HomeMy WebLinkAboutContract 44708-CO3 (2)FO RT WO RT H Clty of Fort WOrth �6`N�i ����i� f� �� ,�-,;�
Change Order Request ����«�� ��• V� "
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 3 City Sec No. 44708
Project No.(s) P265-603170102288 and P275-703170102288 DOE No. 6808 City Proj. No. 01022
Project Description:
Contractor:
Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in Country Club
William J. Schultz, Inc. dlb/a Circle "C" Construction
City Project Mgr. Roberto C. Sauceda
Phone Number: 817-392-2387
Dept,
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revisetl Contract Amount
Original Funtls Available for Change Orders
Remaining Funds Available for this CO
Additional Funtling (if necessary)
Water
536.20
000.00
000.00
Change Order: �3 Date: 1129/2014
City Inspector: Raymond Brice
Phone Number: 817-319-7943
Sewer
,,�
$188,000.00
7
�•
$46,000.00
104.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (OR/GINAL CONTRACT COST + 25%)
Totals
$1,951,201.95
$188,000,00
$2,139,201.95
$88,104.00
$2, 227, 305.95
$68,000.00
$22,000.00
$88,104.00
14.15%
$2,439,002.44
JUSTIFICATION (REASONS)
�
�
—L..4'�!
�
The change order will provide for the following that were necessa�y during constl•uction on Colonial Golf
Cou�se:
.
8-inch bored service to avoid conflict with existing brick masonry wall, 8 hole green and tee
box.
5-foot diameter manholes and additional depth on the project sewer main.
5-foot Type A manhole with internal drop.
8-inch service installed in tunnel.
Staff concurs with the contractor�request
�� ��° I 1 �� -- �
�
�
�
-,�;
R(-.
�
days on this change order.
Contract Time
210
60
270
030
- s ;,� - �.
` - �1 _� r- :- �� � ��_�1•►1�
11�tAR1'l�'J�►\: I�t . II��
It is understood antl agreetl that the acceptance of this Change'1����t`�y.�lie�'�in#ractor constitutes an accord and satis#a�ti—i a�iRd���r�r�t in full (both
time and money) for all costs arising out of, or incitlental to, the above��hange Order.
FORT WORTH
Project Name
Project No.(s)
Project
Description
City of Fort Worth
Change Order Additions
Clear Fork Drainage Basin M-210 Sewer Improvements Part 3 City Sec No. 44708
P265-603170102288 and P275-703170102288 DOE No. 6808 City Proj. No. 01022
Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway antl 2,110 feet of eight-inch water main in
Country Club Circle.
Contractor � William J. Schultz, Inc. d/b/a Circle "C" Construction
City Project Mgr
Roberto C. Sauceda
ADDITIONS
8
9
11
12
14
27
28
29
30
31
32
33
34
35
Concrete Collar
5 Foot Manhole
5 Foot Extra Dept
Manhole Vacuum
Sanitary Line Gro
T�
in
in
ti.
ment Plu
�ir
in Existina Wood Box Tun
Backfill
Foot
Foot
)epth manhole
� Manhole w/ inter
�ay Clean Out
Abandonment Plu
r Line Trench SafE
Change Ortler: 03 Date: 1/29/2014
City Inspector Ra mond Brice
DEPT
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
3.00 EA
3.00 EA
31.00 VF
5.00 EA
31.00 CY
2.00 EA
1200.00 SF
1.00 LS
238.00 LF
149.00 LF
25.00 LF
1.00 EA
2.00 VF
1.00 EA
1.00 EA
2.00 EA
577.00 LF
Sewer
Unit Cost
150.00
150.00
u
$15.00
175.00
$40.00
500.00
175.00
500.00
500.00
500.00
$3.00
Sub Total
$2,178.00
$1,050.00
$16,500.00
$7,750.00
$750.00
$4,650.00
$2,400.00
$3,600.00
$5,000.00
1
731
E,:: �- ��
5,:: �� ��
Page 2 of 4
FORT WORTH Clty Of Fort Worth
Change Order Deletions
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 3 City Sec No. 44708
Project No.(s) P265-603170102288 and P275-703170102288 DOE No. 6808 City Proj. No. 01022
Project Description Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main
in Country Club Circle.
Contractor William J. Schultz, Inc. d/b/a Circle "C" Construction Change Order: �3 Date 1/29/2014
City Project Mgr. Roberto C. Sauceda City Inspector Raymond Brice
DELETIONS
ITEM IDESCRIPTION
DEPT
Unit IUnit Cost �Total
Page 3 of 4 �Deletions Sub Total
Page 4 of 4