CHANGE ORDER~N O . THREE
r
DATE : Nov . 2 , 2010
CITY OF FORT WORTH
CHANGE ORDER REQUEST
D.O .E . NO. (NIA) PROJECT NO. 00456
PROJECT DESCRIPTION : WESTSIDE WATER TREATMENT PLANT PROJECT CITY SECRETARY CONTRACT NO.
38806
ORIGINAL CONTRACT AMOUNT.. ..................................................... $ 47 044 014.00
EXTRAS TO DAT E ................................................. $ ""39~16,_,4"".6"-7 _____ _
Job#2012
NOV O 3 2010
CREDITS TO DA TE ........... . .................................. $ =0.=00~------
CONTRACT COST TO DATE ...................................................................................................................................................................................... $ 47 083 178.67
AMOUNT OF PROPOSED CHANGE ORDER .. . ........................................................................................................................... $ 19 447 .00
REV ISED CONTRACT AMOUNT.. .......................................... . .. ........................................................................................................................ $ 47,102,655 .67
ORIGINAL FUNDS AV AJLABLE FOR CHANGE ORDERS ..................................................................................................................................... $ """0.""00"'----
ADDITIONAL FUNDING (IF NECESSARY) .......................................................................................................................................................... $ 19 447 .00
REMAINING FUNDS AV AJLABLE FOR CHANGE ORDER ................................................................................................................................. $ =0.=00'----
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/c hange the contract as shown below to provide a complete, functional , and
operational plant. These changes are as listed below. Further descriptions and cost breakdowns are attached .
Change Order No. 3 to the Westside Water Treatment Plant Project consists of miscellaneous items identified during the course of construction by the Engineer, Construction
Manager, and Contractor requiring modification . Proposed changes include the following additions to the scope of work .
I . CPR-I 5, Deletion of power monitoring and UPS equipment (CREDIT) .................................................................................................................... $2 ,997.00
2 . CPR-I 7, Electrical Building Plumbing Modifications (COST) .................................................................................................................................. $16 ,755 .00
3 . CPR-21 , Miscellaneou s electrical modifications (COST) ........................................................................................................................................... $4,652 .00
4 . CPR-23, Manhole Modifications (COST) ................................................................................................................................................................... $7 ,365 .00
5. CPR-27, Electrical Duct Bank Backfill Revision (CREDIT) ...................................................................................................................................... $7 ,891 .00
6 . CPR -32, Backwash Suction Line Valve Revision (CREDIT) ..................................................................................................................................... $4 ,350.00
7 . CPR-34, Diaphragm Seal Changes for Lime Transfer Pumps (COST) ....................................................................................................................... $2 , 715 .00
8 . CPR-36, Additional Stainless Steel Filter Sleeves (COST) ........................................................................................................................................ $3 , 198 .00
NET CHANGE ORDER AMOUNT ............................................................................................................................................................................. $19,447.00
Staff has rev iewed this change order and is in agreement with the scope of work and the costs associated with the work. Documentation providing additional information for
each itemized change is attached to and made part of this change order.
It is understood and agreed that th e acceptance of thi s Change Order by the contractor constitutes an accord and satisfaction an d represents paymen t in full
(both in time and money) for all costs arising out of the Change Order.
ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE
None
DA rn1,; 1 , /Jo
DATY/ /alto
DATE
CITY MANAGER DATE
<;i .... :4a.
APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE
TO DA TE ORDER
0 Calendar Da s
PROJECT MANAGER /il DATE /{
DIRECTOR/MANAGING DEPT. DATE
CITY ATTORNEY DATE
COUNCIL ACTION (IF REQUIRED): DATE
D APPROVED D DISAPPROVED D OTHER
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
/,;)
August 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. Jolm Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-15, Deletion of Power Monitoring and UPS Equipment
Dear Mr. Boss:
The contract documents included two redundant power quality monitoring units for the
medium voltage switchgear that, upon review, are not considered to be necessary. In
addition, six 100 VA uninterruptible power supplies (UPS) are to be deleted and replaced
with 120 V power circuits. The Contractor has provided the City with a price proposal to
delete the above referenced equipment and install the additional circuits. The total credit
for this work is $2,997.00
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total credit to the Fort Worth Water Department for
the proposed change amounts to $2,997.00 with no additional time requested. This
change will be incorporated into Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DIVISION
THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
0 Printed on recycled paper
'\ ·1.r~ BLACK & VEATCH
. Building a world of difference:
July 21, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR #15
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order credit amount
of $2,997.00 be approved. Please review the request, and ifit is acceptable, have it executed.
Sncerely, ~
WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com
MAILING ADDRESS : P. 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560-3727
July 20, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request # 15
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #15 revised pricing for changes made to the project due to the
field directive memo from CDM dated 2/1/201 O(REV 0), 5/10/201 O(REV 1 ), and
5/11/2010 (REV 2).
Please do not hesitate to contact me with any questions or concerns.
John Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Paul Laufer -Project Manager
Steve Gotschall -Project Director
Jerry Mayer-Project Director
File
ENC: CPR #15 Revised Pricing
CDM dated 2/l/2010(REV 0), 5/10/2010(REV 1), and 5/11/2010 (REV 2)
r ·---
J
1
Change Proposal Request
CPR# 0015
Date: 07/20/2010
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Architect's Project No.:
Cost Issue Ref # : 28
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein . This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc . will be reimbursed monthly for the cost of this work as completed , whether or not the Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Power Monitoring & UPS Power Changes
SCOPE:
Changes in scope of work to FSG Electric due to a CDM Memo dated 2/1/2010, Revision 1 to CDM Memo dated 5/10/201 O, and
Revision #2 dated 5/11/201 O concerning changes to the project Power Monitoring & UPS Power.
DIRECTIVE:
COM Memo dated 2/1/2010
COM Rev 1 Memo dated 5/10/2010
COM Rev 2 Memo dated 5/11/2010
REFERENCE:
Pricing Details
Company Name
Facility Solutions Group
McCarthy Building Companies, Inc.
Description
Power Monitoring/ UPS Changes
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee {Sub Work)
CO Fee {McCarthy Work)
Net Amount of This Proposed Change
Amount
·2,997 .00
0.00
0.00
0.00
0.00
0.00
0.00
·2,997 .00
Net Change in Calendar Days Due to This Proposed Change
[] Schedule impact to be evaluated at a later date .
0
City of Fort Worth Water Department
Accept
Do Not Accept
BY :
Date:
Printed On: 07/20/2010 03:56:45 PM Page: 1 of 1
•••••• 1•»'8electric
2525 Walnut Hin Lana Suite 100 Dallas , TX 75229 (214)-357-5697 (TECL#
17904)
06/11/10
John Frazier
McCarthy
12001 N. Central EXPWf., Suite 400
Dallas Texas 75243
Subject: Power Monitoring and UPS
Power
John,
Change Order
Proposal
No. 126710
Date:f 06/11/10
Project: Westside Water Treatment Plant
Job NO.: 30J1613
Drawing No:
Spec Section:,
We are pleased to offer the following Change Order Proposal for your consideration. The price includes labor and
material to install additional circuits to replace deleted UPS power per Memorandum dated 5-10-10. GE is not
offering a credit on the deleted UPS's due to the deletion of the 100 VA UPS's required re-design of the
switchgear. See attached pricing sheets for price breakdown and attached Memorandum for scope of work.The
price to perform this work is a credit of $2,997 .00.
Sincerely,
FSG ELECTRIC
Jerry Bevers
Project Manager ?f~
•••••• 1· ht · I t I I
·····-,g mg> e ec .r co > energy • • ••• technology> s,gns
FACILITY SOLUTIONS GROUP
RECAP SHEET
C.O. #4-UPS CHANGES RATE HOURS
LABOR· (ELECTRICAL)
FOREMAN STRAIGHT TIME $30 .00 4.00 $
FOREMAN OVER TIME $45.00 $
JOURNEYMAN STRAIGHT TIME $25.00 $ 21.00 $
JOURNEYMAN OVER TIME $34.50
HELPER STRAIGHT TIME $17 .00 21.00 $
HELPER OVER TIME $25 .50 $
$
$
$
LABOR TOTAL-$
MATERIAL TOTAL $
BURDENS· 6% OF MATERIAL $
GE CREDIT FOR PQM $
BURDENS-(42% OF LABOR) $
SUBTOTAL-$
TOTAL-$
TOTAL
120.00 .
525.00
357.00
.
-
-
-
1,002.00
547.00
32.82
(5,000.00)
420.84
(2,997.34)
(2 997.34)
•••••• 1· ht · I t . I ....... 1g mg> e ec _nca > energy
• • ••• technology> signs
FACILITY SOLUTIONS GROUP
C.0.#4 PRICING SHEET
UC~v. IQUAN. 1MAI UNII MATt:AI. :!...."WI'·=-UNI L•un,~CAI,
3/4" ALUM. CONDUIT 60 $ 1.25 $ 75.00 0.10 6.00
3/4" LB 4 $ 12.00 $ 48.00 1.00 4 .00
CONDUIT SUPPORTS 6 $ 5.00 $ 30 .00 0.25 1.50
3/4 " PVC CONDUIT 100 $ 0.20 $ 20 .00 0 .06 6 .00
PVC CONDUIT SUPPORTS 20 $ 1.00 $ 20.00 0.25 5.00
3/4" PVC COATED 90 2 $ 15.00 $ 30.00 1.00 2.00
3/4" HUBS 7 $ 7 .00 $ 49.00 0 .25 1.75
3/4" GRDING BUSHINGS 1 $ 6.00 $ 6.00 0.15 0.15
3/C#12 400 $ 0.50 $ 200 .00 0 .025 10.00
#12THHN 300 $ 0.20 $ 60.00 0.009 2 .70
TERMINATE #12 18 $ 0.50 $ 9.00 0.15 2 .70
$ -0.00
$ . 0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
TOTAL-$ 547.00 41.80
CDNI
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) /?J..
COM (F-3043) UV
February 1, 2010
Subject: Westside WTP Project
Power Monitoring and UPS Power
As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power
monitoring (PM) equipment is to be provided for the medium voltage switchboards
(MVSWBs), low voltage switchboards (L VSWBs), and motor control centers (MCCs),
respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as
listed below, is noted to be furnished with the switchboards and MCCs.
SWB/MCC
MVSG-HS
MVSG-HS
MVSG-HS
MVSG-HS
SWB-OZ
SWB-OZ
SWB-FLT
SWB-FLT
MCC-FLTA
MCC-FLTB
MCC-OB
MCC-HS
MCC-HS
PM Tag
MVSG-PM-A
MVSG-MR-A
MVSG-PM-B
MVSG-MR-B
PQMSWBOZM-A
PQMSWBOZM-B
SWBFLT-PM-A
SWBFLT-PM-B
MCFLTA-PM-A
MCFLTB-PM-B
PQMCOB-M
MCHS-PM-A
MCHS-PM-B
PM Equipment
Multilin PQM (1)
Multilin 750 (1)
Multilin PQM (1)
Multilin 750 (1)
PQM (1)
PQM (1)
EPM (1)
EPM (1)
EPM
EPM
PQM
PQM
PQM
(1) 100 VA Uninterruptible Power Supply (UPS} to be provided internal to gear per specifica tion .
As per the response to RFI-038, two pieces of PM equipment were proposed for deletion
from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment
as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent
functions. In addition to the PQM units, the associated 100V A UPS should be deleted also.
~ v swes and UPS Power .doc
Boss, Jolm
February 1, 2010
Page2
In effort to provide continuity between City equipment installations, it is proposed that the
EPM units specified for the following be replaced with PQM units similar to the other
installations listed.
SWBFLT-PM-A
MCFLT A-PM-A
SWBFLT-PM-B
MCFLTB-PM-B
To minimize the number of UPS that are installed and associated maintenance, it is
proposed that each lOOVA UPS associated with the following be deleted from the project
scope.
MVSG-MR-A
SWBFLT-PM-A
PQMSWBOZM-A
MVSG-MR-B
SWBFLT-PM-B
PQMSWBOZM-B
The UPS power to each of these units shall be replaced with a 120V /1 ph power circuit
(conduit, wire and terminations) as described below:
Sheet EE-3 -Chemical Building Panel Schedules
1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet
EE-1.
2. Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and
PQMSWBOZM-B", Load KVA to "0.5''. Route 2#12, #12EGC, 3/ 4"C to
PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1
Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram
1. Panel Board "LUIT" -Change existing 20A/1P Circuit No. 23 from "Spare" to
"SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to
SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLT shown on ED-2.
Sheet EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details"
1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to
"MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to
MVSG-PM-A and MVSG-PM-B in Medium Voltage Switchboard MVSG-HS shown
on EF-2.
cc: Chris Harder (FWWD)
Josh Trice (B&V)
VK Gupta (GAI)
Tim Mueck (GAI)
Ernie Clement (COM)
Danny Shannon (COM)
File: 62142 -9.04
LV SWBs and UPS Power.doc
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) /JJ..
COM (F-3043) UV
May 10, 2010
Subject: Westside WTP Project
Power Monitoring and UPS Power-REV-1
As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power
monitoring (PM) equipment is to be provided for the medium voltage switchboards
(MVSWBs), low voltage switchboards (LVSWBs), and motor control centers (MCCs),
respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as
listed below, is noted to be furnished with the switchboards and MCCs.
SWB/MCC PM Tag PM Equipment
MVSG-HS MVSG-PM-A Multilin PQM (1)
MVSG-HS MVSG-MR-A Multilin 750 (1)
MVSG-HS MVSG-PM-B Multilin PQM (1)
MVSG-HS MVSG-MR-B M ul tilin 750 (1)
SWB-OZ PQMSWBOZM-A PQM (1)
SWB-OZ PQMSWBOZM-B PQM (1)
SWB-FLT SWBFLT-PM-A EPM (1)
SWB-FLT SWBFLT-PM-B EPM (1)
MCC-FLTA MCFLT A-PM-A EPM
MCC-FLTB MCFLTB-PM-B EPM
MCC-OB PQMCOB-M PQM
MCC-HS MCHS-PM-A PQM
MCC-HS MCHS-PM-B PQM
(1) 100 VA Uninterruptible Power Supply (UPS) to be provided internal to gear per specification.
As per the response to RFI-038, two pieces of PM equipment were proposed for deletion
from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment
as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent
functions. In addition to the PQM units, the associated 100V A UPS should be deleted also.
LV SWBs and UPS Power,REV1 .doc
Boss, John
May 10, 2010
Page2
In effort to prov ide continuity between City equipment installations, it is proposed that the
EPM units specified for the following be replaced with PQM units s imilar to the other
installations listed .
SWBFLT-PM-A
MCFLTA-PM-A
SWBFLT-PM-B
MCFLTB -PM-B
To minimize the number of UPS that are installed and associated maintenance, it is
proposed that each lOOVA UPS associated with the following be deleted from the project
scope .
MVSG-MR-A
SWBFLT-PM-A
PQMSWBOZM-A
MVSG-MR-B
SWBFLT-PM-B
PQMSWBOZM-B
The UPS power to each of these units shall be replaced with a 120V /1 ph power circuit
(conduit, wire and terminations) as described below.
Sheet EE-3 -Chemical Building Panel Schedules
1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet
EE-1 .
2 . Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and
PQMSWBOZM-B", Load KV A to "0.5''. Route 2#12, #12EGC, 3/4"C to
PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1 .
Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram
1. Panel Board "~" "LUFLT" -Change existing 20A/1P Circuit No.~ 15 from
"Spare" to "SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/4"C. Route
the circuit to SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLT shown
on ED-2 .
Shee t EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details
1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to
"MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to
MVSG-PM-A and MVSG-PM-B in Medium Voltage Switchboard MVSG-HS shown
on EF-2 .
For PQM devices for vvhich circuits are not identified, those shall be powered from the
internal control power transformers of the respective gear line-up .
cc: Chris Harder (FWWD)
VK Gupta (GAi)
Ernie Clement (COM)
File: 62142 -9.04
LV SWBs and UPS Powe r-REV1 .doc
Josh Trice (B&V)
Tim Mueck (GAi)
Danny Shannon (CDM)
Sh op D rawmg R ev1ew C t ommen s
TO : BLACK & VEATCH INC . FROM : CAMP DRESSER & McKEE INC .
12200 OLD WEATHERFORD ROAD 777 TAYLOR STREET, SUITE 1050
FORT WORTH TX 76108 FORT WORTH TX 76 102
TEL. NO . {8 17 ) 429-7558 TEL. NO . (8 17) 332-8727
COM PROJECT NO .: 0515 -62142
PROJEC T: WESTSIDE WATER TREATMENT PLANT PROJECT
OWNER : CITY OF FORT WORTH PROJECT NO .: P262-607540045683
CONTRACTOR: McCARTHY BUILDING COMPAN IES INC PROJECT NO .: 002012
TRANSMITIING HEREWITH :
DESCRIPTION : Low-Voltage Dist ri bution Switchboards-Resubmillal SUB NO .: SD-16425-01-1 {REV-1)
FEDEX : PRIORITY
OTHER :
DISTRIBUTION : B&V
ME I
STANDARD ECONOMY MAI L: EXPRESS PRIORITY REGULAR
""' COM-DAL ""' APA! CP&Y --OTHER --
--GAi ""' CDM -FTW yl KOMATSU --JO --·
SHOP DRAWING REVIEW
ENGINEER'S REVIEW RESPONSE REQUIRED
OF CONTRACTOR
a Approved v Comments a Confirm
v Approved as Noted Attached
a Not Approved a Resubm it
o Receipt Acknowledged (Not Subject to Eng ineer's Review or Approval)
The Eng inee r's review of this shop drawing is limited to the review of di mensions ,
equipment and materials as presented i n the Contract plans, specificati ons , and for
design concept. Th is review does not relieve the Contractor from errors or omissions in
the submittal or from the Contractor's responsibil ity of add ress i ng any deviations from
the Contract Documents. The Contractor is responsible for the details and d imensions
of fab rication and manufacture, the means, methods , techn iques , sequences or
procedu res of const ruction and perform ing his work in a safe manner.
CIJfJI By Chad Bartruff PE Date 5-11-2010
REMARKS NONE! 1 SEE BELOW Iv 1 SEE ATIACHED SHEET [ 1
COMMENT REVIEW
NUMBER BY
1 SK
2 CBfTM
3 TM
S D-16425-01-1_REV1 .d oc
REVIEW COMMENTS
Review performed by GAi and COM electrical , comments are included herein .
Paragraph 1.07 requires a 3-year war ranty from time of final acceptance by Owner. GE submitted 3-years from Ume
of installation/ 3.5 years from time of shipment. Contractor is responsible for provision of warranty as specified .
