HomeMy WebLinkAboutContract 44752 (2)- �� __ - �rs,�� •� ,�
. .�: �. '� � ; '
.i 1';�i,
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality (the "CITY"), and Dunaway Associates, L.P., authorized to do business in
Texas, (the "ENGINEER"), for a PROJECT generally described as: Water Main and
Sanitary Sewer Relocations Along F.M. 156 from State Highway 114 to Martin Ranch
Road.
Article I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article II
Compensation
�
The ENGINEER's compensation shall be $196,487.00 as set forth in
Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENi. Invoices are due and payable within 30 days of rereipt.
(3) Upon completion of services enumerated in Article I, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 08/09/2012
Page 1 of 16
� ' t� Y���■
�� ,
i �� ; '�
� 1�i1�7 � �� �UI�
ti =
No interest will accrue on any contested portion of the billing until mutualiy
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. tn the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
�
1-�
C.
General
engineering
engineering
consultation and advice and furnishmg customary services incidental
thereto.
The ENGINEER will serve as the CITY's professional
representative under this Agreement, providing professional
Standard of Care
The standard of care applicable to the ENGINEER's services will be the
degree of skill and diligence normally employed in the State of Texas by
professional engineers or consultants perForming the same or similar
services at the time such services are performed.
Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
wark to be p�rformed hereunder. The ENGINEER shall also advise
(2)
the CITY concerning the results of same. iuch surveys, tests, and
investigations shall be furnished by the CITY, unle�s atherwise
specified in Attachment A.
In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 2 of 16
� r
observations,
Because of
exploration, and investigations have been made.
the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
�
E.
Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general, if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, wi(I be in accordance with
the Contract Document�, nor shall anything in the �ontract Documents �r
the agreement b�tween CITY and EN�INEER be construed as requiring
ENGINEER to rnake exhaustive or cantinuous on-site inspections to
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a deviation from the Contract Documents, the ENGINEER
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Officia) Release Date: 08/09/2012
Page 3 of 16
shall inform the CITY.
(3) When professional certification of perFormance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and perFormance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractar has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain now or for what purpose
the canstruction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CIiY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
affect the amount that should be paid.
H. Record Drawings
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 08/09/2012
Page 4 of 16
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that are incorporated
into the record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
�ubcc�nsultant, invalving transactions to the subcontract, and further, that the
CITY shall h�ve access during normal working hours to all subconsultant
facilities, and shall be provided adequate and �ppropriate work space, in
order to conduct audits in compliance with the provisions of this article
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
City of Fort Worth, Texas
Standard Agreement for E�gineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 5 of 16
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate pubiished in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000.00 per each
occurrence with a$2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
i. The CITY shall be included as an insured under the CGL, using
ISO additional insured endorsement or a substitute providing
equivalent coverage, and under the commercial umbrella, if any.
This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the
CITY. The Commercial General Liability insurance policy shall
have no exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not I�ss than $1,OOQ,000 each accident. Such insurance shall cover
liability ari�ing out of "any �uto", including owned, hir�d, and non-owned
autr�s, when s�id vehicle is used in the course of the PRQJECT. If the
engineer owns no vehicles, coverage for hired or non-awned is
acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: OS/09/2012
Page 6 of 16
extent these damages are covered by the business auta liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims-made policy, with a minimum of $1,000,000.00 per
claim and aggregate. The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shall be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall
include its employees, officers, officials, agents, and volunteers as
respects the contracted services.
c. Certificate(s) of insurance shall document that insurance �overage
specified in this agreement �re pravided under �pplicable pr�licies
documenfed �hereon.
d. Any failure on part of the CITY to request required insurance
documentation shall not constitute a waiver of the insurance
requirements.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 08/09/2012
Page 7 of 16
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first-dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
C ITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on
claims-made basis, shall contain a retroactive date coincident with
prior to the date of the
insurance shall
claims-made.
state both
0
�•Ti
contractual agreement. The certificate of
the retroactive date and that the coverage is
k. Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
I. The CITY sh�ll nat be responsible for the direcf paym�nt of any
insurance pr�miums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: OB/09/2012
Page 8 of 16
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
Independent Consultant
L.
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
Disclosure
M.
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting properiy cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
Asbestos or Hazardous Substances
�
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
Permitting Authorities - Design Changes
��
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement whi�h the ENGtNEER could nat
have been reasonablv aware of. the ENGINEER shall natifv fhe CITY of
such changes and an adjustment in compens�tion will be made thr�ugh an
amendment to this AGREEMENT.
Schedule
�
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 9 of 16
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's perFormance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and access necessary for the ENGINEER's services or PROJECT
construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; abtain advice of
an �ttorney, insurance counselor, accountant, auditor, bond and financial
�dvi�ors, and ather consultant� as the CITY deem� appropriate; and render
in writing decisions required by the CIiY in a timely manner in accord�nce
with the project schedule prep�red in acc�rdance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08l09/2012
Page 10 of 16
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services performed. C7nly the CITY will be the beneficiary
of any undertaking by the ENGINEEF2."
(2) This AGREEMENT gives no rights or benefits to anyone c�ther than the CITY
and the ENGINEER and there are no third-party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a provision that such entity or person
shall have no third-party beneficiary rights under this Agreement.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 11 of 16
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained
at the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
. _ . -�. ' • •
Am�ndments io Article VI, if any, are included in Attachment C.
. ; � ; � � � � ,,�
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 72 of 16
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's perFormance of its
obligations hereunder.
D.' Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S per�onnel to document
the work underway at the time of fihe CITY'S terrnination for
convenience so that the work effort is suitable fc�r I�ng time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
subrnit to the CITY an itemized statement of all termination expenses. The
CITY`S approval will be obtained in writing prior to proceeding with
termination services.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09I2012
Page 13 of 16
�
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless, and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
negligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
negligence for indemnification. Parties mean the CITY and the ENGINEER,
and their o�cers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigatian related to this AGREEMENT �hall be Tarrant Cc�unty,
Tex�s.
City of FoR Worth, Texas
Standard Agreeme�t for E�gineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 14 of 16
J.
K.
Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itsetf or its employees.
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. The following attachments
and schedules are hereby made a part of this AGREEMENT:
Attachment A- Scope of Services
Attachment B - Compensation
Attachment C- Amendments to Standard Agreement for Engineering Services
Attachment D - Project �chedule
Atta�hm�nt E - Location Map
City of Fort Worth, Texas
Standard Agreement for Engineering Re�ated Design Services
PMO Official Release Date: OS/09l2012
Page 15 of 16
Executed and effective this the ��%��;f�day ��L�., 20.��
, ;.
BY:
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
Date: 2 3 /,3
BY:
ENGINEER
�una� Associates, Inc.
� � r
Brian S. Darby,
Associate
Date:
E.
APPROVAL RECOMMENDED:
�By• ►
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND
LEGALITY
M&C No.: C-26378
�-�.c� vs � La� L o/ 3
M&C Date: �s�--1�,�
By: .
. ac „� , �ti��r� n� � ��/�-
Assistant City Attorney
ATTEST:
\?
J.
City
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: OB/09/2012
Page 16 of 16
��
�
.�
�
•.. , •..�= �,
. ...• • �Y
, f
�.�rv: , rr','. � �TFi.
ci�
�
,.�. • � `' 1�
�
,�
�
! ' ,
ATTACNMENTA
DESIGN SER410E5 fOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PROJECT NO.: 01515
ATTACHMENT A
Scope for Enqineerinq Desian Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
State Highway 114 Water and Sanitary Sewer Relocation Part 3
CITY PROJECT NO.: 01515
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to ciearly define the
work to be performed and address the needs of the Project.
•• • : • • �-i� _��
Task 1.
Task 2,
Task 3.
Task 4.
