Loading...
HomeMy WebLinkAboutContract 44708-CO1 (2)� - K' +'�,! � �'`; � � • • • � • • � � i`_ ` ( ti�ll�, � - - • � •- -• • • � . � - 1 � • ' � f..��- i ' ' •- • ' . •1 1 1 ::. �' 1 1 1 :: �• � •:1: ' • � 1 1 Project Description Contractor: Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in William J. Schultz, Inc. dba Circle "C " Const, Co. City Project Mgr. Roberto C. Sauceda Phone Number: 817-392-2387 Dept. Original Contract Amount Extras to Date Cretlits to Date Pending Change Orders (in M&C Process) Contract Cost to Date ount of Proposed Chanqe Order Revisetl Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funding (if necessary) �il 536.20 Sewer Change Order: �1 Date: 10/24/2013 City Inspector: Raymond Brice Phone Number: 817-223-2269 665.75 1,522,665.75 $98,950.00 1, 621.615.75 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION FOR Totals $1,951 $1,951 $98,950.00 050,151.95 $68,000.00 $68,000.00 $52.950.00 5.07% $2,439,002.44 The change order will provide for the following additional pay items that are necessary on the project: 24-inch sewer pipe in 60-inch wood hand tunnel box. 24-inch sewer pipe in 48-inch wood hand tunnel box. � m � � � n �� f� ;�� --� � c. a,r r--.:, �� Staff concurs with the contractors 0 C� ,�' � � (�' ; ; ; , �: � �, � - i ,; � ti- / !. ►� �.' ' � � Contract Time iaar 210 210 030 240 �iaz�Y J. � er; Cit��e�reeta�r`�"`�;-y`�:- ''— - - It is untlerstood and a reed that the acceptance of this Change Ortler by the contractor constitutes an accord antl satisfaction and represents payment in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. �� � `�� � 1 Water calendar days on this change order. FORT WORTH Project Name � Clear Fork Project No.(s) Project Description Contractor City Project Mgr City of Fort Worth Change Order Additions Basin M-210 Sewer P265-603170102288 and P275-703170102288 ts Part 3 City Sec No. 23966 DOE No. 6808 City Proj. No. 01022 Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in I Country Club Circle William J. Schultz Inc. dba Circle "C " Const. Co. Change Order: �1 Date: 10/24/2013 Roberto C. Sauceda City Inspector Ra mond Brice ADDITIONS �'dCj'C L V I '+ F'C� �2T ��O RT H City of Fort Worth Change Order Deletions Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 3 Project No.(s) P265-603170102288 and P275-703170102288 DOE No. 6808 City Sec No. City Proj. No 23966 01022 Project Description Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main I in Country Club Circle Contractor William J. Schultz, Inc. dba Circle "C " Const. Co. Change Ortler: �1 Date 10/24/2013 City Project Mgr. Roberto C. Saucetla City Inspector Raymond Brice DELETIONS ITEM IDESCRIPTION DEPT Unit IUnit Cost ITotal Page 3 of 4 �Deletions Sub Total � t Page 4 of 4 City of For� Worth Departmental Reques� for Waiver Of MBE/SBE Subcontracting/5upplier Goal Water Department $ 98,950.00 10/16/13 DEPARTMENT NAME: ESTIMATED CpST / PROPOSAL DATE Clear Forlc Draina$e Basin M-210 Sewer Improvements, Part 3 NAME OF PROJECT/BID: Roberto C. Sauceda �..ti.�v...� ------�---�• SIGNATURE OF /PROJECT MANAGER 2387 EXTENSION 10110/13 DATE DOE 6808, CPN: 01422 DOE/PROJECT NO. NIGP CODE ----- or to advertisement, the contracting/managing department shall determine whether the bid/proposal ts ona which MBE/SBE �uirements should not be applied. MBEISBE requirements may be waived upon written approval of the M/WBE Manager. If one the conditions listed below exists, the contractinglmanaging department shall notify the Manager via this form, stating the specific son (s) for requesting a waiver. If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either may appeal to the City Manager, or designee, and his/her decision is final. Pleas� Ch�ck Applicable Reason: A. MWBE Ofiice: A waiver of the goal for MBE/SBE subcontracting requiremen.ts was requested by the Department and approved by the MWBE Office, in accordance vvith the.M/WBE or BDE Ordinance, because ihe public or administrative emergency exists which requires the goads or services to be provided with unusual immediacy; or X B. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and appraved by the MWBE Office, in accordance with the M/WBE or BDE Ordinance, beeause the purchase of goods or services from source(s) where subcantracting or supplier opportunities are negligible; or C. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M jWBE or BDE Ordinance, because the application of the provisions of this ordinance will impose an economic risk on the City or uxzduly delay acqwisition of the goods or services; or D. MWBE Of�ce: A waiver of the goal for MBE/SBE subcontractxxxg requirements was requested by the Department and approved by the MWBE Ofiice, in accordance wifh the MJWBE or BDE Ordinance, because the MWBE Waiver is soiicited based on the sole source information provided to the MWBE Office by the znanaging department's project manager. Justify Cornmodi�y or Service Waiver Requesfi: A&0 and 48 inch hand funnel is required to accommodate a sewer [ine for changer arder No. 1 M/W� OFFI� Approved Not Approved Please use additional shcets, if needed USE ONLY: - ;rtOG� l Signature of / BE Authorized Personnel Signature of M%WBE Autharized Personnet !� {G' � Date Date Rev, 2-20-13 —y�s� si7�— � '�Sr;�fz s `-`-.a: ��_ �_: !'�'—=.. ---