Loading...
HomeMy WebLinkAboutContract 45236-CO1 (2)City of Fort worth Change Order Request Chan e Order No. Date TPW Project No. 9 1 1 (one) 1 5/3/12 Facility and Project Description Parking Access and Revenue Control System WRMC ORIGINAL CONTRACT AMOUNT................................................................ EXTRASTO DATE...................................................................6. CREDITSTO DATE.................................................................... Funding (FAC) P219 541200 247060172280 City Secretary Contract No. CS-45236 CONTRACTCOST TO DATE................................................................................................. AMOUNT OF PROPOSED CHANGE ORDER............................................................................ REVISED CONTRACT AMOUNT............................................................................................. ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS......................................................... ADDITIONAL FUNDING (IF NECESSARY)................................................................................ IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL; Furnish all labor and material as per the attached Propose Change Request: Revise Base Bid items as per user request to include Relocation of Booth E and add new drive approach and paving as per ASI 2. $ 1,534,740 $ 49,671 $ 1,584,411 $ 130,235 $ 80,564 ADD $ 49,671 ADD $ 49,671 It is understood and agreed that the acceptance of this Chance Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name SP Plus Maintenance Original Contract Time Additional Approved Time To Date � Approved Contract Time To Date 0 cd Contr ctor — SP Plus Architectural Services Manager Project Architect — Dunawa?% As istant ity ttorney Distribution File Construction Manager Project Manager Contractor Additional Time For This Change Order 0 cd Date C tructio Hager . Date ctor, ran ortation and Public Works cJ. �J Date ' Manager�/ Date Council Action El Approve El Other _,ry TPW Facilities Management Division 0:� -1 1 -1 2 R 1 0 � 22 I N Change Order Form (01/31/12) x DsteV/so� � � Date Date Date CIAL REC®R® CITY SECRETARY iFT. WORTH, TX ®SP Plus Maintenance ISuperior People. Superior Performance. C Mr. Jack Durham Project: WRMC Parking and Revenue Control Systems Project Fort worth Texas Project No: 45236 CPMS 01722 (TPW2010-16) Proposed Changes To: ASI 2 CHANGE ORDER PROPOSAL We hereby propose to provide material, equipment, taxes, and labor for the revision of the above project according to the Vendigm/SP master contract as follows Items Cost Changes Proposed Booth E delete foundation concrete pour $ (465.04) Add Booth E-1 Foundation $ 2,626.08 Bollard total credit for E-1 for 10 less bollards $ (6,018.10) Asphalt remove / replace 4" thick in Booth E-1 area. Excavate approx 12" to new approach grade. Standard compaction and grade. No Sub -base repair $ 34,708.02 Striping crosswalk remove and replace areas per plans $ 2,626.08 Remove / Replace curb ramp. Replace lead walk to ADA $ 2,844.92 Excavate and install E-1 approach $ 11,926.78 Booth D electrical credit for utility boxes $ (820.65) Adjust manhole, and existing meter boxes $ 465.04 Cut down and haul off one tree $ 957.43 Fence remove / set 2 posts $ 820.65 Net Chanae $ 49,671.21 The Original Contract sum was: $ 1,534,740.00 Net Change by previous authorized Change Order was: $ 20,756.98 The Contract sum prior to this Change Order was: $ 1,555,496.98 The Contract sum