Task 5.
Task 6.
Task 7.
Task 8.
Task 9.
Design Management
Conceptual Design
Preliminary Design
Final Design
Bid Phase Services
Construction Phase Services
ROW/Easement Services
Survey and Subsurface Utility Engineering Services
Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
1.1.
.
.
.
.
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
Managing the Team
Lead, manage and direct design team activities
Ensure quality controi is practiced in performance of the work
Communicate internally among team members
Task and allocate team resources
City of Fort Worfh, Texas
Attachment A
PMO Release bate: 07.23.2012
Page 1 of 14
ATTACHMENT A
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PRO)ECT NO.: 01515
1.2. Communications and Reporting
• Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
• Comp�ete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately refiected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 12 MWBE reports will be prepared
• 4 meetings with city staff
DELIVERABLES
A. Monthly invoices
B. Monthly M/WBE Report Form and Final Summary Payment Report Form
TASK 2. CONCEPTUAL DESIGN (30 PERCENTj.
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
• Study the project,
■ Identify and develop alternatives that enhance the system,
■ Present (through the defined deliverables) these alternatives to the CITY
■ Recommend the alternatives that successfutly addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 2 of 14
ATTACHMENT A
DESIGN SERVICES FOR
STATE NIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PROIECT NO.: 07575
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
• The ENGINEER will aiso identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The data collection efforts will afso include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
2.2. Geotechnicallnvestigations
• ENGINEER shall advise the CITY of test borings and other subsurface
investigations that may be needed for the project. If the CITY determines that
such borings or investigations are needed, then the ENGINEER shall work with
the CITY and CITY's geotechnical consultant to draw up specifications for such
testing program. The cost of such testing will be paid for by the CITY.
2.3. The Conceptual Design Package shall include the following:
• Graphic exhibits.
• Proposed phasing of any water and sanitary sewer work that is included in this
project.
• Estimates of probable construction cost.
ASSUMPTIONS
• 0 Geotechnical borings are expected for this project.
• 1 copy of the conceptual design package (30% design) will be delivered.
Drawings will be half size.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
DELIVERAB�ES
A. Conceptual Design Package
1 . 111 � - � ; A , .. ! � .. .* . .
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 3 of 14
ATTACHMENTA
DESIGN SERVICES FOR
STATE NIGNWAY 774 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PRO)ECT NO.: 01515
3.1. Development of Preliminary Design Drawings and Specifications shall include the
foilowing:
� Cover Sheet
• A Proiect Control Sheet, showing ali Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall proiect easement lavout sheet(s) with property owner information.
• Overall proiect water and/or sanitary sewer lavout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity.
• Overall water and/or sanitary sewer abandonment sheet
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
• Bearinqs aiven on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
numbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view.
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement af existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed, provisions will be made in the final plans andlor specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 4 of 14
ATTACNMENTA
DESIGN SERVICES fOR
STATE NIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITV PROJECT NO.: 01515
realignment of the existing pubiic sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During
design survey, if a rod can be inserted through the cieanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. if the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed}. The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or (3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de-
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may included connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF file� should be created directly from the CAD files as opposed
to PDF files.
�, �.... .:: •.... • ..
• 1 sets of half size plans will be de�ivered for the Preliminary Design
(60% design).
City of Fort Worth, Texas
Attachment A
PMO Release Dale: 07.23.2012
Page 5 of 14
ATTACHMENTA
DESIGN SERVICES FOR
STATE HIGHWAY 714 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PROIECT NO.: 01515
• 1 sets of specifications wiil be delivered for the Preliminary Design
(60% design).
• The CITY's front end and technical specifications wili be used. The ENGINEER
shall supplement the technical specifications if needed.
• ENGINEER shali not proceed with Final Design activities without written approval
by the CITY of the Pre�iminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Estimates of probable construction cost
TASK 4. FINAL CONSTRUCTION DOCUMENTS (100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• For projects that disturb an area greater tnan one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Deve/opment and Construction which will be incorporated into the SWPPP by the
contractor.
