguson Waterworks #788 2650 S Pipeline Road Euless, TX 76040 Phone: 817-267-3900 Fax : 817-267-3912 Cust Phone: Terms ......... : 972-991-5500 NET 10TH PROX Customer.: MCCARTHY BUILDING COMPANIES WESTSIDE WATER TREATMENT Ship To ....... : MCCARTHY BUILDING COMPANIES WESTSIDE WATER TREATMENT PO BOX 122419 PO BOX 122419 FORT WORTH, TX 76121 FORT WORTH, TX 76121 Cust PO# .. : PLUMBING REVISIONS Job Name.: WESTSIDE WATER TREATMENT (Item ; Description Quantity Net Price lUM \Total J _ I --I 4! 102.430 jEA ! 409.72 l I .I ' ' 41 123.460 j EA 1 I 493.84 I 14 NH ROOF DRN WI SUMP RCVR & CLMP ,---------':------------------------_;,-__ i SP-Ml 104BRU j 4 ROOF ORN W/ SUMP CLMP & WTR DAM l SP-MR1104BU I 40 3.450 EA l 138 .00 l 2.c, 0 I l g JO i 11.180 JEA I 111.80 . B 'l I !Fl05644 4 CI PVC X 4 CI PVC COUP jNH4P J4 NH 1/8 BEND I L,.~ 8 15 .240 l EA 121.92 i ·~lib ! e s j 106.530 j EA 852.24 I '?Sl. j NH9P 4 NH 1/4 BEND l SP-MRI 944 14 NB DOWNSPOU T NOZ E4010600EG J6 PLTD ADJ STD CLEVIS HGR 30 1 5.240 jEA ! 151.20 ! v . , I . I . • BB24SHGAL V20 l 1-5/8Xl-5/8X20_'.4_.C:,~V H/SL STRUT 2-oc ~ 24 .61 i Z.lllo ! .. I ERIGD0400EG j 4 JPS PL TD STRUT CLMP 32 j 88 .00 ! I/' NHPPIO I 4Xl O NH SOIL PIPE r ·2."?o 240 j 1506.96 i GATRElO j s1sx10 ZJPLT ALL THRD ROD i i I\) 2oo j 186 .00 j PSGHHNE j s,s -II THRD ZN PLTD HVY HEX NUT I 2 ~s--2001 59 .92 I PSGFSWE j s/8 ZN STL FLT WSHR 1 i. " "' 200 1 31 .10 I RWW5860 ls/8X6 SS 304 TRUBOLT WDG ANCR I Ct 1c 64 J 314.20 ; ! Net Total: 4501.51 Tax : 0.00 Total: 4501.51 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SffiPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricin·g due to causes beyond ·our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at http://wolselevna.com/terms conditionsSale.html. Govt Buyers: All items quoted are open market unless noted otherwise. 2 I ! Frazier, John From: Sent: To: Subject: Pepping, Nick Monday, August 16, 2010 1:40 PM Frazier, John FW: Westside WTP --Quote, Downspout Nozzle Still need to talk with Maxwell concerning i nsulation Nick Pepping Project Engineer McCarthy Building Companies Westside WTP 12200 Old Weatherford Rd. Fort Worth, TX 76108 PO Box 122419 (602) 980-7327 npepplng@mccarthy.com Leaving Green Foote!J..nts . Think before you print From: Robert.Parris@Ferguson.com [mallto:Robert.Parris@Ferguson.com] Sent: Friday, August 13, 2010 3:51 PM To: Pepping, Nick Subject: Westside WTP --Quote, Downspout Nozzle Nick, Here is the downspout pricing you requested . Please let me know if you have any questions. Thanks Robert Parris Plant Sales Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA T : (210) 662 4902 C: (972) 670 5500 F: (210) 662 4825 E : robert.parris@ferguson.com www .ferguson .com Bid No ....... : B161959 Bid Date ... : 08/13/10 Quoted By: RCP Price Quotation# 8161959 Ferguson Waterworks #788 2650 S Pipeline Road Euless, TX 76040 . Phone : 817-267-3900 Fax: 817-267-3912 Cust Phone: 972-991-5500 Terms ......... : NET 10TH PROX Customer.: MCCARTHY BUILDING COMPANIES WESTSIDE WATER TREATMENT PO ·BOX 122419 Ship To ....... : MCCARTHY BUILDING COMPANIES WESTSIDE WATER TREATMENT PO BOX 122419 FORT WORTH, TX 76121 FORT WORTH, TX 76121 1 ·Cust PO# •. : DOWNSPOUT ADPT Item j Description 125014 ! 4 CABR PARAPET DOWNSPOUT NOZ Job Name.: WESTSIDE WATER TREATMENT !Quantity ! I Net Price I s i ' Net Total : Ta,c : Total: 118.490 j EA 947.92 0.00 947.92 !Total I I 947 .92 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at http://wolseleyna.com/terms conditionsSale.html. Govt Buyers: AU items quoted are open market unless noted otherwise. 2 CDM Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff (TX PE #91688) /?J.. CDM.(F-3043) L,4J March 16, 2010 Subject: Westside WTP Project Electrical Building Plumbing Modifications Sheet AH-1.01 identifies proposed locations for the Electrical Building roof drains and the requirements for tapered roofing. The intent is for the collected runoff by the roof drains to be conveyed within an interior, overhead piping system and discharged to the exterior via wall nozzles. The piping system associated with the roof drains is not shown in the design drawings, and must therefore be added. As shown in the attached revision of Sheet PH-1 is the proposed piping system and required routing. The routing was coordinated with the electrical equipment layout provided by FSG, so that the drains and piping would not be located directly over the electrical equipment All piping and appurtenances shall be as specified. Also shown on PH:-1 of the contract drawings is interior plumbing for service water supply. The interior plumbing, including pipe, valves, backflow preventer, freeze-protected hydrants, and related appurtenances shall be deleted per the attached. Please discuss the referenced modifications with McCarthy. cc: Chris Harder (FWWD) Josh Trice (B&V) Steve Tiberg (Komatsu) Danny Saenz (Multatech) George Cloyd (Multatech} Alex Howse (Multatech) Danny Shannon (CDM) File: 62142 -9.04 Elec Bu lding Pk.mblng Mocflfocatlons.doc: i i ,: $-4 .Nf.) C)..D. , ffilMl»M'lr ~CIIAl'! ~ _;....-;r-"""_ ... Z2Lt -'JY-f . ----...... .. --. -~ • ;._ -'_,, .-: JJ:. -•• , /u..,o 4" LP ,o n, .. .._,'l:f;, <,,.,..Af'~ I •· a.c. 'r : ---;·-;·,·. ·-•• I ot -. i .{~; , • -,o :L .. ·w10Pi,D. i'1J:::-·.:~~rr~,::·=: it .... ! t::=J ' ... ; ,·C] f ~-;r::-..... ------.. -.-~ UlCNC"--T, f · · !':«"~~-~wic:_.:.~~o::1us_~-,...1WJN2t __ fC"., J -4.~CflQClftfWNt.,CCA1XIHSW/·~.~ ti i ELECTRJCAL BUILDJNG ~ PLBG PLAN -~ i $Al.£: 1/•:-1·-q~ ~-s -~~==:r::::r:::i::::i:::::::::::::::::::::::::::::::.iT"-.... --""'--:,...::-::_::,::-_,-::,.,....::::-:"::'.""::='"TCDM===-------,-------arr--~-.Ofl-_r-·.WOR-_-_-n-~-:ro<M-.-------r-------------------..,..,....,,-..:, .. =-==--.. -,..,-l l ,_':: __ .._;,.._•_-, ... _~ ... _-----------.. -_ g§:"" ~..:.; ..;.;.,.....,,__.._ WESTSIDE WATER TREATMENT PLANT PROJECT ELECTRlcAL BUILDING _PLUMBING LAYOUT "'""'' ;:,: 0 "" I i ! 1 f ii I i f l i s cwt •· s..c. NCI o.o. Sr..&C OUT 1a· .-ec,,,t CAtl« i.llNOCl!MiPCIJrNOZZll / / ..... --:.·,i.:· · ;1f~/~ Et: 7~t(\:~~:;:,::'n:¥ ;; '.tf;r7[;~):~;::,;:t,~. :~ 1 25( t:· ~":-~---, , I ,I I ' .-1 .•. ; •' i :·,. 1-·. .. [ __ ELECTR ICA L BUI LDING PLB G PLAN SCAl£: 1/4"•1"-o" +---t-+-----------------t«--ff~ "{IIFT stJrrtlS +---t-+-----------------1 _..,,.,~ ~~~ +---+-+-----------------l~o., r,~ 'l--+-.-----------------1--afl~ ~NOf~-~ --~ -.;WOIIQOU,,JOOI Xlrl.n~T """" lf1 1, SlCRI CIIN(S NCI CMJlf1.0W o.lNS SfWi. NOt 1K .atnUI "8JVC tl£CnlC,t,L CQW"l,IOff. 2.~NOZhl:SIW..1.Kca.w..lOJOSlriW:l50\0'IIITMIA1"'11JISll4IIIIOfrQl:'KIP. J.P'MMCltCOlctl(lt,v..'9411UJQ(IIO,.CJW~NOUUS. 4. COCMJll«J£ POOi llMM l.OCAT'Ord W/ NilCM'!ICJ\M.. ~ CflY Of FORT WORTH. TEXAS WESTSIDE WATER TREATMENT PLANT PROJECT ELECTRICAL BUILDING PLUMBING LAYOUT PH-1 September 25, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-21 -Miscellaneous Electrical Modifications Dear Mr. Boss: I have reviewed CPR-21, which includes a memorandum from COM, dated May 10, 2010 that responds to numerous questions received from the electrical subcontractor regarding the scope of work. Changes to the scope of work include a modified detail for the light poles at the sedimentation basin as well as the installation of an additional electrical junction box and conduit near the flocculation basins. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. Total cost for the proposed change amounts to $4,652.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P .E., CDM Project File WATER DEPARTMENT PRODUCTION DIVISION THE CITY OF FOR'r WORTH * 1511 11TH AVENUE * FORT WORrn, TEXAS 76102 (817) 871-8258 * FAX (817) 871-8410 0 Printed on recycled paper 1=111 BLACK & VEATCH ~, Building a world of difference: September 7, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 A TIN: Mr:. Chris Harder, P.E. RE: Dear Mr. I-larder: Westside Water Treatment Plant Project No. P262-607540045683 CPR#21 Transmitted herewith please find three copies ofMcCarthy's change proposal request for the referenced extra work. Black & Veatch has recommended the total change order amount of $4,652.00 be approved. Please review the request, and if it is acceptable; baveit e;i<~µted. Sincerely, ~ August 26, 2010 WESTSIOE'WATER lREAlMENT PlANT 12200 OLD WEATHERFORD ROAD. FORT WORTH; TEXAS 76100 wwwmccarthy,com MAILING ADDRESS: P. 0. BOX 122419 FORTWORTil, TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 5~0 -3727 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn: Mr. John Boss Re ~ Change Proposal Request #21 Westside Water Treatment Plant P262-607540045683 . Mr . Boss , Please find attached revised CPR #21 pricing fot changes i:ri.ade to the project due to CDM memo dated .May 10, 2010-Revi'sion#i This memo makes nwnerous changes to the .electrical details ofthe project, as well as some minor structural changesin order to facili tate these changes to the electrical details. Attached is a detailed breakdown of the associated additional costs , as well as · breakdowns from affected subcontractors; This revision of the original pricing is to provide aluminum junction boxes i.n place of stainl~ss steel ru; originally specified . Please do not heshate to contact me with any questions or concerns. CC: Steve Gotschall -Project Director Jerry Mayer~ Project Dh·ector F.ile · ENC: CDM Memo date~ May 10, 20 io-Revision #2. CPR #21 Revised Pricing Change Proposal Request CPR# 0021 Date: 08/23/2010 Project Name: Westside Water Treatment Plant Project No. ; 002012.000 Architect's Project No.: Cost Issue Ref# : 46 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, th is work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. · DESCRIPTION OF THE PROPOSED CHANGE: Electrical Clarifications SCOPE: COM Memo Dated 4/28/2010 CDM Memo Dated 5/10/2010. DIRECTIVE: REFERENCE: Pricing Details Company Name Facility Solutions Group United Forming Inc McCarthy Build ing Companies , Inc. McCarthy Building Companies., Inc. Description CDM Memo 05/10/2010 Formwork MEMO Electrical Revt Subcontractor Bond General Liability Builders Risk Project Bond · CO Fee (Sub Work) co Fee (McCarthy Work) Net Amouht of This Proposed Change Amount 3;291.00 436,00 364.00 41 .00 36.00 14 .00 42.00 373.00 55.00 4,652.00 Net Change In Calendar Days Due to This Proposed Change 0 Schedule Impact to be evaluated at a la\er date. Ciiy of Fort Worth Water.Department Accept Accept Do Not Accept Do Not Accept BY· ----·-···-··-·····--·-···--. -·-······· ...... BY: __ --·········--·-····-··········· ...... __ .. . Da.te : Date · ___ ···--·····-.......................... _ --·-·-...... . Printed On:, 08/23i201 O 11 :25:34 .AM Page: 1 of 1 Revised Pnang McCARTHY ········-··--T.-...... ·-· .. =r=Jj .... _______ ,,_ . --·--·-""" --.. -J ....... __________ =t=-·=--1 --------·· p...:_C!f·p~~~::·-CPR #21 • Electric Clarincatlon Mamo ~~;J ----~--:~·=:·_-~.:~jj'41,;r~~ ·: .... :_·~=--J~~:.·--~J --~-----' ---•---I ' I I I I I T :~-+~~-· 1--· ~-+------1------·----1 _M!ln_HoUrs Unit Costs . ~ Toi~ Colt$ · ··-----·-~+-·--· --··+-··-+""---------· ... ·---------.. ~----· 111em 1-~-----Oescrie_tlon _______ .... -••••. JC!uantll\f !UOMJ. ~~+u~~-j-T~~et ~ L";or ·l=M;r1 =J 1:9;1-P--· I S~b -f-----·La:"r. ··I M;r'-· I·· E~ip __ , _, ... ___ 3,i(f9" Sub ·s -s Line ···Total. s·-3400 s··-----... MCC_j~~~~J~t31S,c;_.a,______ -----·----1---100 ____ , ~~ ·1 .. ti . --.·. --~~I-__ I =:__3¥Jt -----·· .,.--------~ --... --------· _ J,oo .... LS .. ____ • __ • __ .90tJ:O.'. I"'---q 000 :·1::~~----_-:-. _--~--------4~:: ··tisj_---·-=: -----_· __ -~~---------· :.· --~-:~:~~-=-I::..:~~-----~ ---i---~--1---· r-· · <i:i6 s·----. -UF .E"''"'""--------------~· s ........... .'436.cx:q --. . .. · 1 -=-1 · 1 -------_: ____ · . · . .=.i _____ .. -_ ............ ~36 S ·3.291 .L -. ----3"jg;-... T.:::=:1.ffi.1_!&J=-------<·J----:-} -----.. ... -----. ---------------------------.. cy_ ' • ..... . ' . ' -------------.. --~ -!-----'. -.. ~t!· ----··· ' 000 ~c~· i>,.;;;·~~e:'iab~-:-=---_.::.::_ ___ -_·_~ :2£1,:_· ___ lir :-__ ··:_-:::_-:::·~Jgg __ ·_·:.: ·.:.~"':_··:._ _ __, _________ _ _ __ ::;~~~~1~~==-~~-~-: r~·:-:-.~: = ·--s 000 "---··>--------·--------~=.· ·. l _J-.