SUBMIT wha t is proposed as a substitution for the 316 SS screws required in paragraph 2.03.A.2
PAGE _1 _OF _2 _ PAGES
BY •. CB
PROJECT : WESTSIDE WATER TREATMENT PLANT PROJECT. PROJECT NO.:
OWNER : CITY OF FORT WORTH OWNER : P262--607540045683
ENGINEER: CAMP DRESSER & McKEE INC. ENGINEER: 0515-62142
CONTRACTOR: McCARTHY BUILDING COMPANIES INC CONTRACTOR : 002012
DESCRIPTION : Low-Voltage Distribution Switchboards -Resubmittal SUB NO .: SD-16425-01-1
COMMENT REVIEW REVIEW COMMENTS
NUMBER BY
It is understood that the submitted Spectra Programmable devices require TVPBP battery packs for programming
4 TM/CB but these are not permanent installation; rather portable for programming purposes only. And, the devices used
for this oroiect will be turned over to the Owner at oroiect completion .
5 CB Submittal included a section for the Mobile Generator Quick-Connect panel (SWB-GEN). This section was not
reviewed as ii was resubmitted under separate cover SD-16428-01-1.
As applicable, electrical gear shall not be released for production until resolution of pending PQM modifications .
6 CB PQM modifications are pending receipt and review of the associated proposal. Contractor shall coordinate . Refer
to attached memorandum.
S0.16425-01 -1_REV1 .doc
PAGE _2 _0F _2 _ PAGES
BY CB
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) 11P..
COM (F-3043) v4J
May 11, 2010
Subject: Westside WTP Project
Power Monitoring and UPS Power-REV-2
Following further coordination with the engineers and electrical supplier regarding
equipment to be supplied and the associated design elements, the following modifications
to the power monitoring system are proposed. To further clarify, attached to this memo
are revised submittal comments pertaining to SD-16480-01 and SD-16425-01-1 .
As shown on the Drawings and as specified in Sections 16345, 16425, and 16480, power
monitoring (PM) equipment is to be provided for the medium voltage switchboards
(MVSWBs), low voltage switchboards (LVSWBs), and motor control centers (MCCs),
respectively, where shown on the Drawings. Per the Drawings, different PM equipment, as
listed below, is noted to be furnished with the switchboards and MCCs.
SWB/MCC
MVSG-HS
MVSG-HS
MVSG-HS
MVSG-HS
SWB-OZ
SWB-OZ
SWB-FLT
SWB-FLT
.MCC-FLTA
MCC-FLTB
MCC-OB
MCC-HS
MCC-HS
MVSG-PM-A
MVSG-MR-A
MVSG-PM-B
MVSG-MR-B
PQMSWBOZM-A
PQMSWBOZM-B
SWBFLT-PM-A
SWBFLT-PM-B
MCFLTA-PM-A
MCFLTB-PM-B
PQMCOB-M
MCHS-PM-A
MCHS-PM-B
PM Equipment
Multilin PQM (1)
Multilin 750 (1)
Multilin PQM (1)
Multilin 750 (1)
PQM (1)
PQM (1)
EPM (1)
EPM (1)
EPM
EPM
PQM
PQM
PQM
(1) 100 VA Uninterruptible Power Supply (UPS) to be provided internal to gear per specification.
LV swss and UPS Power-REV2.doc
Boss, John
May 11, 2010
Page 2
As per the response to RFI-038, two pieces of PM equipment were proposed for deletion
from the project scope. MVSG-PM-A and MVSG-PM-B are redundant pieces of equipment
as the Multilin 750 units (MVSG-MR-A and MVSG-MR-B) will provide equivalent
functions. In addition to the PQM units, the associated 100V A UPS should be deleted also.
In effort to provide continuity between City equipment installations, it is proposed that the
EPM units specified for the following be replaced with PQM units similar to the other
installations listed.
SWBFLT-PM-A
MCFLTA-PM-A
SWBFLT-PM-B
MCFLTB-PM-B
To minimize the number of UPS that are installed and associated maintenance, it is
proposed that each 100V A UPS associated with the following be deleted from the project
scope .
MVSG-MR-A
SWBFLT-PM-A
PQMSWBOZM-A
MVSG-MR-B
SWBFLT-PM-B
PQMSWBOZM-B
Power to each installed PQM unit shall be provided with a 120V /1 ph power circuit
(conduit, wire and terminations) as described below.
Sheet EB-13 -Ozone Contactor Area Panel Schedules
1 . Panel UL-OB, change existing 20A/1P Circuit No. 10 from "SPARE" to "PQMCOB-
M", Load KVA to "0.3". Route 2#12, #12G, 3/4"C to PQMCOB-M in MCC-OB
shown on EB-15.
Sheet EE-3 -Chemical Building Panel Schedules
1. Rename "Lighting Panelboard UL-OZ" to "UPS Panel UL-OZ" as shown on Sheet
EE-1 .
2. Change existing 20A/1P Circuit No. 15 from "SPARE" to "PQMSWBOZM-A and
PQMSWBOZM-B", Load KVA to "0.5''. Route 2#12, #12G, 3/4"C to
PQMSWBOZM-A and PQMSWBOZM-B in SWB-OZ shown on EE-1.
Sheet ED-13 -Power Panel HFLT-6B One-Line Diagram
1. Panel Board "M,1,1+" "LUFLT" -Change existing 20A/1P Circuit No.~ 15 from
"Spare" to "SWBFLT-PM-A and SWBFLT-PM-B". Use 2#12, #12G, 3/ 4"C. Route
the circuit to SWBFLT-PM-A and SWBFLT-PM-B in Switchboard SWB-FLTshown
onED-2.
2. Panel Board "LUFLT" -Change existing 20A/1P Circuit No. 17 from "Spare" to
"MCFLTA-PM-A". Use 2#12, #12G, 3/4"C. Route the circuit to MCFLTA-PM-A in
MCC-FLTA shown on ED-32 .
LV SWBs and UPS Power-REV2 .doc
Boss,John
May 11, 2010
Page3
3. Panel Board ''LUFLT" -Change existing 20A/1P Circuit No. 19 from "Spare" to
"MCFLTA-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to MCFLTA-PM-B in
MCC-FLTB shown on ED-32.
Sheet EF-9 -Medium Voltage Fused Switch (MVFSA / MVFSB) Elevation & Details
1. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 15 from Spare to
"MVSG-MR-A and MVSG-MR-B". Use 2#12, #12G, 3/4"C. Route the circuit to
MVSG-MR-A and MVSG-MR-B in Medium Voltage Switchboard MVSG-HS shown
on EF-2.
2. Panel Board "LUHS" -Change existing 20A/1P Circuit No. 16 from Spare to
"MCHS-PM-A and MCHS-PM-B". Use 2#12, #12G, 3/4"C. Route the circuit to
MCHS-PM -A and MCHS-PM-B in MCC-HS shown on EF-5.
cc: Chris Harder (FWWD)
VK Gupta (GAI)
Ernie Clement (CDM)
File: 62142 -9.04
LV SWBs and UPS Power-REV2 .doc
Josh Trice (B&V)
Tim Mueck (GAi)
Danny Shannon (CDM)
September 15, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-17 -Electrical Building Plumbing Modifications
Dear Mr. Boss:
CPR-17 consists of modifications to the electrical building plumbing plan. Construction
plan sheet AH-1.01 shows four roof drains and four overflow drains , designed to convey
rain water off the electrical building roof. However, plans were not included in the
contract documents for the internal piping within the building, connecting these roof
drains to exterior building downspouts. Construction plan sheet PH-I shows a l' service
water line with RPZ to serve the electrical building.
CPR-17 includes the additional internal building piping necessary to connect the roof
drains to external downspouts at the electrical building , as shown in a plan developed in
the March 16 , 2010 memo from CDM, which is attached to this CPR. In addition, CPR-
17 includes the deletion of the 1" potable water service to the electrical building.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification . Total cost for the proposed change amounts to
$16,755.00 with no additional time requested. This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DNISION
THE CITY Of FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
0 Printed on recycled paper
r;;'1I BLACK & VEATCH 1111.:.1 . Building a world of difference~
August 19, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris H!!rder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR #17
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order amount of
$16, 755;00 be approved. Please review the·request, and jf it is acceptable, have jt executed.
John Boss
:::..-.' '._: :. MC 1111 RT.'HY ?~; -~ IJ
August 18, 2010
WESTSIDE WATB! TREATMENT Pl.ANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com
MAILING ADDRESS : P. 0. BOX 122419 FORT WORTH, TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560·3727
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request # 17 -Revised Pricing
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached revised CPR #17 pricing for changes made to the project due to the
field directive memo from CDM dated 3/16/2010.
The revised pricing has been amended per our previous conversations, and does not
include any provisions to insulate the drain piping per CDM's clarification, or install
splash blocks outside of the structure.
Please do not hesitate to contact me with any questions or concerns.
John Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Paul Laufer -Project Manager
Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #17 Pricing
CDM Memo dated 3/16/2010
Change Proposal Request
CPR# 0017
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Date: 08/18/2010
Architect's P_roject No.:
Cost Issue Ref # : 30
Attached is an itemized quotation for changes in th _e Contract sum and/or time on subject Project as described here i n. This
document, when fully executed , as accepted, shall constitute authorization to proceed with the work described herein . Due to
schedu le impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Build lng Companies, Inc. will be reimbursed monthly for the cost of th is work as completed , whether o r not the Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Added Plumbing drawings at HS Elec Bldg per COM Memo dated 3/16/201 O
SCOPE:
Added plumbing drawings at HS Elec Bldg .
-Delete-
1" PW line
1 -RPZ backflow preventer
2-Freeze proof hose connections
-Add -
4 -Roof Drains and associated piping
4 -.Overflow Dra ins and associat ed piping
DIRECTIVE:
CDM Memo Dated 3/16/2010
REFERENCE:
B&V Transmittal# 402
CDM Memo Dated 3/16/2010
Pricing Details
Company Name
McCarthy Build ing Companies , Inc .
McCarthy Build ing Compan ies, Inc .
Description
Added roof drains at HSEB
Added roof drains at HSEB
Subcontractor Bond
General Liability
Bu ilders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
Net Change in Calendar Days Due to This Proposed Change
. [$l.. Schedule Impact to be evaluated at a later date.
Amount
7 ,732.00
6,548.00
0 .00
131 .00
51 .00
151 .00
0.00
2,142.00
16,755.00
Printed On : 08/18/2010 04:48:24 PM Page : 1 of 2
McCar hy Building Companies, Inc.
..
Project Name: Westside Water Trea1men1 Plant
Project No. : 002012 .000
McCarthy Building Companies, Inc.
Accept
Do Not Accept
Change Proposal Request
CPR #0017
Date: 08/18/201 O
Architect's Project No.:
Cost Issue Ref # : 30
City of Fort Worth Water Department
Accept
Do Not Accept
BY:
Date:
Printed On: 08/18/2010 04:48:24 PM Page : 2 of 2
REVIS ED ltemlud Pricing
" McCARTHY
I I
Job: Wcstah:MWTP O.ScrloUon:: CPR• 17 HSPS EJeo Bl'dg Plumbing changes Date: 0611<1/10
I
tAan Hours UrlitCotts Total Costs
tttm Oescriotlon ~ UOM MHI Unl1sl Total labor Mlrl Eoulo .... Labo< Mtrl e=n Sub Uni
Uolt MH MH s $ s s s s s $ Total
Delete s
1•eoa--1•2.00 ft o.oa -11 .36 19.6 2 .008 (22J 1285 s <~M
1·r-eouolina -8.00 ea 0 .65 .520 19.6 0.969 1102 re s 111 0
1· r90 -8.00 •• 0.83 •5.!M 19.6 1.761 -11, $ {113 -~ .. -1.00 •• 0 .92 -0.92 19.6 4.072 !1S: (4 s 122 . -1.00 .. -1.3,C •1.34 19.6 176.36 1261 !1 76 . $ r,03 -·-·15.00 •• 1 -15.00 19.8 0.534 "'"' 8 $ •= I-1"FPWH .2.00 •• 1.05 -2.10 19.8 12 (41 124 $ '"" 0.00 s
Add 0.00 . s
... Roo!Or.afnAssemon,wf {)od( d..-na andf'OCOM:r 0 •• 0 0.00 19.6 102.0 s
... 00 Root Or.lo auemblvw/ deck cl amo rrd f9Nivor 0 .. 0 0.00 19.6 123.-4@ . $
4• No hub w/ SST bSl'lm roer 15-430 2.048) .... 0 0.00 19.15 HS 290 • I s 290
,. No hub45 dea bends 811 a.a MO 19.6 11.18 125 •• s 215 ,·-~·l:~ 24 u 0.8J 19.92 19.8 15.24 390 366 y $ 756 • a•• 2.03 2 1.04 19.6 106.53 41 2 852 s 1~ -e-30 .. 2 60.00 19.8 5.2. 1178 157 s 1333 -izedunirtul 200 ft 0 0.00 19.6 1.2305 246 . s 246
I-3.2 t3 2 6<1 .00 19.6 2.75 1.25-4 88 s 13'2
210 n 0.24 8'.80 19.6 G.279 1~70 16!15 . s 21166
-od 110 n 0.00 0.93 102 s 102 -.... 2"5ea 0.00 02""'1 . 711 s 711 .... 2e6 •• 0.00 0.1 855 . '9 . s •• !II" SS Tru8oll wodat •nchors 61!1H 0.00 4.9094 . 33' s 334
6"' cores ,nrnul'lti CMO wail (ConcrefG Ctll by PVll"EI a .. 0.00 65 520 . . s 520 . s
Manlltl 2 wks 0.00 $ 200.00 . . 400 $ 400
,~1or 75 hrs 0 .00 s 5.96 . 447 $ 447
1 ............ 8 E• 1 8.00 19.5 118.49 157 948 $ 1105
0.00 . . $
0.00 . . $ .
0.00 . s
0.00 . s
T01alHRS 20320 SUBTOTAL s 3.992.72 $ 5.297.25 $ 847.00 $ . $ 10.1 27
FUE OI &PARTS: a.cos OF s s 847.00 O F EOM s s $ $ s .
OVERTIME FACTOR: 20.00% OF s s ,-1 OFlBR s 796.54 $ s $ s 797
lABOR BURDEN: 55.00S OF s $ • OFLBR $ 2 6 28.59 • $ $ s 2629
CONSUMABLES 7.oo,i, OF S $ $297~ OF MAT s $ 370.8 1 s s s 371
SAFETY S0.50 PER HOUR oflabor $ 101.50 s . s s s 102
SMAl.l TOOLS 3.00% OF $ s 7407. OFLBR s 222.2< ' $ s ' 222
TAX: 8.75% O F S s 370.81 Of MTUFUB. s s 32.4S $ s $ 32
SUBTOTAL $ 7 731 .58 s 5.700.51 $ 847.00 $ $ 1'.279
! GC 15.00S $ 1 159.74 $ 855.08 s 127.o:i s 2142
i Su~s 10.001' s . s s
1,1;.e 0.00!. s s . s . s s .
S UBTOTAL s 8,891.33 • 6 555.56 s 974.05 $ . s 16.421
S~orBond 1.0000% $ . s
lns1.n1nco o.8000,, $ 71.13 $ 52.4' s 7.79 s $ 131
Builders RI«< 0.3100% s 27.78 s 20 .,s s 3.0, s . s 51
AckO<loooll!ondPro""'-"' 0 .9106';0 s 81.87 s 60.36 s 8.97 $ . $ 151
I Total $ 9 ,072.11 s 6 ,688.87 $ 993.65 s . $ 16,755
TOTAL $ 16,755
· Frazier, John
From:
Sent:
To:
Cc:
Subject:
John,
Robert. Parris@Ferguson .com
Tuesday, August 03, 2010 11 :15 AM
Frazier , John
Pepping, Nick; larry.fischer@ferguson.com
Westside WTP -Revised Quote , Plumbing Revisions
Below is th rev ised quote r the plumbing revisions we discussed yesterday . Please review and contact me with any
questions .
Regards,
Robert Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410 , San Antonio , TX, 78219, USA
T : (210) 662 4902 C : (972) 670 5500 F: (210) 662 4825
E: robert.oarris@ferguson.com
www.ferguson .com
Bid No ....... : 8158257
Bid Date ... : 06/15/10
Quoted By : RCP
Price Quotation# 9158257
Ferguson Waterworks #788
2650 S Pipeline Road
Euless, TX 76040
Phone: 817-267-3900
Fax : 817-267-3912
Cust Phone:
Terms ......... :
972-991-5500
NET 10TH PROX
Customer.: MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
Ship To ....... : MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
PO BOX 122419 PO BOX 122419
FORT WORTH, TX 76121 FORT WORTH, TX 76121
Cust PO# .. : PLUMBING REVISIONS Job Name.: WESTSIDE WATER TREATMENT
(Item ; Description Quantity Net Price lUM \Total
J _ I --I 4! 102.430 jEA ! 409.72 l I .I ' ' 41 123.460 j EA 1 I 493.84 I
14 NH ROOF DRN WI SUMP RCVR & CLMP ,---------':------------------------_;,-__ i SP-Ml 104BRU j 4 ROOF ORN W/ SUMP CLMP & WTR DAM
l SP-MR1104BU
I 40 3.450 EA l 138 .00 l 2.c, 0
I l g JO i 11.180 JEA I 111.80 . B 'l I
!Fl05644 4 CI PVC X 4 CI PVC COUP
jNH4P J4 NH 1/8 BEND
I L,.~ 8 15 .240 l EA 121.92 i ·~lib
! e s j 106.530 j EA 852.24 I '?Sl.
j NH9P 4 NH 1/4 BEND l SP-MRI 944 14 NB DOWNSPOU T NOZ
E4010600EG J6 PLTD ADJ STD CLEVIS HGR 30 1 5.240 jEA ! 151.20 ! v . , I . I .
• BB24SHGAL V20 l 1-5/8Xl-5/8X20_'.4_.C:,~V H/SL STRUT 2-oc ~ 24 .61 i Z.lllo !
.. I
ERIGD0400EG j 4 JPS PL TD STRUT CLMP 32 j 88 .00 ! I/'
NHPPIO I 4Xl O NH SOIL PIPE r ·2."?o 240 j 1506.96 i
GATRElO j s1sx10 ZJPLT ALL THRD ROD i i I\) 2oo j 186 .00 j
PSGHHNE j s,s -II THRD ZN PLTD HVY HEX NUT I 2 ~s--2001 59 .92 I
PSGFSWE j s/8 ZN STL FLT WSHR 1 i. " "' 200 1 31 .10 I
RWW5860 ls/8X6 SS 304 TRUBOLT WDG ANCR I
Ct 1c 64 J 314.20 ; !
Net Total: 4501.51
Tax : 0.00
Total: 4501.51
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SffiPMENTS BEYOND 48
HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not
responsible for delays, lack of product or increase of pricin·g due to causes beyond ·our control, and/or based upon Local, State
and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this
document, or on the web at http://wolselevna.com/terms conditionsSale.html. Govt Buyers: All items quoted are open market
unless noted otherwise.
2
I
!
Frazier, John
From:
Sent:
To:
Subject:
Pepping, Nick
Monday, August 16, 2010 1:40 PM
Frazier, John
FW: Westside WTP --Quote, Downspout Nozzle
Still need to talk with Maxwell concerning i nsulation
Nick Pepping
Project Engineer
McCarthy Building Companies
Westside WTP
12200 Old Weatherford Rd. Fort Worth, TX 76108
PO Box 122419
(602) 980-7327
npepplng@mccarthy.com
Leaving Green Foote!J..nts . Think before you print
From: Robert.Parris@Ferguson.com [mallto:Robert.Parris@Ferguson.com]
Sent: Friday, August 13, 2010 3:51 PM
To: Pepping, Nick
Subject: Westside WTP --Quote, Downspout Nozzle
Nick,
Here is the downspout pricing you requested . Please let me know if you have any questions.