• The ENGINEER shall submit Construction Documents (100%) to the CITY perthe
approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by
the ENGINEER registered in State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
the 100% design packages. This estimate shall use ONLY standard CITY bid items.
ASSUMPTIONS
• 1 sets of full size drawings and 1 specifications will be delivered for the 100%
Design package.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 6 of 14
ATTACHMENTA
DESIGN SERVICES FOR
STA7E HIGHWAY 114 WATER AND
SANITARY SEWER REIOCATION PART 3
CITY PROJECT NO.: 01575
• Sheet Number Sheet Title
1 Cover Sheet
2 Legend / Index
3 General Notes
4 Key Map
5 Control Layout
6 Easement Layout
7 Abandonment Layout
8 Water Vaive Isolation Layout
9 to 20 Construction Sequencing
21 to 32 Plan & Profile
33 iSWM Construction Plan
34 Details
,� � :
A. 100% construction plans and specifications.
B. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
C. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a.PDF file.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all p�an holders.
• Attend the bid opening in support of the CITY.
+ Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 7 of 14
9
ATTACNMENTA
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER REI.00ATION PART 3
CITY PROIECT NO.: 01515
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be upioaded into the project's Bid Results folder on Buzzsaw.
• �ncorporate up to two (2) addenda into the contract documents and issue
conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall be created from the original
CAD drawing files and shall contain all associated sheets of the particular plan
set. Sinqular PDF and DWF files for each sheet of a plan set will not be
accepted. PDF and DWF files shall conform to naming conventions as follows:
I. TPW file name example —"W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original pian set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example —"X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shali be the total number
of sheets in this file.
Example: X-12755_org18.pdf
Both PDF and DWF files shail be upioaded to the project's Final Drawing folder in
Buzzsaw.
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the
plans were prepared in DGN format, they shall be converted to DWG prior to
uploading. The naming convention to be used for the DWG files shall be as
foilows:
I. TPW files shall use the W number as for PDF and DWF files, but shall
include the sheet number in the name —"W-1956_SHT01.dwg", "W-
1956_SHT02.dwg", etc.
City of Fort Worth, Texas
Attachment A
PMO Reiease Date: 07.23.2012
Page 8 of 14
ATTACHMENT A
DESIGN SERVICES FOR
STATE HIGNWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PROJECT NO.: 01515
II. Water and Sewer file names shall use the X number as for PDF and
DWF files, but shall include the sheet number in the name —"X-
12155_SHT01.dwg", "X-12755_SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Pubiic Works Vault at
telephone number (817) 392-8426. File numbers will not be issued to a project
uniess the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 10 sets of construction documents will be sold to and made available on
Buzzsaw for plan holders and/or given to plan viewing rooms.
• 1 sets of fuli size and 1 sets of half size drawings plans and 1
specifications (conformed, if applicable) will be delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to Buzzsaw.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
6.2 Record Drawings
s The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Finai Drawings during construction.
The following information shall be provided by the CITY:
o As-Built Survey
o Red-�ine Markups from Contractor
o Red-Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
Ciry of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 9 of 14
ATTACHMENT A
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER REIOCATION PART 3
CITY PROIECT NO.: 01515
• The ENGINEER shall modify the Finai Drawings electronically and shali piace a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall cleariy indicate all changes which appiy to that sheet by
clouding and numbering, or other suitabie means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red-lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Sinqular PDF and DWF files for each sheet of a
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example —"W-1956_rec47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is
of a record drawing plan set, "47" shall be the total number of sheets in this
file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example —"X-35667_rec36.pdf' where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_rec18.pdf
�oth PDF and DWF files shall be uploaded to the project's Record Drawings folder
in Buzzsaw.
