FIRST AMENDMENT TO
CITY SECRETARY CONTRACT NO. 46403
'1
�� \,
r
.v
tj�
�
Z
��
��
THIS FIRST AMENDMENT to City Secretary Contract No. 46403 is entered into by and
between the City of Fort Worth ("City"), a home-rule municipality in the State of Texas,
acting through Fernando Costa, its duly authorized Assistant City Manager, and 1
Priority Environmental Services, Inc. ("Contractor"), acting through Gary Caldwell, its
duly authorized President and CEO.
WHEREAS, the City and 1 Priority Environmental Services, Inc. have entered into that
certain agreement identified as City Secretary Contract No. 46403 (also the "Contract")
commencing on July 25, 2014 for the removal, packaging, transportation, and disposal
of asbestos-containing materials from the general terminal building, Meacham
International Airport, as authorized by Mayor and Council Communication C-26842; and
and
WHEREAS, the contract provides for compensation of three-hundred seventy-nine
thousand, six-hundred and six dollars and ninety cents ($379,646.90) for abatement
services at the General Terminal Building at Fort Worth Meacham International Airport;
WHEREAS, the Scope of Work under Contract No. 46403 has unforeseeably increased
due to additional asbestos-containing materials being discovered during the interior
demolition phase of certain areas of the General Terminal Building.
WHEREAS, Administrative Change Order No. 1 provides for a twenty-four thousand,
three-hundred seventy-nine dollars and seventy cent ($24,379.70) increase in the
contract amount for the original contract term; and
WHEREAS, the parties wish to increase the contract amount for the original contract by
an additional one hundred ninety-thousand, eight-hundred, sixty-two dollars and ninety
cents ($194,862.90) to provide for additional asbestos abatement removal services at
Meacham International Airport General, Terminal Building beyond the original scope of
the contract, and sufficient funds have been appropriated as approved by Mayor and
Council Communication C-27371; and
WHEREAS, the parties agree that all other terms and conditions shall remain the same
as stated in City Secretary Contract No. 46403;
First Amendment to Contract # 46403
1 Priority Environmental Services, Inc.
;' ��FFICIAL RECOR� ;
� :':ITY SECRE�'AR� ;
I �T. i�oitri"�, Tx �
i
- �
Page 1 of 3
NOW, THEREFORE, for and in consideration of the mutual covenants contained herein,
and other good and valuable consideration, the receipt and sufficiency of which are
hereby acknowledged and confessed, the parties hereto agree as follows:
1. Scope of Work:
Contractor will furnish all labor, materials and equipment necessary to perform the
removal of additional asbestos-containing materials discovered during interior
demolition activities which includes approximately 10,771 square feet (SF) of fire-
proofing overspray on the perimeter beams, existing columns, and on the underside of
the 1St and 2"d Floor decks, plus, approximately 12,085 SF of plaster/fireproofing
overspray located on the north stairwell, center stairwell/utility shaft, and HVAC
ductwork located within the General Terminal Building located at Meacham International
Airport, in accordance with the abatement and work specifications determined by the
City's consultant, attached as Specifications for Asbestos Abatement Addendum 1.
2. Compensation Not to Exceed Amount:
Compensation to provide for additional asbestos abatement removal services at
Meacham International Airport Generai, Terminal Building is increased by an additional
one hundred ninety-four thousand, eight-hundred, sixty-two dollars, and ninety cents
($194,862.90). Total compensation, including the original amount for Contract No.
46403 of three-hundred seventy-nine thousand, six-hundred forty six dollars and ninety
cents ($379,646.90), plus Administrative Change Order No. 1 which provides for a
twenty-four thousand, three-hundred seventy-nine dollar and seventy cent ($24,379.70)
increase, and this Amendment totals to a new total amount of five hundred ninety-eight
thousand, eight-hundred eighty-nine dollars and fifty cents ($598,889.50) for the
original, revised, and amended scope of work, subject however to all other terms and
conditions as stated in City Secretary Contract No. 46403.