}j ~. •·... :_ . = T=: ::: L : ~. __ : ___ .. "-·-.: 0.00 --··-................... ________________ --·--•--·-· .. ··---·-·-· ·o:oo ·· cfoo --·---' .... -, ....... ., _____ ·. ·-1-s-----.. --·--··· -s ................. s" s" s· ·'· ....... ______ -.s ......... . --------------·--....... ----------l ··, --'J ·-r.·-1. ·· ---1'. ::iJF···-·1-----:· . oool ·I ·I·---......... -----+···· ········-····· --·--· ·---t··------t--------~ '·------.. ---, ..... ............... f-----____ ,,,,_ C.j .. , ______ , ___ ........... . ............. ____ , ____________ ,_,., ..................... . ····---·------··-· -..i-1--------~---·-· l-· s L •• .s if :s·· ·-...... $ ............ 000 --000 -----· --·,.!------· ·s s ----....... ' ·---.. fotalHRS 000 SUBTOTAL $.. -~-~-FUEL OIL & PARTS; • O.OO'h -ors-··-$ -OF EQM s s "OVERTIMEFACTOR: 10.00% · -OF,.s.. ,-----·------------OFLBR ... • s s . --LAEiORBuFioEN: ·ss.00%. ·--·-oF .. s_-.. _$ ....... ---:-----·--:cii=iaR·-·. s s ~ . s , ..... _ ·------------_, ...... CONSUMAlllES 7.00'h OF S $ 340.00 OF MAT S $ 2 ----r----~-~~~L5MJY. 1~: ~-~eg~r-· :---------: ci .-:~:~~~:--~ . • : . f" .-.-::~~-=-... ,,,.,., --~~ift---w=-1·: "!oor 1~ ~,rz700r 4.~1, J :i~;-~~-~-~~-.;j.~ ~~,l'[~f f "·+ I ••• : '. lnsurm 08000%. S S -·--• , • -.--1 • -liu,lders Risk Q3100% -' $ s -----;-~-----····~ ·:·-·· __ t:·~--~:-::~~~-~~~·.::r~~ . ~--:~~~:~~;:,: . I: 42 I I TOTAL I $ 4,6521 ............. , ... ___ _ ~ : .. _.. " ----' -· 1----------__ . .J ---·-1--t---------·-· ... f-.. --• ----------l----------·• ....... ---·· ....... ·:::--:-::.::::::-~-::::7_-----.:-:-------·-·-- ISCl£ · • ••~• el ectr1 c 2525 Walnut Hill Lane Suite 100 Danas, lX.75229 (214)-357-5697 (TECL# 17904) 08/23/10 John Frazier McCarthy 12001 N. Central EXPWY ., Suite 400 Dallas Texas 75243 Subject: Revised Priclng for Contract Changes Per Memorandon Dated 5:.10-10 for Requests for Clarification John, - Change Order Proposal No. 127584 Date:! 08/23/10 ProJe_ct: Westside Water Treatment Plant Job NO.: 30J1613 Drawing No:j ,Spec Section:. We are pleased to offer the fo!lowlng Change Order Proposal for your consideration.The price includes labor, material, and equipment to perform the additional work that was not part of the contract per the response to the questions asked by FSG Electric in Memorandum dated May 10, 201 o; See attached sheets fo( price breakdown and attached Memorandum. The price to perfonn this work is $3,291 .00, Sincerely, FSG ELECTRIC Jerry Bevers · Fi"~ astta: fighting> elec~rica( > energy • • ••• technology> signs FACII.ITY S01.UTION5 'GROUP RECAP SHEET C.0.#3 RATE HOURS LABOR-{ELECTRICAL} FOREMAN STRAIGHT TIME $30.00 1.00 $ FOREMAN OVER TIME $45.00 $ JOURNEYMAN STRAIGHT TIME $25.00 $ 10.00 $ JOURNEYMAN OVER TIME $34,50 HELPER STRAIGHT TIME $17 .00 $ HELPER OVER TIME $25 .50 $ $ $ $ LAaOR TOTAL-$ MATERIAL TOTAL $ EXPENDABLES-6% OF MAT. $ BURDENS· (42% OF LABOR) $ SUBTOTAL· $ PROFIT& OVERHEAD $ TOTAL• $ TOTAL 30 .00 - 250.00 . - - - - - 280.00 2 325.00 139;50 117.60 2,862.10 429.32 3,291.42 -~Ct£ lighting> elec~rical > energy • • ••• technology> signs ·FACILITY SOI.UTIOM5 GROUP C.O. #3-REVISED PRICING SHEET OESc;, QUAN. MAl UNI! IMAI t:AI, -"-~-·-UNII ADD 4" CONDUIT-ALUM. 150 $ 10.00 $ 1,500:00 0.22 ADD CONDUIT SUPPORTS 20 $ 8.00 $ 160.00 0.25 ADD4" LB's 6 $ 150;00 $ 900:00 5.00 $ - DELETE 2" CONDUIT 600 $ (3.00 $ (1,800 .00 (0.08' DELETE ALUM. J-BOXES 2 $ (125 .00' $ (250 .00 (2 .0000' DELETE CONDUIT SUPPORTS 60 $ (5.00 $ (300 .00 --0.25 ADD 36"X 36"X12" NEMA 4X-1 $ 1,300 .00 $ 1,300.00 8 ALUM. J-BOXW/ TERMINALS AND BACKPLATE 12"X12"X72" NEMA 4X ALUM . ., 1 $ 900.00 $ 900.00 4 WIREWAY $ - S.S .SUPPORTS FOR J-BOX-ITEM $ 200.00 $ 200.00 ANDWIREWAY $ - DELETE F.O. CABLE 300 $ (0.95 $ (285 .00) ~0 .01 $ - $ . $ - .$ -· $ - $ - $ - $ - $ - $ - $ •. $ - $ - $ - $ - $ - $ - $ - $ . TOTAL-$ 2,325 .00 -~-··--:.t:At. 33 .00 5.00 30 .00 0.00 (48.00) (4 .00' (15 .00 1 8.00 4 .00 0.00 0.00 (3.00 0.00 o:oo .0.00 0.00 0.00 0.00 .0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:00 0.00 0.00 10.00 Project Value Adjustment Request Dayton Location: 95000 W. Highway 90 P.O. Box279 Dayton, Texas 77535 Phone .936 •258•8221 Fax 936•258~9637 · Friday, July 02, 2010 Re: Westside Water Tteatn1enl Plant Nufab Rebar Project #05509013 Wirxaf1acl1ie Location: 1535 W Highway 287 Bypass -Suite A · W1lxahachie, TX 75165 Phone .972•923•2636 .Fax 972•923•2771 Li:mgview Location: 806 Jordan Valley Road Longview, TX 75604 Phone 903•297•7477 Fnx 903•297•7446 Thank you (or selectingNufob Rebar, LLC M the concrete .reinforcing steel and rel~ted prod11cts htnterinl supplier for the project referenced . We are request:i.hg review and accephmce of the.following cxtra(s). Item Descr/ptiou Additional reinforcing required for light corbels at Sedimentation Basin per request 2010.05.10 plus ·4 hours addi tiorutl detailing time. ):teui Weiglst 100 lbs. A.ilio1111t $340 .00 Fraire's Re~ar II\ay isSt1ea Change Order or sign and return the Project Value Adjustmeut request It ls our goal to 1rtake this project a successful partnership fotFrair'e's Rebnt and Nulab Rebar, LLC. This Project Value Adjustment Request Is accepted and incorporil.tetl into Westside Wa.ter Trea.tment ~~ . T.o preveutdelny qf fabrication and sliipment of the above, please sign and rehtrn 11t your earliest convenience. · Frairc's :Rebar . Authorized Signatiire Date Nufab Rebar, LLC. A Harris Rebar Co111pruiy I l Date: 06/29/2010 Project Name : Westside Water Treatment Plant Architect's ProJectNo : ~roject No: 002012.000 Cost Jssue Ref# 46 CPf3 No 0021 To : United. Forming Inc Date Quote Due.:07/06/2010 Please submit an itemized quotation for changes in your subcontract sum and/or time on subject project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. DESCRIPTION OF PROPOSED CHANGE: Formwork SCOPE: COM Memo Dated 4/28/2010 COM Memo Dated 5/10/2010. REFERENCE: Net.amount ofThis Proposed Chan,ge: (ADD)(OOFI ICI)(tlQ GH"NGF) ! Net change in Calendar days of this Proposed Change: (Aee)(etSUCJ)(NO CHANGE) ______ Days • Attach Petailed Cost Breakdown Unlt,,d l'onning lne . ~ By~:::::-~ $ . . . McCarthy Building Companies, Inc. (Prior to ArchitecVOwner rev iew) __ Recommend Acceptance __ Do Not Recommend Acceptance __ No Recommendation -Price M~rglnal By :---------------- Date :·-------------~------ McCarthy Building Companies, Inc. (After ArchitecUOwner review) __,..... Accept __ Do Not Accept By:--------------- bate : ________________ . Printed on: 06/29/2010 04:48:11 PM Page: 1 ho : McCarthy Bu lld!ng C:,mpenies 12200 Old Wealherford Rd. Fl)!\ Worth.Texas 76108 , ATIN: Glsel De ta Orta .PH: 817.5!,0.3740 FX; 817.560.3727 CHANGE & COST BREAKDOWN f.'rnleet Westside Water·Treatmont Plant Descrlplion : Rf'P· Cost Issue Ref #48 Revised Corbel @ Sed Basins ITEM NO. DATE DESCRIPTION QTY 1 07.07.10 RFP Ref#48 Rev1S!ld Corbels 30.00. LABOR UNIT AMT SF $. ··a.es s 265.50 QUal. Lavoul lo ho .established from Mee•""" orovldod 3 c!lmclll>lon lavout Dian, . . SUBTOTALS 265:50 ISALESTAX 8 .25%1 I SMALL TOOLS("/, OF LABOR) I - I SUBTOTAL COST OF LABOR, MATERIA!.c, and EQUIPMENT ACC EPTED B)': NAME:~-----------~ T ITLE'. ________ ~~--~- ACCEPTED BY: Vniled Forming, ln.e. NAME:·Brett P BIQYnl ·SUBCONTRACTOR'S OVE!{HEAD. SUBCONTRACTOR'S FEE CHANGE ORDER REctUEST# DATE: 07.07 .10 I Prepared bv: BreH D Brown I I MATERIAL EQUIPMENT SUBCONTRACT AMT EA AMT A~T s 3.50 $105.00 105.00 - 9 .00 . ( 15%) ..... , .... , ... , ....................... O'Y,) .................... · ................ . TITLE: ProJect Manager Nole: This change adds scope to 6~r Subc:cn1J1!cl .All twms and c:cnd1 Uons or lhe onginal Subc:cnlracl shall apply io lhese chang.es .. Pleaslissue us a Change Order in the amo~l or $ . 436 . ff you have B.'l)' que saons or comments, pleas11 contact Luke .Zoell er al 713-875-0222 United Forming, lnc. Confidential 7/7'2010 4 s TOTAL J70.50 370.50 9 .00 J79.50 56.93 4:l6.43 0.00 Memorandum To:· From: Date: John Boss Black & Veatch. Chad Bartruff, P.E. (TX #91688) COM (TX #F-3043) {JI> M~y 10, 2010 Subject: Westside WTP Requests for Cla"rification -Electrical-REV-1 A meeting with John Frazier (McCarthy), Fred Burgeson(FSG), and Josh Trice (B&V) was held on-site to discuss and identify specific electrical questions that have been identified. There is one item that requires structural coordination listed below. The following is a paraphrased summary of those items: 1. Phone wires are shown to be routed within the Administration Building via the cable tray system to the point of demarcation. Per Fred~ for Eagle Mountain WTP and .the Como Pump Station projects, the phone company would not install the wire in.a cable .tray and required a conduit. Verify. Refer to drawings E-10, E-17, ED-32~ and ED-38. The te1eplione cables from service provide1' to telephoiie board (Point ofDenU1rctrtion) are routed in conduits .. Localfo11 of the telepho1ie boai'(t (Demarc) is shown pn ED-38 and graplticnlly on I~ 1. Conduits for telephone service prauider cable shall be routed to the telephone board shown on ED-38 as required/or tem1i11nlion. Modification ciftelephone b0ttrd positfrm, conduit entn; locotion lll1d cable tray am be exa1Jzji7.!!d tofarjlitate routing . Refer to E-17 fo1· Teleplwne System Electrical Conduit Rise,· Diirgr.11111. Contluil/cable ftilis betweei1 nll teleplwmf /1Qr1rds are shown for n:finm:e. Sheet ED-32, Note 6 instm.cts rc:il1filzg of the rc:sr1ectivc tdcp1w1w tond11its/cables to t1ie 1T Room in ccudult. Con,fuit from the Ductbank 'J' sluill enter 11t the kvcl sliow11 n11d bend vertical for routing vi(l tlie Electrical Room l:is . shorim. Co11d1tit for tdephone l:al7.lc tlrat cu tets the IT Room shall lie coordinated to enter hmnediately adjacent to or u11der tlle Teleplwae Board for direct coimecticm and teri11i1mtio11. Roqueat ·'°' Clanlica.llon • FINAL RE'{-1 :c!OC May 10, 2010 · Page2 2. Sheet EA-1: The two sets of junction boxes on the west side of the struch1re appear to be redundant. It is proposed to eliminate the north boxes and install all conduit directly to the south set of boxes. Junction boxes were provided to allow instilllation of condiiits feeding equipment mid devices to be run without exceeding the equivalent of three 90 degree bends as specified in 16110.3.07.A. 'function boxes ca1i be deleted if conduit ins.tallation meets specifications. Coardinate with Co11structiori manager. · Controls and discoru,ect for the tank--mounted mixers are shown on top of the tank-. It is proposed to mount adjacent to the ladder on Unisfrut system. It is propdseri tlzat the controls mid discol!nects be installed frt locatio11$ show_ atop the tanks to permit direct access to the mixer colltrols and disconnect for maintenance work. A lmndrail S1Jste111 at tile top of tlle tank can be used along with as trut system to mount the ,:ievices. However, it is recomme11ded tlmt prior to settillg ofpnnels, ti~ Construction Manager sl1ould coordinate with CihJ staff 011-site for verification of their preference. 3. Sh_eets EB-5 / EC-i: On EB-5, at the southeast corner of Sedimen.tation Basin l:'{o. 3, J- Box-A is shown to have 120V power. On EC-1, at the same locatio~, PB-A appears to have 480V power and 120V power. Verify what is intended. Related to this, the 'P2' fixtures called out for mounting on the Clarifier·walkways are 480V fixtures shown to be powered by 120V circuits. All other'lighting around the Sedimentation Basins is fed from 120Vcontactors. No lighting confactor is shown for control of the Clarifier lights. The tp2' fixture ·is a 20-ft hinged pole and with placement atop the clarifier the fixture will be hinged out over the water surface. FSG proposes use of a 'U' fixture and tie into a 120V circuit in art existing contactor. Liglit fixtures atop the Clarifiers slzall. be revised to 'P' ti;pefixtures witli photocells. Conduit and conductors shall be routed as tioted. The 'P' typefixtures are to be mounted atop the Clarifier work platform so tl1at tliey hinge to the walkway jQr liglit fixture access. Position of t!ie poles on tlte platform sliall be .on tlie walkway centerline, and at tlie far en .d of tlze work platform opposite tTie walkway. The pole win be 1iwun.ted on aJabncated angle bracket welded to tlte platform framework outsiile the guardrail perimeter. Confirmation ofadditio11al framework loading with the Clarifier mfr (WesTec/1) will be 1·eq"itired prior to proceeding. J-Box-,A and Pull Box A (PB-A) (lre not tlze same.fixture. J-BQ;1:-A is intended only for the 120V circuits see adjacent box in Detail A shorunmz EB-5. All 480V circuits pawering the C!arifiers and associated controls as sho.wn EC-1 s7ml1 be routed via PB- Requosl IO< Clart icahon • FINAL REV-1.doc May 10, 2010 Page3 A as shown 011 EC-1. The conduit shown 011 EC-1 exiting PB~A to the North is not required and is not intended to serve nny equip111e1it . 