ASSUMPTIONS
• One copy of full size (22"x34") mylars will be delivered to fhe CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 10 of 14
ATTACHMENT A
DESIGN SER4ICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER RELOChTION PART 3
CITY PROJECT NO.: 01515
DELIVERABLES
A. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER wiii support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right-of-Way Research
• The ENGINEER shail determine rights-of-way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations wili be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The docurnentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
availab�e on the CITY's Buzzsaw site.
ASSUMPTIONS
• 6 Easements or right-of-way documents will be necessary.
• Right-of-Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal [7istrict (TAD) information available at the
start of the project and available on-ground prnperty information (i.e. iron rods, fences,
stakes, etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures.
,� - • -
A. Easement exhibits and meets and bounds provided on CITY forms.
Ciry of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 11 of 14
ATTACNMENTA
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION pART 3
CITY PROJECT NO.: 01515
TASK 8. SURVEY SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
• ENGINEER will perform fieid surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shail include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys. Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
- A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X�, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
North Side Drive at the East end of radius at the Southeast corner of North Side Drive and
North Main Street).
- Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
- No less than two horizontal bench marks, per line or location.
- Bearings given on all proposed centerlines, or baselines.
- Statian equations relating utilities to paving, when appropriate.
, , i
• Topographic survey at intersection will include no more than 1Q0 ft. in each directidn.
� -�.
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 12 of 14
ATTACHMENTA
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITARY SEWER RELOCATION PART 3
CITY PROJECT NO.: 07515
B. Drawing of the project layout with dimensions and coordinate list.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existina Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right-of-entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right-of-entries.
• Services to sup�ort, prepare, document, bring, ciefend, or assist in litigation
undertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by the
contractor.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 13 of 14
ATTACHMENTA
DESIGN SERVICES FOR
STATE HIGHWAY 114 WATER AND
SANITpRY SEWER RELOCATION PART 3
CITY PROJECT NO.: 01515
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• SWPPP inspection services are not included. it is understood that the contractor will
provide this service during construction.
• Anything not specifically defined as included in Tasks 1-8 above shali be considered
not included in the scope of this contract.
m
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 14 of 14
�
ATTACHMENT B
COMPENSATION
Design Services for
State Highway 114 Water and Sanitary Sewer Relocation Part 3
City Project No. 01515
l.ump Sum Project
I. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $196,487.00 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1.
B. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
C. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
City o( Fort Worth, Texas
Attachment 8
PMO O�cial Release Date: 8.09.2012
Page 1 of 3
i
Y
ATTACHMENT B
COMPENSATION
III.
Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Dunaway Associates, Design $158,612 81 %
L.P.
Proposed MBE/SBE Sub-Consultants
Gorrondona & Survey & Easements $37,875 19°/o
Associates, inc.
Non-MBE/SBE Consultants
TOTAL $196,487 100%
Project Number 8� Name Total Fee MBE/SBE Fee MBE/SBE
%
State Highway 114 Water and Sanitary $196,487 $37,875 19%
Sewer Relocation Part 3
City MBE/SBE Goal = 17%
Ciry of Fort Worth, Texas
Attachment B
PMO O(ficial Release Date: f1.09.2012
Page 2 of 3
Consuitant Committed Goai = 19 %
:
�
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
ailocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment 8
PMO Official Release Date: 8.09.2012
Page 3 of 3
s
�
/C
�
�
�
a
�
�
(n
� M
� �
� Q'
a �
�
�
N �
d �
�
�
���.
�
d-
v��
'� z �
y�5
�
R
C
O �
.�• u
��
N V �O
O �O a
V ` �`
(l. a U
b
d d
c �
y O
O m
; U
O
O C
� '
C T
d 9
� a
v <
A c
`� ;
A A
o �
� q
D m
A r
n
E �
O d
IL N
0
y u
a
E � m
� D
Z >�
d
V y�j N
.� � �
� d �o
c E a
N V O C
C � V
� C � �
2 N " �
� a
« �
� V C r�.