3. Time to Complete Work:
All work shall commence and be completed as specified in a new Notice to Proceed
issued by the City.
4. Miscellaneous_
All other definitions, terms, and conditions of City Secretary Contract No. 46403 shall
remain unchanged except as expressly set forth herein.
First Amendment to Contract # 46403
Page 2 of 3
1 Priority Environmental Services, Inc.
E
IN WITNESS THEREOF, the parties have executed this contract in triplicate in Fort
Worth, Texas, on the dates written below.
CITY OF FORT WORTH
BY: (.H�
Fernando Costa
Assistant City Manager
Date: //�S�S w
ATTEST:
� . ��` �'�
Mary J. Kayser
� City Secretary
�,-
. _.
� � t`'iYi,
�� � , a...
���� t! H
�t � �.1
�jj�� , ��
.��Ta�r�_ ��� , �'.�
' . �; 4
� _' � ,`'`, �a tssiy
.
RECO ED:
>
�� �
C ce Reed
Acting Assistant Director
APPROVED AS TO FORM
AND LEGALITY:
,
� �� 2- �'L_ �� � � � � �
Arthur N. Bashor
Assistant City Attorney
First Amendment to Contract # 46403
1 Priority Environmental Services, Inc.
CONTRACTOR
1 Priority Environmental Services, Inc.
�ary Caldv�c�IT
Presiden�and CEO
r►vEss:
\ o
i ��FFI�IAL ��C�ft�i���� ��
`I CITY �f�CRETA�.`?
� �1(. �II�R.�'�1� T�.
,,
Page 3 of 3
■ � � . • • � � •
� � �
ADDENDUM 1
SPECIFICATIONS
FOR
Industrial Hygiene and
Safety Technology, Inc.
2235 Keller Way
Carroliton, TX 75006
Phone: (972) 478-7415
Fax: (972) 478-7615
http://www. i hst. com
ASBESTOS ABATEMENT
ADDENDUM #1
Prepared for:
City of Fort Worth Texas
Department of Environmental Management
1000 Throckmorton Street
Fort Worth, Texas
Leaders in
Quality, Service
and Innovation
Project:
Meacham Airport
4201 North Main Street
Fort Worth, Texas
DATE: October 29, 2015
Specifications Prepared by:
�
�r ���1-�'
��-
Tracy K. Bramlett, CIH, CSP
TDSHS LICENSE #10-5040
Expiration: 12/31/15
Prepared by:
Industrial Hygiene & Safety Technology, Inc.
2235 Keller Way
Carrollton, Texas 75006
972-478-7415
PART 1- GENERAL SECTION, ASBESTOS REMOVAL SPECIFICATIONS
1.1. SUMMARY OF THE WORK
9.1.2. EXTENT OF WORK:
A brief summary of the extent of the work and non-binding to the contract documents includes:
ADDITIONAL WORK:
Removal and disposal of asbestos-containing materials (ACM) and asbestos-contaminated el-
ements (ACE) utilizing wet methods within full, negative-pressure containments equipped with
HEPA ventilation from specified areas of the buildings. The following asbestos- containing ma-
terials (ACM) will be removed at the property where applicable.
1. Fireproofing on Beams, Columns, Deck and HVAC Ductwork:
. . �
-.
1 St Floor — Overspray on Perimeter Beam 2,631 SF
1 S' Floor — Overspray on Deck 1,086 SF
15t Floor — Overspray on Columns 3,377 SF
2�a Floor — Overspray on Columns 3,677 SF
North Stairwell — Overspray on structural members 2,972 SF
mixed with some laster overs ra
Center Stairwell/Utility Shaft — Overspray on structural members 8,825 SF
Throughout Building — Overspray on HVAC Ductwork 288 LF
These locations and estimated quantities are in addition to the Base Bid included in the Specifi-
cations for Asbestos Abatement dated October 16, 2014.
