Loading...
HomeMy WebLinkAboutContract 52223-CO5 CSC No.52223-CO5 FORT WORTH City of Fort Worth Change Order Request Project Name:1 Meadow Lakes Lift Station Sanitary Sewer Force Main City Sec No.: 1 52223 Project No.(s): 56016-0700430-CO1783 DOE No. N/A CityProj.No.:l 01829 Project Description: The construction of the S.S.gravity main from Jenkin Heights Lift Stalon to Meadow Lakes Lift Station,the force main from Meadow Lakes Lift Station to east of Boat Club Rd.and the decommissioning of Jenkin Heights Lift Station. Contractor: Mountain Cascade of Texas,LLC Change Order# Date: 7/8/2021 City Project Mgr.1 Walter Norwood City Inspector: I Jesse Reed Phone Number:1 817-392-5026 Phone Number: 817-392-8362 Dept. Sewer Force Main Sewer Gravity Totals Contract Time Main (Calendar days) Original Contract Amount $2,616,385.00 $1,379,690.00 $3,996,075.00 365 Extras to Dale $80,879.98 $80,879.98 167 Credits to Dale Pending Change Orders(in M&C Process) Contract Cost to Date $2,697,264.98 $1,379,690.00 $4,076,954.98 532 Amount of Proposed Change Order $0.00 $0.00 $0.00 128 Revised Contract Amount $2,697,264.98 $1,379,690.00 $4.076,954.98 660 Original Funds Available for Change Orders $159,843.00 $159,843.00 Remaining Funds Available for this CO $78,963.02 $78,963.02 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.02% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,995,093.75 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.5 will provide an additional 128 calendar days on the project due to the following: • The time it took for grass seed to become established. • The time it took to remove debris and re-tv a newly installed sewer main that initially appeared to have a sag in it. • The time it took to reconstruct an existing sewer service line that was originally constructed from the center of a residence,across a driveway and underneath a storm drain curb inlet before connected to the project sewer main. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Contractor's Company Name Contractor Name nt a D to Mountain Cascade of Texas,LLC Andy McCulloch Inspector Date Project Uana r Date Director(Water Dept Date Construction Supervisor Water Dept) Date w Stu rorJul 12,2021 _ ����t/�>Io�iizfc✓� -- Assistant City Attorney Date Assistant City Manager Date war, Ju119,2021 -3 Jul 21,2021 Council Action If Required) M&C Number N/A M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fcc P,"i WOP..-- " City of Fort Worth Change Order Additions Project Name Meadow Lakes Lift Station Sanitary Sewer Force Main City Sec No.: 52223 Project No.(s): 56016-0700430-CO1783 I DOE No. N/A City Proj,No.: 01829 Project The construction of the S.S.gravity main from Jenkin Heights Lift Staton to Meadow Lakes Lift Station,the force main Description from Meadow Lakes Lift Station to east of Boat Club Rd.and the decommissioning of Jenkin Heights Lift Station. Contractor Mountain Cascade of Texas,LLC I Change Order: Date:1 7/8/2021 City Project Mgr, Walter Norwood City Inspector F Jesse Reed ADDITIONS DEFT, ` 'Qt Unit' Unit Cott Totat" 1 Sewer Force Main Sewer Gravity Main Page 1 of i Additions Sub Total FORT WoRTH City of Fort Worth Change Order Deletions Project Name Meadow Lakes Lift Station Sanitary Sewer Force Main City Sec No.: 52223 Project No.(s): F 56016-0700430-001783 DOE No. N/A City Proj,No.: 01829 Project Description The construction of the S.S.gravity main from Jenkin Heights Lift Staton to Meadow Lakes Lift Station,the force main from Meadow Lakes Lift Station to east of Boat Club Rd.and the decommissioning of Jenkin Heights Lift Contractor Mountain Cascade of Texas,LLC Change Order: F 5-1 Date 7/812021 City Project Mgr. Walter Norwood City Inspector: Pesse Reed DELETIONS ITEM:DESCRIPTION DEPT City Unit Unit Cost Total Sewer Force Main Sewer Gravity Main Page 1 of 1 IDeletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co-# DATE AMOUNT Total $0.00 Page 1 of 1 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements, Signature "4A0y Alviloao CP Name of Bmployee Title � a )jrp�°FORT� ATTEST: 9�°° oO1 �d 0 Rd�c�t/y P. �CdrUza/ee� o o Ronald P.Gonzales(Jul 202111:41 CDT) ° tag g=d o Ronald Gonzales ��� °°°OO°°°pO°o Aa Acting City Secretary ail rEXArro�1 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX