Client Project #(s)� 00259100302
Contractor S.J. Louis
Dept.
Original Contract Amount
Extras to Date
Cretlits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Chanae Order
Revised Contract Amount
TPW
E�
PM Tariqul islam Inspector Brenz
Change Order Submittal #�1 Date 11/11/2014
Contract Time
Water Sewer Totals (CD)
6136,219.00
,502,604,00
E�
2.00
32.00
11
��
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding (if necessary) $136,219.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,4CT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR,4CT COST + 25%J
JUSTIFICATION
FOR CNANGE ORDER
$2,415,410.00
$2,415,410.00
$136,219.00
$2,551,629.00
$0.00
$136,219.00
5.64%
�u3,019,262.50
285
112
397
This change order is to add 8" concrete paving over 6" flexbase and 4" asphalt in TxDOT ROW at Chapin Road bridge. This type of pavement
was not included in original plan but this improvement is done per TxDOT recommendation. A time extension of 16 days is needed for the stop
and restart of work with TxDOT approval. This change order also covers cost for channel excavation at Cravens Road bridge which was
inadvertently omitted during bid. This change order is also to adtl cost for remobilization, restoration and regrading of channel slope. The cost
for widening of asphalt driveway with pipe culvert to an adjacent property to ensure proper access is also included to this change order. An
extension of 36 days is proposetl for this portion of work. Additional days are being requested for delays incurred at Chapin Road bridge due to
a gas line conflict that total 30 days and at Cravens Road bridge due to an overheatl AT&T conflict that total 30 days. A total tiem extension of
112 days is being requested for these two projects.
C�,- a� I ��
Co�tract huthorizatioA
�-J I -� � I � -
�at�
,�, �,.= . r�. �
RECEIVED MAR 0 6 201�
,. �
�
� ��
Fo ar.�
City of Fort Worth
Change Order Additions
Project Name Chapin RoadlCravens Road Bridge Replacement City Sec # 45105
ClientProject# 00259/00302
ConUactor S.J. Louis PM Tariqul Islam Inspector Brenz
Change Order Submittal #�1 Date 11/1112014
ADDITIONS
�
iw� , .. �: `•. 1
� :" r
�
S !
Change Order Additions Page 1 of 1
Foar_� r�i
ciry of Fort wortn
Change Order Deletions
Project Name Chapin Road/Cravens Road Bridge Replacement Ciry Sec # 45105
ClientProject# 00259/00302
ConVactor S.J. Louis PM Tariqul Islam Inspector Brenz
Change 0rder Submittal # �1 Date 11/11/2014
DELETIONS
f` '. -C s' �
c :a ff
, ,k:
' �, i'- j ; i ; i
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE Sub
AEA Trucking
of Service
Trucking of excavated materials
Total
Amount for this G4
$17,250.00
$17,250.00
,i ; �`, ' �. � � � �.
� .� � �� � ;� :�.� .P
� � �,�i: ��.
fii�iir.-�'vii 'r i
-�� �City o�:Fort'W'orth
pGCEPTANC� OF'' Pl�EV`lQUS 'MBE �OiVr.]4iI1�TMEN7:�'ORIV1
. . :.
(icr usAw�th.�HAN,��xC.,ORb�RS or AMENDMENTS greafe"r'ttian �50,�dOj
— ' � �.»'� ain� 1 �- i�{L }� 4�t �`��''�o �b7 � O•�SF7I�F��+��y+�l�/��1 O�eC;fiMa�a�er�: ,x�t�,�, .�� L�, � � i�..!
���,i t a jl c�' r�`-�.r'w�iti� � ��`��Zn�{i,��E 'u: r� �`�tii ��f, �a;i �' ,} r�`��r (i���ti��_a.� ` -�'�-�s{7� �t'L �.' -� �i
41iu � Ys�t �»��—r�� Ir 'tE . �Q�'�n�8 ���2{�1�i�Of �Q�StfII�Gt�11i5f��f�2Ct� �5� `'�4?I�a'�il--' ���� , �s, ��;
'� ' � i.;, <�y� ,� er�,�_kS,����<,. . 2 .�1
._.1.., ..i,Vi<..i�?�tht�,-.:..-a.,.�.,.�:,�.-.,;:.,�-„�,.�.._,.-.c-� .��;..., .crv,.�,;y�-, � ,z..Eina.,�.� .rc„�.y�� =y'�.1.>'1..�u�K" .
-�� - -, . .. . �;-...:>r�; v.. ...�:,... ,.�,,�'=x3�a.ae�-s�5% �� .....�;,F��.:
ChapCn and C�av�ns Rqad �rldgs R�pl'�cernent antl
..... . •
� G�av���.Ra�dWaf�r•arid,Sanita,rySewer.R,e�acation
Conlract;qr;:;y;
� :S:J;�Lqul�
� , , � �:A4i0i
, - TO}fa(;a1
, ;�Afti�c
. _. .�,RE
af�
,'�"�Af`�.�. .'-.
ii� �
k;-,.: .