4. Sheet EB-2: Conduits in Ductbank 'L' to the east side of the Flocculation Basins includes 3" dia conduits for the multi-conductor cables. The cables include excess conductors that wm not be needed and FSG must termina;te. Additionally, the 3" conduits are to transition to 1" conduits in the slab. No means to accomplish this is shown. Note 2 calls out for spare conduits to be stubbed out into a J-Box ~ this is not shown anywhere; Refer to response for RFI-111. 5; Sheet EB-9: Schematic.No. 2 indicates that a photocell and a timer are to be_installed for operation ofthe lighting. Advise how this ·will operate and clarify schematic. 'I11e Tork lighting control tlzatis listed s7wuld be revised toflre Tork 'DGLC' model to provide the in tended Junction slwwi1.in Schematic 2/ EB-9. Should the lighting fixtur~ shown for instiillation atop the Clarifier mechanisms be wired to this contactor? See Item No.10 below. Refer to Item No. 3 above. The lights shall nm off of the supplied photoceli mid shall be directly wired to ·tlre refererice panel. 6. Sheet EB-15: The FOCthat is identified as 'FO-RIO-OZA' is shown to route from the Chemical/Ozone Building to the Contact Basin via the chemical Pipe Chase an.d multiple termination boxes a.re shown/noted to be installed within the Chase. Refer to EE-6 also. Sheet E.D-35 shows a blocl< diagram that identifies this FOC as FOC-3 c1nd it is identified for routing via Ductbank 'M' along the westside of the Administration Bldg that enters the Filter Gallery Area. Refer to sheet ls3 for fiber requirements. FSC requests clarification if these are the same fiber run shown to be hJrnished and .installed via two routings. FSG proposes that the fiber and boxes shown 0.n EB-15 and EE-6 be deleted and the fiber routed per the ductbank and within theTunnel B cable tray system/conduit to FOPP-RlO-OZ. Fiber FO-RIO-OZA is a duplicnte inst4llation of FOC:-3, therefore, the fiber, (FO- RIO-OZA), (2) 2;'cxmduits, and FR1> and alu111i11.um pttll/ju11ctio11 !,oxes shown 011 Si1eets EE-6 nnd EB-15 shall be deleted. Coutmctor s7mll 111aintai11 pull box(es) nt the Ozone/C7zemical Building as r~quired for installation. T/1e required FOC is shown as FOC-3 1md shall be furnished nnd installed as slumm via Ductbm1k Mand the cable tray system within Tunnel B to tl1e Ozone Contact Basin area ; Note{ the cable tray systems .shown 011 EB-15 and ED-40 must be co11tin1,ous for iiistallation of all power, Request fa Clenfioalion -FINM. REV-I .~ May10, 2010 Page4 i,zstm rnentatioll, nl!d fiber cables from Tumid B to tl1e Ozone Contact Basi,z gallenJ area. 7. Sheet EB-16: The conduits for the Destruct units are shown to be surface mounted and routed to enter the Gallery directly below at the east end of the gallery. FSG proposes that the conduits be installed in the slab and enter the Gallery from directly above and drop into the cable tray, similar to . other installations atop the Basin. T/ze referenced conduits slzall pe routed in the middle third of the slab i11 accordance with Detail G/SZ-3, the minimum conduit spacing from center-to 0 center shall be 3-in. 8. Sheet EC-1: The mutli-conductor cables assigned to each sedimentation 'basin c!arifiers appear to bein excess of what is required. See Items No. 3 and No. 4 ·above also. FSG has inquired as to what they are to do w:ith the additional conductors that will not be used. Refer to :tespo11se for RFI-1 H. 9. Sheet EC-3: The riser diagram for the valve actuator shows 2" dia conduits routed to the valve. actuator for powel" and controls. Valve actuators will only accept 3/ 4'' conduits and that should be all that is required for the .conductors. Also, the concrete pad shown is in conflict with the Chemical Pipe Chase thatis to be routed around that area. FSG proposes wall-mounting of disconnects and related panels and deletion of the concrete pad. · To avoid conflict with the Ozone Pipe Trench shmv11 on C~6, the concrete pad s/wwn in Plan and Detail A/ EC-3 and Ductbmtk N slinll be deleted. Relocate controls and disconnec:ts for valves SB ~SL-PV-001, 002, and 003 nnd LSH-13255 for wall mounting adjacent to the respective valves. Field coordinate mounting location witl1 Constrnction Manager and City Personnel prior to pe1formi11g work. Route the conductors ns shown in Diagrani 1/ EC-3 urith 2" conduit from t7ie cable tray to the wireway(s). From the wirewa.y ta tlre devices, 3/4" conduit slmll be %,!sed. If . conduits are installed to se,:ve only one actuntol' without a wiretvay; 3/4(' cn11 be in.s"tdlled from tlte table tray. 10. Sheet EE-2 & EE-7: Security riser diagram for the Chemical/Ozone Building is not shown on these sheets; only a reference to CP-24. In comparison.the Electrical Building shows. a riser diagram for the security system. Requesi !O( C1"nr,cat,on. FINALREV-i .d.co .. May 10,2010 Pages A related question regarding requirement for an exterior push-button with key is specified to be provided. CDM needs to verify if the City Wants this external push-. . button. As noted in tile origintil question, Sheet EE~l identifies tfze Cardkey SecurihJ Coritrol Systei11 as being referenced 01t Sheet CP-24 and powered by the UPS Panel UL-OZ . Ot11er sheets note a cross"'.reference for insfallation of security conduft, wire, and devices shown on the related 'CP' sheets -CP-22,· CP-23 and CP-25 -nt other facilities. On tl1ese sheets, the conduit, wire, and devicerequirements assodated with security features of the Ozone/Chemical Buz1c!ing are also shown. 11. Lighting atop the Sedimentation Basin walkways is shown to be installed on a concrete corbel (structural detail) that is lower than the top cjeck of the structure. This creates conduit routing issues as the conduit will be in the top slab of concrete. It would be difficult if not impossible to route the conduit into. the pole base via the corbel. Proposed resolution isto delete the corbels and form a notch-out in the top deck thru~ bolt the anchors to a steel plate on the underside of the concrete deck. f.ight poles sllallbe installed in the locations shown. It is f!ll~ssefl iJiat the C{Ji1traetsy s!e11rl tire f@J' sl,ab BOJ'err tha eerl;el; f:fo1;•1z 11sie/.1 suts) te .1110teh t/18 relfltire.4 9ltfsr: dit11e11sis11s of #1e esrlieki, Pl'twide ROB (2~ #6 1J s~.lmrs that enei¥ele-tl1e f!neJisJ<fi8e p!!Oam uf #1e light rsltis t11t" splilHI n:ifh U1s wilt1ffva!f tsp :tr1ti listtsm ,nat reinforeement l,ll nne.tis,:lfga S:liall he llimd Bif J<effllir<eti eml,cdment R€fH+ZBBlely · "Hlit.'iiJI .the esrbe/6 mt emlmlme,tt erre1lit slu,11 be t<i.~enf-0r #he t911 sl-as tliiehr1ess . . Anel1sl"B' slofll!l 11e lsJ1gi11e1rnd seesriii1ig!y, ·cssrdinate light rsls srie11mtiim s@ tlffll hi11g,s 1foseeJis11 i, :p,wnilel is t!tS u1Al,'Ru!f8. Corl,el height shall lie raised by 10-in fo match the top of the walkway ns i.T1ow11 in the at.tached figcm:. Mod{jicat/011 of the Corl,cl n•injorcemc:nt is 11otreq11 ired. 01zly tlu: (2) #:3 U~slmped liars slur/11,c addc:,i to encircle t/11: nnchomge pattt!rn of tire light poles and splice with the walkway top t111d z,ottom mat reiltfardng steel.. Anclzor /lo/ts $linll /1,: as ~uppUed by t11e nw11ufncturer . Coordinate liglzt 1,ole orie-11 tnticm so tTtnt lli11gc: direction is pamlld to the walkways. 12. Sheet EE-6: TI1e heat trace for the chilled water pipe is shown as 120Vand the chilled watei.: pipe goes froin the Chemical/Ozone Building to the Chiller J1orth of the 8rea:k Tank. FSG indicated that this di.stance may be exi::essively long for the 120V system. Based on toads mid circuit size, the l1eat trnce distance is within .limrts based Oil tape installation per Section 16859. R~est.lor ClanficaUon • Ftwil, Rl;Y·1 doc May 10,2010 Page6 13. Sheet EE-8: P1 light fixtures are called-out on the drawing. These are.480V. The circuits referred to are 120V. FSG proposes revision fo 'P' type fixtures which are 120V. The reference lighting shall be revised from type 'P1 'fixtures to type 'P'. 14. Sheet EE-14: Detail A shows the heat trace control panel to have a separate conductor for the thermostat and the heat tape segment(s). Per Schematics Nol and No 2,the thermostat is actually installed on the same conductor as the heat tape . FSG proposes deletion of the conduit and wit'e associated with the Schematics and installations. Hea.t trace is specified to be provided with a11 ambient .sensing tllermostatfor co1itrol af i11dividualor 11111/tiple circuits (C/remelex AMC 1A). As slwwn in Detail A, tlzermostnt slmll be installed separate from the tape. Please forward these comments, and as needed, discuss applicable responses and all associated modifications with the Contractor. cc: 0-u'is Harder: (FWWD) TimA!len (FWWD) V.K. Gupta (GAI) Tim Mueck (GAI) Cong Nguyen (COM) Danny Shannon (COM) Ernie Clement (COM) j ohn Mischkot OQ) Chris Story GQ) Sagar Khole (COM) Larry Reynolds (CDM) Josh Trice (B&V) File: GS-9.05 Roques! lorCtanllaUori -FINAL REV-I .doe JA STER.-QUINTANiLLA DALLAS, LLP F.NGINEI!RS SURVEYORS i !. i ' i ' --·l · PROJECT LJ f 5"'1 S (~ b.rrP JOB NO. 3?(;o / t.{ 7''2... SHEET ___ OF· __ _ DESIGNER _ _c.~;c;__;_....;M___,_ __ OATE~S:=-+/_7....._,/--'-1~0~- I f ; ;:.,·' • •·. ' ; ·.·! : , -, r..1 . ; . :. ,- ' . : . ~ , j i" ,, : ; i ·i ' ·-·· .. --~··-:-· ~: .... v-• ·-... ~-t ... ,j.. ! .; .... : .i Page 1 of 1 Harder, Christopher from: Bartruff, Chad [BartruffCD@cdm.com] Sent: Wednesday, September 15, 2010 6:35 PM To: Harder, Christopher; Boss, John F.; Trice, Josh R Cc: Shannon,J.Danny Subject: RE : CPR-17 and CPR-21 -Westside WTP Project Chris, The J-Box is to be installed at the south wall of the Flocculation Basins following EMH-5. It will provide a means for termination of spare conductors (termination strip required) and transition from ductbank into the Flocculation Basin slab conduits. Originally, it was priced out as a SST box, but it was to be revised to aluminum. Thanks, Chad D. Bartruff, P .E. COM (TX #F-3043) I 777 Taylor Street, Suite 1050 I Fort Worth, TX 76102 Ph: (817) 332-8727 I Fx: (817) 332-6870 I www.cdm .com ,Jj Please consider the environment before printing this email . From: Harder, Christopher [mailto:Christopher.Harder@fortworthgov.org] Sent: Wednesday, September 15, 2010 9:03 AM To: 'Boss, John F.'; 'Trice, Josh R' Cc: Shannon, J. Danny; Bartruff, Chad Subject: CPR-17 and CPR-21 -Westside WfP Project Hi John: Attached is the approval letter for CPR-17 -electrical building plumbing modifications. I'll drop off the original to you some time this week. Regarding CPR -21, can you give me some idea of where this new 36" x 36" NEMA 4X J-Box is being installed, that FSG has priced out. Thanks, Chris Harder, P.E. Engineering Manager Fort Worth Water Department 151111th Avenue Fort Worth, TX 76102 817-392-8293 9/24/2010 Westside WTP Project# 002012 12200 Old Weatherford Rd Fort Worth, TX 76108 Submitted To Black & Veatch International John Boss 100 E 15th St. Suite 600 Fort Worth, TX 76102 Subject: Ozone Basin Conduits Dlsclpllne: Category: Reason: Question Request For Information PROJ RFI #: 0111-0 Date Created: 04/06/2010 Priority: Normal Tel: 817-560-3740 Fax: 817-560-3727 Answer Required By: 04/13/2010 Submitted By McCarthy Building Companies, Inc. John Frazier 12200 Old Weatherford Rd Fort Worth, TX 76108 Initiated By: FSG -Jerry Bevers Ref RFI: The conduits for the Ozone Basin are shown on drawing E-7, Section L. The conduit numbers listed in Section L on Drawing E-9 are 95 thru 114. Drawing EB-6 list these conduits as 1" and 2". The wire and conduit schedule on drawing