Loading...
HomeMy WebLinkAboutContract 43484-CO1 (2)F'�RT Z�ORTH Clty Of Fort Worth r ry Copy Chan e Order Re uest ��� �� � 9 q ��N�'�� � �- i' �: '; � .! _ p �, Project Name Construction of the Reclaimed Water Main Extension on American Blvd. City Sec No. 43484 Project No.(s) P258-705290178980 DOE No. 6929 City Pro. No. 01789 Project Description Reclaimed Water Main Extension along American Blvd. Contractor Jackson Construction, Lttl. City Project Mgr. David Townsend Phone Number: 817-392-8430 Dept. � Water Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revisetl Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funding (if necessary) Change Order # �1 Date: 6/10/2013 City Inspector Thomas Bean Phone Number: 817-392-8370 328.10 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) J The change order will provide for the following: 328.1 3.94% $708,595.00 • The installation of 8-inches of reinforcement concrete (instead of 7 inches) to match the pavement depth that was encountered during construction. • The replacement of conflicting storm drain inlet throats. • Restocking fee for 24"x12" conc�t�,,�ucer and 12-inch pipe that were not needed on the project. • The deletion of pay item q �ye S+d 9 Sta�f concurs v�cith the�ntractors !� � i: . Sewer Totals Contract Time aar 120 120 030 150 � calendar days on �d��'o�1�t�.q y, r � .s '; � �.� . - I F , ~ ,«. It is understood and agreed that the acceptance of this Char��i�.,"�e'�ontractor constitutes an accortl and satisfaction antl represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Ortler. Contractor's Companv Name Jackson Construction, Ltd. - ��-- � %:-_ M&C Number _ �' L�- .:mYr'��+� : - - - . Contractor Name � Conifac r Steve Haberstroh i� Date P' t Mana er �ll� ►�� � � - Date Co struction Supervisor W� � . �;. f °, �� --- - — Date ana er � . � r�, � � - Council Action (if required) M&C Date Approved N/A ,n� / Date �— �-� Date � l U�<3 Date f�4'` �3 FORT V��ORTH City of Fort Worth Change Order Additions Project Name Construction of the Reclaimetl Water Main Extension on American Bivd. City Sec No. 43484 Project No.(s) P258-705290178980 DOE No. 6929 City Pro. No. 01789 Project Description Contractor Reclaimed Water Main Extension along American Blvd. Jackson Construction, Ltd. Change Order #�1 Date: 6/10/2013 David Townsend City Inspector Thomas Bean City Project Mgr ADDITIONS DEPT 23 8-inch Concrete Pa 10-foot Inlet Throat "x 12" Concentric -inch Non Potable Fee Sewer Sewer Sewer Sewer 918. 1. 1. 1. EA EA EA LF r Unit 1,500. ?,500. $518. $1,500.00 $1,197.60 b Total $83,788.1 $83,788.1 Page 2 of 4 F+� RT WO RT H Project Name Project No.(s) Project Description Contractor City of Fort Worth Change Order Deletions �onstruction of the Reclaimed Water Main Extension on American Blvd. City Sec No. DOE No. 6929 City Pro. No 43484 01789 P258-705290178980 Reclaimed Water Main Extension along American Blvd. Jackson Construction, Ltd. City Project Mgr. David Townsend ITEM DESCRIPTION 4 7-inch Concrete Pavement Repair (Monolithic Curb) 12 12" Water Pipe 13 Connection to Existing 12" Water Main 14 Connection to Existing 24" Water Main Change Order #�1 Date 6/10/2013 City Inspector Thomas Bean DELETIONS DEPT Sewer Sewer Sewer Sewer Qty Unit 750.00 SY 60.00 LF 1.00 EA 1.00 EA Water Sewer Unit Cost Total $74.00 $51.00 $900.00 $2,000.00 $55,500.00 $3,060.00 $61,460.00 Page 3 of 4 �Deletions Sub Total � $61 MlWBE Breakdown for this Change Order JACKSON CORISTRUCTION LTD. Force Account Daily Tirt�e and MaEerial County Tarrant Pro)act American 6aufevard Project G25151 Highway �a Descrlptian of Work: Because of the CQFlW added fire 12" rectatmed water pJggfng wye (by othersJ the 24" x 12" concenfrtc reducer pu Date: for credit and a restackin fee was charged. in additlon, 60' ai f?" pt!!Dl@ DIIIB O(!fClteSEd 6V JCL wJl/ nnf hw roH�rn: Descrip�on Hrs Rate Amount � _..._ � � - s - s - � - $ - $ - s - - $ - � " - - � - � - � - � - $ - Sub-7otal $ - 15°% $ - Tatal EauiomenL• S . Descrip�on x 12" concenUic �cer meterial reium pproved_ U8M Rafe Amount � $ - $ - EA $ 518.QD $ 518.0 �._.,,. $ - LF $ 19.96 $ _.1�i97.6 $,__ - $ - $ - Sub-Toisi $ 1,715.6 $ - Total Material: S 1.715.6� �o, date 03115113 Da[e JACKSON CONSTFtUCTiON JOB # 306i JC,C was ��� �E �E �E �E �E �E E�'!E �E �E �E �� �E �� �� . �: .: :�, Quanityr � UOM � Rate 5°�a ( � Tofal Subcantract•) � Amount Amaunt 5124l2013 3:32 PM