Loading...
HomeMy WebLinkAboutContract 53214-A1 City Secretary Contract No.: 53214-A1 AMENDMENT NO. 1 TO CITY SECRETARY CONTRACT NO.53214 WHEREAS, the City of Fort Worth ("City") and BTC III Carter Logistics Center LLC ("Owner") made and entered into a Transportation Impact Fee Credit Agreement, City Secretary Contract No. 53214(the"Agreement"); and WHEREAS,it has become necessary to execute this Amendment No. 1 to said Agreement to replace Exhibit"D"attached to the Agreement with the Exhibit"D-1" attached to this Amendment; and WHEREAS, it has become necessary to update Exhibit"E" attached to the Agreement with the Exhibit"E-I"attached to this Amendment. NOW THEREFORE, City and Owner, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Agreement: 1. Exhibits"D"and"E"to the Agreement shall be replaced with the Exhibits"D-1"and"E-1 respectively, attached hereto and incorporated herein by this reference. 2. All other provisions of the Agreement which are not expressly amended herein shall remain in full force and effect. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement Amendment 1 OFFICIAL RECORD BTC III Carter Logistics Center-CA-19-016 CITY SECRETARY FT. WORTH, TX IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager. CITY OF FORT WORTH,TEXAS OWNER BTC III Carter Logistics Center LLC a Delaware limited liability company Dana Burghdoff(Jul 6,202 :05 CDT) Dana Burghdoff By Build-To-Core Industrial Partnership III LLC Assistant City Manager A Delaware limited liability company Jul 6 2021 its sole member Date: � By: BCG BTC III Managing Member LLC a Delaware limited liability company Recommended By: its Investment Managing Member DJ Harrell(Jun 28,202108:52 CDT) D.J. Harrell Melissa Barrett Director,Development Services Vice President—Asset Management Approved as to Form and Legality: Qfjzd� Contract Compliance Manager: Mack(Jul 2,202111:14 CDT) Douglas Black By signing, I acknowledge that I am the person Assistant City Attorney responsible for the monitoring and administration of M&C: None required this contract, including ensuring all performance and �o44`r0R reporting requirements b opo R) ATTEST: p�►o°° °0Lod�� ° ° C r � ° ° V o o=d LEONARD A MANTEY(Jun 25,202115:50 CDT) o o* Mary J.Kayser �� °°° °°°°°°° a Leonard Mantey City Secretary ��nEXAs�pa Planning Manager, Development Services OFFICIAL RECORD Transportation Impact Fee Credit Agreement Amendment 1 BTC III Carter Logistics Center-CA-19-016 CITY SECRETARY FT. WORTH, TX EXHIBIT D-1 Transportation Improvements BTC III Carter Logistic; Cel7Cel' *il"e foT CmdR Agaimsi r _ f �y! ..= Tmnspoilet»n Jm:pact fees AAghi-of-Way Ded i:a Lim &{+rnsVuci»n irr min ate.- _ ----- 2.1 ,,. . E'g:We Nnp mvements U"ts im .' .03kcnweRd ROW DE(5Mtj0fk[PS-19-03[ ili iyin Oak GGveRd ConsbWiariofwesterfi two Jarkw[CPH107,77 ka �11114if r��'Y r Transportation Impact Fee Credit Agreement Amendment 1 Page 3 of 7 BTC III Carter Logistics Center-CA-19-016 EXHIBIT E-1 Credits Against Transportation Impact Fees BTC III Carter Logistics Center Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument# Plat Case# Eligible Arterial Value D219252891 FS-19-063 Oak Grove Road $ 63,389.00 Value of Capacity Added City Project# Plat Case# Eligible Arterial Value 102222 FS-19-063 Oak Grove Road $ 1,910,796.00 Transportation Impact Fee Credit $ 1,974,185.00 Value of Existing Demand Number of Permits Collection Rate Building Permits 4 $ 255,049.78 Net Credit Available $ 1,719,135.22 Transportation Impact Fee Credit Agreement Amendment 1 Page 4 of 7 BTC III Carter Logistics Center-CA-19-016 Right-of-Way Valuation for Oak Grove Rd 2017 Transportation Improvements Elan Project X-18 Estimated Construction Costs from 2017 $7,361,000.00 Transportation Improvements Plan Value of Total Project Right-of-Way (20% of 1,472,200.00 Construction Cost) Total Project Length (LF) 6,600 Arterial Cross-Section Width (LF) 110 Additional ROW needed for Roundabout (SF) 0 Total Project Right-of-Way (SF) 726,000 Fight-of-Way Value Per Square Foot $2.03 TAD Value as of 09/10/19 TAD Account 00437158 Total Area (SF) 1,264,982 Appraised Value $2,904.00 Value per Square Font $0.01 Right-of-Way Dedication Oak Grove Rd FS-19-063 Recording Instrument D219252891 Total area of ROW to he dedicated 32,226 sq ft Value per . F $ .03 Total Credit Available 63,388.78 Transportation Impact Fee Credit Agreement Amendment 1 Page 5 of 7 BTC III Carter Logistics Center-CA-19-016 Capacity Provided by Oak Grove Roadlmprovemenis CPN 102226. Paving (tern Eligible completed No Description unit quanti� Quantity Unit Price credit Available 1 4"CONC SIDEWALK CO#1' SF 28,870 28,1370 $ 4.05 76 423.5D 2 SO"CONC PVMT ICO PI SY 7,369 7 369 $ 65.24 $ 486 753.55 3 6"LIMETR EATMENT lco n) SY 7,945 7,645 $ 4.19 $ 32r792_113 A HYDRATED UM E(CO 91[ TN 160 160 $ 22095 $ 35r352_DO 36 RAPRIER FREE RAMPr TYPE P-1(OD#1) Eh 8 8 $ 1,672.25 $ 13r37&00 37 REMOVE ASPHALT PAVEM ENT JIDD#1 SY 6,741 6,742 $ 9.56 $ 5 443.95 39 3"ASPHALT PVMT TYPE C CC-1 SY 404 404 $ 21.50 $ 666.00 39 7"ASPHALT BASE TYPE B CD#1 SY 404 404 $ SU.95 $ 2 5&3.60 40 IMPORTED EM BEDMENTAMCKFI LL CRUSHED ROCK(COS) SY 70 7113 $ 47.78 $ 3,344.60 41 4"5LD PVMT MARKI NG HAS(W)(CO#1) LF 2,272 2,272 $ 2.39 $ 5,430.0s 42 4"SLD PVMT MARKI NG HAS(Y)[CD#1) LF 3,998 3,999 $ 2.39 $ 9,555.22 43 6"SLD PVMT MARKING HAS W CONY LF 243 243 $ 4.79 $ 1 i61.54 44 6"SLD PVMT MARKING HIS. Y CD#1 LF 927 927 $ 4.79 $ 3 953_D6 45 BLOCK SOD PLACEMENT(00 Ni) SY 3,217 3,217 $ 8.56 $ 27,537.52 46 SEEDING HYDROMULCH(CO N1) SY 41332 4,332 $ 1.79 $ 7,75A_23 47 UNCLASSIFIED EXCAVATION BY PLAN(CD#1[ Cy 749 749 $ 14.33 $ 20,733.17 48 EMBANKMENT BY PLAN CD#1j Cy 2,273 2,173 $ 9.56 $ 2 773.88 14 BORROW BY PLAN CO 4f1 CY 3,015 8,1115 $ 7.00 $ 5 112_DO 13 TRAFFIC CONTROL OD#1j Mo 6 6 $ 1391.i10 $ M6_DO 16 DETOUR ROUTE(Co#21 LS 1 1 $ 2,M.16 $ 2,966_16 ?i 2"SURFACE MILLING[CC 01) SY 155 155 $ 15.00 $ 2,325.10 22 VARIABLE DEPTH T-1(00#1[ SY 155 155 $ 30.00 $ 4,650.00 23 2"T-0 SURFACE COURSE CD#i) SY 155 15.5 $ L5.00 $ 2 325.00 Paying Subtotal $ 899 DOA3 Storm Drain Item Eligible completed Description Unit Unit Price No. quantity Quantity credit Available 1. CONCRETE RI PRAP[C0#1) SY 92 92 $125.42 $ 11,53&64 2 S'MAN HOLE(CC#1[ EA 2 2 $5,972.32 $ 11,944.54 3 6'MAN HOLE 00 41 EA 2 2 $8 361.M $ 1 722.50 4 6%4 BO%CULVERT CD#1 LF 635 635 $355.51 $ 225743L65 5 5%4 BO%CULVERT(OD#1 LF 329 329 $32336 $ 1 392.02 6 24"RCA CLASS III(CD 40 LF 45E 45E $94.39 $ 38,650.52 T 36"RCA CLASS III(CO qY) LF 397 397 $125.42 $ 49,791.74 & 42"RCA CLA65 III(CD#1) LF 200 200 $1551& $ 31,D56 DO 9 46"RCA CLASS III CD#i LF 149 249 $165.14 $ 27,503_y6 10 4 STORM 1 UNCTION BOX CO 91 EA 2 2 $5 375 09 $ 1 750.13 11 G'STORI I 1 UNCTION BOX[CO 01[ EA 1 1 $6,956A6 $ 8,958.1v 12 4'STACK ED MANHOLE(CID#1) EA 1 I $5,375.O9 $ 5,37539 13 VY CURB IN LET�CO Ni) EA 5 5 $3,561.00 $ 17,805.DO 14 CUSTOM JUNCTION BOX CO 41 LS 1 1 515 708.00 $ 15 70&OD Storm Drd In Subtotal S 576,027.62 Street Light Im prime ments Items El-0ibde completed Description Unit Unit Price No_ Quantiq Quantity Credit AYailaMe 1 2"CONDT PVC SCi 60(T)IGO.I) LF ==7E 2,=?,S L4.33 S 32r643.74 2 ORNAMENTAL ASSMBLY,51 MPLE(CO#1[ EA 16 10 $ 1,194.46 s 11,944_W 3 CONTACT ENCL05UP E�PAD MOUNT[CO#1) EA 1 1 $ 10,152.94 $ 10,15234 4 GROUND BOX TYPE B W/APRON CD 41 EA 1 1 $ 1,493.08 $ 1 493_D8 5 RDUWY ILLUM TY 18 POLE ICO pi EA 10 10 $ 3,344.50 $ 33 445_DO 6 RD71WY ILLUM FOUNDATION TY 3,5,6,AND&(CONY) EA 10 10 $ 1i433.36 $ 14,333.50 7 6-63TRIPLEX€ALUM ELEC CONDUCTOR[COA#1) LF 2279 2,278 $ 4.78 $ 1or68&84 5lreet lights 9ubtutal S 114,901.&0 Pa�i ng Subtotal $ 899r40oA3 Storm Drain Subtotal ; 578r027.52 Street Lights subtotal $ 11 9D1.8D CONSTRUCTION SUBTOTAL $ 1--92,329.85 Other Eligible Items Desuiption Engineering,Surveying and Material Testing 20P1A of Paving&Storm Drain S 318r465.97 otal Value of Ca pacify Provided $ 4910r796.00 Transportation Impact Fee Credit Agreement Amendment 1 Page 6 of 7 BTC III Carter Logistics Center-CA-19-016 Existing Demand (Building Permits) CPN 102222 4 $1,480,988.00 Street No Street Permit No. Collection Rate Credit Available 7100 Oak Grove Rd PB19-09700 $ 63,388.78 $1,417,599.22 7424 Oak Grove Rd PB19-0701 $ 46,003.29 $1,371,595.93 7300 Oak Grove Rd PB19-0702 $ 131,013.42 $1,240,582.51 7424 Oak Grove Rd P021-01206 $ 14,644.29 $1,225,938.22 Credit Remaining $1,225,938.22 Existing Demand $255,049.78 Transportation Impact Fee Credit Agreement Amendment 1 Page 7 of 7 BTC III Carter Logistics Center-CA-19-016