A d � N
� p1 T �
N C C N
a
s
U LL � C�J
�
a
E
�
Z
�
�
U
a
a"i
0
�
ci
E
ca
Z
A
C
R
Q
�
O
v
.. � L
,m�� .
E � v � aEi
o+Ot-LL �
�
�
a��
� �o a�i v
> 2 ci �o
m � � O
� yCI�N
u�ia°E ca�
cc�,�0'0
od�o°o>
U>d u.F- �
C C1 M �
C C �vi v
'b A � �
w m �
�
c �
d ._
� �
� �
V —
w �'
� �
� o
c '�
wa
�
C �
61 d
u n,
a o
U
'D
:� c
v �
a o
o ¢
U
O �
� M
a�i O � "'
E � '�
¢a
v �
a '
C O
�a
Q
E�
�
d E
aa
.0
N
d
�
Y
O
�
a
e
R
B
u.
�-INIMI�tIN
0
0
r
�
rn
�
o y
� �
v
� ac
w C
0
v
Qi
�
a�+
d
�
N
a
o �
a
� �
V �
� �
m O
�
y
N
�
C'
N
�
++
C
d
�
T
�
a
N
�
�
�
0
�
�,
n
�
E
N
a
�
�
r
�
�I
�
N
lJ
O
� �
G
R �
�O
T
� 9
�a
v
> �
a A
m�
�
�m
c �
c °1
9 ffi
n y
�j A v
� q�
8 "i
a m o
w a. ..
c E a
q 9 O C
G � „ ��
O m
. Ci V C y �
� � N .O
W � � $ C O
� O � � T A
U
0� C C 0 q
C
a Q U ii � U
N�
LL
V
�
�
N
N �
N �,
(� � J
d C 7
� tt5 s,"
G � �
C � �
G ` C ^
� O
9� =3
� � u=�
� `�
N� e} � rz
V � � � �
. : `
.� = N �y ��»,
V
� �O�
�
C � a a�i
O V � � �
Nl U°: c' Z a,
4-'�a�' �nt
O O«`o�«�
� �-U?sliUd
a
�
3
n
0
N
�
Z
c
�
�
E
O
U
�
F0-
r
3
�i
S
3 �
N N
N �
� 0 �
� Q � ^
C
m �
O N
� m � �
�n h m 0
NN
N
V L
'O C
Q L
_ N
�� " aai ii
E`�kdA
vOF-LL
u
�
�
t
0
3
0
LL
<
�
�
C
R
m
N
�E
�
w
a
�
a
m`
ik
�
au�
N O N v
c>�5i m
a�+ C � �
7 O � � ro U
C C T p 0 >
o v A o
c> > a u. i-- 5
� y
N
� C'
E
0
U
d
Q1
w
C
u
N
a
�
i
0
N�
�
N
C
N
O
5
n
a
�
a
�
m
$
0
�
�
��
C �
� T
d 9
M Q
D �
> �
a ;
o �
u
S m
c R
c F
0
� 8
ma
°� a
u! o n $
a c q�
� s H�
� ��m'n a
`n w n �
r c E a
m •• y p C
2� � V �' $C
\' J t�j p $ `
i: �1-+
2 a � S ]L�' �
A C
C 0 j �
U' �O '�~'J � T �
(B c m a
° �> o ==o
a Q U ii � U
�
�
�
�
�
�
N�
� � � �
c' ro ;
� �� � =;
m y
C � �
d � � �
�
� � o .» �
�. � � �
U, �
tl }
y P � � �
yC� r �n y �
L `n °� � �
y (A o (n ;. . _
�
C v nd
� �o Ea
�O
N U°=°a Zm
�,�- .� a �" �n t
0 o�,oa��
� aU'�u.Ua'
a
m
Q
o'
N
E
rt
Z
�
�C
�
°
0
o$ '�
N N
� 0
; Q N �
G
0 �
v' m
�m `m� c�
� `n m
NN �
`
'O Cl
'O C
Q O
.. d L
a
•�ud
wOt�tLL
�
�
m
�
c
�
�
'a
9
N
T
q
�
E
K
W
u
�
0
�
m #
a��
!^ 'o m �
� �� d m
� � � �
�
do d
m u
'��E,Eo'o
oa�m�o>
c»aLLF- �
��
�
�V
C
�
N
c
�
b
D
O
E
N
Y
d
a
�
O
U
N
�
f0
c
a�
L
d
a
�
Gf
�
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
State Highway 114 Water and Sanitary Sewer Relocation Part 3
City Project No. 01515
"None"
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page I of i
.