Thanks
Robert Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA
T : (210) 662 4902 C: (972) 670 5500 F: (210) 662 4825
E : robert.parris@ferguson.com
www .ferguson .com
Bid No ....... : B161959
Bid Date ... : 08/13/10
Quoted By: RCP
Price Quotation# 8161959
Ferguson Waterworks #788
2650 S Pipeline Road
Euless, TX 76040 .
Phone : 817-267-3900
Fax: 817-267-3912
Cust Phone: 972-991-5500
Terms ......... : NET 10TH PROX
Customer.: MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
PO ·BOX 122419
Ship To ....... : MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
PO BOX 122419
FORT WORTH, TX 76121 FORT WORTH, TX 76121
1
·Cust PO# •. : DOWNSPOUT ADPT
Item j Description
125014 ! 4 CABR PARAPET DOWNSPOUT NOZ
Job Name.: WESTSIDE WATER TREATMENT
!Quantity
!
I Net Price
I
s i '
Net Total :
Ta,c :
Total:
118.490 j EA
947.92
0.00
947.92
!Total
I I 947 .92
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48
HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not
responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State
and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this
document, or on the web at http://wolseleyna.com/terms conditionsSale.html. Govt Buyers: AU items quoted are open market
unless noted otherwise.
2
CDM
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) /?J..
CDM.(F-3043) L,4J
March 16, 2010
Subject: Westside WTP Project
Electrical Building Plumbing Modifications
Sheet AH-1.01 identifies proposed locations for the Electrical Building roof drains and the
requirements for tapered roofing. The intent is for the collected runoff by the roof drains to
be conveyed within an interior, overhead piping system and discharged to the exterior via
wall nozzles.
The piping system associated with the roof drains is not shown in the design drawings, and
must therefore be added. As shown in the attached revision of Sheet PH-1 is the proposed
piping system and required routing. The routing was coordinated with the electrical
equipment layout provided by FSG, so that the drains and piping would not be located
directly over the electrical equipment All piping and appurtenances shall be as specified.
Also shown on PH:-1 of the contract drawings is interior plumbing for service water supply.
The interior plumbing, including pipe, valves, backflow preventer, freeze-protected
hydrants, and related appurtenances shall be deleted per the attached.
Please discuss the referenced modifications with McCarthy.
cc: Chris Harder (FWWD)
Josh Trice (B&V)
Steve Tiberg (Komatsu)
Danny Saenz (Multatech)
George Cloyd (Multatech}
Alex Howse (Multatech)
Danny Shannon (CDM)
File: 62142 -9.04
Elec Bu lding Pk.mblng Mocflfocatlons.doc:
i
i
,: $-4 .Nf.) C)..D.
, ffilMl»M'lr ~CIIAl'!
~
_;....-;r-"""_ ... Z2Lt -'JY-f . ----...... .. --. -~ • ;._ -'_,, .-: JJ:. -•• ,
/u..,o 4" LP ,o n, .. .._,'l:f;, <,,.,..Af'~
I •· a.c.
'r : ---;·-;·,·. ·-••
I ot -. i .{~; , •
-,o :L .. ·w10Pi,D.
i'1J:::-·.:~~rr~,::·=: it
.... !
t::=J ' ... ;
,·C]
f
~-;r::-..... ------.. -.-~ UlCNC"--T, f · · !':«"~~-~wic:_.:.~~o::1us_~-,...1WJN2t __ fC"., J -4.~CflQClftfWNt.,CCA1XIHSW/·~.~ ti
i ELECTRJCAL BUILDJNG ~ PLBG PLAN -~ i $Al.£: 1/•:-1·-q~ ~-s
-~~==:r::::r:::i::::i:::::::::::::::::::::::::::::::.iT"-.... --""'--:,...::-::_::,::-_,-::,.,....::::-:"::'.""::='"TCDM===-------,-------arr--~-.Ofl-_r-·.WOR-_-_-n-~-:ro<M-.-------r-------------------..,..,....,,-..:, .. =-==--.. -,..,-l l ,_':: __ .._;,.._•_-, ... _~ ... _-----------.. -_ g§:"" ~..:.; ..;.;.,.....,,__.._ WESTSIDE WATER TREATMENT PLANT PROJECT ELECTRlcAL BUILDING _PLUMBING LAYOUT "'""'' ;:,:
0
""
I
i
!
1
f
ii
I
i
f
l
i
s
cwt
•· s..c. NCI o.o.
Sr..&C OUT 1a· .-ec,,,t CAtl«
i.llNOCl!MiPCIJrNOZZll
/ /
..... --:.·,i.:·
· ;1f~/~ Et: 7~t(\:~~:;:,::'n:¥ ;; '.tf;r7[;~):~;::,;:t,~. :~
1
25(
t:· ~":-~---,
, I
,I
I ' .-1 .•. ; •' i
:·,.
1-·. ..
[ __
ELECTR ICA L BUI LDING PLB G PLAN
SCAl£: 1/4"•1"-o"
+---t-+-----------------t«--ff~ "{IIFT stJrrtlS +---t-+-----------------1 _..,,.,~ ~~~ +---+-+-----------------l~o., r,~
'l--+-.-----------------1--afl~ ~NOf~-~ --~ -.;WOIIQOU,,JOOI Xlrl.n~T
"""" lf1 1, SlCRI CIIN(S NCI CMJlf1.0W o.lNS SfWi. NOt 1K .atnUI "8JVC tl£CnlC,t,L CQW"l,IOff.
2.~NOZhl:SIW..1.Kca.w..lOJOSlriW:l50\0'IIITMIA1"'11JISll4IIIIOfrQl:'KIP.
J.P'MMCltCOlctl(lt,v..'9411UJQ(IIO,.CJW~NOUUS.
4. COCMJll«J£ POOi llMM l.OCAT'Ord W/ NilCM'!ICJ\M.. ~
CflY Of FORT WORTH. TEXAS
WESTSIDE WATER TREATMENT PLANT PROJECT ELECTRICAL BUILDING PLUMBING LAYOUT
PH-1
September 25, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-21 -Miscellaneous Electrical Modifications
Dear Mr. Boss:
I have reviewed CPR-21, which includes a memorandum from COM, dated May 10,
2010 that responds to numerous questions received from the electrical subcontractor
regarding the scope of work. Changes to the scope of work include a modified detail for
the light poles at the sedimentation basin as well as the installation of an additional
electrical junction box and conduit near the flocculation basins.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$4,652.00 with no additional time requested. This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P .E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DIVISION
THE CITY OF FOR'r WORTH * 1511 11TH AVENUE * FORT WORrn, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
0 Printed on recycled paper
1=111 BLACK & VEATCH
~, Building a world of difference:
September 7, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
A TIN: Mr:. Chris Harder, P.E.
RE:
Dear Mr. I-larder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#21
Transmitted herewith please find three copies ofMcCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order amount of
$4,652.00 be approved. Please review the request, and if it is acceptable; baveit e;i<~µted.
Sincerely, ~
August 26, 2010
WESTSIOE'WATER lREAlMENT PlANT 12200 OLD WEATHERFORD ROAD. FORT WORTH; TEXAS 76100 wwwmccarthy,com
MAILING ADDRESS: P. 0. BOX 122419 FORTWORTil, TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 5~0 -3727
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re ~ Change Proposal Request #21
Westside Water Treatment Plant
P262-607540045683
. Mr . Boss ,
Please find attached revised CPR #21 pricing fot changes i:ri.ade to the project due to
CDM memo dated .May 10, 2010-Revi'sion#i
This memo makes nwnerous changes to the .electrical details ofthe project, as well as
some minor structural changesin order to facili tate these changes to the electrical details.
Attached is a detailed breakdown of the associated additional costs , as well as
· breakdowns from affected subcontractors; This revision of the original pricing is to
provide aluminum junction boxes i.n place of stainl~ss steel ru; originally specified .
Please do not heshate to contact me with any questions or concerns.
CC: Steve Gotschall -Project Director
Jerry Mayer~ Project Dh·ector
F.ile ·
ENC: CDM Memo date~ May 10, 20 io-Revision #2.
CPR #21 Revised Pricing
Change Proposal Request
CPR# 0021
Date: 08/23/2010
Project Name: Westside Water Treatment Plant
Project No. ; 002012.000
Architect's Project No.:
Cost Issue Ref# : 46
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to
schedule impact, th is work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has
been fully executed. ·
DESCRIPTION OF THE PROPOSED CHANGE:
Electrical Clarifications
SCOPE:
COM Memo Dated 4/28/2010
CDM Memo Dated 5/10/2010.
DIRECTIVE:
REFERENCE:
Pricing Details
Company Name
Facility Solutions Group
United Forming Inc
McCarthy Build ing Companies , Inc.
McCarthy Building Companies., Inc.
Description
CDM Memo 05/10/2010
Formwork
MEMO Electrical Revt
Subcontractor Bond
General Liability
Builders Risk
Project Bond ·
CO Fee (Sub Work)
co Fee (McCarthy Work)
Net Amouht of This Proposed Change
Amount
3;291.00
436,00
364.00
41 .00
36.00
14 .00
42.00
373.00
55.00
4,652.00
Net Change In Calendar Days Due to This Proposed Change
0 Schedule Impact to be evaluated at a la\er date.
Ciiy of Fort Worth Water.Department
Accept Accept
Do Not Accept Do Not Accept
BY· ----·-···-··-·····--·-···--. -·-······· ...... BY: __ --·········--·-····-··········· ...... __ .. .
Da.te : Date · ___ ···--·····-.......................... _ --·-·-...... .
Printed On:, 08/23i201 O 11 :25:34 .AM Page: 1 of 1
Revised Pnang McCARTHY ········-··--T.-...... ·-· .. =r=Jj .... _______ ,,_ . --·--·-""" --.. -J ....... __________ =t=-·=--1 --------·· p...:_C!f·p~~~::·-CPR #21 • Electric Clarincatlon Mamo ~~;J ----~--:~·=:·_-~.:~jj'41,;r~~ ·: .... :_·~=--J~~:.·--~J --~-----' ---•---I ' I I I I I T :~-+~~-· 1--· ~-+------1------·----1 _M!ln_HoUrs Unit Costs . ~ Toi~ Colt$ · ··-----·-~+-·--· --··+-··-+""---------· ... ·---------.. ~----· 111em 1-~-----Oescrie_tlon _______ .... -••••. JC!uantll\f !UOMJ. ~~+u~~-j-T~~et ~ L";or ·l=M;r1 =J 1:9;1-P--· I S~b -f-----·La:"r. ··I M;r'-· I·· E~ip __ , _, ... ___ 3,i(f9" Sub ·s -s Line ···Total. s·-3400 s··-----... MCC_j~~~~J~t31S,c;_.a,______ -----·----1---100 ____ , ~~ ·1 .. ti . --.·. --~~I-__ I =:__3¥Jt -----·· .,.--------~ --... --------· _ J,oo .... LS .. ____ • __ • __ .90tJ:O.'. I"'---q 000 :·1::~~----_-:-. _--~--------4~:: ··tisj_---·-=: -----_· __ -~~---------· :.· --~-:~:~~-=-I::..:~~-----~ ---i---~--1---· r-· · <i:i6 s·----. -UF .E"''"'""--------------~· s ........... .'436.cx:q --. . .. · 1 -=-1 · 1 -------_: ____ · . · . .=.i _____ .. -_ ............ ~36 S ·3.291 .L -. ----3"jg;-... T.:::=:1.ffi.1_!&J=-------<·J----:-} -----.. ... -----. ---------------------------.. cy_ ' • ..... . ' . ' -------------.. --~ -!-----'. -.. ~t!· ----··· ' 000 ~c~· i>,.;;;·~~e:'iab~-:-=---_.::.::_ ___ -_·_~ :2£1,:_· ___ lir :-__ ··:_-:::_-:::·~Jgg __ ·_·:.: ·.:.~"':_··:._ _ __, _________ _ _ __ ::;~~~~1~~==-~~-~-: r~·:-:-.~: = ·--s 000 "---··>--------·--------~=.· ·. l _J-.}j ~. •·... :_ . = T=: ::: L : ~. __ : ___ .. "-·-.: 0.00 --··-................... ________________ --·--•--·-· .. ··---·-·-· ·o:oo ·· cfoo --·---' .... -, ....... ., _____ ·. ·-1-s-----.. --·--··· -s ................. s" s" s· ·'· ....... ______ -.s ......... . --------------·--....... ----------l ··, --'J ·-r.·-1. ·· ---1'. ::iJF···-·1-----:· . oool ·I ·I·---......... -----+···· ········-····· --·--· ·---t··------t--------~ '·------.. ---, ..... ............... f-----____ ,,,,_ C.j .. , ______ , ___ ........... . ............. ____ , ____________ ,_,., ..................... . ····---·------··-· -..i-1--------~---·-· l-· s L •• .s if :s·· ·-...... $ ............ 000 --000 -----· --·,.!------· ·s s ----....... ' ·---.. fotalHRS 000 SUBTOTAL $.. -~-~-FUEL OIL & PARTS; • O.OO'h -ors-··-$ -OF EQM s s "OVERTIMEFACTOR: 10.00% · -OF,.s.. ,-----·------------OFLBR ... • s s . --LAEiORBuFioEN: ·ss.00%. ·--·-oF .. s_-.. _$ ....... ---:-----·--:cii=iaR·-·. s s ~ . s , ..... _ ·------------_, ...... CONSUMAlllES 7.00'h OF S $ 340.00 OF MAT S $ 2 ----r----~-~~~L5MJY. 1~: ~-~eg~r-· :---------: ci .-:~:~~~:--~ . • : . f" .-.-::~~-=-... ,,,.,., --~~ift---w=-1·: "!oor 1~ ~,rz700r 4.~1, J :i~;-~~-~-~~-.;j.~ ~~,l'[~f f "·+ I ••• : '. lnsurm 08000%. S S -·--• , • -.--1 • -liu,lders Risk Q3100% -' $ s -----;-~-----····~ ·:·-·· __ t:·~--~:-::~~~-~~~·.::r~~ . ~--:~~~:~~;:,: . I: 42 I I TOTAL I $ 4,6521 ............. , ... ___ _ ~ : .. _.. " ----' -· 1----------__ . .J ---·-1--t---------·-· ... f-.. --• ----------l----------·• ....... ---·· ....... ·:::--:-::.::::::-~-::::7_-----.:-:-------·-·--
ISCl£ · • ••~• el ectr1 c
2525 Walnut Hill Lane Suite 100 Danas, lX.75229 (214)-357-5697 (TECL#
17904)
08/23/10
John Frazier
McCarthy
12001 N. Central EXPWY ., Suite 400
Dallas Texas 75243
Subject: Revised Priclng for Contract Changes
Per Memorandon Dated 5:.10-10 for Requests for
Clarification
John,
-
Change Order
Proposal
No. 127584
Date:! 08/23/10
ProJe_ct: Westside Water Treatment Plant
Job NO.: 30J1613
Drawing No:j
,Spec Section:.
We are pleased to offer the fo!lowlng Change Order Proposal for your consideration.The price includes labor,
material, and equipment to perform the additional work that was not part of the contract per the response to the
questions asked by FSG Electric in Memorandum dated May 10, 201 o; See attached sheets fo( price breakdown
and attached Memorandum. The price to perfonn this work is $3,291 .00,
Sincerely,
FSG ELECTRIC
Jerry Bevers · Fi"~
astta: fighting> elec~rica( > energy
• • ••• technology> signs
FACII.ITY S01.UTION5 'GROUP
RECAP SHEET
C.0.#3 RATE HOURS
LABOR-{ELECTRICAL}
FOREMAN STRAIGHT TIME $30.00 1.00 $
FOREMAN OVER TIME $45.00 $
JOURNEYMAN STRAIGHT TIME $25.00 $ 10.00 $
JOURNEYMAN OVER TIME $34,50
HELPER STRAIGHT TIME $17 .00 $
HELPER OVER TIME $25 .50 $
$
$
$
LAaOR TOTAL-$
MATERIAL TOTAL $
EXPENDABLES-6% OF MAT. $
BURDENS· (42% OF LABOR) $
SUBTOTAL· $
PROFIT& OVERHEAD $
TOTAL• $
TOTAL
30 .00
-
250.00 .
-
-
-
-
-
280.00
2 325.00
139;50
117.60
2,862.10
429.32
3,291.42
-~Ct£ lighting> elec~rical > energy
• • ••• technology> signs
·FACILITY SOI.UTIOM5 GROUP
C.O. #3-REVISED PRICING SHEET
OESc;, QUAN. MAl UNI! IMAI t:AI, -"-~-·-UNII
ADD 4" CONDUIT-ALUM. 150 $ 10.00 $ 1,500:00 0.22
ADD CONDUIT SUPPORTS 20 $ 8.00 $ 160.00 0.25
ADD4" LB's 6 $ 150;00 $ 900:00 5.00
$ -
DELETE 2" CONDUIT 600 $ (3.00 $ (1,800 .00 (0.08'
DELETE ALUM. J-BOXES 2 $ (125 .00' $ (250 .00 (2 .0000'
DELETE CONDUIT SUPPORTS 60 $ (5.00 $ (300 .00 --0.25
ADD 36"X 36"X12" NEMA 4X-1 $ 1,300 .00 $ 1,300.00 8
ALUM. J-BOXW/ TERMINALS
AND BACKPLATE
12"X12"X72" NEMA 4X ALUM . ., 1 $ 900.00 $ 900.00 4
WIREWAY $ -
S.S .SUPPORTS FOR J-BOX-ITEM $ 200.00 $ 200.00
ANDWIREWAY $ -
DELETE F.O. CABLE 300 $ (0.95 $ (285 .00) ~0 .01
$ -
$ .
$ -
.$ -·
$ -
$ -
$ -
$ -
$ -
$ -
$ •.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ .
TOTAL-$ 2,325 .00
-~-··--:.t:At.
33 .00
5.00
30 .00
0.00
(48.00)
(4 .00'
(15 .00 1
8.00
4 .00
0.00
0.00
(3.00
0.00
o:oo
.0.00
0.00
0.00
0.00
.0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0:00
0.00
0.00
10.00
Project Value
Adjustment Request
Dayton Location:
95000 W. Highway 90
P.O. Box279
Dayton, Texas 77535
Phone .936 •258•8221
Fax 936•258~9637 ·
Friday, July 02, 2010
Re: Westside Water Tteatn1enl Plant
Nufab Rebar Project #05509013
Wirxaf1acl1ie Location:
1535 W Highway 287 Bypass
-Suite A ·
W1lxahachie, TX 75165
Phone .972•923•2636
.Fax 972•923•2771
Li:mgview Location:
806 Jordan Valley Road
Longview, TX 75604
Phone 903•297•7477
Fnx 903•297•7446
Thank you (or selectingNufob Rebar, LLC M the concrete .reinforcing steel and rel~ted prod11cts htnterinl
supplier for the project referenced . We are request:i.hg review and accephmce of the.following cxtra(s).
