HomeMy WebLinkAboutContract 54212-CO2 CSC No.54212-CO2 FORT WORTH —�� Change Order Request Project Name 2018 Bond,Street Reconstruction Contract 17 City Sec No. 54212 _ ,i Project No.(s)[56002.0600430/0700430.001780b34018.000431.002480 City Pro.No.I 1 477 1 Project Description 1combined Street Paving and Water and Sewer Main Replacements for 2018 Bond Reconstruction Contract 17 Part 1 Contractorl Stabile and Winn,Inc. J Change Order n Dale: 6/30/2021 City Project Mgr.f Dena Johnson City Inspector F Aaron Yb ar r i Phone Number:[ 817-392-7866 Phone Number 817-392.8306 Dept. UNIT 1 Water I UNIT 2 Sewer UNIT 3 Paving NIT 4 Drainage Totals Contract Time (Calandar Days) Original Contract Amount .217,8 . 450 Extras to Dale 1 $0.001 $0,001 $42,150.001 $0.001 $42,150.001 28 I Credits to Dale j 1 I I I Pending Change Orders(in M&C Process) ) ) , I 1 Contract Cost to Dale $1,675,777.50 $653.464.50 $4,259.984.30 $224,475.00 $6.813,701.30 478 [Amount of ProposedChange order , 50 Revised Contract Amount , 75,777.50 3, 528 Orig.Funds Available for Change Orders 83, 8 .00 32, 73.0U--VT,= $22,448.001 $349,802.00 I Remaining Funds Available for this CO $22,4411.01 $307,652.001 Additional Funding(if necessary) , . � $267,518.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5,3 0 MEW JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.2 provides for replacement of the failed backfill material for sanitary sewer main on West Shaw Street from Gordon Avenue to 10D feet east of West Shaw/Livingston Avenue intersection.The failed trench has caused pavement subsidence and creating a traffic hazard.Additionally,during construction,it was discovered that the existing storm drain was not located as shown on existing City records necessitating this Change Order for additional storm drain improvements. Staff concurs with the contractor's request for 50 additional calendar days for this change order. It is understood and agreed[hat the acceptance of[his Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both lime and money)for all costs arising out of,or incidental to,the above ange Order. Contractor's Company Name Contractor Name nt acior iynature Date Stabile and Winn,Inc. Jerry Henderson (p 30 2.a Inspector Pr&qWanager Date 6/30/2021 D94-a- �� 7/9/21 Director(Water Depl) Construcliop ervfsor(TPW Dept) Dale ftp7�,4,77 7777T, f 6/30/2021 Assistant Clty,At(omey Assistant City Manager Dale R ° a D Black(Jul 15,202123:00 CDT) n� ti—. Jul 20,2021 Council Action(if required) OFFICIAL RECORD M&C Number 1- 4 M&C Dale Approved - CITY SECRETARY FT. WORTH, TX FoR-r WO R—f'14 City of Fort Worth Change Order Additions Project Name 1 2018 Bond,Slreot econstruction Contract 17 City Sec No, 64212 1 Project No,(s) 56002.060043010700430-001780&34018.000431.002480 DOE No, N/A City Pro.Na, l 77 1 Protect Description Combined Street Paving and Water and Sewer Main Replacements for 2018 Bond