E-18, list these conduit sizes as 3". The cables that are required per the wire and conduit schedule cannot be installed in a 1" conduit because the 1" conduit is not large enough to accomodate the cables per the wire and conduit schedule. The concrete slab for the Ozone Basin is 10" deep, so you cannot install 3" conduit in this slab (90 degree bends). The conduits will have to be installed above grade into the Ozone Basin slab and there are no provisions shown on the drawings to transition from underground to above ground. Suggestion A termination box could be installed so that you could install 3" conduit in the underground ductbank and 1" conduit in the slab. We would have to terminate the multi-conductor cables in the termination box and install required single conductor wiring in the 1" conduit installed in slab. Please advise. Answer Date Answered: Refer to the attached description from GAi regarding modification of multi-conductor cables and conduits for the referenced ductbank conduits. In conjunction with the reduction in number of conductors and size of conduits, a termination cabinet shall be provided in accordance with Division 16, similar to FSG's suggestion above. Architect/Engineer Signature By: Chad Bartruff, P.E. Consultant: _c&:l~ Date: __ 4-_21_.2_0_10 ___ _ Priri!ed On: 4/6/2010 Page 1 or 1 GAi Gupta & Associates, Inc. To: COi1Sl.frl;J engneeri1g 13626Gmna Rooo, Dallas, Texas 752440 Tel:97.24~7661 Fax:97.2-4~7125 Chad Bartruff Shop Drawing Review From: Timothy J. Mueck Fax: Pages: 1 Phone: 1-817-332-8727 Date: 04-23-10 Re: GAi 627R C of FW Westside WTP CC: Submittal No. Comments: RFl-111 "Ozone Basin Conduits" Revised Proceed per Comments The contractor proposed solution of using 1 • conduits for individual circuits in the slab, combining the circuits in boxes, and continuing in manholes with larger conduits Is acceptable. After reviewing the circuits, the number of spare control wires can be reduced as follows: • Refer to drawing E-18: Circuits MCFLTA-2, 5, 6, 7, 8, 9, 10 and MCFLTB-2, 4, 5, 6, 7, 8, 9 require 12 control wires each; the spare wires will be reduced from 7 to 4. Twelve wire and 4 wire multiconductor cables can be used for each circuit The conduit size will change from 3" to 2". • Refer to drawing EB-6: Change conduits 95 -110 from 1" to 2" During the circuit review, some errors were found. Revise as follows: • Refer to drawing E-18: Circuits MCFLTA-3, 4 and MCFL TB-3 require 18 control wires . The spares will be increased from 1 to 4. Nineteen wire and 3 wire multiconductor cables can be used for each circuit. • Refer to drawing EB-2: On the Plan change circuit to 10-3 to MCFLTA-5, 10-5 to MCFLTA-6, 1D-9to MCFLTA-8, 10-11 to MCFLTA-9, and 1D-13to MCFLTA-10 . August 12, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-23, Manhole Modifications Dear Mr. Boss: CPR-23 consists of modifications to manholes in order to improve accessibility. In order to reduce the depth of the wash water return line manhole, it will be relocated, thus reducing about 20 vertical feet of manhole riser. In order to improve access, manhole steps will be added to three manholes. In order to prevent injuries, these three manholes will have the access lids changed to ductile iron from cast iron, making them much lighter and easier to open. The contractor has provided a price proposal that credits the city for less material for the reduced depth of the wash water return manhole, while including additional costs for the manhole steps, as well as the piping modifications resulting from the relocation of the wash water return manhole. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. Total cost for the proposed change amounts to $7,365.00 with no additional time requested . This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P .E., CDM Project File WATER DEPARTMENT PRODUCTION DNISION THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102 - (817) 871-8258 * FAX (817) 871-8410 0 Prlnled on recycled paper ~ BLACK & VEATCH ~ Building a world of difference: July 26, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 ATTN: Mr. Chris Harder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No. P262-607S40045683 CPR#23 Transmitted herewith please find three copies of McCarthy's change proposal request for tbe referenced extra work. Black & Veatch has recommended the total change order amount of $7,365.00 be approved. Please review the request, and if it is acceptable, have it executed. Jt1ly 19, 2010 WESTSIDE WATER TRfATMENT PWrr 12200 OI.O WEATHERFORD ROAD FORT WORlli. TEXAS 76108 www.mccarthy.com MAILING ADDRESS : P.O . BOX 122419 FORT WORTH. TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 560·3727 Black & Veatch Corporation 12200 Old Weatherford Road Fo1t Worth, Texas 76108 Attn: Mr. John Boss Re: Change Proposal Request #23 Westside Water Treatment Plant P262-607540045683 Mr. Boss, Please find attached CPR #23 pricing for changes made to the project due to the field directive memo fromCDM dated 5/28/2010 concerning Manhole Revisions. As you are aware, the Memo from CDM changed trie location and depth of the manhole for valve PLT-RWGA-003 on the 18" WR line. As McCarthy had already procured the pipe material for the entire line, it was necessary to prom.ire additional material in order to facilitate the new location of the valve and manhole. ln addition to the valve relocation, post installed manhole Steps were requested to be installed in manholes PLT-RWGA-001, PLT-RWGA-002, and the Raw Water Inspection manhole. Per the project plans, DRMH#9 is currently the only manhole on the project that is supposed to receive steps to facilitate entry. Additionally, per our mate1ial supplier, the change from cast iron to ductile iron lids will be done at no cost to the project. Please do not hesitate to contact me with any questions or concerns. Sincerely, razier Project Manager McCarthy Buitding Companies, lnc. CC: Steve Gotschall -Project Director Jerry Mayer -Project Director File ENC: CPR #23 Pricing COM Memo dated 5/28/2010 Change Proposal Request CPR#0023 Project Name: Westside Water Treatment Plant Project No. : 002012 .000 Date: 07/19/2010 Atchitect's Project No.: Cost Issue Ref#: 47 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein . This document, when fully executed , as accepted, shall consiltute authorization to proceed with the work described herein. Due to schedule impact, this . work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies, Inc. will oe reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. DESCRIPTION OF THE PROPOSED CHANGE: Gate Valve Manhole Modifications SCOPE: As submitted, PD-03260-04 included manholes for the gate valve, air valve, inspection access, sample, and Injection station installations. The manholes as shown on the related detalls are noted to have cast Iron lids of specific sizes and shapes. In lieu of the cast iron lids shown, it is proposed that the lids be revised to 30-in inside-clear, ductile iron of the City of Fort Worth standard type. For the manholes with non-tapered barrel configuration and flat-top, the manhole lid shall be positioned off-center providing an eccentric entrance to the manhole. 'To facilitate access into specific manholes , It 1s proposed that post-installed manhole steps be furnished. The manhole steps shall comply with ASTM C478 and be of a steel .(1 /2" min . . dia , Grade 60 -. ASTM A615)/copolymer polypropylene '(non-corrosive in sewer.environments -ASTM D4101) construction with mechanical anchorage. In addition to those manholes shown on the plans, steps shall be provided for PLT-RW-GA-001 , PL T- RWGA-002, and the RawWater Inspection Ma'nhole , Construction Manager'shall field coordinate pos\tioning of the manhole access and steps with City personnel. Due to the resulting depth (approx 224t) ofthe ·Valve manhole associated with PL T-RWGA-003 at the location of installation shown ori C-15, it Is proposed that this valve and manhole be relocated . Specifically, it is proposed thafthe valve installatron be relocated to Station 7+12.00 as shown in attached Figure·.C25A-B. REFERENCE: CDM Memo Dated 5/28/2010 Pricing Details Company Name Tri Dal Utilities Ltd McCarthy Building Companies, Inc. Description moving of Gate Valve Manhole Manhole revisions near RWMV Subcontractor Bond General Liability Builders Risk Project Bond CO Fee (Sub Work) CO Fee (McCarthy Work) Net Amount of This Proposed Change NetChange in Calendar Days Due to This Proposed Change Schedule impact to be evaluated at.a ·later date. Printed On: 07/19/2010 02 :23 :42 PM Page:: Amount 4,855.00 1,586.00 5.3 .00 58.00 23.00 66 .00 486.00 238 .00 7,365 .00 1 of 2 McCarthy Building Companies, Inc. Project Name: Westside Water Treatment Plant Project No . : 002012 .000 McCarthy Building Companies, Inc. Accept Do Not Accept BY: _ Date : Change Proposal Request CPR#·0023 Date : 07/19/2010 Architect's Prpject No.: Cost Issue Ref# : 47 City of Fort Worth Waler Department Accept Do Not Accept BY : Date: Printed On: 07/19/2010 02 :23:42 PM Page : 2 of 2 McCARTHY Joi>; Dato: Wests~WTP 07/06110 thun r 0<1crfpllc• Delete ·..ie--~sect.ons Add 48"1lll!nl"ldes«I.IOn · 18'" x 2'1'" FL a:.PE spool ?«e ur lll 9"..e"'R.x PE spoo1ptect: 18" SST BN&G lil 1n0a1mi.ilaoonotMarl>oloS-@JM""""'es t..\anl1Qleslei,5 ~l·y UOM ~.00 VF 850 VF 100 •• 100 ea 100 ea 100 lS 39 .. .1!'!11 Uolt Man Haun. Unlsl M~ t-TolJII MH . ~.00 ·t!l·-0~ 0.00 000 000 0.00 o.oo· oool 000 000 0.00 000 000 o.cx( ODO ooci 0.00 o:oo 0.00 li,.<ii 0.00 0,00 0~ 0.00 0~ 000. 0.00 000 JTolal -~--dOO! utr I ~~r'!e !~; ,~':';. l.A80II eVRrifl'i : . i.s.oo'I. CONSU!~f ~-c: SMAUTOOI.S: 3.00% . . ·1~·· B75'1\ i I -$ $ s $ s s Ueno.ized Pncing Duc.rtplton. CPR t, 23 Manhole R.ovfs.lons UnU Costa TotolCos<s Mlrt Eq•lp Lobor Ml~ Eci."!P --s i" ___ s ~00 . --··-(1.300): ···------e.oo '23 420.60 •21 1.Q5987 1.oeo: 480711 .a~. s •. "'5.00 10CO 390 ·-I-· OF $ S Of s s OF $ S ~ s SU810TAL I s 1·s -,;,74o !;i H Ii I OF S S 1,474 02 e PBi"HOUli . SYb ·s· s s s s s $ s s s s ,.s,s Is s ~ $ s s $ s } $ s $ s s s $ s ·s s s 4.80500 US UM T~I !1.300) 423 -.21 1,080 •e1 ·-3llll lfd29 IOl OF S <iF s . s s ~ s . I I ,ai,eTF 11--I' •''*'· . s $ ~ : • ...... ~.~~f .•. -'! .:.. ~ . -~ . a2,1s Is •. a5~.ro1, ·····I . <>. GC Sct,s. i.l1sc rTiii s ~ --------l I" _,_t,I; r-·'85:50 i = . • . . • .. ··--• •• _ •. 16 • I s 5.340.50 I . t.1115 I 5~~: ~= ls ·]$ , ... 1. .,..,< Bt.ildor5Rlii<" ···o.3100% $ . -~Bond~-o.i1oe11 -S 1 s ·---r. -····· . . . S 1.8&1.25 $ S MOJ07 S I,~ -TOTAL $ 7,365 Project Name : Westside Water Treatment Plant Project No: 002012:000 To; Tri Dal Utilities Ltd Date Quote Due:06/30/2010 Request for Proposal Dale : 06/23/2010 Architect's Project No: Cost Issue Ref# 47 CPR No 0023 Please submit an itemized quotation for changes In your subcontract sum and/or time on subject project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. DESCRIPTION OF 'PROPOSED CHANGE: moving of Gate Valve Manhole SCOPE: As subm1tted, Pb-03260-04 Included manholes for the gate valve, air valve; !hspectioh access; sample, and -frijection staUon installations; The manholes as shown on tbe ;related -. details are no.ted ·to hc,!ve cast iron lids of specific sizes and shapes. In lieu ofthe cast iron lids shown, it is proposed that the , lids be revised to 30,in inside-,clear, ductile iron of the City of Fort Worth standard type. For the manholes with non-tapered barrel configuration ana flaHop, the manhole lid shall be positioned off-center providing an eccentric entrance to the manhole. To facilitate access Into specific manholes, ft is proposed that post-installed manhole steps be furnished. The manhole steps shall comply with ASTM C4 78 and be of a steel {1 /2a€• min dia, Grade 60 • ASTM A615)/copolymer polypropylene (non,corrosive In sewer environments a€' ASTM 04101) construction with mechanical anchorage. In addition to those manholes shown on the plans, steps. shall be provided for PLT-RW-GA-001, PLT- RWGA-002, and the Raw Water Inspection Manhole. Construction Manager shall field coordinate . positioning of the manhole access and steps with City personnel. · · · Due to the resulting depth(a.pprox 22-ft) of the valve inanhole associated with PLT,RWGA:-003at the location oflnstailation shown on C-1?, it is proposed that this valve and manhole be relocated. Specifically, it is proposed that the valve Installation be relocated to Station 7+12.00 as shown 1n .attached ·Fig\Jre C25A-B. · REFERE~CE: Net amount of This Propose·d Change: {ADD)(DEDUCT){NO CHANGE} $ __ _.