Item Descr/ptiou
Additional reinforcing required for
light corbels at Sedimentation Basin per
request 2010.05.10 plus ·4 hours
addi tiorutl detailing time.
):teui Weiglst
100 lbs.
A.ilio1111t
$340 .00
Fraire's Re~ar II\ay isSt1ea Change Order or sign and return the Project Value Adjustmeut request It ls
our goal to 1rtake this project a successful partnership fotFrair'e's Rebnt and Nulab Rebar, LLC.
This Project Value Adjustment Request Is accepted and incorporil.tetl into Westside Wa.ter Trea.tment
~~ .
T.o preveutdelny qf fabrication and sliipment of the above, please sign and rehtrn 11t your earliest
convenience. ·
Frairc's :Rebar .
Authorized Signatiire
Date
Nufab Rebar, LLC.
A Harris Rebar Co111pruiy
I
l Date: 06/29/2010
Project Name : Westside Water Treatment Plant Architect's ProJectNo :
~roject No: 002012.000 Cost Jssue Ref# 46
CPf3 No 0021
To : United. Forming Inc
Date Quote Due.:07/06/2010
Please submit an itemized quotation for changes in your subcontract sum and/or time on subject project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein.
DESCRIPTION OF PROPOSED CHANGE:
Formwork
SCOPE:
COM Memo Dated 4/28/2010
COM Memo Dated 5/10/2010.
REFERENCE:
Net.amount ofThis Proposed Chan,ge: (ADD)(OOFI ICI)(tlQ GH"NGF)
!
Net change in Calendar days of this Proposed Change: (Aee)(etSUCJ)(NO CHANGE) ______ Days
• Attach Petailed Cost Breakdown
Unlt,,d l'onning lne . ~ By~:::::-~ $ . . .
McCarthy Building Companies, Inc.
(Prior to ArchitecVOwner rev iew)
__ Recommend Acceptance
__ Do Not Recommend Acceptance
__ No Recommendation -Price M~rglnal
By :----------------
Date :·-------------~------
McCarthy Building Companies, Inc.
(After ArchitecUOwner review)
__,..... Accept
__ Do Not Accept
By:---------------
bate : ________________ .
Printed on: 06/29/2010 04:48:11 PM Page: 1
ho : McCarthy Bu lld!ng C:,mpenies
12200 Old Wealherford Rd.
Fl)!\ Worth.Texas 76108 ,
ATIN: Glsel De ta Orta
.PH: 817.5!,0.3740 FX; 817.560.3727
CHANGE & COST BREAKDOWN
f.'rnleet Westside Water·Treatmont Plant
Descrlplion : Rf'P· Cost Issue Ref #48 Revised Corbel @ Sed Basins
ITEM
NO. DATE DESCRIPTION QTY
1 07.07.10 RFP Ref#48
Rev1S!ld Corbels 30.00.
LABOR
UNIT AMT
SF $. ··a.es s 265.50
QUal. Lavoul lo ho .established from Mee•""" orovldod 3 c!lmclll>lon lavout Dian, .
. SUBTOTALS 265:50
ISALESTAX 8 .25%1
I SMALL TOOLS("/, OF LABOR) I -
I SUBTOTAL COST OF LABOR, MATERIA!.c, and EQUIPMENT
ACC EPTED B)':
NAME:~-----------~ T ITLE'. ________ ~~--~-
ACCEPTED BY: Vniled Forming, ln.e.
NAME:·Brett P BIQYnl
·SUBCONTRACTOR'S OVE!{HEAD.
SUBCONTRACTOR'S FEE
CHANGE ORDER REctUEST#
DATE: 07.07 .10
I Prepared bv: BreH D Brown
I
I
MATERIAL EQUIPMENT SUBCONTRACT
AMT EA AMT A~T
s 3.50 $105.00
105.00 -
9 .00
. ( 15%) ..... , .... , ... , .......................
O'Y,) .................... · ................ .
TITLE: ProJect Manager
Nole: This change adds scope to 6~r Subc:cn1J1!cl .All twms and c:cnd1 Uons or lhe onginal Subc:cnlracl shall apply io lhese chang.es ..
Pleaslissue us a Change Order in the amo~l or $ . 436 .
ff you have B.'l)' que saons or comments, pleas11 contact Luke .Zoell er al 713-875-0222
United Forming, lnc. Confidential 7/7'2010
4
s
TOTAL
J70.50
370.50
9 .00
J79.50
56.93
4:l6.43
0.00
Memorandum
To:·
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff, P.E. (TX #91688)
COM (TX #F-3043) {JI>
M~y 10, 2010
Subject: Westside WTP
Requests for Cla"rification -Electrical-REV-1
A meeting with John Frazier (McCarthy), Fred Burgeson(FSG), and Josh Trice (B&V) was
held on-site to discuss and identify specific electrical questions that have been identified.
There is one item that requires structural coordination listed below. The following is a
paraphrased summary of those items:
1. Phone wires are shown to be routed within the Administration Building via the cable
tray system to the point of demarcation. Per Fred~ for Eagle Mountain WTP and .the
Como Pump Station projects, the phone company would not install the wire in.a cable
.tray and required a conduit. Verify.
Refer to drawings E-10, E-17, ED-32~ and ED-38. The te1eplione cables from service
provide1' to telephoiie board (Point ofDenU1rctrtion) are routed in conduits .. Localfo11 of
the telepho1ie boai'(t (Demarc) is shown pn ED-38 and graplticnlly on I~ 1. Conduits for
telephone service prauider cable shall be routed to the telephone board shown on ED-38
as required/or tem1i11nlion. Modification ciftelephone b0ttrd positfrm, conduit entn;
locotion lll1d cable tray am be exa1Jzji7.!!d tofarjlitate routing .
Refer to E-17 fo1· Teleplwne System Electrical Conduit Rise,· Diirgr.11111. Contluil/cable
ftilis betweei1 nll teleplwmf /1Qr1rds are shown for n:finm:e. Sheet ED-32, Note 6
instm.cts rc:il1filzg of the rc:sr1ectivc tdcp1w1w tond11its/cables to t1ie 1T Room in ccudult.
Con,fuit from the Ductbank 'J' sluill enter 11t the kvcl sliow11 n11d bend vertical for
routing vi(l tlie Electrical Room l:is . shorim. Co11d1tit for tdephone l:al7.lc tlrat cu tets the
IT Room shall lie coordinated to enter hmnediately adjacent to or u11der tlle Teleplwae
Board for direct coimecticm and teri11i1mtio11.
Roqueat ·'°' Clanlica.llon • FINAL RE'{-1 :c!OC
May 10, 2010
· Page2
2. Sheet EA-1: The two sets of junction boxes on the west side of the struch1re appear to
be redundant. It is proposed to eliminate the north boxes and install all conduit
directly to the south set of boxes.
Junction boxes were provided to allow instilllation of condiiits feeding equipment mid
devices to be run without exceeding the equivalent of three 90 degree bends as specified
in 16110.3.07.A. 'function boxes ca1i be deleted if conduit ins.tallation meets
specifications. Coardinate with Co11structiori manager. ·
Controls and discoru,ect for the tank--mounted mixers are shown on top of the tank-. It
is proposed to mount adjacent to the ladder on Unisfrut system.
It is propdseri tlzat the controls mid discol!nects be installed frt locatio11$ show_ atop the
tanks to permit direct access to the mixer colltrols and disconnect for maintenance
work. A lmndrail S1Jste111 at tile top of tlle tank can be used along with as trut system to
mount the ,:ievices. However, it is recomme11ded tlmt prior to settillg ofpnnels, ti~
Construction Manager sl1ould coordinate with CihJ staff 011-site for verification of their
preference.
3. Sh_eets EB-5 / EC-i: On EB-5, at the southeast corner of Sedimen.tation Basin l:'{o. 3, J-
Box-A is shown to have 120V power. On EC-1, at the same locatio~, PB-A appears to
have 480V power and 120V power. Verify what is intended.
Related to this, the 'P2' fixtures called out for mounting on the Clarifier·walkways are
480V fixtures shown to be powered by 120V circuits. All other'lighting around the
Sedimentation Basins is fed from 120Vcontactors. No lighting confactor is shown for
control of the Clarifier lights. The tp2' fixture ·is a 20-ft hinged pole and with
placement atop the clarifier the fixture will be hinged out over the water surface. FSG
proposes use of a 'U' fixture and tie into a 120V circuit in art existing contactor.
Liglit fixtures atop the Clarifiers slzall. be revised to 'P' ti;pefixtures witli photocells.
Conduit and conductors shall be routed as tioted. The 'P' typefixtures are to be
mounted atop the Clarifier work platform so tl1at tliey hinge to the walkway jQr liglit
fixture access. Position of t!ie poles on tlte platform sliall be .on tlie walkway centerline,
and at tlie far en .d of tlze work platform opposite tTie walkway. The pole win be 1iwun.ted
on aJabncated angle bracket welded to tlte platform framework outsiile the guardrail
perimeter. Confirmation ofadditio11al framework loading with the Clarifier mfr
(WesTec/1) will be 1·eq"itired prior to proceeding.
J-Box-,A and Pull Box A (PB-A) (lre not tlze same.fixture. J-BQ;1:-A is intended only for
the 120V circuits see adjacent box in Detail A shorunmz EB-5. All 480V circuits
pawering the C!arifiers and associated controls as sho.wn EC-1 s7ml1 be routed via PB-
Requosl IO< Clart icahon • FINAL REV-1.doc
May 10, 2010
Page3
A as shown 011 EC-1. The conduit shown 011 EC-1 exiting PB~A to the North is not
required and is not intended to serve nny equip111e1it .
4. Sheet EB-2: Conduits in Ductbank 'L' to the east side of the Flocculation Basins
includes 3" dia conduits for the multi-conductor cables. The cables include excess
conductors that wm not be needed and FSG must termina;te. Additionally, the 3"
conduits are to transition to 1" conduits in the slab. No means to accomplish this is
shown. Note 2 calls out for spare conduits to be stubbed out into a J-Box ~ this is not
shown anywhere;
Refer to response for RFI-111.
5; Sheet EB-9: Schematic.No. 2 indicates that a photocell and a timer are to be_installed
for operation ofthe lighting. Advise how this ·will operate and clarify schematic.
'I11e Tork lighting control tlzatis listed s7wuld be revised toflre Tork 'DGLC' model to
provide the in tended Junction slwwi1.in Schematic 2/ EB-9.
Should the lighting fixtur~ shown for instiillation atop the Clarifier mechanisms be
wired to this contactor? See Item No.10 below.
Refer to Item No. 3 above. The lights shall nm off of the supplied photoceli mid shall be
directly wired to ·tlre refererice panel.
6. Sheet EB-15: The FOCthat is identified as 'FO-RIO-OZA' is shown to route from the
Chemical/Ozone Building to the Contact Basin via the chemical Pipe Chase an.d
multiple termination boxes a.re shown/noted to be installed within the Chase. Refer
to EE-6 also. Sheet E.D-35 shows a blocl< diagram that identifies this FOC as FOC-3
c1nd it is identified for routing via Ductbank 'M' along the westside of the
Administration Bldg that enters the Filter Gallery Area. Refer to sheet ls3 for fiber
requirements.
FSC requests clarification if these are the same fiber run shown to be hJrnished and
.installed via two routings. FSG proposes that the fiber and boxes shown 0.n EB-15 and
EE-6 be deleted and the fiber routed per the ductbank and within theTunnel B cable
tray system/conduit to FOPP-RlO-OZ.
Fiber FO-RIO-OZA is a duplicnte inst4llation of FOC:-3, therefore, the fiber, (FO-
RIO-OZA), (2) 2;'cxmduits, and FR1> and alu111i11.um pttll/ju11ctio11 !,oxes shown 011
Si1eets EE-6 nnd EB-15 shall be deleted. Coutmctor s7mll 111aintai11 pull box(es) nt the
Ozone/C7zemical Building as r~quired for installation. T/1e required FOC is shown as
FOC-3 1md shall be furnished nnd installed as slumm via Ductbm1k Mand the cable
tray system within Tunnel B to tl1e Ozone Contact Basin area ; Note{ the cable tray
systems .shown 011 EB-15 and ED-40 must be co11tin1,ous for iiistallation of all power,
Request fa Clenfioalion -FINM. REV-I .~
May10, 2010
Page4
i,zstm rnentatioll, nl!d fiber cables from Tumid B to tl1e Ozone Contact Basi,z gallenJ
area.
7. Sheet EB-16: The conduits for the Destruct units are shown to be surface mounted and
routed to enter the Gallery directly below at the east end of the gallery.
FSG proposes that the conduits be installed in the slab and enter the Gallery from
directly above and drop into the cable tray, similar to . other installations atop the
Basin.
T/ze referenced conduits slzall pe routed in the middle third of the slab i11 accordance
with Detail G/SZ-3, the minimum conduit spacing from center-to 0 center shall be 3-in.
8. Sheet EC-1: The mutli-conductor cables assigned to each sedimentation 'basin
c!arifiers appear to bein excess of what is required. See Items No. 3 and No. 4 ·above
also. FSG has inquired as to what they are to do w:ith the additional conductors that
will not be used.
Refer to :tespo11se for RFI-1 H.
9. Sheet EC-3: The riser diagram for the valve actuator shows 2" dia conduits routed to
the valve. actuator for powel" and controls. Valve actuators will only accept 3/ 4''
conduits and that should be all that is required for the .conductors. Also, the concrete
pad shown is in conflict with the Chemical Pipe Chase thatis to be routed around that
area.
FSG proposes wall-mounting of disconnects and related panels and deletion of the
concrete pad. ·
To avoid conflict with the Ozone Pipe Trench shmv11 on C~6, the concrete pad s/wwn in
Plan and Detail A/ EC-3 and Ductbmtk N slinll be deleted. Relocate controls and
disconnec:ts for valves SB ~SL-PV-001, 002, and 003 nnd LSH-13255 for wall
mounting adjacent to the respective valves. Field coordinate mounting location witl1
Constrnction Manager and City Personnel prior to pe1formi11g work.
Route the conductors ns shown in Diagrani 1/ EC-3 urith 2" conduit from t7ie cable
tray to the wireway(s). From the wirewa.y ta tlre devices, 3/4" conduit slmll be %,!sed. If
. conduits are installed to se,:ve only one actuntol' without a wiretvay; 3/4(' cn11 be
in.s"tdlled from tlte table tray.
10. Sheet EE-2 & EE-7: Security riser diagram for the Chemical/Ozone Building is not
shown on these sheets; only a reference to CP-24. In comparison.the Electrical
Building shows. a riser diagram for the security system.
Requesi !O( C1"nr,cat,on. FINALREV-i .d.co ..
May 10,2010
Pages
A related question regarding requirement for an exterior push-button with key is
specified to be provided. CDM needs to verify if the City Wants this external push-. .
button.
As noted in tile origintil question, Sheet EE~l identifies tfze Cardkey SecurihJ Coritrol
Systei11 as being referenced 01t Sheet CP-24 and powered by the UPS Panel UL-OZ .
Ot11er sheets note a cross"'.reference for insfallation of security conduft, wire, and
devices shown on the related 'CP' sheets -CP-22,· CP-23 and CP-25 -nt other
facilities. On tl1ese sheets, the conduit, wire, and devicerequirements assodated with
security features of the Ozone/Chemical Buz1c!ing are also shown.
11. Lighting atop the Sedimentation Basin walkways is shown to be installed on a
concrete corbel (structural detail) that is lower than the top cjeck of the structure. This
creates conduit routing issues as the conduit will be in the top slab of concrete. It
would be difficult if not impossible to route the conduit into. the pole base via the
corbel.
Proposed resolution isto delete the corbels and form a notch-out in the top deck thru~
bolt the anchors to a steel plate on the underside of the concrete deck.
f.ight poles sllallbe installed in the locations shown. It is f!ll~ssefl iJiat the C{Ji1traetsy
s!e11rl tire f@J' sl,ab BOJ'err tha eerl;el; f:fo1;•1z 11sie/.1 suts) te .1110teh t/18 relfltire.4 9ltfsr:
dit11e11sis11s of #1e esrlieki, Pl'twide ROB (2~ #6 1J s~.lmrs that enei¥ele-tl1e
f!neJisJ<fi8e p!!Oam uf #1e light rsltis t11t" splilHI n:ifh U1s wilt1ffva!f tsp :tr1ti listtsm ,nat
reinforeement l,ll nne.tis,:lfga S:liall he llimd Bif J<effllir<eti eml,cdment R€fH+ZBBlely ·
"Hlit.'iiJI .the esrbe/6 mt emlmlme,tt erre1lit slu,11 be t<i.~enf-0r #he t911 sl-as tliiehr1ess .
. Anel1sl"B' slofll!l 11e lsJ1gi11e1rnd seesriii1ig!y, ·cssrdinate light rsls srie11mtiim s@ tlffll
hi11g,s 1foseeJis11 i, :p,wnilel is t!tS u1Al,'Ru!f8. Corl,el height shall lie raised by 10-in fo
match the top of the walkway ns i.T1ow11 in the at.tached figcm:. Mod{jicat/011 of the
Corl,cl n•injorcemc:nt is 11otreq11 ired. 01zly tlu: (2) #:3 U~slmped liars slur/11,c addc:,i to
encircle t/11: nnchomge pattt!rn of tire light poles and splice with the walkway top t111d
z,ottom mat reiltfardng steel.. Anclzor /lo/ts $linll /1,: as ~uppUed by t11e nw11ufncturer .
Coordinate liglzt 1,ole orie-11 tnticm so tTtnt lli11gc: direction is pamlld to the walkways.
12. Sheet EE-6: TI1e heat trace for the chilled water pipe is shown as 120Vand the chilled
watei.: pipe goes froin the Chemical/Ozone Building to the Chiller J1orth of the 8rea:k
Tank.
FSG indicated that this di.stance may be exi::essively long for the 120V system.
Based on toads mid circuit size, the l1eat trnce distance is within .limrts based Oil tape
installation per Section 16859.
R~est.lor ClanficaUon • Ftwil, Rl;Y·1 doc
May 10,2010
Page6
13. Sheet EE-8: P1 light fixtures are called-out on the drawing. These are.480V. The
circuits referred to are 120V.
FSG proposes revision fo 'P' type fixtures which are 120V.
The reference lighting shall be revised from type 'P1 'fixtures to type 'P'.
14. Sheet EE-14: Detail A shows the heat trace control panel to have a separate conductor
for the thermostat and the heat tape segment(s). Per Schematics Nol and No 2,the
thermostat is actually installed on the same conductor as the heat tape .
FSG proposes deletion of the conduit and wit'e associated with the Schematics and
installations.
Hea.t trace is specified to be provided with a11 ambient .sensing tllermostatfor co1itrol af
i11dividualor 11111/tiple circuits (C/remelex AMC 1A). As slwwn in Detail A,
tlzermostnt slmll be installed separate from the tape.