will be modified by this Change Order: $ 49,671.21 The Contract sum including this Change Order is: $ 1,605,168.19 All terms and conditions of the original contract remain unchanged unless modified within this change order. Not Valid unless signed by the Owner & Contractor SP Plus Maintenance By: Regional Project Director Date: Owner By: City of Fort Worth Date: 4 Greenway Plaza Suite, C905 Houston, TX 77046 1 03/19/2012 Change Order No. 2 Initiation Date 03-31-12 Master Contract Date: 11-21-11 Units Material Labor Equip/Haul 1 ($229.78) ($191.49) ($43.77) 1 $612.75 $1,323.98 $689.35 10 ($4,103.25) ($984.78) ($930.07) 6,100 18,741.46 5,206.20 10,760.36 1 623.69 1,247.39 755.00 1 771.41 1,378.69 694.82 1,100 3,676.51 4,157.96 4,092.31 2 (601.81) (218.84) - 5 131.30 251.67 82.07 1 - 623.69 333.74 1 120.36 471.51 229.78 $19,742.64 $13,265.98 $16,663.59 Note Vendigm Construction 5725 E. Lancaster, Fort Worth, TX 76112 �c Office 817.496.5220 Fax 214.722.1290 Change Order Proposal David Hirsh Chanoe Order No. 2 Project: WR Parking and Revenue Control Systems Project Initiation Date 03-31-12 Fort Worth Texas Master Contract Date: 12-1-11 Project No: 45236 Proposed Changes To: ASI 2 We hereby propose to provide material, equipment, taxes, and labor for the revision of the above according to the VendigmlSP master contract as follows Proiect tems Cost Changes Proposed Booth E delete foundation concrete pour $ (425.00) Add Booth E-1 Foundation $ 2,400.00 Bollard total credit for E-1 for 10 less bollards $ (5,500.00) Asphalt remove / replace 4" thick in Booth E-1 area. Excavate approx 12" to new approach grade. Standard compaction and grade. No Sub -base repair $ 31,720.00 Striping crosswalk remove and replace areas per plans $ 2,400.00 Remove / Replace curb ramp. Replace lead walk to ADA $ 2,600.00 Excavate and install E-1 approach $ 10,900.00 Booth D electrical credit for utility boxes $ (750.00) Adjust manhole, and existing meter boxes $ 425.00 Cut down and haul off one tree $ 875.00 Fence remove / set 2 posts $ 750.00 Net Change $ 45,395.00 The Original Contract sum was: $ 330,000.00 Net Change by previous authorized Change Order was: $ 18,970.00 The Contract sum prior to this Change Order was: $ 348,970.00 The Contract sum will be modified by this Change Order: $ 45,395.00 The Contract sum including this Change Order is: $ 394,365.00 All terms and conditions of the original contract remain unchanged unless modified within this change order. Not Valid unless signed by the Owner & Contractor Vendigm Construction Owner By: By: Vendigm Officer David Hirsh Date: Date: # Units Material SPP Labor SPP Equip/Haul SPP SPP TOTAL 1 $ (210.00) $ (229.78) $ (175.00) $ (191.49) $ (40.00) $ (43.77) $ (465.04) 1 $ 560.00 $ 612.75 $ 1,210.00 $ 1,323.98 $ 630.00 $ 689.35 $ 2,626.08 10 $ (3,750.00) $ (4,103.25) $ (900.00) $ (984.78) $ (850.00) $ (930.07) $ (6,018.10) 6100 $17,128.00 $18,741.46 $ 4,758.00 $ 5,206.20 $ 9,834.00 $ 10,760.36 $ 34,708.02 1 $ 570.00 $ 623.69 $ 1,140.00 $ 1.247.39 $ 690.00 $ 755.00 $ 2,626.08 1 $ 705.00 $ 771.41 $ 1,260.00 $ 1,378.69 $ 635.00 $ 694.82 $ 2,844.92 1100 $ 3,360.00 $ 3,676.51 $ 3,800.00 $ 4,157.96 $ 3,740.00 $ 4,092.31 $ 11,926.78 2 $ (550.00) $ (601.81) $ (200.00) $ (218.84) $ - $ (820.65) 5 $ 120.00 $ 131.30 $ 230.00 $ 251.67 $ 75.00 $ 82.07 $ 465.04 1 $ - $ - $ 570.00 $ 623.69 $ 305.00 $ 333.73 $ 957.43 LS $ 110.00 $ 120.36 $ 430.00 $ 470.51 $ 210.00 $ 229.78 $ 820.65 $18,043.00 $19,742.65 $12,123.00 $13,264.99 $ 15,229.00 $ 16,663.57 $ 49,671.21