$.__4...._1--'8"'"54--'-=.5-=0'-------- Net change in Calendar days of this Proposed Change: (ADD)(DEDUCT)(NO CHANGE) 6 Days • Attach Detailed Cost Breakdown 1 Steps , M~terial ~lot Include:: Un~ CO$\ 1tem Cost 39 Each 60.i!J 2.372 .-50 Maten;;t Labor Eq;it 5 63 JS.DO 17 .Qo 2 .Confined Spaea Entry 3 Eac~ 602.00 __ 1'"".6""0""'6.""00 _________ -==;;.. 4,17S 50 22D.OO 3S2-.00 21.7 50 2,142.CO 1,80t00 Coald lib: Snd any refo1ence to step alignment ,n 'FIN Sp2es ·so I.figured tnenfto be cenLe<'?d 12'ci.c vert:caUy, wnt; no ~1agonal offsat. itamng 2' from bo\ton, a!\d 'Z ft9m top SaTesTax , :·eo11d -12 .00 0 & ~; lS%· 63.1. 00 Total 11\!s Propoul S 4,6!'.J .50 Tri Dal Utilities· ltd Average unit pr:ce per step. ,1 more quimttly are required S 12-447 By: McCarthy Building Companies, Inc. (Prior to ArchitecVOwner review) __ Recommend .Acceptance __ Do Not Recommend Acceptance __ No Recommendation -Price Marginal By: Date: bate: ___ 7-2-:10 McCarthy Building Companies; Inc. (After Architect/Owner review) __ Accept __ Do Not Accept By: Date: Printed on: 06/23/201 O 01 :30:19 PM Page: 1 . Pepprng, Nick From: Sent: To: Subject: Nick, .Robert.Parris@Ferguson.com Friday, July 02, 2010 4 :26 PM Pepping, Nick Quote --Spools for Westside Here is the pricing on · the spools you requested . Please let me know if you have any questions. Th.anks, Robert· Parris Plant Sales Ferguson, a Wolseley company, 8007 NE Loop 410,. San Antonio, TX, 78219, USA T: (210) 662 4902 C : (972) 670 5500 F : {210) 662 4825 E: robert.parris@ferquson.com www.ferguson .com Bid No ....... : BIS9391 Bid Date ... : 07/02/10 Quoted By:. RCP Price Quotation# 8159391 Ferguson Waterworks #788 2650 S Pipeline Road Euless, TX76040 Phone: 817-267-3900 Fllx: 817-267-3912 Cust Phone: Terll'lS ......... : 972-991-5500 NET 101:}l. PROX Customer.: MCCARTHY BlJILDING C01"IPANIES WESTSIPE WATER TREATMENT PO BOX 122419 Ship To ....... : MCCARTIJ:Y .BUILDING COMPANIES WESTSIDE WATER TREATMENT FORT WORTH, TX 76121 Cust PO# .. : SPOOL PC PRICING Item SP -DI 80906FECP D 180206FECP FBSSl6SJ8 Description 18 X 9'·6 FXPE DIP C/LS/P 18 X 2'-6 FLGXPE DIP CL SP 18 SS 316 FLG BOLT SET PO BOX 122419 FORT WORTH, TX 76121 Job Name.:· WESTSIDE WATER TREATMENT Quantity .2. Net Toto I: Tax: Total: Net ·Pricc UM Tota.I 1059.870 EA 420.860 ~A 480.790 EA 2382 .38 0.00 2382.38 1059.87 841.72 -180.79 Quoted prices are based upon receipt of the total quantity for Immediate shipment (48 hours). Sffn>MENTS BEYOND 48 HOU.RS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS N'OT'ED OTHERWlSE. Seller not • responsible foT delays, lack of product or Increase of pricing due to causes beyond our control, ancl/or based ·upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's accepta:nce or Sel,ler's terms and !=O~ditions, WQich are incorporate~ .by ref~rertce and found either following this document, or on the web at http://wolsclevna.com/ter.ms conditlonsSale.html. Govt Buyers: All items quoted are Qpen market unless noted otherwise. Pepp i ng, Nick ·From: Sent: To: Marty Anderson [manderson@theturnerco,com] Wednesday, June 23, 201 o 1 :51 PM · Pepping ; Nick Subject: Re : Manhole Steps $.1 O ea for the steps only. ----Original Message ----- From: Pepping . Nick To: Marty Anderson Sent: Wednesday, June 23. 201 D 1 :42 PM Subject: RE: Manhole Steps Marty, What is the cost each on these? Nick Pepping Project Engineer McCarthy Bu il ding Companies Westside WTP 12200 Old Weatherford Rd . Fort Wort h , TX 76108 PO Box 122419 (602) 980-7327 npepping@mccarthy.com Leaving Green Footprints . Think before you print From: Marty Anderson [ma ilto:manderson@thetumerco.com] Sent: Wednesday, June :23, 2010 1:21 ·Pfvl · To: Pepping, Nick Subject: R.e: Manhole Steps Here is submittal fnfo on the steps we carry . If you waritto sut;>m itttiese. Thanks, Marty ----Original Message----- From : Pepping. Nick To: Marty Anderson Cc: Eddie Bray Sent: Wednesday, June 23 , 2010 8:07 AM Subject: Manhole Steps Marty, Due to a recent change in the GV manhole for our 18" they are requesting we add steps to the GV manholes. Below is an excerpt from the CDM Memo. "To facilitate access into specific manholes, it is proposed that post-installed manhole steps be furn ished . The manhole steps shall comply with ASTM C478 and be of a steel {l/2" min dia, Grade 60 -ASTM A615)/copolymer polypropylene (non-corrosive in sewer environments -ASTM D4 l O 1) construction with mechani cal anchorage . In addition to 1 those-manholes shown on the plans, steps shall be provided for PLT-RW-GA-001, PLT-RWGA- 002, and the Raw Water Inspection Manhole. Construi;:tion Manager shall field • coordinate positioning of the manhole access and steps With City personnel." Please provide pricing per vertical foot for ~he steps ; Any questions please let me know. Thank you, Nick Pepping Project Engineer McCarthy Building Companies Westside WTP 12200 Old Weatherford Rd . Fort Worth, TX 76108 PO Box 122419 (602) 980-7327 npepplng@mccarthy.com Leaving Green Footprints . Think before you print *** This e1ectronic mail message, including attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any unauthorized use, review, disclosure, distribution, or actions taken in reliance. on the contents of this information, is prohibited. If you received this e-mail in error and are not the intended recipient, please notify me immediately by telephone or reply e-mail and destroy all copies of the original message. *"'* *** This electron'ic mail message, including attachment$, is intended orily for the ·person or entity to which it is addressed :and may contain confidential and/or privileged material. Ariy unauthorized ~e •. review, disclosure, distribution, or actions taken in .reliance on the contents -of this infonnation; is prohibited. If you-received this e-mail irt error and are not the intended recipient, please notify me immediately by telephone or reply e-mail and .destroy all copies of the original message. *** .2 ML-10-NCR r . :;!: .... C7l 14----------------12" ---------------.i 10 3/4' ML-10-NCR Mechanical lock Installation Mcthuds Minimum Concrete Strength Must Be .WOO psi. Preformed Holes Twn preformed holes on 10•· centers Holc5 must be pnrl)llcl Diameter .of holes .arc I. I'' tapering to 7/8" in 3 •,," of depth Drilled Holes Drill two 1 ·• hole s on IO" centers with a minimum depth of 3 3/4" U~c I" masonry bit for drilling . Holes must be parallel. Drive step wilh slcdg~ hammer until both legs .in.: completely seated This srep mec·ts ur e.n-el!ds ASTM C 47S and OSHA Srmrdcml,· whM tlr;iperly in.wuU<!d. YzinchASTMA615 Grade 60 steel .Reinforcement American Step Company, Inc. P.O. Box 137 830 East Broadway Griffin, GA 30224-0137 800-988-STEP 770-467-9844 (OFFICE) 770-467-80 I I (FAX) Pepping, Nick From: Sent: To: Subject: Nick, Robert.Parris@Ferguso.n .com Monday, July 19, 2010 12:06 PM Pepping , Nick Westside WTP --Ring & Cover Regarding your question about the cost difference between the ring & cover assembly with the cast iron lid versus the ductile iron lid, there is no price change to McCarthy. Please contact me with any questions. Thanks, Robert Parris Plant Sales Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA T : (210) 662 4902 G: (972) 670 5500 F : (210) 662 4825 E: robert.parris@ferquson .com www Jerguson.com Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartfuff (TX PE#~1688) {)$ COM (F-3043) May 28, 2010 Subject: Westside WTP Project PD-03260-04 -Valve, Inspection, arid Injection Manholes As submitted, PD-03260--04 included manholes for the gate valve, air valve, inspection access, sample, and injection stationinstallations. The manholes as shown on the related details are noted to have casl iroh lids of specific sizes and shapes. In lieu ofthe cast iton lids shown, it is proposed that thelids·be revised to .3Q-in inside-clear, ductile iron of the City of Fort Worth standard type. For the manholes with· non--tapered barrel configuration and flat-top~ the manhole lid shall be positioned off-center-providing an eccentric entrance to the manhole. To facilitate access into specific manholes, it is proposed that post-installed manhole steps be furnished. The manhole steps shall comply with ASTM C478 and be of a steel (1/2." min dia, Grade 60 -ASTM A615)/ ¢opolymerpolypropylene (non-corrosive in se.wer environments -ASTM 04101) construction with mechanical anchorage. In addition to those manholes shown on the plans, steps shall be provided for PLT-RW-GA-001, PLT-RW- GA-002, and the Raw Water Inspection Manhole. Construction M,mager shall field coordinate positioning of the manhole aq:ess and steps with City personnel. Due to the resulting depth (approx 22-ft) ,of the valve rnanhoJe E!SSO~iated With PLT-RW- GA~003 at the lcx:atio~ of installation shown 911 c;:.:.15, itis. proposed that this valve and manhole be relocated: Sp'ecifica Ily, it is . proposed thatthe val.ve i.nstalla,tion be relocated to Station 7+ 12.00 as shown in a~ached Figure C25AcB. Please discuss with McCarthy and advise of.any comments. cc: Chris Hardet (FWWD) J.C. Tolson (FWWD) Danny Sharu,on (COM) File: 62142 -9.04 so~o3260-04 I ~ ~ N Cl ·°' 0 .... "' === N Ill 0 !!l 0 1/). 0 1"'10 i~ 1/1 --10 () :r ~"Tl I " -id !?. N ~ ::0 ::0 z ~-I 0 '-l === ~o z~ -0 1/1 -I :c 0 I C -o· O" ~-I 0 2. vi z1"'1 N ~ -I~ Ol 0 -0 I z ::0 0 0 2 ~ l"'1 Q () ::i "' N C t .., " co z 0 SlA 7+12.00 18 VALVE IE 855 .. 98 STA 7+20.62 90 DEG HOR BEND ·VERT BEND IE 856.00 STA 7+27.62 VERT BEND IE 849 ;00 STA 8+65.62 90 DEG HOR BEND VERT BEND • IE 846.50 Ma 28, 20 10 -1 0 :57om User: bartruffcd I 1- ..Jo~ . Cl> ~:E ;o Cf) I 50 -0 Pl VALVE SEE NOTE 3 STA 7+38.62 36 PW-RCC (WS-3) IE 853.13 STA 7+53.63 30 PW-RCC (WS-4) IE 853.15 \ STA 7+77.94 Ei;.EC CONDUIT \ \ \ \ \ \ '\ August 12, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-27 -Electrical Duct Bank Backfill Revision Dear Mr. Boss: The Fort Worth Water Department instructed the Engineer to prepare a revised trench detail for on-site electrical duct banks, modifying the detail to allow sand backfill with concrete cap in lieu of reinforced concrete duct banks. The Contractor has provided the City with a credit of $7,891.00 for utilizing the revised detail to construct the remaining duct banks. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. The total credit for the proposed change amounts to $7 ,891.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P.E., CDM Project File WATER DEPARTMENT PRODUCTION DMSION THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102 (817) 871-8258 * FAX (817) 871-8410 0 Printed on recycled paper \ ~ l.f ~ BLACK & VEATCH . Building a world of difference: July 19, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 ATTN: Mr. Chris Harder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No. P262-607540045683 CPR#27 Transmitted herewith please find three copies of McCarthy's change proposal request for the referenced extra work. Black & Veatch has recommended the total change order credit amount of $7,891.00 be approved. Please review the request, and if it is acceptable, have it executed. WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com MAILING ADDRESS: P. 