HomeMy WebLinkAboutContract 45402-CO1 (2)c�r� s�c���
FORT WORTH�.: City of Fort Worth �p(�'j�q�T {��v ,��;�'� � r�' ;' �-;r�,,,� �
Change Order Request Breakdown �
Project Name N. Riverside Dr. and Northern Cross Boulevard City Sec # 45402
Client Project #(s)� DOE: 7175 and
No. 02241
Change Order Submittal # � Date
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
unt of Pro
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
280.86
E.� ��
WATER I SEWER I Totals
CHANGE ORDERS to DATE (INCLUD/NG THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%J
JUSTIFICATION
CHANGE ORDER
-1.73°/a
$3,677,851.08
20
120
Changes in the plans once project bid. Changes are as follows: Irrigation Controller Change per Parks Comments, Concrete Truck Apron and
Striping Changes per modifications to roundabout standards and added items that were not in the original proposal form: Removal of Street
Light Foundation, Water Line Lowering and Storm Drain Manhole
�
�
m
r-s
m
C
m
0
�
c
r
�
cn
S
.�
j �:�:_ � s i �� ';
� ��
Dept. � TPW
�
,�i
a42.280.86
942.280.86
$50,844.49
11
t. .
�
�:�.. ' -
� �
` � � r: � �. r
- '� �
-; r
� .
i
.tti��
4/30/2014
Contract Time
F�R__ T�TH ciry of Fort wortn
Change Order Additions
Project Name N. Riverside Dr. and Northern Cross Boulevard City Sec # 45402
Client Project # DOE: 7175 and City Project. No. 02241
Change Order Submittal #�1 Date 4/30/2014
ADDITIONS
ty ni nit ost ota
. . emove isc. oncrete tructure - treet ig t oun ahon .
A.02 3339.1001 4' Manhole (Storm) TPW 2.00 EA 5,520.00
A.03 9999.000018" BRKN Pvmt Maricing HAE (1A� TPW 96.00 LF 4.45
A.04 Irrigation Controller- Leit TPW 1.00 EA 1,518.23
A.05 3305.0002 6" Waterline Lowering TPW 2.00 EA 4,840.00
A.O6 3305.0109 Trench Sa(ety TPW 348.00 LF 6.90
A.07 Exploratory ExcavaUon for Exis6ng Water Line TPW 1.00 EA 1,265.00
A.08 9999.0000 Integral ColoredlTextured 11" Concrete Truck Apron TPW 510.00 SY 9.78
A.09 9999.00001 Intergral Coloredltextured Concrete Pedestrian Buffer TPW 4,670.00 SF 1.08
A.10 9999.0000 Integreal ColoredfTextured Median Lug TPW 960.00 LF 10.06
A.11 Electrical Line loweing at Storm Inlet Line B TPW 1.00 EA 2,300.00
A.12 12"x18" Retaining Wall TPW 255.00 LF 22.48
TPW $56,972.24
WATER $0.00
SEWER $0.00
Sub Total Additions 56,972.24
Change Order Additions Page 1 of 1
F�R� H c�ty of Fort wortn
Change Order Deletions
Project Name N. Riverside Dr. and Northern Cross Boulevard City Sec # 45402
Client Project# DOE: 7175 and City Project. No. 02241
Change Order Submittal # 01 Date 4I30/2014
DELETIONS
ly nit nit ost ota
. rngat�on ontro er- unter - , .
D.02 9999.0000 Install 18" Yield Triangles TPW 62.00 EA 30.85
D.03 3311.0001 Duc61e Iron Fittings w/ Restraint TPW 1.00 TON 9,255.52
D.04 3339-1001 4" SS Manhole TPW 0.30 EA 5,413.15
D.05 3471.0002 Portable Message Boards TPW 2.00 EA 8,885.29
D.06 6" Concrete Curb (Truck Apron) TPW 255.00 LF 8.45
D.07 3211.0113 8" Flexible Base, Type A, GR-1 TPW 5,598.00 SY 13.40
TPW $107,816.73
WATER �0.00
SEWER $0.00
Sub Total Deletions 107,816.73
Change Order Deletions Page 1 of 1