.
I I
NAVADA�" WAY
. � - ,� ,� a� ,
� y K
• F � �y ` C
_ l�+1 � l' . .. . r�- A
�_
�J��
i
' � � ///�
_` �, �,
� ^ �_
' �. � �
� 1�ART/NRq
. _ _ NCh,Ro�� , ��
r % � �� `�
.� � '
' �.
* i�
, `
` ;�
' .- ,
, , /,' :<< .r,.:
i 1 �;.
' ' � '.'�1 f'� �.c
t . y' - . .� � Q j . �.
, . .. S, , '�i� /i
+ � t�_ � . .i.. -�- -- - �tj !'
f � � ' �,� �
�' �,_��
j� �:
'�y � �� � � � a t'/ '' "' ' .Z , ' ii a ' �
�y+. : �
A�� • �`11• . �•;. , r"%- � � - i �
. -+...� �" - ~ � � �
S * T i a � �
+FJ 3 � ',��. �f �ii f
, •^�: •� •.� . �� �
v•
� � t!r '�� R �� '� , � � � `St♦
- � ... ,,;.. � `��
� �Irr` -• ` �'. ' ' .. J . R7'TR�C,1�
`� +�� , *." - - C'T
�? � �"�, �
�_, �: =,�a�s:��- ;.
_ � � _' , • �."
' � r.� ,�
. }�Ic� � w� _ •
�-- -,- ` ,
�, ` w.' ��'� y ' . .
II
� �*- *;�; . _ � 4,'`
�y~ � ? r'
, -.���
�T�,�� �� �.
�4 ��'i'.�".,.�i- ��•�^.�I
�g.
r � � .. .
y x� .
� � r �
�� - t'� ,� '"` � ' �t� : 4%j
� � `�°�' ,
' � �_ �..� � /�
I'� ���,;
.— � �r ?
I�r� _ � �: � t �� �•,�
I ' ,�.=. � ' O f
I� ��� '
_�� e�� ..A� 1 a� i�' I! .
..• . , I� � . `,,�'a.Si�. ��' � ` 4'1"J �
Z
F RT �V RT H ' �
� � �. �
� �i
..
WA'TER r�
� �
. , _ ,�.
,- ,.� .
:� r �� .
1� ! �•�,� _ - . _
;' ; Ij
' _
;-�
�� .
�� ) PETTYf� PI;��,
- �T
�
- �: t-
' ';_. �' •
; � ,�� ;
� �{�,r
.�
;'k[ti,
� �'R" f-:T/ �
,"
�: �
,�
� �� :-
Ca ; �. C�t
� ,
(O� ' �
i
W �
' _ jF� : �
�` ' �.'`= '
. � � .�� � � � � - ,
�?.... � -_ a� ... � � � �� - .
� � �y
r �.�
'�'f; � � ; > �-�
N _�'
: �' �
, � �►.
� n ��F`�„ `,,, '
f' � ;
, �'i`��`'�" al�
, � �1.�� 4.�«
� � � , } _:�.=.��i;..
� ,.�.. � � .
_'• � ',� f� j
l
,�A . �; ,
`#% S_..
. �` � � .`;�. ,,,� �
, f,:�. ` '��
- i t,` � tsl � •s�
u _ y' ' � � � �i.• �. r+�+lE�
��d .