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560-3727 July 13, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn: Mr. John Boss Re : Change Proposal Request #27 Westside Water Treatment Plant P262-607540045683 Mr. Boss, Please find attached CPR #27 pricing for changes made to the project due to the field directive memo from CDM dated 5/15/2012 concerning changes to the reinforced concrete duct-banks. Please find attached a quote from FSG Electric to credit the project ($7,891) to use sand backfill with a concrete cap per CDM's revised detail as attached in place of reinforced concrete backfill per the original duct-bank drawings. As per previous conversations with CDM and Black & Veatch, this pricing does not include "select fill" as referenced in the attached CDM Detail. This pricing proposal utilizes on site native material for backfill which will be placed per the project specifications. Please be aware that this proposal is time sensitive, as FSG Electric is currently installing duct-bank on the project. Please do not hesitate to contact me with any questions or concerns. John Frazier Project Manager McCarthy Building Companies, Inc. CC: Steve Gotschall -Project Director Jerry Mayer -Project Director File ENC: CPR #27 Pricing FSG Electric Quote and Scope of Work CDM Memo dated 5/15/2010 •••••• 1--u11 electric Change Order Proposal 2525 Walnut HIii Lane Suite 100 Dallas. TX 75229 (214)-357-5697 (TECL# 17904) No. 126990 07/06/10 John Frazier McCarthy 12001 N. Central EXPWY., Suite 400 Dallas Texas 75243 Subject: Underground Conduit Ductbank Modification John , Date: 07/06/10 Project: Westside Water Treatment Plant Job NO.: 30J1613 Drawing No: iSpec Section:! We are pleased to offer the following Change Order Proposal for your consideration. The price includes labor, material, and equipment to install remaining ductbanks (2,900') per attached Detail A in lieu of reinforced concrete ductbanks. See attached sheets for price breakdown . This price Is based on ductbanks not installed as of this date. This credit price could change If this change order is not approved as soon as possible because we are continuing to Install ductbanks to meet contract schedule. The price to perform this work is a credit of $7,891.00. Sincerely , FSG ELECTRIC Jerry Bevers Project Manager m~· '. ·~·iiW·fWt I Jt · I t . ' ·····-ffJ 1 111y > !? f!C _11rn1 .> Pnergy • .. •• teclmology ;-s19nr; FACILITY SOUITIONS GROUP RECAP SHEET C.O. #5 DUCTBANK CHANGE RATE HOURS TOTAL LABOR-(ELECTRICAL) FOREMAN STRAIGHT TIME $30.00 $ - FOREMAN OVER TIME $45.00 $ - JOURNEYMAN STRAIGHT TIME $25.00 $ (5.00' $ (125.00 JOURNEYMAN OVER TIME $34.50 HELPER STRAIGHT TIME $17.00 (6.00) $ (102 .00 HELPER OVER TIME $25.50 $ - $ - $ - $ - LABOR TOTAL-$ (227.00 MATERIAL TOTAL $ (8,650.00 EXPENDABLES-6% OF MAT. $ (519.00 TAMPER $ 600.00 BOBCAT-ADDITIONAL TIME· $ 1,000.00 TO MOVE SAND BURDENS· (42% OF LABOR) $ {95.34) SUBTOTAL· $ (7,891.34) $ - TOTAL-$ (7,891.00 •u-•••• ·····-lighting> electrical> energy • •••s1 technology> s1g11 s FACII.ITY SOLUTIONS GROUI' C.0.#5 PRICING SHEET IDESC. IQUAN. IMAI UNII IMAI t:AI. !......lla!::!~'": UNll !.....".::::'..!"( ~Al, DELETE RED CONCRETE-[YDS 296 $ {75.00) $ (22,200.00) (1 .00) (296.00' DELETE #4 REBAR-(LF) 20,000 $ (0.35' $ (7,000.00) (0.010) (200.00' $ -0.00 $ -0 .00 $ -0 .00 $ -0.00 $ -0.00 ADD SAND-(YDS) 350 $ 18 .00 $ 6,300.00 0 .30 105.00 ~DD 3 " RED CONCRETE CAP 190 $ 75.00 $ 14,250.00 2.00 380.00 .;, $ -0 .00 f'Z,io\) L-.-){ 1') { '3Ad ::: 80 l , $ 0.00 1 --• $ -0.00 $ -0.00 $ -0.00 $ -0 .00 $ -0.00 $ -0 .00 $ -0 .00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0.00 $ -0 .00 $ -0.00 $ -0 .00 $ -0 .00 $ -0 .00 $ -0 .00 $ -0.00 $ -0.00 $ . 0.00 $ -0.00 $ -0 .00 TOTAL-$ (8,650 .00 (11.00' CDM Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff (TX PE #91688) />I. CDM (F-3043) LIV May 15, 2010 Subject: Westside WTP Project Underground Conduit Ductbank Modification Detail 1/EZ-3 illustrates the original contract requirements for installation of reinforced concrete encased ductbank for the Westside WTP. Modifications to this Detail were provided as part of RFI-088. Consideration is being given to further modification of the ductbank installation based on revised City installation requirements. In lieu of the reinforced concrete ductbank shown in Detail 1, installation of the ductbank with sand backfill and a concrete cap is proposed as shown in the attached Detail A. It is understood that FSG has pre-purchased some steel reinforcement for installation of Detail 1 type ductbank. It is proposed that the on-site and pre-purchased materials be used until exhausted for installation of ductbank as per Detail 1. Once those materials are used, the remaining ductbank shall be installed per Detail A. It is requested that a price proposal for this modification be developed for consideration. cc: Chris Harder (FWWD) Tim Allen (FWWD) V.K Gupta (GAI) Tim Mueck (GAI) Danny Sharui.on (CDM) File: 62142 -9.04 62142-RFI-088 Eloe1rioal Ouctbank ModifioeUons.doc -0 u .... -:I ... ..... ... 0 ..0 ... Cl) VJ ::::l. E · o , m N X CX) I a a <{ I ~ w · Cl i75 f- (/) w s: ~ POLVETHYLENE WARNI~ T"PE nNISHEll GRA!J:: RED co~~m TOP CloP M,IJMTAJN r @ t--;:-....,..,..,.,,~"*r.-'.',....,---'-:°7--i MIN CO'IER MIX @ 3" lol lN. .tiQIES: {!) Sll..ECT flU. TO A MINIMUM OF 2 FT . "'80YE &AND LAYER. COMPACT AU.. S.Cl<nLL 1;4 I 11-1, LFTS TO 90 PERCEITT OF STAHON,0 PROCTOR (ISTII. 0 69&) OEllSrTY, UNLESS UliDER EXJ$nNG 0~ PROPOSED PA\'EMEITT. 011-IER UNDERca:>UNO IJTILmES. Off ffiUc;fURES, IF Dl.m 8A.'IK IS liNOER EXIS11NG CR PROPOSED PAIIEMEWT, OTHER UNDER~<XI.Nil VTIUTID:, Oll S""ftl.JClVilES, COl,PACT ALL 11',CKfU. IN 8 IN. U~ TO 115 PERCENT OF STN,IOAAD PROCTOR DENSITY. @ R~ TO SPEC SEcno,i 16600 FOR AODlllO'l,',L RE:rJUTREMOlTS. @ REFER TO CONCRETE SPECS (030COli) f"OR t,JI( 01:SIGN. (D R£D DYE TO BE '1!XEO IN <XmCRETE BEFORE f'IACEl,U:Nr. @ Flll \IOIDS AROUN) AND ABOVE CONDUIT 10 S Al!O\JE CQNt>UITS WITH SCREENEO SAND. @ ALL 6" BELO'H CC"100ITS WITH SCREENED ~O UNDERGROUND C)NDUIT OUCTSANK ® DErAIL NTS Fl . . I C l'l/0 IWlE l1N1{ED COPPER V ElC01!- wF1 l'I f4/0- SE GROI 1~--------------"'t-----------------------~ N "It N (0 en CITY OF FORT WORTH, TEXAS WESTSIDE WATER TREATMENT PLANT PROJECT Date Sheet No Document Ref MAY 15, 2010 EZ-3 Fi gure No EZ3-A September 25, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-32-Backwash Suction Line Valve Revision Dear Mr. Boss: I have reviewed CPR-32, which includes a memorandum from CDM, dated August 2, 2010, requesting the contractor provide three 18" diameter butterfly valves in lieu of three 18" diameter gate valves on the suction line to the backwash pumps. A quote has been provided by the Contractor's valve supplier that shows a net $4,350 deduct in the purchase price of the butterfly valves , when compared to the price of the gate valves. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. Total credit for the proposed change amounts to $4,350.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. Engineer Xe: Danny Shannon, P.E., CDM Project File WATER DEPARTMENT PRODUCTION DIVISION THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102- (817) 871-8258 * FAX (817) 871-8410 G Printed on recycled paper ~ BLACK & VEATCH ~. Buifding a world of difference: September 16, 2010 City of Fort Worth Water Engineering Department 1511 11th A.venue Fort Worth, TX 76102. A TIN: Mr. Chris Rarder, P .E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project.No. P262-607540045683 CPR#32 1:ransmitted herewith please find three copies of McCarthy's change proposal request for the referenced extra work. Black & Veatch has recomm~ded the total credit amount 9f $4,350.15 be approved. Please reyiew the request, and if it is acceptable, have it executed. September 15, 2010 WESTSIDEWATER TREATMENT PlAITT 12200 OLDWEATii:RFORD ROAD FORTWORTH, TEXAS7610B www.mccartny.com . MAILING .ADDRESS : P. 0. BOX 12241 .9 FORT WORTtl, TEXAS 76121 PHO~E (817) 59~3740 FAX (817) 560-3n7 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn : Mr. John 13oss Re: Change Proposal Request #32 Westside. Water Treatment Plant P262 -607540045683 Mr. Boss, Piease find attached CPR #32 pricing for changes made to the project due to the field dii:ective memo from COM dated ,8/2/2010 concern:irtg change from 18'' Gate Va]ves to 18" Butterfly Valves at the: suctionside of the J3W Pumps . . Please do not hesitate to contac t me with any questions or co_ncerus . Sincerely, .Ftazier Project Manager McCarthy Building Companies, Inc . CC: Steve Gotschall-Project Director Jerry Mayer -Project Director File ENC : CPR#32 Pricing CDM Memo dated 8/2/2010 ••••• ~--..••-•-·---·•••·----,,. • ~-·-·•,·~---•··-·-.•w •· Change Proposal Request CPR#0032 Date: 09/15/201 o Project Name: Westside Water Treatment Plant Project No. : 002012.000 Architect's Project No.: Cost Issue Ref#: 60 Attached is an itemized quotation for changes in the Contract sum and/or lime on subject Project as described herein. This document, when fully e_xecuted, as accepted, shall constitute authorization to proceed with the work-described herein . Due to schedule impact, this work may be performed prior to approval of the formal Chanf!e Order. The Owner agrees that McCarthy Building Companies, Inc. will be reimbursed monthly for the cost of this work as. completed, whether or 11ot the Change Order has been .fully executed. DESCRIPTION OF THE PROPOSED Cl:fANGE: Change from 18" GVs to 18" BFVs at BW Pumps SCOPE: Delete (3) 18" Gate Valves at the suction side of the BW pumps and add (3) 18" Butterfly Valves. DIRECTIVE: CDM Memo Dated B/2/201 o REFERENCE; Pricing Details Company Name McCarthy Building Companies, Inc. McCarthy Building Companies, Inc. BY: ····--- Date: · _;:T.t(~/."'?-l>IP Description Amount Delete 18" GVs and add 18" BFVs at BW Pumps -4,350 .15 Subcontractor Bond General Liability Builders Risk Project Bond CO Fee (Sub Work) CO Fee (McCarthy Work) Net Amount of This Proposed Change 0.00 0.00 0.00 0.00 o.oo 0.00 -4 ,350 .15 Net Change in Calendar Days Due to This Proposed Change CJ Schedule impact to be evaluated at a later date. Accept Do Not Accept' BY· ·----- Date· . -·· -· -··----···---· ______ ··-···--····----·-. -· .. "- Printed On: 09/15/2010 10:35:07 AM City of Fort Worth Water Department Accept Do Not Accept BY· -·------·--·-··--·····---····-.. Date· -----·--·------·--··· Page: 1 of 1 Pepping, Nick · Subject: FW: Westside WTP --18'' Valve Change Order From:.Robert.Parris@Ferguson.com [mallto:Robert.Parris@Ferguson.com] Sent: Thursday, August 12, 2010 3:06 PM To: Pepping, Nick Cc: larry.fischer@ferguson.corn Subject: Westside WTP -.18" Valve Change Order Nick, Here is the quote for the 18" valves as you requested, Thanks, Robert. Parris Plant Sales Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA T : (210) 662 4902 C: (972) 670 5500 F : (210) 662 4825 E: robert.parris"t@ferguson.com www.ferquson.com .. ~···· "t::···.,.-·-----,.,-~------··--~~······~,----·.o.---~---.~--........ ----.. --· .. -----·-------------·---.... , .... ~--.-·--~-·-·~-·-·- Bid No .•.••.. : Bl 61830 Bid Date ••• : 08/12/10 Quoted By: RCP . Price Quotation# B1(>1830 Ferguson Waterworks #788 2650 S Pipeline Road Euiess, TX 76040 Phone: 817-267~3900 F'.ax: 817-267-3912 Cust Phone: 972-991-5500 Terms ......... : NET IOTH.PROX Customer.: MCCARTHY BUILDING COMPANIES WESTSIDE WATER TREATMENT Ship To ...... ;: MCCARTHY BUILDING COMPANIES PO BOX 122419 . WESTSIDE; WATER TREATl\ifEJ'iT PO BOX iz2419 FORT WORTH; TX 76121 FORT WORffi, TX 76121 Cust PO# .. : 18" BFV QUOTE .-CDM Job Nallie.: WESTSID:E WATER 'I'REATMJ?.NT ... -"-r••·-···•-": ...... -..,.,... ............. ·-··--.. -·------·-.. ·--.• _. ........... --····r·---····-r···-·-··v ....... · ... ,._.,.,.,. .. -----·· .... , .............. ·-·-·-··----.. -.-···· Item Descripti,on i Qua:nti~ ;NetPrlte. UM ;Total ' 1-IGHFIS 18 FlG BFV 4986 .050 EA 14958 .15 · • Cost for BPV's associated with · -change order; : ···•··. ' . SP-JSFGVBG18 : 18 J&S FLG GATE VLV W/BEVEL GEAR 3 -19308 .. 30 .. -.. ·-······---·····- : -Credit for cost of l~". gate 1 -~Ives as part ofretum due to ~ change order; Net Total: Tax: Total: -4350.15 0.00 -4350.15 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS.BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or·increase of pricing due to causes beyond our control, and/or based up~n Loci)], State and Federal laws governing type .of products fhat can be sold or put into. commerce. This Quote.is offered contingenfupon the Buyer's acceptance ofSeller's terms and conditions, which are Incorporated by reference and found either following this document_, or on th_e w~b. at http://wolselevna.com/tcrms conditionsSale.btml. Govt Buyers: All items quoted are open market unless noted othenvfse. . . 