Please forward these comments, and as needed, discuss applicable responses and all
associated modifications with the Contractor.
cc: 0-u'is Harder: (FWWD)
TimA!len (FWWD)
V.K. Gupta (GAI)
Tim Mueck (GAI)
Cong Nguyen (COM)
Danny Shannon (COM)
Ernie Clement (COM)
j ohn Mischkot OQ)
Chris Story GQ)
Sagar Khole (COM)
Larry Reynolds (CDM)
Josh Trice (B&V)
File: GS-9.05
Roques! lorCtanllaUori -FINAL REV-I .doe
JA STER.-QUINTANiLLA DALLAS, LLP
F.NGINEI!RS SURVEYORS
i
!. i
'
i ' --·l ·
PROJECT LJ f 5"'1 S (~ b.rrP
JOB NO. 3?(;o / t.{ 7''2... SHEET ___ OF· __ _
DESIGNER _ _c.~;c;__;_....;M___,_ __ OATE~S:=-+/_7....._,/--'-1~0~-
I f ; ;:.,·' •
•·.
' ; ·.·! : , -, r..1 . ; . :. ,-
'
. : . ~ ,
j
i"
,, :
; i
·i '
·-·· .. --~··-:-· ~: .... v-• ·-... ~-t ... ,j..
! .; .... :
.i
Page 1 of 1
Harder, Christopher
from: Bartruff, Chad [BartruffCD@cdm.com]
Sent: Wednesday, September 15, 2010 6:35 PM
To: Harder, Christopher; Boss, John F.; Trice, Josh R
Cc: Shannon,J.Danny
Subject: RE : CPR-17 and CPR-21 -Westside WTP Project
Chris,
The J-Box is to be installed at the south wall of the Flocculation Basins following EMH-5. It will provide a means for
termination of spare conductors (termination strip required) and transition from ductbank into the Flocculation Basin
slab conduits.
Originally, it was priced out as a SST box, but it was to be revised to aluminum.
Thanks,
Chad D. Bartruff, P .E.
COM (TX #F-3043) I 777 Taylor Street, Suite 1050 I Fort Worth, TX 76102
Ph: (817) 332-8727 I Fx: (817) 332-6870 I www.cdm .com
,Jj Please consider the environment before printing this email .
From: Harder, Christopher [mailto:Christopher.Harder@fortworthgov.org]
Sent: Wednesday, September 15, 2010 9:03 AM
To: 'Boss, John F.'; 'Trice, Josh R'
Cc: Shannon, J. Danny; Bartruff, Chad
Subject: CPR-17 and CPR-21 -Westside WfP Project
Hi John:
Attached is the approval letter for CPR-17 -electrical building plumbing modifications. I'll drop off the original to
you some time this week.
Regarding CPR -21, can you give me some idea of where this new 36" x 36" NEMA 4X J-Box is being installed,
that FSG has priced out.
Thanks,
Chris Harder, P.E.
Engineering Manager
Fort Worth Water Department
151111th Avenue
Fort Worth, TX 76102
817-392-8293
9/24/2010
Westside WTP
Project# 002012
12200 Old Weatherford Rd
Fort Worth, TX 76108
Submitted To
Black & Veatch International
John Boss
100 E 15th St.
Suite 600
Fort Worth, TX 76102
Subject: Ozone Basin Conduits
Dlsclpllne:
Category:
Reason:
Question
Request For Information
PROJ RFI #: 0111-0
Date Created: 04/06/2010
Priority: Normal
Tel: 817-560-3740 Fax: 817-560-3727
Answer Required By: 04/13/2010
Submitted By
McCarthy Building Companies, Inc.
John Frazier
12200 Old Weatherford Rd
Fort Worth, TX 76108
Initiated By: FSG -Jerry Bevers
Ref RFI:
The conduits for the Ozone Basin are shown on drawing E-7, Section L. The conduit numbers listed
in Section L on Drawing E-9 are 95 thru 114. Drawing EB-6 list these conduits as 1" and 2". The wire
and conduit schedule on drawing E-18, list these conduit sizes as 3". The cables that are required per
the wire and conduit schedule cannot be installed in a 1" conduit because the 1" conduit is not large
enough to accomodate the cables per the wire and conduit schedule. The concrete slab for the
Ozone Basin is 10" deep, so you cannot install 3" conduit in this slab (90 degree bends). The conduits will
have to be
installed above grade into the Ozone Basin slab and there are no provisions shown on the drawings
to transition from underground to above ground.
Suggestion
A termination box could be installed so that you
could install 3" conduit in the underground ductbank and 1" conduit in the slab. We would have to
terminate the multi-conductor cables in the termination box and install required single conductor
wiring in the 1" conduit installed in slab. Please advise.
Answer Date Answered:
Refer to the attached description from GAi regarding modification of multi-conductor cables and conduits for the
referenced ductbank conduits.
In conjunction with the reduction in number of conductors and size of conduits, a termination cabinet shall be
provided in accordance with Division 16, similar to FSG's suggestion above.
Architect/Engineer Signature
By: Chad Bartruff, P.E.
Consultant:
_c&:l~ Date: __ 4-_21_.2_0_10 ___ _
Priri!ed On: 4/6/2010 Page 1 or 1
GAi Gupta & Associates, Inc.
To:
COi1Sl.frl;J engneeri1g
13626Gmna Rooo,
Dallas, Texas 752440
Tel:97.24~7661 Fax:97.2-4~7125
Chad Bartruff
Shop Drawing
Review
From: Timothy J. Mueck
Fax: Pages: 1
Phone: 1-817-332-8727 Date: 04-23-10
Re: GAi 627R C of FW Westside WTP CC:
Submittal No.
Comments:
RFl-111 "Ozone Basin Conduits" Revised
Proceed per Comments
The contractor proposed solution of using 1 • conduits for individual circuits in the slab, combining
the circuits in boxes, and continuing in manholes with larger conduits Is acceptable.
After reviewing the circuits, the number of spare control wires can be reduced as follows:
• Refer to drawing E-18: Circuits MCFLTA-2, 5, 6, 7, 8, 9, 10 and MCFLTB-2, 4, 5, 6, 7, 8, 9
require 12 control wires each; the spare wires will be reduced from 7 to 4. Twelve wire
and 4 wire multiconductor cables can be used for each circuit The conduit size will
change from 3" to 2".
• Refer to drawing EB-6: Change conduits 95 -110 from 1" to 2"
During the circuit review, some errors were found. Revise as follows:
• Refer to drawing E-18: Circuits MCFLTA-3, 4 and MCFL TB-3 require 18 control wires .
The spares will be increased from 1 to 4. Nineteen wire and 3 wire multiconductor cables
can be used for each circuit.
• Refer to drawing EB-2: On the Plan change circuit to 10-3 to MCFLTA-5, 10-5 to
MCFLTA-6, 1D-9to MCFLTA-8, 10-11 to MCFLTA-9, and 1D-13to MCFLTA-10 .
August 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-23, Manhole Modifications
Dear Mr. Boss:
CPR-23 consists of modifications to manholes in order to improve accessibility. In order
to reduce the depth of the wash water return line manhole, it will be relocated, thus
reducing about 20 vertical feet of manhole riser. In order to improve access, manhole
steps will be added to three manholes. In order to prevent injuries, these three manholes
will have the access lids changed to ductile iron from cast iron, making them much lighter
and easier to open. The contractor has provided a price proposal that credits the city for
less material for the reduced depth of the wash water return manhole, while including
additional costs for the manhole steps, as well as the piping modifications resulting from
the relocation of the wash water return manhole.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$7,365.00 with no additional time requested . This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P .E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DNISION
THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102 -
(817) 871-8258 * FAX (817) 871-8410
0 Prlnled on recycled paper
~ BLACK & VEATCH ~ Building a world of difference:
July 26, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607S40045683
CPR#23
Transmitted herewith please find three copies of McCarthy's change proposal request for tbe
referenced extra work. Black & Veatch has recommended the total change order amount of
$7,365.00 be approved. Please review the request, and if it is acceptable, have it executed.
Jt1ly 19, 2010
WESTSIDE WATER TRfATMENT PWrr 12200 OI.O WEATHERFORD ROAD FORT WORlli. TEXAS 76108 www.mccarthy.com
MAILING ADDRESS : P.O . BOX 122419 FORT WORTH. TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 560·3727
Black & Veatch Corporation
12200 Old Weatherford Road
Fo1t Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request #23
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #23 pricing for changes made to the project due to the field
directive memo fromCDM dated 5/28/2010 concerning Manhole Revisions.
As you are aware, the Memo from CDM changed trie location and depth of the manhole
for valve PLT-RWGA-003 on the 18" WR line. As McCarthy had already procured the
pipe material for the entire line, it was necessary to prom.ire additional material in order to
facilitate the new location of the valve and manhole.
ln addition to the valve relocation, post installed manhole Steps were requested to be
installed in manholes PLT-RWGA-001, PLT-RWGA-002, and the Raw Water Inspection
manhole. Per the project plans, DRMH#9 is currently the only manhole on the project
that is supposed to receive steps to facilitate entry.
Additionally, per our mate1ial supplier, the change from cast iron to ductile iron lids will
be done at no cost to the project.
Please do not hesitate to contact me with any questions or concerns.
Sincerely,
razier
Project Manager
McCarthy Buitding Companies, lnc.
CC: Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #23 Pricing
COM Memo dated 5/28/2010
Change Proposal Request
CPR#0023
Project Name: Westside Water Treatment Plant
Project No. : 002012 .000
Date: 07/19/2010
Atchitect's Project No.:
Cost Issue Ref#: 47
Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein . This
document, when fully executed , as accepted, shall consiltute authorization to proceed with the work described herein. Due to
schedule impact, this . work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies, Inc. will oe reimbursed monthly for the cost of this work as completed, whether or not the Change Order has
been fully executed.
DESCRIPTION OF THE PROPOSED CHANGE:
Gate Valve Manhole Modifications
SCOPE:
As submitted, PD-03260-04 included manholes for the gate valve, air valve, inspection access, sample, and Injection station
installations. The manholes as shown on the related
detalls are noted to have cast Iron lids of specific sizes and shapes. In lieu of the cast iron lids shown, it is proposed that the lids
be revised to 30-in inside-clear, ductile iron of the
City of Fort Worth standard type. For the manholes with non-tapered barrel configuration and flat-top, the manhole lid shall be
positioned off-center providing an eccentric entrance
to the manhole.
'To facilitate access into specific manholes , It 1s proposed that post-installed manhole steps be furnished. The manhole steps
shall comply with ASTM C478 and be of a steel .(1 /2" min . .
dia , Grade 60 -. ASTM A615)/copolymer polypropylene '(non-corrosive in sewer.environments -ASTM D4101) construction with
mechanical anchorage. In addition to those manholes shown on the plans, steps shall be provided for PLT-RW-GA-001 , PL T-
RWGA-002, and the RawWater Inspection Ma'nhole , Construction Manager'shall field coordinate pos\tioning of the manhole
access and steps with City personnel.
Due to the resulting depth (approx 224t) ofthe ·Valve manhole associated with PL T-RWGA-003 at the location of installation
shown ori C-15, it Is proposed that this valve and manhole be relocated . Specifically, it is proposed thafthe valve installatron be
relocated to Station 7+12.00 as shown in attached Figure·.C25A-B.
REFERENCE:
CDM Memo Dated 5/28/2010
Pricing Details
Company Name
Tri Dal Utilities Ltd
McCarthy Building Companies, Inc.
Description
moving of Gate Valve Manhole
Manhole revisions near RWMV
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
NetChange in Calendar Days Due to This Proposed Change
Schedule impact to be evaluated at.a ·later date.
Printed On: 07/19/2010 02 :23 :42 PM Page::
Amount
4,855.00
1,586.00
5.3 .00
58.00
23.00
66 .00
486.00
238 .00
7,365 .00
1 of 2
McCarthy Building Companies, Inc.
Project Name: Westside Water Treatment Plant
Project No . : 002012 .000
McCarthy Building Companies, Inc.
Accept
Do Not Accept
BY: _
Date :
Change Proposal Request
CPR#·0023
Date : 07/19/2010
Architect's Prpject No.:
Cost Issue Ref# : 47
City of Fort Worth Waler Department
Accept
Do Not Accept
BY :
Date:
Printed On: 07/19/2010 02 :23:42 PM Page : 2 of 2
McCARTHY Joi>; Dato: Wests~WTP 07/06110 thun r 0<1crfpllc• Delete ·..ie--~sect.ons Add 48"1lll!nl"ldes«I.IOn · 18'" x 2'1'" FL a:.PE spool ?«e ur lll 9"..e"'R.x PE spoo1ptect: 18" SST BN&G lil 1n0a1mi.ilaoonotMarl>oloS-@JM""""'es t..\anl1Qleslei,5 ~l·y UOM ~.00 VF 850 VF 100 •• 100 ea 100 ea 100 lS 39 .. .1!'!11 Uolt Man Haun. Unlsl M~ t-TolJII MH . ~.00 ·t!l·-0~ 0.00 000 000 0.00 o.oo· oool 000 000 0.00 000 000 o.cx( ODO ooci 0.00 o:oo 0.00 li,.<ii 0.00 0,00 0~ 0.00 0~ 000. 0.00 000 JTolal -~--dOO! utr I ~~r'!e !~; ,~':';. l.A80II eVRrifl'i : . i.s.oo'I. CONSU!~f ~-c: SMAUTOOI.S: 3.00% . . ·1~·· B75'1\ i I -$ $ s $ s s Ueno.ized Pncing Duc.rtplton. CPR t, 23 Manhole R.ovfs.lons UnU Costa TotolCos<s Mlrt Eq•lp Lobor Ml~ Eci."!P --s i" ___ s ~00 . --··-(1.300): ···------e.oo '23 420.60 •21 1.Q5987 1.oeo: 480711 .a~. s •. "'5.00 10CO 390 ·-I-· OF $ S Of s s OF $ S ~ s SU810TAL I s 1·s -,;,74o !;i H Ii I OF S S 1,474 02 e PBi"HOUli . SYb ·s· s s s s s $ s s s s ,.s,s Is s ~ $ s s $ s } $ s $ s s s $ s ·s s s 4.80500 US UM T~I !1.300) 423 -.21 1,080 •e1 ·-3llll lfd29 IOl OF S <iF s . s s ~ s . I I ,ai,eTF 11--I' •''*'· . s $ ~ : • ...... ~.~~f .•. -'! .:.. ~ . -~ . a2,1s Is •. a5~.ro1, ·····I . <>. GC Sct,s. i.l1sc rTiii s ~ --------l I" _,_t,I; r-·'85:50 i = . • . . • .. ··--• •• _ •. 16 • I s 5.340.50 I . t.1115 I 5~~: ~= ls ·]$ , ... 1. .,..,< Bt.ildor5Rlii<" ···o.3100% $ . -~Bond~-o.i1oe11 -S 1 s ·---r. -····· . . . S 1.8&1.25 $ S MOJ07 S I,~ -TOTAL $ 7,365
Project Name : Westside Water Treatment Plant
Project No: 002012:000
To; Tri Dal Utilities Ltd
Date Quote Due:06/30/2010
Request for Proposal
Dale : 06/23/2010
Architect's Project No:
Cost Issue Ref# 47
CPR No 0023
Please submit an itemized quotation for changes In your subcontract sum and/or time on subject project as described herein. This
document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein.
DESCRIPTION OF 'PROPOSED CHANGE:
moving of Gate Valve Manhole
SCOPE:
As subm1tted, Pb-03260-04 Included manholes for the gate valve, air valve; !hspectioh access; sample, and -frijection staUon
installations; The manholes as shown on tbe ;related -.
details are no.ted ·to hc,!ve cast iron lids of specific sizes and shapes. In lieu ofthe cast iron lids shown, it is proposed that the , lids be
revised to 30,in inside-,clear, ductile iron of the
City of Fort Worth standard type. For the manholes with non-tapered barrel configuration ana flaHop, the manhole lid shall be
positioned off-center providing an eccentric entrance
to the manhole.
To facilitate access Into specific manholes, ft is proposed that post-installed manhole steps be furnished. The manhole steps shall
comply with ASTM C4 78 and be of a steel {1 /2aۥ min
dia, Grade 60 • ASTM A615)/copolymer polypropylene (non,corrosive In sewer environments a€' ASTM 04101) construction with
mechanical anchorage. In addition to those manholes shown on the plans, steps. shall be provided for PLT-RW-GA-001, PLT-
RWGA-002, and the Raw Water Inspection Manhole. Construction Manager shall field coordinate . positioning of the manhole access
and steps with City personnel. · · ·
Due to the resulting depth(a.pprox 22-ft) of the valve inanhole associated with PLT,RWGA:-003at the location oflnstailation shown on
C-1?, it is proposed that this valve and manhole be relocated. Specifically, it is proposed that the valve Installation be relocated to
Station 7+12.00 as shown 1n .attached ·Fig\Jre C25A-B. ·
REFERE~CE:
Net amount of This Propose·d Change: {ADD)(DEDUCT){NO CHANGE} $ __ _.$.__4...._1--'8"'"54--'-=.5-=0'--------
Net change in Calendar days of this Proposed Change: (ADD)(DEDUCT)(NO CHANGE) 6 Days
• Attach Detailed Cost Breakdown 1 Steps , M~terial ~lot Include::
Un~ CO$\ 1tem Cost
39 Each 60.i!J 2.372 .-50
Maten;;t Labor Eq;it
5 63 JS.DO 17 .Qo
2 .Confined Spaea Entry 3 Eac~ 602.00 __ 1'"".6""0""'6.""00 _________ -==;;..
4,17S 50
22D.OO 3S2-.00
21.7 50 2,142.CO 1,80t00
Coald lib: Snd any refo1ence to step alignment
,n 'FIN Sp2es ·so I.figured tnenfto be cenLe<'?d
12'ci.c vert:caUy, wnt; no ~1agonal offsat.
itamng 2' from bo\ton, a!\d 'Z ft9m top
SaTesTax
, :·eo11d -12 .00
0 & ~; lS%· 63.1. 00
Total 11\!s Propoul S 4,6!'.J .50
Tri Dal Utilities· ltd Average unit pr:ce per step. ,1 more quimttly are required S 12-447
By:
McCarthy Building Companies, Inc.
(Prior to ArchitecVOwner review)
__ Recommend .Acceptance
__ Do Not Recommend Acceptance
__ No Recommendation -Price Marginal
By:
Date:
bate: ___ 7-2-:10
McCarthy Building Companies; Inc.
(After Architect/Owner review)
__ Accept
__ Do Not Accept
By:
Date:
Printed on: 06/23/201 O 01 :30:19 PM Page: 1
.
Pepprng, Nick
From:
Sent:
To:
Subject:
Nick,
.Robert.Parris@Ferguson.com
Friday, July 02, 2010 4 :26 PM
Pepping, Nick
Quote --Spools for Westside
Here is the pricing on · the spools you requested . Please let me know if you have any questions.