��: . , .
. • � ti „W
„ .:,a�, ;
. 1,�;:..,o/a
2q'14 '�
,::;:.�., ......
'����'��� );.
_L�ngu
fPil
for t.his. Con,tra
:. .� . .. .,_ . .
�,J, l;buis'�on5tructiqn of TeXas, Ct�: °�gi'e.e.s td rilaihfain �ts iriiti.�[.�1J1��:�ommifinent' of �3�/o that lt
made aii t17e origlna.l oontr�ct a�►d ��etid �rtd rr�aiifitain fh:af same MR�;�ommltmen� �f ��p/o fd.�h;ls
�ir�t �han�e �rder. Therefare 5 J: l.ouls Constrilotiori,.�f Tex���'�:td. r�m�in's in compliatic� V�11fh
't}�e �i,�y's;B[3E O.e�(nar►Ce and atte�ts fo lt�"commitment�y its�sigii�fur�.an'the:Ae;cep.tanCe bf
:�reviou'� MB� C�mrriitme�iti fnrm exec,y�ed lay a.n. authorized'repr.e.sentati�e� of its comp�.riy:.
. . _ . . ............... ... _..... ...
To be Gom;pl�te�i by tiie:Repres�rtatiVe di tfi
��th RoWiieY. _.. . . ;Pr41e�t Matiage�
. .. . ........... _ . .
.
Pr[nt�d.Signature� '�111�" � �
S�,1; �auis C6:n�trU:�ti`ori. af Texas,, Ltd, .
Company N'ame
: . ..:::........ ............. . ........ .. .... .... . . .. .. .
��20, s::;�:th Av�._ . seii
:Address ... � .. ............... .. .... ...... ..... . .... `
.... � E-m:�
j: Go �t�act r »
,.�i��u47,i.. �"•_:
` Autljoriz�d signature! ate
_ .. . _
�onta�t,Nam'�'((f. d(fFer�nt)
�tla�as�
�ll%1�t56�eld; TX 76063 8.17-4,T7-9320 81,7�47,'T�A652
:
.C. , -- ... ........ .. ... ..... _... ._ _... . � . .
.lrylsf.akel�lp � phoh��numb.er ,Fax.N,umb$r
9Qb/.o .a� of �$1�0/2b�(4„ �
, - . —. -- �
� .. . : MBE q/o Paid td:D�te 'Dafe
..... ... . ... .. .....
�
+�„
h+J
Iv
,'a'§
��
{ap
�r
� `.,� : .�._ � �', r
` `� � � ;
,� .
�� ,,
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 2/17/2015
DATE:
LOG NAME:
SUB.TECT:
Tuesday, February 17, 2015 REFERENCE NO.: **C-27189
20CHAPIN CRAVENS CHANGE ORDER NO.1
Authorize Execution of Change Order No. 1 to City Secretary Contract No. 45105 with S.J. Louis
Construction of Texas Ltd., in the Amount of $136,219.00 for a Revised Total Contract Amount of
$2,551,629.00 for Chapin Road Bridge and Cravens Road Bridge Replacements and Water and Sanitary
Sewer Relocations at Cravens Road (COUNCIL DISTRICTS 3 and 5)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 1, to City Secretary
Contract No. 45105 with S.J. Louis Construction of Texas, Ltd., in the amount of $136,219.00 for a revised
contract amount of $2,551,629.00 for Chapin Road Bridge and Cravens Road Bridge Replacements and
Water and Sanitary Sewer Relocations at Cravens Road.
DISCUSSION:
On October 7, 2013, (M&C C-26492) the City Council authorized execution of a contract with S.J. Louis
Construction of Texas, Ltd., in the amount of $2,415,410.00 for Chapin Road Bridge and Cravens Road
Bridge Replacements and Water and Sanitary Sewer Relocations at Cravens Road. Change Order No. 1 will
allow for additional asphalt underneath of concrete paving on the east approach road of Chapin Road Bridge
located in Texas Department of Transportation (TxDOT) right—of—way. The TxDOT inspector called for
additional improvements, which was not in the original proposed project plan. As for the Cravens Road
Bridge, this change order will cover cost for channel excavation, which was inadvertently omitted in bid
documents. This change order will also add cost for remobilization and widening of an asphalt driveway to
an adjacent property to ensure proper access delineation for property owners. Funding for this change order is
available in the 2004 Bond Street Improvement Fund.
M/WBE OFFICE — S.J. Louis Construction of Texas, Ltd. agrees to maintain its initial MBE commitment of
13 percent that it made on the original contract and extend and maintain that same MBE commitment of 13
percent to this Change Order No. 1. Therefore, S.J. Louis Construction of Texas, Ltd., remains in compliance
with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous
MBE Commitment form executed by an authorized representative of its company.