2 CDM. Memorandum (Email) To: From: Date: John Boss Black & Veatch. Chad Bartruff, P.E. (TX #91688) CDM (TX #F-3043) (X> August 2, 201 O Subject: Westside WTP Project . Backwash Pump Suction Valves -Revisions Refer to attached Figures MD~A and MDlO-B. As shown, deletion of FLT-BW-GA .. 101,, 102,103 is proposed. In their place, butterflyvalves,FLT-BW-BFVv-104, 105, and 106 shall be .furnished and installed in accordance with Section 15100. Associated suction piping shall be modified to acco1I1ID9date the installation. Based on - discussion with McCarthy, the suction piping beyond the 90~deg bend to each pump has not been fabricated~ of yet. Therefore, the spool sections shown to be in$talted with the suction piping shall be modified accordingly. Please coordinate accordingly with McCarthy. cc: Chris Harder (FWWD) Josh Trice (B&V) File: GS-9.04 BWP SucilO!l Val...,_1 doc S: .62142-WESTSIOE MD-8.dw Jul 29 2010 ~ 4:00 m User: bortruffcd EMICAL FACILl1Y 18" DIA FLT-SW-~ 18" BW-STL ~ CL EL 852.75 B . DISMANTLING .t_µ JOINT FF EL 857.00 8" .UW-DI . CL EL 854.67 SEE YARD PIPING 8" UW-DI CL EL 850.75 .!2 1 1 /2" FEJ-,PVC 1 1" LAS-PVC 1 1 1 /2" CS-PVC 1 1" SHC-PVC 1 · 1" HF-PVC TO OZONE CONTACT BASIi\ -----, I FF EL 844.75 (LP) SEE STRUCTURAL CITY . OF FORT WORTH, TEXAS WESTSIDE WATER TREATMENT PLANT PROJECT EQUIPMENT PRE-SELECTION Dole JUL'!' 29, 2010 Sheet No MD-8 Revision No &. Figure No MD8-A S: 62142-WESTSlDE Jul 29 20 lO -3 :51 m User: bartruftcd I I I 1. I I I I I I ·I I I I DRAIN TRENCH 1/2" SPL-PVCll;=~:111 (FTW) SEE NOTE '10 BW-P-001 .. ~~BW-BFV-lOo I DISCHARGE · PIPE NOT SHOWN FOR CLARl1Y r BW-P-po2 BW-P-po3 : ,. _,.,,-r .(2) 1 112·_· :_:FE:,:3~-.:..PV::C:.._ ____ ..!.......;;..;;.....,....;;... ___ _:;~;:::-~-...... · ..... ~ ...... ~=I=· ===·=----1 CITY OF" FORT WORTH, TEXAS WESTSIDE WATER TREATMENT Pi.ANT PROJECT EQUIPMENT PRE-SELECTION Dote JULY 29. 2010 Sheet No MD ~10 Revision No Figure No MDlO-B October 14 , 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth , Tex as 76108 Attn .: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-34, Diaphragm Seal Changes for Lime Transfer Pumps Dear Mr. Boss : The Fort Worth Water Department requested Ashcroft Type 80 isolation rings be pro v ided for the lime transfer pump pressure switch and gauge in lieu of the Red Valve diaphragm isolators proposed. A change order documenting the increased cost of the requested equipment has been provided. The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification . Total cost for the proposed change amounts to $2 ,715 .00 with no additional time requested . This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P . E. Engineer Xe: Danny Shannon, P .E., CDM Project File WATER DEPARTMENT P RODUC TI ON DIVISI ON THE C ITY OF FORT WORTH * 15 11 11TH AVENUE * F ORT WORTH, T EXAS 76 102 (817) 871 -8258 * FAX (817) 87 1-8410 0 Printed on recycled paper · c~~ BLACK & VEATCH · • Building a world of difference~ October 13, 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue Fort Worth, TX 76102 ATTN: Mr. Chris Harder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No. P262-607540045683 CPR#34 Transmitted herewith please find three copies of McCarthy's change proposal request for the referenced extra work. Black & Veatch has recommended the total cost amount of $2,715.00 be approved. Please review the request, and if it is acceptable, have it executed. Sincerely, ~&4_ WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORi WORTH , TEXAS 76108 www.mccarthy.com MAILING ADDRESS : P. D. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (81 7) 550-3727 October 7, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn: Mr. John Boss Re: Change Proposal Request #'ff '!»Al Westside Water Treatment Plant P262-607540045683 Mr. Boss, 3'{ Please find attached CPR #¥! pricing for changes made to the project due to the field directive memo from CDM dated 8/18 /2010. Please do not hesitate to contact me with any questions or concerns. Sincerely,~~-_ . 4-~-~//''~ John Frazier Project Manager McCarthy Building Companies, Inc. CC: Steve Gotschall -Project Director Jerry Mayer -Project Director File ENC: CPR #32 Pricing · CDM Memo dated 8/18/20 I 0 Submittal Comments PD-13300-01-1 0 Change Proposal Request CPR # 0034 Project Name: Wests ide Wate r Treat ment Plant Project No . : 002012 .000 Date : 09/28 /2010 Architect 's Project No .: Cost Issue Ref#: 62 Attac hed is an item ized quotati on for changes in the Con t ract s um and/or t ime on su bj ect Project as described here in. This document , w hen full y exec uted , as accepted , shall co nsti t ut e autho rizat io n to proceed with th e work desc rib ed herein . Due to sc hed ule im pac t , this work may be pe rf ormed prio r to approval of the forma l Cha nge Order . The Owner ag rees that McCa rt hy Bu il di ng Companies , In c . will be reimbu rsed mo nthly for the cost of th is wo rk as completed , w hethe r or not t he Cha nge Orde r has been fully executed . DESCRIPTION OF THE PROPOSED CHANGE: Cha nge to d iaph ragm seals SCOPE: Change to diaphragm seals pe r COM Memo dated 8/18/2010 a nd su bmi ttal 13300-01 -1 . DIRECTIVE: COM Memo dated 8/18/201 o REFERENCE: Pricing Details Company Name Fac ili ty So luti ons Gro up Description Change to diaphragm seals Subcontractor Bond General Liab ili ty Builde rs Risk • Project Bond 10 I. _., CO Fee (Sub Wo rk ) ""'"'"P CO Fee (McCarthy Work ) Net Amount of This Proposed Change Net Change in Calendar Days Due to This Proposed Change Schedu le impact to be evaluated at a late r date . Amount 2 ,395 .00 26 .00 22 .00 8 .00 24 .00 240 .00 0 .00 2 ,715 .00 McCarthy Building Compan ies, Inc . City of Fo rt Worth Water Department Accept Accept Do Not Accept Do No t Accept BY : BY : BY : Date : Date : Date : Printed On : 09 /28 /2010 05 : 11 :04 PM Page : 1 of 1 2525 Wal nut Hill La ne Suite 100 Dallas , TX 75229 (2 14)-357-5697 (TECL# 17904) 09/17/10 John Frazier McCarthy 12001 N. Central EXPWY., Suite 400 Da llas Texas 75243 Subject: Diaphragm Seal Changes for Lime Transfer Pumps John , Change Order Proposal No. 127948 Date:I 09/17/10 -~j_~ct:j Wests ide Water T reatment Pla nt Job N0.:0 0J16 13 Drawing No:I --/Spec Section :· We are pleased to offer the following Change Order Proposal for your consideration . The price for Bauman Instrument Corporation to change the diaphragm seals for the Lime T ransfer Pumps per engineer's memo dated August 18 , 2010 is $2 ,395 .00 . See attached s heet for Ba uman's cost breakdown and scope description . Bauman Pricing-$2,178 .00 FSG Markup-$217 .00 -IO i. Mr,\C"p Total Price-$2,395.00 Sincerely, FSG ELECTRIC Jerry Bevers Pr ·ect Manager BAUMAN INSTRUMENT CORPORATION "PROVIDING OUR CUSTOMERS WITH THE MOST ECONOMICAL INSTRUMENT AND CONTROL SOLUTIONS." MAIN OFFICE: P. 0 . B0X470583 11604 East 58th Street Tulsa, Oklahoma 74147-0583 (918) 254-2424 FAX : (918) 254-1966 FSG Electric September 17, 2010 2525 Walnut Hill, Suite 100 Dallas, TX 75229 Attention: Jerry Bevers Reference: Fort Worth Westside WTP Field Instrument Memo August 18, 2010 Dear Jerry, We have reviewed the engineer's memo dated August 18, 2010 concerning the changes to the diaphragm seals for the Lime Transfer Pumps . As part ofBauman's scope of work the memo changed the manufacturer and model number of the specified in-line diaphragm seals for the Lime Transfer Pumps. These changes will result in an increase in the scope of our work in the amount of $2,178.00 as detailed below. DEVICE QTY UNIT UNIT$ EXT. Material Oriainal 4" Red Valve w/ Gauae & Switch -2 EA $614 -$1,228 Oriainal 4" Red Valve w/ Switch -2 EA $419 -$838 Oriainal 1" Red Valve w/ Gauqe & Switch -3 EA $537 -$1,611 New 4" Ashcroft w/ Gauge & Switch 2 EA $874 $1 ,748 New 4 " Ashcroft w/ Switch 2 EA $762 $1 524 New 1" Ashcroft w/ Gauae & Switch 3 EA $748 $2,244 Total Material $1,839 Labor Documentation Updates 1 HR $55 $55 Total Labor $55 OH&P 15% $1 ,894 $284 Total Chanae Request $2,178 Bauman will proceed with order of the diaphragm seals upon receipt of subcontract change order. If you have any questions please don't hesitate to contact me. Sincerely, bB2PJWM Project Manager TULSA-ARLINGTON Memorandum (Email) To : John Boss Black & Veatch. From: Chad Bartruff, P . E. (TX #91688) COM (TX #F-3043) cl> Date: August 18, 2010 Subject: Westside WTP Project Submittal PD-13300-01-1 Process Instruments -Annular Diaphragm Seals Per the City's request, revision of the submitted Red Valve diaphragm isolators to the alternative specified Ashcroft Type 80 isolation rings is proposed. This applies to the following pressure instruments: 1 . 12400-01 Lime Transfer Pump No. 01 -Suction Pressure Switch, 4" 2. 12400-01 Lime Transfer Pump No. 01 -Discharge Pressure Gauge & Switch, 4" 3. 12400-02 Lime Transfer Pump No. 02 -Suction Pressure Switch, 4" 4. 12400-02 Lime Transfer Pump No. 02 -Discharge Pressure Gauge & Switch, 4" 5. 12420-01 Lime Metering Pump No. 01 -Discharge Pressure Gauge & Switch, l" 6. 12420-02 Lime Metering Pump No. 02 -Discharge Pressure Gauge & Switch, 1" 7. 12420-03 Lime Metering Pump No. 03 -Discharge Pressure Gauge & Switch, 1" Coordinate as requir~d with McCarthy and the PCSS. cc: Chris Harder (FWWD) Luke Matus (FW\ND) Tim Allen (FWWD) Todd Kay (FWWD) Josh Trice (B&V) Larry Reynolds (CDM) Kamran Khan (CDM) File: 9.04 PD-13300-01-1 P0,13300-01 -1_M emo _REV1 .doc Sh op D rawmg R ev1ew C t ommen s TO: BLACK & VEATCH INC. FROM : CAMP DRESSER & McKEE INC . 12200 OLD WEATHERFORD ROAD 777TAYLOR STREET SUITE 10 50 FORT WORTH TX 76108 FORT WORTH . TX 76102 TEL. NO. (817} 429-7 55 8 TE L. NO. (817) 332-8727 COM PRO JECT NO .: 0515 -62142 PROJECT : WESTSIDE WATER TREAT MENT PLA NT PROJECT OWNER : CITY OF FORT WORTH PRO JECT NO.: P26 2-607 54 0045683 CONTRACTOR : McCARTHY BUILDING COMPANIES INC PROJECT NO .: 002012 TRANSMITTING HEREWITH : DESCR IPTION : Project Plan & Fie ld Devices Resubmittal SUB NO .: PD-13300-01 -1 FEDEX: PRIOR ITY STA NDARD ECONO MY MA IL: EXPRESS PRIORITY REG ULAR OTHE R: DISTRIBUTION : REMARKS B&V 1 COM -DAL 1 APA I CP&Y OTHER MEI ---- GA i CDM-FTW 1 KOMATSU JQ ------ SHOP DRAWING REVIEW ENGINEER'S REVIEW RESPONSE REQUIRED OF CONTRACTOR o Approved Y' Comments D Confirm vc Approved as Noted Attached o Not Aooroved D Resubmit o Receipt Acknowledged (Not Subj ect to Eng ineer 's Rev iew or Approva l) The Engineer 's review of this shop drawing is limited to the review of dimensions, equipment and materials as presented in the Contract plans , spec ifications , and for des ign concept. This rev iew does not relieve the Contractor from errors or omissions in the submittal or from the Contracto r's responsibility of addressing any dev iations from the Contract Documen ts. The Contractor is responsible for the detai ls and dimensions of fabrication and manufacture , the means , methods , techniques , sequences or procedures of construc tion and performing his wo rk in a sa fe manner. CDfJI By --~K~. K~h~a=n/~L~. ~Re""y~n=ol=ds~ Date -~08=-·_,_18=-·_,_1 o=--- NONE( ) SEE BE LOW ( v ] SEE ATTACHED SHEET [ v) CO MM ENT REV IEW REV IEW COMME NTS NUMBER BY System Architecture Drawing 1008-COMM-0 2: No Response Required. Change the Tag numbers for the fo ll owing Power Monitoring Units (as per RF !# 137 dated 7/2/2010): 1 KAK Old Tag Number MVSG-PM-A : Update to TWP001-MR-A Old Tag Number MVSG-PM-8 : Update to TWP002-MR-B Old Tag Number MV HS-A : Update to TWP003-MR-A. Additionally , show th is PMU as futu re equipment. Old Tag Number MV HS-8: Update to TWP006-MR-B . Additionally , show thi s PMU as futu re equipment. PD-13300·0 1-1 RE V1 doc PAGE _1_0F _2 _ PAGES BY KAK/LJR , ' ~ PROJECT : WESTSIDE WATER TREATMENT PLANT PROJECT . PROJECT NO .: OWNER: CITY OF FORT WORTH OWNER : P262-607540045683 ENGINEER : CAMP DRESSER & McKEE INC . ENGI NEER : 0515-62 142 CONTRACTOR : McCARTHY BU ILDING COMPANIES INC CONTRAC TOR: 002012 DESCRIPTION : Pro jec t Plan & Field Devices Resubmittal SUB NO .: PD-13300 -01-1 COMMENT REVIEW REVIEW COMME NTS NUMBER BY 2 KAK System Architecture Drawing 1008-COMM-02: No Response Required. Delete RIO-HS Enclosure shown on the drawing (as per RFI# 137 dated 7/2/2010). 