Th.anks,
Robert· Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410,. San Antonio, TX, 78219, USA
T: (210) 662 4902 C : (972) 670 5500 F : {210) 662 4825
E: robert.parris@ferquson.com
www.ferguson .com
Bid No ....... : BIS9391
Bid Date ... : 07/02/10
Quoted By:. RCP
Price Quotation# 8159391
Ferguson Waterworks #788
2650 S Pipeline Road
Euless, TX76040
Phone: 817-267-3900
Fllx: 817-267-3912
Cust Phone:
Terll'lS ......... :
972-991-5500
NET 101:}l. PROX
Customer.: MCCARTHY BlJILDING C01"IPANIES
WESTSIPE WATER TREATMENT
PO BOX 122419
Ship To ....... : MCCARTIJ:Y .BUILDING COMPANIES
WESTSIDE WATER TREATMENT
FORT WORTH, TX 76121
Cust PO# .. : SPOOL PC PRICING
Item
SP -DI 80906FECP
D 180206FECP
FBSSl6SJ8
Description
18 X 9'·6 FXPE DIP C/LS/P
18 X 2'-6 FLGXPE DIP CL SP
18 SS 316 FLG BOLT SET
PO BOX 122419
FORT WORTH, TX 76121
Job Name.:· WESTSIDE WATER TREATMENT
Quantity
.2.
Net Toto I:
Tax:
Total:
Net ·Pricc UM Tota.I
1059.870 EA
420.860 ~A
480.790 EA
2382 .38
0.00
2382.38
1059.87
841.72
-180.79
Quoted prices are based upon receipt of the total quantity for Immediate shipment (48 hours). Sffn>MENTS BEYOND 48
HOU.RS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS N'OT'ED OTHERWlSE. Seller not
• responsible foT delays, lack of product or Increase of pricing due to causes beyond our control, ancl/or based ·upon Local, State
and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's accepta:nce or Sel,ler's terms and !=O~ditions, WQich are incorporate~ .by ref~rertce and found either following this
document, or on the web at http://wolsclevna.com/ter.ms conditlonsSale.html. Govt Buyers: All items quoted are Qpen market
unless noted otherwise.
Pepp i ng, Nick
·From:
Sent:
To:
Marty Anderson [manderson@theturnerco,com]
Wednesday, June 23, 201 o 1 :51 PM ·
Pepping ; Nick
Subject: Re : Manhole Steps
$.1 O ea for the steps only.
----Original Message -----
From: Pepping . Nick
To: Marty Anderson
Sent: Wednesday, June 23. 201 D 1 :42 PM
Subject: RE: Manhole Steps
Marty,
What is the cost each on these?
Nick Pepping
Project Engineer
McCarthy Bu il ding Companies
Westside WTP
12200 Old Weatherford Rd . Fort Wort h , TX 76108
PO Box 122419
(602) 980-7327
npepping@mccarthy.com
Leaving Green Footprints . Think before you print
From: Marty Anderson [ma ilto:manderson@thetumerco.com]
Sent: Wednesday, June :23, 2010 1:21 ·Pfvl ·
To: Pepping, Nick
Subject: R.e: Manhole Steps
Here is submittal fnfo on the steps we carry . If you waritto sut;>m itttiese.
Thanks,
Marty
----Original Message-----
From : Pepping. Nick
To: Marty Anderson
Cc: Eddie Bray
Sent: Wednesday, June 23 , 2010 8:07 AM
Subject: Manhole Steps
Marty,
Due to a recent change in the GV manhole for our 18" they are requesting we add steps to the GV manholes. Below is
an excerpt from the CDM Memo.
"To facilitate access into specific manholes, it is proposed that post-installed manhole steps
be furn ished . The manhole steps shall comply with ASTM C478 and be of a steel {l/2" min
dia, Grade 60 -ASTM A615)/copolymer polypropylene (non-corrosive in sewer
environments -ASTM D4 l O 1) construction with mechani cal anchorage . In addition to
1
those-manholes shown on the plans, steps shall be provided for PLT-RW-GA-001, PLT-RWGA-
002, and the Raw Water Inspection Manhole. Construi;:tion Manager shall field
• coordinate positioning of the manhole access and steps With City personnel."
Please provide pricing per vertical foot for ~he steps ;
Any questions please let me know.
Thank you,
Nick Pepping
Project Engineer
McCarthy Building Companies
Westside WTP
12200 Old Weatherford Rd . Fort Worth, TX 76108
PO Box 122419
(602) 980-7327
npepplng@mccarthy.com
Leaving Green Footprints . Think before you print
***
This e1ectronic mail message, including attachments, is intended only for the person or entity to which it is
addressed and may contain confidential and/or privileged material. Any unauthorized use, review, disclosure,
distribution, or actions taken in reliance. on the contents of this information, is prohibited. If you received this
e-mail in error and are not the intended recipient, please notify me immediately by telephone or reply e-mail
and destroy all copies of the original message.
*"'*
***
This electron'ic mail message, including attachment$, is intended orily for the ·person or entity to which it is
addressed :and may contain confidential and/or privileged material. Ariy unauthorized ~e •. review, disclosure,
distribution, or actions taken in .reliance on the contents -of this infonnation; is prohibited. If you-received this
e-mail irt error and are not the intended recipient, please notify me immediately by telephone or reply e-mail
and .destroy all copies of the original message.
***
.2
ML-10-NCR
r
.
:;!: ....
C7l
14----------------12" ---------------.i
10 3/4'
ML-10-NCR
Mechanical lock Installation Mcthuds
Minimum Concrete Strength Must Be .WOO psi.
Preformed Holes
Twn preformed holes on 10•· centers
Holc5 must be pnrl)llcl
Diameter .of holes .arc I. I'' tapering to 7/8" in 3 •,," of depth
Drilled Holes
Drill two 1 ·• hole s on IO" centers with a minimum depth of 3 3/4"
U~c I" masonry bit for drilling .
Holes must be parallel.
Drive step wilh slcdg~ hammer until both legs .in.: completely seated
This srep mec·ts ur e.n-el!ds ASTM C 47S and OSHA Srmrdcml,·
whM tlr;iperly in.wuU<!d.
YzinchASTMA615
Grade 60 steel .Reinforcement
American Step Company, Inc.
P.O. Box 137
830 East Broadway
Griffin, GA 30224-0137
800-988-STEP
770-467-9844 (OFFICE)
770-467-80 I I (FAX)
Pepping, Nick
From:
Sent:
To:
Subject:
Nick,
Robert.Parris@Ferguso.n .com
Monday, July 19, 2010 12:06 PM
Pepping , Nick
Westside WTP --Ring & Cover
Regarding your question about the cost difference between the ring & cover assembly with the cast iron lid versus the
ductile iron lid, there is no price change to McCarthy.
Please contact me with any questions.
Thanks,
Robert Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA
T : (210) 662 4902 G: (972) 670 5500 F : (210) 662 4825
E: robert.parris@ferquson .com
www Jerguson.com
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartfuff (TX PE#~1688) {)$
COM (F-3043)
May 28, 2010
Subject: Westside WTP Project
PD-03260-04 -Valve, Inspection, arid Injection Manholes
As submitted, PD-03260--04 included manholes for the gate valve, air valve, inspection
access, sample, and injection stationinstallations. The manholes as shown on the related
details are noted to have casl iroh lids of specific sizes and shapes. In lieu ofthe cast iton
lids shown, it is proposed that thelids·be revised to .3Q-in inside-clear, ductile iron of the
City of Fort Worth standard type. For the manholes with· non--tapered barrel configuration
and flat-top~ the manhole lid shall be positioned off-center-providing an eccentric entrance
to the manhole.
To facilitate access into specific manholes, it is proposed that post-installed manhole steps
be furnished. The manhole steps shall comply with ASTM C478 and be of a steel (1/2." min
dia, Grade 60 -ASTM A615)/ ¢opolymerpolypropylene (non-corrosive in se.wer
environments -ASTM 04101) construction with mechanical anchorage. In addition to
those manholes shown on the plans, steps shall be provided for PLT-RW-GA-001, PLT-RW-
GA-002, and the Raw Water Inspection Manhole. Construction M,mager shall field
coordinate positioning of the manhole aq:ess and steps with City personnel.
Due to the resulting depth (approx 22-ft) ,of the valve rnanhoJe E!SSO~iated With PLT-RW-
GA~003 at the lcx:atio~ of installation shown 911 c;:.:.15, itis. proposed that this valve and
manhole be relocated: Sp'ecifica Ily, it is . proposed thatthe val.ve i.nstalla,tion be relocated to
Station 7+ 12.00 as shown in a~ached Figure C25AcB.
Please discuss with McCarthy and advise of.any comments.
cc: Chris Hardet (FWWD)
J.C. Tolson (FWWD)
Danny Sharu,on (COM)
File: 62142 -9.04
so~o3260-04
I
~
~
N Cl ·°' 0 ....
"' === N Ill 0 !!l 0 1/).
0
1"'10
i~
1/1 --10
() :r ~"Tl
I " -id !?. N
~ ::0 ::0 z ~-I 0
'-l === ~o
z~ -0 1/1 -I :c 0
I C -o·
O" ~-I 0 2. vi z1"'1
N ~ -I~ Ol
0 -0 I z ::0
0 0 2 ~ l"'1
Q
() ::i
"' N C t ..,
" co z
0
SlA 7+12.00
18 VALVE
IE 855 .. 98
STA 7+20.62
90 DEG HOR BEND
·VERT BEND
IE 856.00
STA 7+27.62
VERT BEND
IE 849 ;00
STA 8+65.62
90 DEG HOR BEND
VERT BEND •
IE 846.50
Ma 28, 20 10 -1 0 :57om User: bartruffcd
I
1-
..Jo~ .
Cl> ~:E ;o
Cf) I 50
-0
Pl
VALVE
SEE NOTE 3
STA 7+38.62
36 PW-RCC
(WS-3)
IE 853.13
STA 7+53.63
30 PW-RCC
(WS-4)
IE 853.15
\
STA 7+77.94
Ei;.EC CONDUIT
\
\
\
\
\
\
'\
August 12, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-27 -Electrical Duct Bank Backfill Revision
Dear Mr. Boss:
The Fort Worth Water Department instructed the Engineer to prepare a revised trench
detail for on-site electrical duct banks, modifying the detail to allow sand backfill with
concrete cap in lieu of reinforced concrete duct banks. The Contractor has provided the
City with a credit of $7,891.00 for utilizing the revised detail to construct the remaining
duct banks.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. The total credit for the proposed change amounts to
$7 ,891.00 with no additional time requested. This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DMSION
THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
0 Printed on recycled paper
\
~ l.f ~ BLACK & VEATCH
. Building a world of difference:
July 19, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#27
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total change order credit amount
of $7,891.00 be approved. Please review the request, and if it is acceptable, have it executed.
WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH, TEXAS 76108 www.mccarthy.com
MAILING ADDRESS: P. 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (817) 560-3727
July 13, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re : Change Proposal Request #27
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
Please find attached CPR #27 pricing for changes made to the project due to the field
directive memo from CDM dated 5/15/2012 concerning changes to the reinforced
concrete duct-banks.
Please find attached a quote from FSG Electric to credit the project ($7,891) to use sand
backfill with a concrete cap per CDM's revised detail as attached in place of reinforced
concrete backfill per the original duct-bank drawings. As per previous conversations
with CDM and Black & Veatch, this pricing does not include "select fill" as referenced in
the attached CDM Detail. This pricing proposal utilizes on site native material for
backfill which will be placed per the project specifications.
Please be aware that this proposal is time sensitive, as FSG Electric is currently installing
duct-bank on the project.
Please do not hesitate to contact me with any questions or concerns.
John Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #27 Pricing
FSG Electric Quote and Scope of Work
CDM Memo dated 5/15/2010
•••••• 1--u11 electric
Change Order
Proposal
2525 Walnut HIii Lane Suite 100 Dallas. TX 75229 (214)-357-5697 (TECL#
17904) No. 126990
07/06/10
John Frazier
McCarthy
12001 N. Central EXPWY., Suite 400
Dallas Texas 75243
Subject: Underground Conduit
Ductbank Modification
John ,
Date: 07/06/10
Project: Westside Water Treatment Plant
Job NO.: 30J1613
Drawing No:
iSpec Section:!
We are pleased to offer the following Change Order Proposal for your consideration. The price includes labor,
material, and equipment to install remaining ductbanks (2,900') per attached Detail A in lieu of reinforced
concrete ductbanks. See attached sheets for price breakdown . This price Is based on ductbanks not installed as
of this date. This credit price could change If this change order is not approved as soon as possible because we
are continuing to Install ductbanks to meet contract schedule. The price to perform this work is a credit of
$7,891.00.
Sincerely ,
FSG ELECTRIC
Jerry Bevers
Project Manager m~·
'.
·~·iiW·fWt I Jt · I t . ' ·····-ffJ 1 111y > !? f!C _11rn1 .> Pnergy • .. •• teclmology ;-s19nr;
FACILITY SOUITIONS GROUP
RECAP SHEET
C.O. #5 DUCTBANK CHANGE RATE HOURS TOTAL
LABOR-(ELECTRICAL)
FOREMAN STRAIGHT TIME $30.00 $ -
FOREMAN OVER TIME $45.00 $ -
JOURNEYMAN STRAIGHT TIME $25.00 $ (5.00' $ (125.00
JOURNEYMAN OVER TIME $34.50
HELPER STRAIGHT TIME $17.00 (6.00) $ (102 .00
HELPER OVER TIME $25.50 $ -
$ -
$ -
$ -
LABOR TOTAL-$ (227.00
MATERIAL TOTAL $ (8,650.00
EXPENDABLES-6% OF MAT. $ (519.00
TAMPER $ 600.00
BOBCAT-ADDITIONAL TIME· $ 1,000.00
TO MOVE SAND
BURDENS· (42% OF LABOR) $ {95.34)
SUBTOTAL· $ (7,891.34)
$ -
TOTAL-$ (7,891.00
•u-•••• ·····-lighting> electrical> energy • •••s1 technology> s1g11 s
FACII.ITY SOLUTIONS GROUI'
C.0.#5 PRICING SHEET
IDESC. IQUAN. IMAI UNII IMAI t:AI. !......lla!::!~'": UNll !.....".::::'..!"( ~Al,
DELETE RED CONCRETE-[YDS 296 $ {75.00) $ (22,200.00) (1 .00) (296.00'
DELETE #4 REBAR-(LF) 20,000 $ (0.35' $ (7,000.00) (0.010) (200.00'
$ -0.00
$ -0 .00
$ -0 .00
$ -0.00
$ -0.00
ADD SAND-(YDS) 350 $ 18 .00 $ 6,300.00 0 .30 105.00
~DD 3 " RED CONCRETE CAP 190 $ 75.00 $ 14,250.00 2.00 380.00 .;, $ -0 .00
f'Z,io\) L-.-){ 1') { '3Ad ::: 80 l , $ 0.00 1 --• $ -0.00
$ -0.00
$ -0.00
$ -0 .00
$ -0.00
$ -0 .00
$ -0 .00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0.00
$ -0 .00
$ -0.00
$ -0 .00
$ -0 .00
$ -0 .00
$ -0 .00
$ -0.00
$ -0.00
$ . 0.00
$ -0.00
$ -0 .00
TOTAL-$ (8,650 .00 (11.00'
CDM
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff (TX PE #91688) />I.
CDM (F-3043) LIV
May 15, 2010
Subject: Westside WTP Project
Underground Conduit Ductbank Modification
Detail 1/EZ-3 illustrates the original contract requirements for installation of reinforced
concrete encased ductbank for the Westside WTP. Modifications to this Detail were
provided as part of RFI-088.
Consideration is being given to further modification of the ductbank installation based on
revised City installation requirements. In lieu of the reinforced concrete ductbank shown
in Detail 1, installation of the ductbank with sand backfill and a concrete cap is proposed as
shown in the attached Detail A.
It is understood that FSG has pre-purchased some steel reinforcement for installation of
Detail 1 type ductbank. It is proposed that the on-site and pre-purchased materials be used
until exhausted for installation of ductbank as per Detail 1. Once those materials are used,
the remaining ductbank shall be installed per Detail A. It is requested that a price proposal
for this modification be developed for consideration.
cc: Chris Harder (FWWD)
Tim Allen (FWWD)
V.K Gupta (GAI)
Tim Mueck (GAI)
Danny Sharui.on (CDM)
File: 62142 -9.04
62142-RFI-088
Eloe1rioal Ouctbank ModifioeUons.doc
-0 u .... -:I ... ..... ...
0
..0
...
Cl)
VJ
::::l.
E · o , m
N
X
CX)
I a a
<{
I
~
w ·
Cl
i75
f-
(/) w s:
~
POLVETHYLENE
WARNI~ T"PE
nNISHEll GRA!J::
RED co~~m TOP
CloP M,IJMTAJN r @
t--;:-....,..,..,.,,~"*r.-'.',....,---'-:°7--i MIN CO'IER MIX @
3" lol lN.
.tiQIES:
{!) Sll..ECT flU. TO A MINIMUM OF 2 FT . "'80YE
&AND LAYER. COMPACT AU.. S.Cl<nLL 1;4 I 11-1,
LFTS TO 90 PERCEITT OF STAHON,0 PROCTOR
(ISTII. 0 69&) OEllSrTY, UNLESS UliDER EXJ$nNG
0~ PROPOSED PA\'EMEITT. 011-IER UNDERca:>UNO
IJTILmES. Off ffiUc;fURES, IF Dl.m 8A.'IK IS
liNOER EXIS11NG CR PROPOSED PAIIEMEWT,
OTHER UNDER~<XI.Nil VTIUTID:, Oll
S""ftl.JClVilES, COl,PACT ALL 11',CKfU. IN 8 IN.
U~ TO 115 PERCENT OF STN,IOAAD PROCTOR
DENSITY.
@ R~ TO SPEC SEcno,i 16600 FOR AODlllO'l,',L
RE:rJUTREMOlTS.
@ REFER TO CONCRETE SPECS (030COli) f"OR t,JI(
01:SIGN.
(D R£D DYE TO BE '1!XEO IN <XmCRETE BEFORE
f'IACEl,U:Nr.
@ Flll \IOIDS AROUN) AND ABOVE CONDUIT 10 S
Al!O\JE CQNt>UITS WITH SCREENEO SAND.
@ ALL 6" BELO'H CC"100ITS WITH SCREENED ~O
UNDERGROUND C)NDUIT
OUCTSANK
® DErAIL
NTS
Fl .
.
I
C
l'l/0 IWlE
l1N1{ED COPPER V
ElC01!-
wF1 l'I
f4/0-
SE
GROI
1~--------------"'t-----------------------~ N
"It
N
(0
en
CITY OF FORT WORTH, TEXAS
WESTSIDE WATER TREATMENT PLANT PROJECT
Date Sheet No Document Ref
MAY 15, 2010 EZ-3
Fi gure No
EZ3-A
September 25, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-32-Backwash Suction Line Valve Revision
Dear Mr. Boss:
I have reviewed CPR-32, which includes a memorandum from CDM, dated August 2,
2010, requesting the contractor provide three 18" diameter butterfly valves in lieu of three
18" diameter gate valves on the suction line to the backwash pumps. A quote has been
provided by the Contractor's valve supplier that shows a net $4,350 deduct in the
purchase price of the butterfly valves , when compared to the price of the gate valves.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total credit for the proposed change amounts to
$4,350.00 with no additional time requested. This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
Engineer
Xe: Danny Shannon, P.E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DIVISION
THE CITY OF FORT WORTH * 1511 11TH AVENUE * FORT WORTH, TEXAS 76102-
(817) 871-8258 * FAX (817) 871-8410
G Printed on recycled paper
~ BLACK & VEATCH
~. Buifding a world of difference:
September 16, 2010
City of Fort Worth
Water Engineering Department
1511 11th A.venue
Fort Worth, TX 76102.