The project is located in COiTNCIL DISTRICTS 3 and 5, Mapsco 72V and 79Z.
FISCAL INFORMATION:
The Financial Management Services Director certifies that funds are available in the current capital budget,
as appropriated, of the 2004 Bond Street Improvements Fund. The 2004 Bond Street Improvement Program
included $3,500,000.00 for Bridge Replacements. Upon execution of Change Order No. 1, remaining funds
in the 2004 Bond Program for Bridge Replacements will be $74,862.30. --__--_--_ _
�
FUND CENTERS:
��`��l �f��4���'A��T
� �� :.
TO Fund/Account/Centers
FROM Fund/Account/Centers
C200 541600 205260030283
C200 541200 207260025983
$123,520.00
$12.699.00
CERTIFICATIONS:
Submitted for Citv Manager's Office b�
Originating Department Head:
Additional Information Contact:
Fernando Costa (6122)
Douglas W. Wiersig (7801)
Richard Martinez (7914)
TariqulIslam (2486)
ATTACHMENTS
1. C200 00302 & 00259.doc
2. Cha�in and Cravens MBE Commitment Form.�df
3. FAR Cravens for Change Orderl.�df
4. Location Map Cha�in Rd.�df
5. Location Map CravensRd.�df
,� ,� _ :�,
��� ,,�r
, , �,
r ; 7
CFW Change Order Approval St-COApp01
Routina
Assigned To:
Assigned By:
Links 3
fortworthQov/Infrastructure Proiects/00259 - Chaqin Road over Santa Clara Channel BridQe
Replacement/Contractor/Chanqe Orders/M&C Chanqe Orderi.pdf
fortworthQov/Infrastructure Proiects/00259 - Chapin Road over Santa Clara Channel Bridae
Reqlacement/Contractor/Chanqe Orders/Chaqin and Cravens MBE Commitment Form.odf
fortworthQov/Infrastructure Proiects/00259 - Chapin Road over Santa Clara Channel BridQe
Replacement/Contractor/Chanae Orders/Cravens and Chaqin ChanQe Orderl breakdown revised2.xls
Attachments (0)
No Attachments have been added to this form.
Page 1 of 3
Due Date:
Due Time:
t , d � � �;
� ,, • �
, � .
' i� .� �
�,
https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/4/2015
CFW Change Order Approval St-COApp01
��� ��%���� City of Fort Worth
�-�, �- Change Order Request Approval
(Change Order Breakdown Available in Links)
Page 2 of 3
For Change Order Submittal No.: COSub01
Change Order No.: St-COApp01 Date Started: '2015-02-19 �
_ __ _ _ _.._,
_ _ _ _ _ _ __.
- _ __ _ _ __
City Sec. No.: 45105 ' Date Due: 2015-03-03
_ ___ _ _
_ __ _ _ _ ___ _ _ _ _ _ _ _ _ _ _
Project Name: Unit 1- Chapin Rd Bridge Unit 2- Cravens Rd Bridge Unit 3&4 - Cravens ...'
_ _ __... _ _- _ _ _ _ ___ _ _ _ :
__ _ _ _ _ _
_ _ _ _
_ _ _ _
00259 'DOE Numbers:
Project Numbers: . _: _ _ -- _-- _ .
6604
_ .. __. __ _ _ __
PI'OjeCt Chapin Road bridge replacement over Santa Clara channel and ,
DeSCriptlon:'Cravens Road bridge replacement over Wildcat branch. This
;project also includes water and sanitary sewer relocation at ,
'Cravens Rd. '
_. _ __ __ __ _ ___ __ ___ __
Project Manager: ITariqul Islam City Inspector: Kim Brenz ;
_ _ - -- - - _.
Contractor: S.J. Louis Construction of Texas, Ltd
COUNCIL ACTION (If Required):
M&C Log Name: 20 CHAPIN CRAVENS CHANGE ORDER N0.1
M&C Number: G27189 M&C Date: ;2015-02-17
COST AND DAYS SUMMARY:
Department:
____ _ __ _ __.
TPW
_ __—
:TPW
Requested
Cost($) Fund Account Center: Days:
_ _ _.. _ - _ _ __ __ _ _.
$ 123,520.00 C200-541600-205260030283 ' 46 �
— _ _ _ _ _ _ .....a
__ _ _ _ _ _ — , _ _ _._. _...�
',$ 12,699.00 IC200-541200-207260025983 ''66
__ _ _ __ _ _ _ _ _ ,
_ _ __ _ _ ...__ _ _ _ _ . ____..... - - --_ __ _ _._ ,, _ __. __._
__ _.__ ___
_ _ _.
Total Cost: $ 136,219.00I Total Requested Days: 112
Approval Status:
,!; � ' ,, . :' ; r �:
— �. � :, .
s�
� :�r .� ' ` �
i : i
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/4/2015