3 LJR Secti on 16 (Diap hragm Seal -Annu lar Flange Mo unted): Not Approved. Please provide Ashcroft Type 80 iso lation linq in lieu of the Red Valve diaphraqm iso lators . See attac hed memo for deta ils . PD-13300-01 -1 REV1 doc PAGE _2_0F _2 _ PAGES BY __ """KAc..:.:Kf..::..L=Jc:...:R ___ _ October 7 , 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth, Texas 76108 Attn.: Mr. John Boss FORT WORTH WESTSIDE WATER TREATMENT PLANT PROJECT RE: CPR-36, SS Filter Sleeves Dear Mr. Boss: The Westside Water Treatment Plant construction includes the installation of eight reinforced concrete filter basins, with only three filters being brought on-line initially. In order to expedite future filter activation, CPR-36 consists of adding a total of ten stainless steel wall sleeves in filter basins #4 through #8 for the 2" air scour vent and the Yi" filter head loss measurement piping . The Fort Worth Water Department concurs with the recommendation of Black & Veatch to accept the contract modification. Total cost for the proposed change amounts to $3,198.00 with no additional time requested. This change will be incorporated into Change Order #3 to the contract. Sincerely, Chris Harder, P. E. E ngineer Xe: Danny Shannon: P .E., CDM Project File WATER DEPARTMENT PRODUCTION DIVISION THE CITY OF FORT WORTH* 1511 11TH AVENUE* F ORT WORTH, TEXAS 76102 (817) 871-8258 * FAX (817) 871-8410 0 Printed o n recycled paper 1='11 BLACK & VEATCH ~ Building a world of difference: September 27 , 2010 City of Fort Worth Water Engineering Department 1511 11th Avenue ,Fort Worth , TX 76102 ATTN: Mr. Chris Harder, P.E. RE: Dear Mr. Harder: Westside Water Treatment Plant Project No . P262-607540045683 CPR #36 Transmitted herewith please find three copies of McCarthy 's change proposal request for the referenced extra work. Black & Veatch has recommended the total cost amount of$3 ,198.00 be approved. Please review the request, and if it is acceptable, have it executed. John Boss WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH , TEXAS 76108 www .mccarth y.com MAILING ADDRE SS : P 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 560-3727 September 23, 2010 Black & Veatch Corporation 12200 Old Weatherford Road Fort Worth , Texas 76108 Attn: Mr. John Bos s Re : Change Proposal Request #3 6 Westside Water Treatment Plant P262-607540045683 Mr. Boss , Please find attached CPR #3 6 pricing for changes made to the project due to the field directive memo from CDM dated 9/14/2010 concerning the addition of stainless steel pressure tap sleeves and vent piping in the future Filters 4 - 8 . Please do not hesitate to contact me with an y question s or concerns. John Frazier Project Manager McCarth y Building Companies, Inc . CC: Steve Gotschall -Project Director Jerry Mayer -Project Director File ENC: CPR #3 6 Pricing CDM Memo dated 9/14/20 I 0 ----------- Change Proposal Request j CPR# 0036 Date : 09/22/2010 Project Name: Westside Water Treatment Plant Architect's Project No .: Project No. 002012 .000 Cost Issue Ref# : 64 Attached is an itemized quotation for changes in the Contract sum and /or time on subject Project as described herein . This document , when fully executed , as accepted , shall constitute authorization to proceed with the work described herein . Due to schedule impact , this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies , Inc. will be reimbursed monthly for the cost of this work as completed , whether or not the Change Order has been fully executed . DESCRIPTION OF THE PROPOSED CHANGE : Added Filter Wall Sleevs SCOPE : Add (5) - 4 " x 1'-4" Sch 10 304 SST sleeves for 2" Vent at Filters and (5)-1/2" x 1'4" 316SST sleeves for 1/2 " Filter headless assemblies . REFERENCE: Pricing Details Company Name McCarthy Building Companies , Inc . McCarthy Bu ilding Companies , Inc . McCarthy Building Companies , Inc. BY : Description Added Filter headless/ VT sleeves Added Filter headless/ VT sleeves Subcontractor Bond General Liabil ity Builders Risk Project Bond CO Fee (Sub Work) CO Fee (McCarthy Work) Net Amount of This Proposed Change Net Change in Calendar Days Due to This Proposed Change D Schedule impact to be evaluated at a later date . Amount 1,103 .00 1,622 .00 0.00 25 .00 10 .00 29 .00 0 .00 409 .00 3,198 .00 City of Fort Worth Water Department Accept Accept Do Not Accept _ Do Not Accept BY : BY : Date : Date : Printed On : 09/22 /2010 11:10 :59 AM Page : 1 of 1 Pepping, Nick Subject: Bid No ....... : B163793 Bid Date ... : 09/15/10 Quoted By: RCP Westside WTP --Rev ised Quote , PR 2012-3044 Price Quotation# 8163793 Ferguson Waterworks #788 265 0 S Pipeline Ro ad Euless, TX 76040 Phone : 817-267-3900 Fax : 817-267-3912 Cust Phone: 972-991-5500 Terms ......... : NET 10TH PROX Customer.: MCCARTHY BUlLDING COMPANIES WESTSIDE WATER TREATMENT Ship To ....... : MCCARTHY BUILDING COMPANIES PO BOX 122419 FORT WORTH, TX 76121 Cust PO# .. : 4" & 1/2" WALL SLV Item SP-S4 WSWSR040 I 04 SP-S4 WPWSRO 120 I 04 De scription 4 X l'-4 SS 304 WALL SLV W/SR Seep ring centered ***** ***** I /2 X 1 '-4 SS 304 WALL PIPE W/SR Thrd coup on each end Seep rin g centered WESTSIDE WATER TREATMENT PO BOX 122419 FORT WORTH, TX 76121 Job Name.: WESTSIDE WATER TREATMENT Quantity Net Total: Tax: Freight: Total: 5 1 I I ' 5 1 Net Price UM Total 77.640 EA 97.300 EA 874.70 0.00 150.00 1024 .70 388.20 486 .50 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE I N EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays , lack of product or increase of pricing due to causes be yond our control, and/or based upon Local , State and Federal laws governing ty pe of products that can be sold or put into commerce. This Quote is offered contingent upon the Buye r's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document , or on the web at http://wo lse lev na.com/terms conditionsSale.html. Govt Buye rs: All items quoted are open market unless noted otherwise. Itemized Pricing Job: -r---West side WTP ~------09116/10 ~--+--+---+---+---+----+--------+-----+--------+-------I . : -~ ----1-- -____ ~----+---1----+----+----+----------·-----l-'D~•=•~c~rla~t~iocc.ncc.:--, CPR# 36 _L __ L_ ____ L---·----=- -------+------~------/-,----+---------': ----------,-----!--t---1-1-----+-----+----+-------l-------!------l---------- McCARTHY Man Hours Un it Cost s Tota l Costs ~'.!!-_ Descripti on __ Qu anti ty ~ UMnH 1 /t UMniHts/ Total Labo r _ccM;o.tr,_I ___ 1 __ _,E,,,~$u ie______,-__ S~u_b ___ ,_ __ L_a7b_o_r --·,---M~t~rl ___ I,_ __ ~~~-I~. Line MH $ $ $ $ $ I $ -,· $ Tota l _ ,1/2"x 1'4"3 16SSTthdxthdwallpi~----1---s_.oo_--;~•~•-+--4·~63.c+----+---~2=3'-.1~s.,. __ ~19'-.c.+6 _____ 9'-7~.3+---------1------ll-------'4~5~4 +--~---. , ____ . _$ __ ~ ~. ~'-4 " Sch1 0 304 SST sleeve w/ SR centered s .oo ea 4.63 23 .15 19.6 __ 77 .64 45~ ~: ;____ _____ :-f--~ . _ -~gilt _ = __ --=-===---=----=---+ 1.00 LS ggg 150 ____ -:----:, : +-----:-_5_ _ ~ -----i-.-o.oo 3·--------==-_:J__ ., -T-- ---_, 0.00 _ _:L___ ·;-_ .:.. -$$ 0.00 --:-= .. _ -----;----------. ·1 ·-"_j. ~: _:_,__-=--:-J-__ :1'--: ; ---=-~ -t-=----+-.• -+---==i-----------·---___:_j.__ . _ _ o.oo --· ::..I _ :..,.__ -:.--s -, L ------j---+---t----+-------1-----~~.gg-c.i----+-:±=--+-: ! : ·_r---===-. _-----=---~.gg ~·~ -_l __ ~ -; l ~---+------------------+----+---l----+---+-----o~.700ct-----t ----11--------1------. . $ 0.00 ::._ ---~-_:___::_.,-: J__ ~ ..I_ _ ~-------------t----+----t---~---+---~o=.oo~"'-----c-· ·----+-----1--------1-------1---. -J . s -+-·-_ 0.00 --~ t--_ _.:.. _L .:.. :.:·-t =-=--=--____________ , __ -_-_-_-_-_;_-_-_-:.:·,---~----~-+-1----_-_-_-_-_++----_-_-_-..,g~·gg~-~=======:.=======--~--++--~~~--~~--~~--.::-~~~~--~~-=====:============--+----·.. : ! --j ------·---J--0.00 -:.---$-----=-+=---~-0.00 ---+----·-· -$- ,----------~~------=----j 0.00 -$ $ ----'----~· -i=== ggg _::._ -:-- --------~~--------~ -_-,:====:·:=.=-_-___ ,--. __ -~g=::~·-----+------f--------1-------f---------+ -----+-- ->----;--_::._ ~ -$-----__ _::._ ~ --; j_ __ :_ --·-~ ---0.00 ·---------·---;··-· --t----~-----i--~g ~ggc-1----+-------i------+------- ------__ J I Total HRS 46 .30 SUBTOTAL $ 907 .48 s 1,024 .70 $ $ $ $ $ 90 .75 $ $ s 549 .03 $ s $ $ 71 .73 $ $ -----•---+-+---1-,~""~=~=~'=r~"°~L"'E"'~"':"';"';o=\='5'l--c'1°o~:°'%'=c%,-t---..;:g'=~-!--+=---.....,90=1.~4sc+-~~='~="~=.:~:c:c~c'---l-,!c------,=--=----t-7----+;;---- ---------------l---+--+-=--='"===--=-----=--,---t-:c-----==°~--~-'----+-=-----c~------t-:c-------+-=--- --------l---f----l--'LA"c'"'~,=~c,~;ci'c'i c':cci'c'c=:=~+-5'=i°":'=%=-%'--'c--g:'~=-'!c---1"7-1.:~~g g: ~~~ ! --· ---------SAFETY SO.SO PER HOUR 46 of labor $ 23 .00 s $ s 46.4 2 $ s $ 6.28 s 6.28 $ $ --=-...:=----=---==-=:::_ ---SM ALL TO~ ~.~~ g~ : : 1,5~;""~~~1--0~F~o=:~T~=Bc,,.F~~E~L-,~:------------------- --~ ----'---'---r------SUBTOTAL $ 1,62 2.96 $ 1,102 .71 $ s 243 .44 $ 165.41 $ ~-_t... _ __ _ _ -----~--_------~~~·· ----,f---+---+----+----1--~!--1---G=c~--+------+--'=1s=-.oo=c%=-·i-,,s---...;.,.~f--f,-',--~=-,+',-----~--- s $ s 1,866 .40 1,268 .12 $ $ $ 14 .93 $ 10.14 s : Subs 10.00% S j Mis c 0.00% S --------_ ---~ 1 --+---+---+----+----+------S=u=bc~o'-n~tr~a~ct~or~Bo=n~d+--_s_u~1 6 ~~=0~T~~=L=--t~S---'----t--'--'----+'------+-::--- ---------l----i Insuran ce 0.8000% -+--I ---,--- 5.83 $ 3.96 $ 17 . 18 $ 11.68 s ----------•--_---j ~B~u~il~de~r~s ~R~is~kt--_o~.~31~00~%'---+-'E-----'c='-+-'E---"'~~'-------+-c---Additiona l Bond Premium 0.9106% --s--· -- $ T -- $ 1,932 $ $ 91 $ 549 s 72 $ 23 $ 46 $ 13 $ 2,726 $ 409 $ $ $ 3,135 $ $ 25 $ 10 s 29 1,904 .35 1,293.90 $ $ 3 ,198 TOTA L $ 3,198 1 ! Tota l S -----1 -t-,----1 -1------+------'--------------- I I • I Harder, Christopher 4 From: Sent:' To: Bartruff, Chad (BartruffCO@cdm .com] Tuesday, September 14 , 2010 9:45 AM Josh Trice Cc: John Boss ; Harder, Christopher Subject: RE : Westside Inspection : 2" VT-SST & 1/2" SST Pipe Attachments: Mb, MD-2 Filter Wall Pipes.pdf (32 ... M0-2 Filter Wall Pipes.pdf John , Refer to the attached memorandum regard i ng what is proposed . Thanks , Chad 0 . Bartruff, P.E COM (TX #F-3043) 1777 Taylor Street , Suite 1050 I Fort Worth , TX 76102 Ph : (817) 332-87271 Fx : (817) 332-6870 I www.cdm .com R:,-Please consider the environment before printing this email. -----Original Message----- From : Bartruff, Chad Sent: Tuesday, September 14 , 2010 9 :08 AM To: 'Josh Trice' Cc: John Boss ; Christopher.Harder@fortworthgov.org Subject: RE: Westside Inspection : 2" VT-SST & 1/2" SST Pipe Josh , I would recommend that these wall pipes be installed now, similar to all other filter wall pipe penetrations . I will issue a memorandum to confirm that we are proposing to have the filter flume vent pipe and the differential pressure wall sleeve installed (cast into the wall) for Filters No . 4 through No . 8, in addition to No . 1 through No. 3 . This will add (5) 2" wall pipes and (5) 1/2" wall pipes , all SST. Please call should you have any questions/comments. Thanks , Chad 0 . Bartruff, P.E . COM (TX #F-3043) 1777 Taylor Street , Suite 1050 I Fort Worth, TX 76102 Ph: (817) 332-8727 I Fx : (817) 332-6870 I www.cdm .com R:,-Please consider the environment before printing this email. -----Original Message----- From : Josh Trice [mailto:jtrice@jqieng .com] Sent: Monday, September 13 , 2010 1:21 PM To: Bartruff, Chad Cc: John Boss Subject: Westside Inspection : 2" VT-SST & 1/2" SST Pipe Chad , 1 . ' • CDM Memorandum (Email) To: From : Date : John Boss Black & Veatch. Chad Bartruff, P. E. (TX #91688) COM (TX#F-3043) Cl> September 14 , 2010 Subject: Westside WTP Project Filter Wall Pipes (Sheet MD-2) 2 " VT-SST and 1/2" SA-SST Sh ee t MD-2 shows the installation of cast-in wall pipes at Filters No. 1 through No. 3 for the 2" VT-SST (air scour vent) and the 1/2" SA-SST (filter headloss measurement). To facilitate future installation and integration of filtration systems, it is proposed that these wall pipes b e furnished and cast into the filter walls similar to all other piping for Filters No. 4 through No . 8. The wall pipes shall be furnished as per the applicable submittals and installed similar to Filters No. 1 -No . 3. cc: Chris Harder (FWWD) Josh Tric e (B&V) Sagar Khole (CDM) Fil e: GS-9.0 4 MD-2 Filter Wall Pipes.doc