' . .._ •'4 ` yy � s� j� '
� � � �
r y �
• � -. �,' . - : ��
� _ t .� . ; , , '
3r-'+,• �` = 1. ; • . •
�LS,; " t,:� �� ' , +��t
"'' �� � y _ ._ . f �`
-_ . ,� ?t�, � �,�
t
� • � � ' � �/ `�? `�' 'r' � �- -
�' ;"� �-` - -- a_ - -
�. �-�.. 'J` :,' � � .; � - -
:�
�' �-1� � q .. - . ' � •. _ - '
' �'„� �., *�' � � - .
. .. d F ; �, r .
� .- . . � �_ y-.•
i y� ' � �,r
. . - - - -- �.s_ . . �� 1 . _ . .' . - - �
_.s
'� PROPOSE� WATER LINE -
� PROPOSED SEWER LINE
City of Fort Worth, Texas
Mayor and Councii Communication
COUNCI� ACTIC?N: Approved on 8/6/2013
DATE: Tuesday, August 06, 2013
LOG NAME: 60WSFM156-DUNAWAY
REFERENCE NO.: **C-26378
SUBJECT:
Authorize Execution of an Engineering Agreement with Dunaway Associates, L.P., in the Amount of
$196,487.00 for Water Main and Sanitary Sewer Relocations Along F.M. 156 from State Highway 114 to
Martin Ranch Road, Provide for Project Management, Real Property Acquisition and Utility Coordination
Costs for a Project Total in the Amount of $218,487.00 (COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an Engineering Agreement with
Dunaway Associates, L.P., in the Amount of $196,487.00 for water main and sanitary sewer relocations
along Blue Mound Road, F.M. 156 from State Highway 114 to Martin Ranch Road.
DISCUSSION:
In order to facilitate the widening of F.M. 156 from State Highway 114 to Martin Ranch Road by the Texas
Department of Transportation, it is necessary to relocate the existing City is 24 inch water and 18 inch
sanitary sewer mains that are in direct conflict with the proposed highway improvements.
The services to be provided include the following:
. Design survey
. Preparation of plans and specifications
. Preparation of easement documents, permits and
. Geotechnical engineering
• Subsurface utility clearance
utility relocation Agreement
Dunaway Associates, L.P., proposes to provide the necessary engineering services for a lump sum fee of
$196,487.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. In
addition to the contract amount, $22,000.00 (water: $12,000.00, sewer: $10,000.00) is required for project
management.
M/WBE Office - Dunaway Assaciates, L.P., is in compliance with the City's BDE Ordinance by committing
to 19 percent S�E participation on this project. The City's SBE go�l on this project is 17 percent.
The project is located in COUNCI� DISTRICT 2.
FISCAL INFORtVIATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund.
FUND CENTERS:
I,��Jna�ne� fi�W�FM15F-f�TTNAWAY o.,,.,, � ,.��
TO F .�nc!/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office b�
Originating Department Head:
Additional Information Contact:
FROM Fund/Account/Centers
P253 531200 602140151531
P253 531200 602140151532
P253 531200 602140151533
P253 531200 602140151551
P258 531200 702140151531
P258 531200 702140151532
P258 531200 702140151533
P258 531200 702140151551
Fernando Costa (6122)
S. Frank Crumb (8207)
Roberto Sauceda (2387)
ATTACHMENTS
1. 156. 60WSFM156-Dunawa rL(FAR funds verification JCT 7-16-2013 docx
2. 60WSFM156 DUNAWAY MAP.qdf (Public)
3. 60WSFM156-DUNAWAY COMPLIANCE.pdf (CFW Internal)
4. FAR-00007 CIP#01515 P253.pdf (CFW �nternal)
5. FAR-00008 CIP#01515 P258.bdf (CFW Internal)
(CFW Internal)
36 902.00
73 802.00
$12,301.00
29 372.00
10 682.00
21 364.00
3 561.00
8 503.00
T.nsrnamP• h(1WCFM15F_Ili(1�TA�h1�1V r,___ �, _r