Change Order Request ���T � � � e`
a
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 3 City Sec No. �. '�e
Project No.(s) P265-603170102288 and P275-703170102288 DOE No. 6808 City Proj. No. 01022
000.00
000.00
Change Order: �2 Date: 11/20/2013
City Inspector: Raymond Brice
Phone Number: 817-223-2269
Sewer
1,522,665.75
$98,950.00
1,621,615.75
$89,050.00
1,710,665.75
$46,000.00
$89.050.00
CHANGE ORDERS io DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
NS) FOR CHANGE ORDER
�
m
c�
r�t
C
m
�
�
m
�
�
�
r�a
0
.�
�
Project
Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in
Contractor: William J. Schultz, Inc. tlba Circle "C " Const. Co.
City Project Mgr. Roberto C. Sauceda
Phone Number: 817-392-2387
Dept. � Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
nt of Proposed Chanqe Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funtling (if necessary)
Totals
1,951
050,151.95
E�:%��1.����I�',
139,201.95
$68,000.00
$22,000.00
9.64%
$2,439,002.44
The change order will provide for an additional 137 feet of 24-inch sewer pipe in 60-inch hand tunnel
box that is necessary on the project.
Staff concurs with the contractors request for 30 additional calendar days on this change order.
Attested by:
- -��
�_ __ ___
f+��� ,�; �.:
� ;.
��> :
��„ .
S
i^
r• � ,
�
- r� �_
�
.�
.•� .��
c� - � ; �
,�•��
c ,
r � ' �- _ � � w�q I
Contract Time
Calendar Days
210
30
240
030
270
It is untlerstood antl agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction antl represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
FC� RT W4 RT H Clty Of FOrt WOrth
Change Order Additions
�rLl�� �
Project Name Clear Fork Draina e Basin M-210 Sewer Im rovements, Part 3 City Sec No. �396�
Project No.(s) P265-603170102288 and P275-703170102288 DOE No. 6808 City Proj. No. 01022
Project Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway antl 2,110 feet of eight-inch water main in
Description Country Club Circle.
Contractor
City Project Mgr
William J. Schultz, Inc. dba Circle "C " Const. Co. Change Order: �2 Date: 11/20/2013
Roberto C. Sauceda City Inspector Ra montl Brice
ADDITIONS
DEPT
n
Sewer
137.00ILF
Sewer
Total
Page 2 of 4 �Additions Sub Total
FORT WORTH
Project Name
Project No.(s)
Clear Fork Drai
City of Fort Worth
Change Order Deletions
Basin M-210 Sewer Improvements, Part 3
P265-603170102288 and P275-703170102288
DOE No. 6808
City Sec No.
City Proj. No.
����
.�66
1022
Project Description Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main I
in Country Club Circle
Contractor William J. Schultz, Inc. dba Circle "C " Const. Co. Change Order: �2 Date 11/20/2013
City Project Mgr. Roberto C. Sauceda City Inspector Raymond Brice
DELETIONS
ITEM IDESCRIPTION
DEPT � Qty �Unit
Unit Cost
�
Page 3 of 4 �Deletions Sub Total
Page 4 of 4
City of Fort Warth
Departmental Request for Waiver
Of MBE/SBE Subcontrac�ing/Supplier Goal
Water Department � 98,950.00 10/16/13
DEPARTMENT NAME: ESTiMATED COST / PROPOSAL DATE
Clear ForEc Drainage Basin M-210 Sewer Improvements, Part 3
NAME OF PROJECT/BID:
Roberto G Sauceda �...4.��„_- -----�---�•
SIGNATURE OF /PROJECT MANAGER
2387
EXTENSION
10/10/13
DATE
DOE 6&O8, CPN: 01422
DOE/PRCJJECT NO.
NIGP CODE
ar to advertisement the contracting/managing department shall determine whether the bid/proposal fs one which MBEISBE
�uirements should not be applied. MBE/SBE requirements may be waived upon written approval of the M/WBE Ivfanager. If one
the conditions listed below exists, the contractingJmanaging department shall notify the Manager via this form, stating the specific
son (s) far requesting a waiver.
If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, and his/her decision is final.
Please Ch�ck Applicable Reason:
A. MWBE Ofiice: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Off'ice, in accordance vvith the M/WBE or BDE
Ordinance, because the public or administrative emergency exists which requires the goads or
services ta be provided with unusual immediacy; or
X B. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accor@ance with the M/WBE or BDE
Ordinance, because the purchase of goqds ar serviees from source(sj where subcontracting or
supplier opportunities are negligible; ar
C. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Of%ce, in accordance with the MJWBE or BDE
Ordinance, because the application of the provisions oi this ordinaxice will impose an economic
risk on the City or urzduly delay acqwisi#.ion of the goods ar services; or
D. MWBE Of�ce: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accorflance wifh the M/WBE or BDE
Ordinance, because the MWBE Waiver is saiicited based on the sole source information
provided to the MWBE Office by the znanagi.rxg department's project manager.
Justify Cornrnodity oar Serviae Wai�rer Req�txes�:
A 60 and 46 inch hand funnel is required to accommodate a sewer line for changer order No. 1
Approved
Not Approved
Please use additional shaets, if needed
Y: - �i�
Signature of / BE Authorized Personnel
Signature of M/WBE Authorized Personnel
lU ��lw
Date
Date
Rev. 2-20-19
_:�ti;x-'i�}'j'"•_ s�=3fr?�
=='.l= 3� �:LYC�_=.s"i'