A TIN: Mr. Chris Rarder, P .E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project.No. P262-607540045683
CPR#32
1:ransmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recomm~ded the total credit amount 9f $4,350.15
be approved. Please reyiew the request, and if it is acceptable, have it executed.
September 15, 2010
WESTSIDEWATER TREATMENT PlAITT 12200 OLDWEATii:RFORD ROAD FORTWORTH, TEXAS7610B www.mccartny.com .
MAILING .ADDRESS : P. 0. BOX 12241 .9 FORT WORTtl, TEXAS 76121 PHO~E (817) 59~3740 FAX (817) 560-3n7
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn : Mr. John 13oss
Re: Change Proposal Request #32
Westside. Water Treatment Plant
P262 -607540045683
Mr. Boss,
Piease find attached CPR #32 pricing for changes made to the project due to the field
dii:ective memo from COM dated ,8/2/2010 concern:irtg change from 18'' Gate Va]ves to
18" Butterfly Valves at the: suctionside of the J3W Pumps .
. Please do not hesitate to contac t me with any questions or co_ncerus .
Sincerely,
.Ftazier
Project Manager
McCarthy Building Companies, Inc .
CC: Steve Gotschall-Project Director
Jerry Mayer -Project Director
File
ENC : CPR#32 Pricing
CDM Memo dated 8/2/2010
••••• ~--..••-•-·---·•••·----,,. • ~-·-·•,·~---•··-·-.•w •·
Change Proposal Request
CPR#0032
Date: 09/15/201 o
Project Name: Westside Water Treatment Plant
Project No. : 002012.000
Architect's Project No.:
Cost Issue Ref#: 60
Attached is an itemized quotation for changes in the Contract sum and/or lime on subject Project as described herein. This
document, when fully e_xecuted, as accepted, shall constitute authorization to proceed with the work-described herein . Due to
schedule impact, this work may be performed prior to approval of the formal Chanf!e Order. The Owner agrees that McCarthy
Building Companies, Inc. will be reimbursed monthly for the cost of this work as. completed, whether or 11ot the Change Order has
been .fully executed.
DESCRIPTION OF THE PROPOSED Cl:fANGE:
Change from 18" GVs to 18" BFVs at BW Pumps
SCOPE:
Delete (3) 18" Gate Valves at the suction side of the BW pumps and add (3) 18" Butterfly Valves.
DIRECTIVE:
CDM Memo Dated B/2/201 o
REFERENCE;
Pricing Details
Company Name
McCarthy Building Companies, Inc.
McCarthy Building Companies, Inc.
BY: ····---
Date: · _;:T.t(~/."'?-l>IP
Description Amount
Delete 18" GVs and add 18" BFVs at BW Pumps -4,350 .15
Subcontractor Bond
General Liability
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
0.00
0.00
0.00
0.00
o.oo
0.00
-4 ,350 .15
Net Change in Calendar Days Due to This Proposed Change
CJ Schedule impact to be evaluated at a later date.
Accept
Do Not Accept'
BY· ·-----
Date· . -·· -· -··----···---· ______ ··-···--····----·-. -· .. "-
Printed On: 09/15/2010 10:35:07 AM
City of Fort Worth Water Department
Accept
Do Not Accept
BY· -·------·--·-··--·····---····-..
Date· -----·--·------·--···
Page: 1 of 1
Pepping, Nick
· Subject: FW: Westside WTP --18'' Valve Change Order
From:.Robert.Parris@Ferguson.com [mallto:Robert.Parris@Ferguson.com]
Sent: Thursday, August 12, 2010 3:06 PM
To: Pepping, Nick
Cc: larry.fischer@ferguson.corn
Subject: Westside WTP -.18" Valve Change Order
Nick,
Here is the quote for the 18" valves as you requested,
Thanks,
Robert. Parris
Plant Sales
Ferguson, a Wolseley company, 8007 NE Loop 410, San Antonio, TX, 78219, USA
T : (210) 662 4902 C: (972) 670 5500 F : (210) 662 4825
E: robert.parris"t@ferguson.com
www.ferquson.com ..
~···· "t::···.,.-·-----,.,-~------··--~~······~,----·.o.---~---.~--........ ----.. --· .. -----·-------------·---.... , .... ~--.-·--~-·-·~-·-·-
Bid No .•.••.. : Bl 61830
Bid Date ••• : 08/12/10
Quoted By: RCP .
Price Quotation# B1(>1830
Ferguson Waterworks #788
2650 S Pipeline Road
Euiess, TX 76040
Phone: 817-267~3900
F'.ax: 817-267-3912
Cust Phone: 972-991-5500
Terms ......... : NET IOTH.PROX
Customer.: MCCARTHY BUILDING COMPANIES
WESTSIDE WATER TREATMENT
Ship To ...... ;: MCCARTHY BUILDING COMPANIES
PO BOX 122419 .
WESTSIDE; WATER TREATl\ifEJ'iT
PO BOX iz2419
FORT WORTH; TX 76121 FORT WORffi, TX 76121
Cust PO# .. : 18" BFV QUOTE .-CDM Job Nallie.: WESTSID:E WATER 'I'REATMJ?.NT
... -"-r••·-···•-": ...... -..,.,... ............. ·-··--.. -·------·-.. ·--.• _. ........... --····r·---····-r···-·-··v ....... · ... ,._.,.,.,. .. -----·· .... , .............. ·-·-·-··----.. -.-····
Item Descripti,on i Qua:nti~ ;NetPrlte. UM ;Total
'
1-IGHFIS 18 FlG BFV 4986 .050 EA 14958 .15
· • Cost for BPV's associated with
· -change order;
: ···•··. ' .
SP-JSFGVBG18 : 18 J&S FLG GATE VLV W/BEVEL GEAR 3 -19308 .. 30
.. -.. ·-······---·····-
: -Credit for cost of l~". gate
1
-~Ives as part ofretum due to
~ change order;
Net Total:
Tax:
Total:
-4350.15
0.00
-4350.15
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS.BEYOND 48
HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not
responsible for delays, lack of product or·increase of pricing due to causes beyond our control, and/or based up~n Loci)], State
and Federal laws governing type .of products fhat can be sold or put into. commerce. This Quote.is offered contingenfupon the
Buyer's acceptance ofSeller's terms and conditions, which are Incorporated by reference and found either following this
document_, or on th_e w~b. at http://wolselevna.com/tcrms conditionsSale.btml. Govt Buyers: All items quoted are open market
unless noted othenvfse. . .
2
CDM.
Memorandum (Email)
To:
From:
Date:
John Boss
Black & Veatch.
Chad Bartruff, P.E. (TX #91688)
CDM (TX #F-3043) (X>
August 2, 201 O
Subject: Westside WTP Project
. Backwash Pump Suction Valves -Revisions
Refer to attached Figures MD~A and MDlO-B. As shown, deletion of FLT-BW-GA .. 101,,
102,103 is proposed. In their place, butterflyvalves,FLT-BW-BFVv-104, 105, and 106 shall
be .furnished and installed in accordance with Section 15100.
Associated suction piping shall be modified to acco1I1ID9date the installation. Based on -
discussion with McCarthy, the suction piping beyond the 90~deg bend to each pump has
not been fabricated~ of yet. Therefore, the spool sections shown to be in$talted with the
suction piping shall be modified accordingly.
Please coordinate accordingly with McCarthy.
cc: Chris Harder (FWWD)
Josh Trice (B&V)
File: GS-9.04
BWP SucilO!l Val...,_1 doc
S: .62142-WESTSIOE MD-8.dw Jul 29 2010 ~ 4:00 m User: bortruffcd
EMICAL FACILl1Y
18" DIA
FLT-SW-~
18" BW-STL ~ CL EL 852.75
B
. DISMANTLING .t_µ
JOINT
FF EL 857.00
8" .UW-DI .
CL EL 854.67
SEE YARD PIPING
8" UW-DI
CL EL 850.75
.!2 1 1 /2" FEJ-,PVC 1 1" LAS-PVC
1 1 1 /2" CS-PVC
1 1" SHC-PVC
1 · 1" HF-PVC
TO OZONE CONTACT BASIi\
-----,
I
FF EL 844.75 (LP)
SEE STRUCTURAL
CITY . OF FORT WORTH, TEXAS
WESTSIDE WATER TREATMENT PLANT PROJECT
EQUIPMENT PRE-SELECTION
Dole
JUL'!' 29, 2010
Sheet No
MD-8
Revision No
&.
Figure No
MD8-A
S: 62142-WESTSlDE Jul 29 20 lO -3 :51 m User: bartruftcd
I
I
I
1.
I
I
I
I
I
I
·I
I
I
I
DRAIN
TRENCH
1/2" SPL-PVCll;=~:111
(FTW)
SEE NOTE
'10
BW-P-001
..
~~BW-BFV-lOo
I
DISCHARGE
· PIPE NOT
SHOWN FOR
CLARl1Y r
BW-P-po2 BW-P-po3 : ,.
_,.,,-r .(2) 1 112·_· :_:FE:,:3~-.:..PV::C:.._ ____ ..!.......;;..;;.....,....;;... ___ _:;~;:::-~-...... · ..... ~ ...... ~=I=· ===·=----1
CITY OF" FORT WORTH, TEXAS
WESTSIDE WATER TREATMENT Pi.ANT PROJECT
EQUIPMENT PRE-SELECTION
Dote
JULY 29. 2010
Sheet No
MD ~10
Revision No Figure No
MDlO-B
October 14 , 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth , Tex as 76108
Attn .: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-34, Diaphragm Seal Changes for Lime Transfer Pumps
Dear Mr. Boss :
The Fort Worth Water Department requested Ashcroft Type 80 isolation rings be
pro v ided for the lime transfer pump pressure switch and gauge in lieu of the Red Valve
diaphragm isolators proposed. A change order documenting the increased cost of the
requested equipment has been provided.
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification . Total cost for the proposed change amounts to
$2 ,715 .00 with no additional time requested . This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P . E.
Engineer
Xe: Danny Shannon, P .E., CDM
Project File
WATER DEPARTMENT
P RODUC TI ON DIVISI ON
THE C ITY OF FORT WORTH * 15 11 11TH AVENUE * F ORT WORTH, T EXAS 76 102
(817) 871 -8258 * FAX (817) 87 1-8410
0 Printed on recycled paper
· c~~ BLACK & VEATCH
· • Building a world of difference~
October 13, 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
Fort Worth, TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No. P262-607540045683
CPR#34
Transmitted herewith please find three copies of McCarthy's change proposal request for the
referenced extra work. Black & Veatch has recommended the total cost amount of $2,715.00 be
approved. Please review the request, and if it is acceptable, have it executed.
Sincerely,
~&4_
WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORi WORTH , TEXAS 76108 www.mccarthy.com
MAILING ADDRESS : P. D. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560-3740 FAX (81 7) 550-3727
October 7, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn: Mr. John Boss
Re: Change Proposal Request #'ff '!»Al
Westside Water Treatment Plant
P262-607540045683
Mr. Boss,
3'{
Please find attached CPR #¥! pricing for changes made to the project due to the field
directive memo from CDM dated 8/18 /2010.
Please do not hesitate to contact me with any questions or concerns.
Sincerely,~~-_ . 4-~-~//''~
John Frazier
Project Manager
McCarthy Building Companies, Inc.
CC: Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #32 Pricing
· CDM Memo dated 8/18/20 I 0
Submittal Comments PD-13300-01-1
0
Change Proposal Request
CPR # 0034
Project Name: Wests ide Wate r Treat ment Plant
Project No . : 002012 .000
Date : 09/28 /2010
Architect 's Project No .:
Cost Issue Ref#: 62
Attac hed is an item ized quotati on for changes in the Con t ract s um and/or t ime on su bj ect Project as described here in. This
document , w hen full y exec uted , as accepted , shall co nsti t ut e autho rizat io n to proceed with th e work desc rib ed herein . Due to
sc hed ule im pac t , this work may be pe rf ormed prio r to approval of the forma l Cha nge Order . The Owner ag rees that McCa rt hy
Bu il di ng Companies , In c . will be reimbu rsed mo nthly for the cost of th is wo rk as completed , w hethe r or not t he Cha nge Orde r has
been fully executed .
DESCRIPTION OF THE PROPOSED CHANGE:
Cha nge to d iaph ragm seals
SCOPE:
Change to diaphragm seals pe r COM Memo dated 8/18/2010 a nd su bmi ttal 13300-01 -1 .
DIRECTIVE:
COM Memo dated 8/18/201 o
REFERENCE:
Pricing Details
Company Name
Fac ili ty So luti ons Gro up
Description
Change to diaphragm seals
Subcontractor Bond
General Liab ili ty
Builde rs Risk
• Project Bond
10 I. _., CO Fee (Sub Wo rk )
""'"'"P CO Fee (McCarthy Work )
Net Amount of This Proposed Change
Net Change in Calendar Days Due to This Proposed Change
Schedu le impact to be evaluated at a late r date .
Amount
2 ,395 .00
26 .00
22 .00
8 .00
24 .00
240 .00
0 .00
2 ,715 .00
McCarthy Building Compan ies, Inc . City of Fo rt Worth Water Department
Accept Accept
Do Not Accept Do No t Accept
BY : BY : BY :
Date : Date : Date :
Printed On : 09 /28 /2010 05 : 11 :04 PM Page : 1 of 1
2525 Wal nut Hill La ne Suite 100 Dallas , TX 75229 (2 14)-357-5697 (TECL#
17904)
09/17/10
John Frazier
McCarthy
12001 N. Central EXPWY., Suite 400
Da llas Texas 75243
Subject: Diaphragm Seal Changes for
Lime Transfer Pumps
John ,
Change Order
Proposal
No. 127948
Date:I 09/17/10
-~j_~ct:j Wests ide Water T reatment Pla nt
Job N0.:0 0J16 13
Drawing No:I --/Spec Section :·
We are pleased to offer the following Change Order Proposal for your consideration . The price for Bauman
Instrument Corporation to change the diaphragm seals for the Lime T ransfer Pumps per engineer's memo dated
August 18 , 2010 is $2 ,395 .00 . See attached s heet for Ba uman's cost breakdown and scope description .
Bauman Pricing-$2,178 .00
FSG Markup-$217 .00 -IO i. Mr,\C"p
Total Price-$2,395.00
Sincerely,
FSG ELECTRIC
Jerry Bevers
Pr ·ect Manager
BAUMAN INSTRUMENT CORPORATION
"PROVIDING OUR CUSTOMERS WITH THE MOST ECONOMICAL
INSTRUMENT AND CONTROL SOLUTIONS."
MAIN OFFICE:
P. 0 . B0X470583
11604 East 58th Street
Tulsa, Oklahoma 74147-0583
(918) 254-2424
FAX : (918) 254-1966
FSG Electric September 17, 2010
2525 Walnut Hill, Suite 100
Dallas, TX 75229
Attention: Jerry Bevers
Reference: Fort Worth Westside WTP
Field Instrument Memo August 18, 2010
Dear Jerry,
We have reviewed the engineer's memo dated August 18, 2010 concerning the changes to the
diaphragm seals for the Lime Transfer Pumps . As part ofBauman's scope of work the memo
changed the manufacturer and model number of the specified in-line diaphragm seals for the
Lime Transfer Pumps. These changes will result in an increase in the scope of our work in the
amount of $2,178.00 as detailed below.
DEVICE QTY UNIT UNIT$ EXT.
Material
Oriainal 4" Red Valve w/ Gauae & Switch -2 EA $614 -$1,228
Oriainal 4" Red Valve w/ Switch -2 EA $419 -$838
Oriainal 1" Red Valve w/ Gauqe & Switch -3 EA $537 -$1,611
New 4" Ashcroft w/ Gauge & Switch 2 EA $874 $1 ,748
New 4 " Ashcroft w/ Switch 2 EA $762 $1 524
New 1" Ashcroft w/ Gauae & Switch 3 EA $748 $2,244
Total Material $1,839
Labor
Documentation Updates 1 HR $55 $55
Total Labor $55
OH&P 15% $1 ,894 $284
Total Chanae Request $2,178
Bauman will proceed with order of the diaphragm seals upon receipt of subcontract change
order.
If you have any questions please don't hesitate to contact me.
Sincerely,
bB2PJWM
Project Manager
TULSA-ARLINGTON
Memorandum (Email)
To : John Boss
Black & Veatch.
From: Chad Bartruff, P . E. (TX #91688)
COM (TX #F-3043) cl>
Date: August 18, 2010
Subject: Westside WTP Project
Submittal PD-13300-01-1
Process Instruments -Annular Diaphragm Seals
Per the City's request, revision of the submitted Red Valve diaphragm isolators to the
alternative specified Ashcroft Type 80 isolation rings is proposed. This applies to the
following pressure instruments:
1 . 12400-01 Lime Transfer Pump No. 01 -Suction Pressure Switch, 4"
2. 12400-01 Lime Transfer Pump No. 01 -Discharge Pressure Gauge & Switch, 4"
3. 12400-02 Lime Transfer Pump No. 02 -Suction Pressure Switch, 4"
4. 12400-02 Lime Transfer Pump No. 02 -Discharge Pressure Gauge & Switch, 4"
5. 12420-01 Lime Metering Pump No. 01 -Discharge Pressure Gauge & Switch, l"
6. 12420-02 Lime Metering Pump No. 02 -Discharge Pressure Gauge & Switch, 1"
7. 12420-03 Lime Metering Pump No. 03 -Discharge Pressure Gauge & Switch, 1"
Coordinate as requir~d with McCarthy and the PCSS.
cc: Chris Harder (FWWD)
Luke Matus (FW\ND)
Tim Allen (FWWD)
Todd Kay (FWWD)
Josh Trice (B&V)
Larry Reynolds (CDM)
Kamran Khan (CDM)
File: 9.04
PD-13300-01-1
P0,13300-01 -1_M emo _REV1 .doc
Sh op D rawmg R ev1ew C t ommen s
TO: BLACK & VEATCH INC. FROM : CAMP DRESSER & McKEE INC .
12200 OLD WEATHERFORD ROAD 777TAYLOR STREET SUITE 10 50
FORT WORTH TX 76108 FORT WORTH . TX 76102
TEL. NO. (817} 429-7 55 8 TE L. NO. (817) 332-8727
COM PRO JECT NO .: 0515 -62142
PROJECT : WESTSIDE WATER TREAT MENT PLA NT PROJECT
OWNER : CITY OF FORT WORTH PRO JECT NO.: P26 2-607 54 0045683
CONTRACTOR : McCARTHY BUILDING COMPANIES INC PROJECT NO .: 002012
TRANSMITTING HEREWITH :
DESCR IPTION : Project Plan & Fie ld Devices Resubmittal SUB NO .: PD-13300-01 -1
FEDEX: PRIOR ITY STA NDARD ECONO MY MA IL: EXPRESS PRIORITY REG ULAR
OTHE R:
DISTRIBUTION :
REMARKS
B&V 1 COM -DAL 1 APA I CP&Y OTHER
MEI
----
GA i CDM-FTW 1 KOMATSU JQ ------
SHOP DRAWING REVIEW
ENGINEER'S REVIEW RESPONSE REQUIRED
OF CONTRACTOR
o Approved Y' Comments D Confirm
vc Approved as Noted Attached
o Not Aooroved D Resubmit
o Receipt Acknowledged (Not Subj ect to Eng ineer 's Rev iew or Approva l)
The Engineer 's review of this shop drawing is limited to the review of dimensions,
equipment and materials as presented in the Contract plans , spec ifications , and for
des ign concept. This rev iew does not relieve the Contractor from errors or omissions in
the submittal or from the Contracto r's responsibility of addressing any dev iations from
the Contract Documen ts. The Contractor is responsible for the detai ls and dimensions
of fabrication and manufacture , the means , methods , techniques , sequences or
procedures of construc tion and performing his wo rk in a sa fe manner.
CDfJI By --~K~. K~h~a=n/~L~. ~Re""y~n=ol=ds~ Date -~08=-·_,_18=-·_,_1 o=---
NONE( ) SEE BE LOW ( v ] SEE ATTACHED SHEET [ v)
CO MM ENT REV IEW REV IEW COMME NTS
NUMBER BY
System Architecture Drawing 1008-COMM-0 2: No Response Required. Change the Tag numbers for the
fo ll owing Power Monitoring Units (as per RF !# 137 dated 7/2/2010):
1 KAK Old Tag Number MVSG-PM-A : Update to TWP001-MR-A
Old Tag Number MVSG-PM-8 : Update to TWP002-MR-B
Old Tag Number MV HS-A : Update to TWP003-MR-A. Additionally , show th is PMU as futu re equipment.
Old Tag Number MV HS-8: Update to TWP006-MR-B . Additionally , show thi s PMU as futu re equipment.
PD-13300·0 1-1 RE V1 doc
PAGE _1_0F _2 _ PAGES
BY KAK/LJR
, '
~
PROJECT : WESTSIDE WATER TREATMENT PLANT PROJECT . PROJECT NO .:
OWNER: CITY OF FORT WORTH OWNER : P262-607540045683
ENGINEER : CAMP DRESSER & McKEE INC . ENGI NEER : 0515-62 142
CONTRACTOR : McCARTHY BU ILDING COMPANIES INC CONTRAC TOR: 002012
DESCRIPTION : Pro jec t Plan & Field Devices Resubmittal SUB NO .: PD-13300 -01-1
COMMENT REVIEW REVIEW COMME NTS
NUMBER BY
2 KAK System Architecture Drawing 1008-COMM-02: No Response Required. Delete RIO-HS Enclosure shown on
the drawing (as per RFI# 137 dated 7/2/2010).
3 LJR Secti on 16 (Diap hragm Seal -Annu lar Flange Mo unted): Not Approved. Please provide Ashcroft Type 80
iso lation linq in lieu of the Red Valve diaphraqm iso lators . See attac hed memo for deta ils .
PD-13300-01 -1 REV1 doc
PAGE _2_0F _2 _ PAGES
BY __ """KAc..:.:Kf..::..L=Jc:...:R ___ _
October 7 , 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth, Texas 76108
Attn.: Mr. John Boss
FORT WORTH
WESTSIDE WATER TREATMENT PLANT PROJECT
RE: CPR-36, SS Filter Sleeves
Dear Mr. Boss:
The Westside Water Treatment Plant construction includes the installation of eight
reinforced concrete filter basins, with only three filters being brought on-line initially. In
order to expedite future filter activation, CPR-36 consists of adding a total of ten stainless
steel wall sleeves in filter basins #4 through #8 for the 2" air scour vent and the Yi" filter
head loss measurement piping .
The Fort Worth Water Department concurs with the recommendation of Black & Veatch
to accept the contract modification. Total cost for the proposed change amounts to
$3,198.00 with no additional time requested. This change will be incorporated into
Change Order #3 to the contract.
Sincerely,
Chris Harder, P. E.
E ngineer
Xe: Danny Shannon: P .E., CDM
Project File
WATER DEPARTMENT
PRODUCTION DIVISION
THE CITY OF FORT WORTH* 1511 11TH AVENUE* F ORT WORTH, TEXAS 76102
(817) 871-8258 * FAX (817) 871-8410
0 Printed o n recycled paper
1='11 BLACK & VEATCH ~ Building a world of difference:
September 27 , 2010
City of Fort Worth
Water Engineering Department
1511 11th Avenue
,Fort Worth , TX 76102
ATTN: Mr. Chris Harder, P.E.
RE:
Dear Mr. Harder:
Westside Water Treatment Plant
Project No . P262-607540045683
CPR #36
Transmitted herewith please find three copies of McCarthy 's change proposal request for the
referenced extra work. Black & Veatch has recommended the total cost amount of$3 ,198.00 be
approved. Please review the request, and if it is acceptable, have it executed.
John Boss
WESTSIDE WATER TREATMENT PLANT 12200 OLD WEATHERFORD ROAD FORT WORTH , TEXAS 76108 www .mccarth y.com
MAILING ADDRE SS : P 0. BOX 122419 FORT WORTH , TEXAS 76121 PHONE (817) 560 -3740 FAX (817) 560-3727
September 23, 2010
Black & Veatch Corporation
12200 Old Weatherford Road
Fort Worth , Texas 76108
Attn: Mr. John Bos s
Re : Change Proposal Request #3 6
Westside Water Treatment Plant
P262-607540045683
Mr. Boss ,
Please find attached CPR #3 6 pricing for changes made to the project due to the field
directive memo from CDM dated 9/14/2010 concerning the addition of stainless steel
pressure tap sleeves and vent piping in the future Filters 4 - 8 .
Please do not hesitate to contact me with an y question s or concerns.
John Frazier
Project Manager
McCarth y Building Companies, Inc .
CC: Steve Gotschall -Project Director
Jerry Mayer -Project Director
File
ENC: CPR #3 6 Pricing
CDM Memo dated 9/14/20 I 0
-----------
Change Proposal Request
j CPR# 0036
Date : 09/22/2010
Project Name: Westside Water Treatment Plant Architect's Project No .:
Project No. 002012 .000 Cost Issue Ref# : 64
Attached is an itemized quotation for changes in the Contract sum and /or time on subject Project as described herein . This
document , when fully executed , as accepted , shall constitute authorization to proceed with the work described herein . Due to
schedule impact , this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy
Building Companies , Inc. will be reimbursed monthly for the cost of this work as completed , whether or not the Change Order has
been fully executed .
DESCRIPTION OF THE PROPOSED CHANGE :
Added Filter Wall Sleevs
SCOPE :
Add (5) - 4 " x 1'-4" Sch 10 304 SST sleeves for 2" Vent at Filters and (5)-1/2" x 1'4" 316SST sleeves for 1/2 " Filter headless
assemblies .
REFERENCE:
Pricing Details
Company Name
McCarthy Building Companies , Inc .
McCarthy Bu ilding Companies , Inc .
McCarthy Building Companies , Inc.
BY :
Description
Added Filter headless/ VT sleeves
Added Filter headless/ VT sleeves
Subcontractor Bond
General Liabil ity
Builders Risk
Project Bond
CO Fee (Sub Work)
CO Fee (McCarthy Work)
Net Amount of This Proposed Change
Net Change in Calendar Days Due to This Proposed Change
D Schedule impact to be evaluated at a later date .
Amount
1,103 .00
1,622 .00
0.00
25 .00
10 .00
29 .00
0 .00
409 .00
3,198 .00
City of Fort Worth Water Department
Accept Accept
Do Not Accept _ Do Not Accept
BY : BY :
Date : Date :
Printed On : 09/22 /2010 11:10 :59 AM Page : 1 of 1
Pepping, Nick
Subject:
Bid No ....... : B163793
Bid Date ... : 09/15/10
Quoted By: RCP
Westside WTP --Rev ised Quote , PR 2012-3044
Price Quotation# 8163793
Ferguson Waterworks #788
265 0 S Pipeline Ro ad
Euless, TX 76040
Phone : 817-267-3900
Fax : 817-267-3912
Cust Phone: 972-991-5500
Terms ......... : NET 10TH PROX
Customer.: MCCARTHY BUlLDING COMPANIES
WESTSIDE WATER TREATMENT
Ship To ....... : MCCARTHY BUILDING COMPANIES
PO BOX 122419
FORT WORTH, TX 76121
Cust PO# .. : 4" & 1/2" WALL SLV
Item
SP-S4 WSWSR040 I 04
SP-S4 WPWSRO 120 I 04
De scription
4 X l'-4 SS 304 WALL SLV W/SR
Seep ring centered
*****
*****
I /2 X 1 '-4 SS 304 WALL PIPE W/SR
Thrd coup on each end
Seep rin g centered
WESTSIDE WATER TREATMENT
PO BOX 122419
FORT WORTH, TX 76121
Job Name.: WESTSIDE WATER TREATMENT
Quantity
Net Total:
Tax:
Freight:
Total:
5 1
I
I
'
5 1
Net Price UM Total
77.640 EA
97.300 EA
874.70
0.00
150.00
1024 .70
388.20
486 .50
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48
HOURS SHALL BE AT THE PRICE I N EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not
responsible for delays , lack of product or increase of pricing due to causes be yond our control, and/or based upon Local , State
and Federal laws governing ty pe of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buye r's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this
document , or on the web at http://wo lse lev na.com/terms conditionsSale.html. Govt Buye rs: All items quoted are open market
unless noted otherwise.
Itemized Pricing
Job: -r---West side WTP
~------09116/10
~--+--+---+---+---+----+--------+-----+--------+-------I . : -~ ----1--
-____ ~----+---1----+----+----+----------·-----l-'D~•=•~c~rla~t~iocc.ncc.:--, CPR# 36 _L __ L_ ____ L---·----=-
-------+------~------/-,----+---------': ----------,-----!--t---1-1-----+-----+----+-------l-------!------l----------
McCARTHY
Man Hours Un it Cost s Tota l Costs
~'.!!-_ Descripti on __ Qu anti ty ~ UMnH
1
/t UMniHts/ Total Labo r _ccM;o.tr,_I ___ 1 __ _,E,,,~$u ie______,-__ S~u_b ___ ,_ __ L_a7b_o_r --·,---M~t~rl ___ I,_ __ ~~~-I~. Line
MH $ $ $ $ $ I $ -,· $ Tota l
_ ,1/2"x 1'4"3 16SSTthdxthdwallpi~----1---s_.oo_--;~•~•-+--4·~63.c+----+---~2=3'-.1~s.,. __ ~19'-.c.+6 _____ 9'-7~.3+---------1------ll-------'4~5~4 +--~---. , ____ . _$ __ ~
~. ~'-4 " Sch1 0 304 SST sleeve w/ SR centered s .oo ea 4.63 23 .15 19.6 __ 77 .64 45~ ~: ;____ _____ :-f--~
. _ -~gilt _ = __ --=-===---=----=---+ 1.00 LS ggg 150 ____ -:----:, : +-----:-_5_ _ ~
-----i-.-o.oo 3·--------==-_:J__ ., -T--
---_, 0.00 _ _:L___ ·;-_ .:.. -$$
0.00 --:-= .. _ -----;----------. ·1 ·-"_j. ~: _:_,__-=--:-J-__ :1'--: ; ---=-~ -t-=----+-.• -+---==i-----------·---___:_j.__
. _ _ o.oo --· ::..I _ :..,.__ -:.--s
-,
L
------j---+---t----+-------1-----~~.gg-c.i----+-:±=--+-: !
: ·_r---===-. _-----=---~.gg ~·~ -_l __ ~ -; l ~---+------------------+----+---l----+---+-----o~.700ct-----t ----11--------1------. . $
0.00 ::._ ---~-_:___::_.,-: J__ ~ ..I_ _ ~-------------t----+----t---~---+---~o=.oo~"'-----c-· ·----+-----1--------1-------1---. -J . s -+-·-_ 0.00 --~ t--_ _.:.. _L
.:..
:.:·-t =-=--=--____________ , __ -_-_-_-_-_;_-_-_-:.:·,---~----~-+-1----_-_-_-_-_++----_-_-_-..,g~·gg~-~=======:.=======--~--++--~~~--~~--~~--.::-~~~~--~~-=====:============--+----·.. : !
--j ------·---J--0.00 -:.---$-----=-+=---~-0.00 ---+----·-· -$-
,----------~~------=----j 0.00 -$
$
----'----~· -i=== ggg _::._ -:--
--------~~--------~ -_-,:====:·:=.=-_-___ ,--. __ -~g=::~·-----+------f--------1-------f---------+ -----+--
->----;--_::._ ~ -$-----__ _::._ ~
--;
j_ __
:_
--·-~
---0.00
·---------·---;··-· --t----~-----i--~g ~ggc-1----+-------i------+-------
------__ J I Total HRS 46 .30 SUBTOTAL $ 907 .48 s 1,024 .70 $ $
$ $ $
90 .75 $ $ s
549 .03 $ s $
$ 71 .73 $ $
-----•---+-+---1-,~""~=~=~'=r~"°~L"'E"'~"':"';"';o=\='5'l--c'1°o~:°'%'=c%,-t---..;:g'=~-!--+=---.....,90=1.~4sc+-~~='~="~=.:~:c:c~c'---l-,!c------,=--=----t-7----+;;----
---------------l---+--+-=--='"===--=-----=--,---t-:c-----==°~--~-'----+-=-----c~------t-:c-------+-=---
--------l---f----l--'LA"c'"'~,=~c,~;ci'c'i c':cci'c'c=:=~+-5'=i°":'=%=-%'--'c--g:'~=-'!c---1"7-1.:~~g g: ~~~ !
--· ---------SAFETY SO.SO PER HOUR 46 of labor $ 23 .00 s $ s
46.4 2 $ s $
6.28 s 6.28 $ $ --=-...:=----=---==-=:::_ ---SM ALL TO~ ~.~~ g~ : : 1,5~;""~~~1--0~F~o=:~T~=Bc,,.F~~E~L-,~:-------------------
--~ ----'---'---r------SUBTOTAL $ 1,62 2.96 $ 1,102 .71 $ s
243 .44 $ 165.41 $ ~-_t... _ __ _ _ -----~--_------~~~·· ----,f---+---+----+----1--~!--1---G=c~--+------+--'=1s=-.oo=c%=-·i-,,s---...;.,.~f--f,-',--~=-,+',-----~---
s
$ s
1,866 .40 1,268 .12 $ $
$
14 .93 $ 10.14 s
: Subs 10.00% S j Mis c 0.00% S
--------_ ---~
1
--+---+---+----+----+------S=u=bc~o'-n~tr~a~ct~or~Bo=n~d+--_s_u~1
6
~~=0~T~~=L=--t~S---'----t--'--'----+'------+-::---
---------l----i Insuran ce 0.8000%
-+--I ---,---
5.83 $ 3.96 $
17 . 18 $ 11.68 s ----------•--_---j ~B~u~il~de~r~s ~R~is~kt--_o~.~31~00~%'---+-'E-----'c='-+-'E---"'~~'-------+-c---Additiona l Bond Premium 0.9106%
--s--· --
$ T --
$ 1,932
$
$ 91
$ 549
s 72
$ 23
$ 46
$ 13
$ 2,726
$ 409
$
$
$ 3,135
$
$ 25
$ 10
s 29
1,904 .35 1,293.90 $ $ 3 ,198
TOTA L $ 3,198 1 ! Tota l S -----1 -t-,----1 -1------+------'---------------
I I • I
Harder, Christopher
4
From:
Sent:'
To:
Bartruff, Chad (BartruffCO@cdm .com]
Tuesday, September 14 , 2010 9:45 AM
Josh Trice
Cc: John Boss ; Harder, Christopher
Subject: RE : Westside Inspection : 2" VT-SST & 1/2" SST Pipe
Attachments:
Mb,
MD-2 Filter Wall
Pipes.pdf (32 ...
M0-2 Filter Wall Pipes.pdf
John ,
Refer to the attached memorandum regard i ng what is proposed .
Thanks ,
Chad 0 . Bartruff, P.E
COM (TX #F-3043) 1777 Taylor Street , Suite 1050 I Fort Worth , TX 76102
Ph : (817) 332-87271 Fx : (817) 332-6870 I www.cdm .com R:,-Please consider the environment before printing this email.
-----Original Message-----
From : Bartruff, Chad
Sent: Tuesday, September 14 , 2010 9 :08 AM
To: 'Josh Trice'
Cc: John Boss ; Christopher.Harder@fortworthgov.org
Subject: RE: Westside Inspection : 2" VT-SST & 1/2" SST Pipe
Josh ,
I would recommend that these wall pipes be installed now, similar to all other filter wall pipe penetrations . I will issue a
memorandum to confirm that we are proposing to have the filter flume vent pipe and the differential pressure wall sleeve
installed (cast into the wall) for Filters No . 4 through No . 8, in addition to No . 1 through No. 3 .
This will add (5) 2" wall pipes and (5) 1/2" wall pipes , all SST.
Please call should you have any questions/comments.
Thanks ,
Chad 0 . Bartruff, P.E .
COM (TX #F-3043) 1777 Taylor Street , Suite 1050 I Fort Worth, TX 76102
Ph: (817) 332-8727 I Fx : (817) 332-6870 I www.cdm .com R:,-Please consider the environment before printing this email.
-----Original Message-----
From : Josh Trice [mailto:jtrice@jqieng .com]
Sent: Monday, September 13 , 2010 1:21 PM
To: Bartruff, Chad
Cc: John Boss
Subject: Westside Inspection : 2" VT-SST & 1/2" SST Pipe
Chad ,
1
. '
•
CDM
Memorandum (Email)
To:
From :
Date :
John Boss
Black & Veatch.
Chad Bartruff, P. E. (TX #91688)
COM (TX#F-3043) Cl>
September 14 , 2010
Subject: Westside WTP Project
Filter Wall Pipes (Sheet MD-2)
2 " VT-SST and 1/2" SA-SST
Sh ee t MD-2 shows the installation of cast-in wall pipes at Filters No. 1 through No. 3 for
the 2" VT-SST (air scour vent) and the 1/2" SA-SST (filter headloss measurement). To
facilitate future installation and integration of filtration systems, it is proposed that these
wall pipes b e furnished and cast into the filter walls similar to all other piping for Filters
No. 4 through No . 8. The wall pipes shall be furnished as per the applicable submittals and
installed similar to Filters No. 1 -No . 3.
cc: Chris Harder (FWWD)
Josh Tric e (B&V)
Sagar Khole (CDM)
Fil e: GS-9.0 4