All other aspects of the Specifications for Asbestos Abatement remain unchanged.
X�K B�""��DSHS License 10-5040 Expires 12-31-15
.. , u�- $ :� _�� _
Date
Original Contract Amount $379,646.90
Extras To Date $0.00
Credits to Date $0.00
Contract Cost To Date $(61,400.00)
Amount of this Change Order $24,379.70
Balance Contract Remaining $318,246.90
Revised Contract Amount $404,026.60
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
Provide removal, transportation, and disposal of additional asbestos-containing materials discovered within the Meacham
International Airport Terminal Building location in accordance with the contract documents.
All work to be performed in accordance with the Proposal Specifications.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction
and rearesents in full (both time and monevl for all costs arisinq out of, or incidental to, the above Chanqe Order.
Contractor's Name
Original Contract Time
Additional
1
120
d Time to Date I None
Additional Time for This Change Order
Gary Caldwell, President &
CEO �
Project Manager
Roger Grantham
Program Manager
Clarence W. Reed
TPW Assistant Director
Michael A. Gange
TPW Director
Douglas W. Wiersig, P.E.
Assistant City Attorney
Art N. Bashor � d y-z z��
Assistant City Manager
Fernando Costa
�.
Action
Yi�il�l�
30 D
Environmental Services, Inc.
,� ,
�
�R�- r s���'.;..�
Date
FORT WORTH�..
�/ io /�S
Date �_ �� _ �� -
Date �.���� /l�
l
Date
Date
Date
�
�( �-//r�
y�z��/f
/S
�� b� �#9���'��, �'J'�
Form (03.13)
• •, I ' .
. • . • • , • . •
COUNCIL ACTION: Approved on 1/6/2015 — Ordinance Nos. 21601—01-2015 &
21602-01-2015
DATE:
LOG NAME:
SUB.TECT:
Tuesday, January 06, 2015 REFERENCE NO.: **C-27139
20MEACHAM TERMINAL ACM REMOVAL
Authoiize Execution of a Contract with 1 Priority Environmental Services, Inc., in the Amount of
$379,646.90 for Removal, Transportation and Disposal of Asbestos Containing Materials from the General
Teiminal Building at Meacham International Airport and Adopt Appropriation Ordinances (COLTNCIL
DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated appropriations in the Environmental
Protection Operating Fund in the amount of $379,647.00 and decreasing the unaudited, unassigned fund
balance by the same amount;
2. Authorize the transfer of $379,647.00 from the Environmental Protection Operating Fund to the
Environmental Protection Project Fund;
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Environmental Protection Project Fund in the amount of $379,647.00; and
4. Authorize City Manager to execute a contract with 1 Priority Environmental Services, Inc., far asbestos
abatement services in the General Terminal Building at Fort Worth Meacham International Airport in the
amount of $379,646.90.
DISCUSSION:
On May 11, 2010, (M&C C-24215) the City Council authorized the execution of an Architectural Services
Agreement with Hahnfeld, Hoffer and Stanford to begin schematic design to renovate and expand the
General Terminal Building at Fort Worth Meacham International Aiiport. The design for the renovation has
been completed and bids have been received for the construction. As part of the renovation, all regulated
asbestos—containing materials located in the General Terminal Building must be removed prior to renovating
the structure, in order for the Ciry to be in compliance with state and federal regulations related to
asbestos—containing materials in City—owned property.
The General Terminal Building contains approximately 35,000 square feet of asbestos—containing sheetrock
and joint compound in the ceilings and walls, approximately 26,000 square feet of asbestos containing floor
tile and/or mastic, approximately 2601inear feet of HVAC duct mastic, approximately 10,000 square feet of
spray—on fireproofing, and approximately 20,000 square feet of exterior surfacing material on columns and
soffits. Under State of Texas rules, the City is required to contract with a firm licensed by the Texas