Roconstruction Contract 17,Part I Contractor LstabIle and Winn,Ino, 1 Change Order g [- 2� Dale:l 6/30/2021 CllyProfect Mgr, _Dena Johnson City Inspector Aaron Ybarra ADDITIONS mw ; � r.Y. IJEP,T F'-: Unit. Tlri�tG�gst. Total= epa r Troric i WICSS backfill' UNIT 2 Sewer 1 1,175.001 CY 1 $126.001 $148,050,00 1 II-39 111"Pavement Pulverization JUNIT 2 Sewer I 800,001 SY 1 $9,001 $7,200,001 II-40 CEM-LIME(rGD_32 LBSISY) UNIT 2 Sewer 15,00 TIN $260,00 $3,900,00 II-41 Asp alI PVMT Type"D" UNIT 2 3ew0r 800,00 SY $18.75 $15,000,00 1 42 Manholo dJ,.Minor UNIT 2 Sewer 3.00 EA $500,00 $1,500,00 1 II-43 1Ternp.Asphalt Pvmt,Repair(2"HMAC on 6"Flexbase) (UNIT 2 Sewer 1 550,001 LF 1 $30.001 $16,500,001 1 _ _ I I I I I I I 1 1[1-5 SSTORM LINE GROUTING JUNIT 4 Drainage 1 112,001 CY 1 $260,001 $H,120,001 1111-13 IPOST-CCTV INSPECTION OF STORM LINE JUNIT 4 Drainage 1 280,001 LF 1 $10.001 $2,800,001 111-22 IREMOVE 18"STORMLINE JUNIT 4 Drainage 1 65.00 LF $3H01 $2,275.00 111-23 REMOV 4 "STOR LINE UNIT4 Drainage 104.00 LF $55.00 $5,720.00 1 111-24 JCONC,ENCASEMENT FOR UTILITY PIPES JUNIT 4(Drainage 1 2,301 CY 1 $875,001 $2,012,501 1 111.25 124"RCP,CLASS III JUNIT 4 Drainage 1 84,001 LF 1 $145.001 $12,1K001 III-26 48"RCP,CLASS III UNIT4 Drainage 1 451,00 LF 1 $394,001 $177,694.00 III-27 CONCRETE COLLAR UNIT4 Drainage I 2.00 EA 1 $5 0.00 $1,000.00 III-28 1 TEMPORARY ASP HALT(}A ING REPAIR(,2"HMAC ON 6"F EXBA E UNIT 4 Drainage 1 636,00 LF $35,001 $18,7266,00 1 111-29 IEXPLORATORYEXCAVATION JUNIT4(Drainage 1 1.001 EA 1 $1,600.001 $1,600.001 1 III-30 ITRENCH SAFETY JUNIT 4 Drainage 1 635,001 LF 1 $3,001 $1,605.001 1 111-31 JEXTRA DEPTH 5'SD JUNCTION BOX JUNIT 4 Drainage 1 13,001 LF 1 $700.001 $9,100,001 1 III-32 IEXTRA DEPTH IV INLETS JUNIT 4 Drainage 1 13,001 LF 1 $850.001 $11,060,001 1 I11.33 1W Pavement Pulverization JUNIT 4 Drainage 1 1060,001 SY 1 $9,001 $9,450,001 1 111-34 ICFM-LIME(@ 32 LBSISY) JUNITA Drainage 1 17.001 TN 1 $260,001 $4,420,001 1 III-35 13"Asphalt PVMT Type°Da JUNIT 4 Drainage 1 1050,001 SY 1 $18.761 $19,687.501 1 III-36 IREMOVE TOURS INLET JUNIT 4 DrdnNe 1 3,001 EA 1 $1,200,001 $3,600,001 1 III-37 IAS-BUILT SURVEY JUNIT 4 Drainage 1 1.001 LS 1 $850.00{ $850.001 I I I I I I I I I I I I f I I I I i I I I 1 I I I I I I I I I f I I I I I I I I I I I I I I I I I I I I I I I I ! I f I I I JUNIT 1 Water I I JUNIT 2 Sewer 1 $192,150.001 JUNIT 3 Paving I I JUNIT 4 Drainage 1 $312,889,001 IAdditlons Sub Total 1 $505,039,001 Page 2 of AL Wo'Ez' City of Fort Worth Change Order Deletions Project Name 010 Ron dot reel Recon at ruction ro nt Wt I City Sec No. 54212 Project No,(s) I 56002-064043010700430,001780&34018-000431-002480 DOE No. N/A City Pro.No. 101477 Project Description mbined Street Paving and Water and Sewer Main Replacements for 2018 Bond Reconstruction Contract 17,Part'I Contractor I Stabile and Winn,fnc, Change Order#F 2 Date 6I3012021_ City Project Mgr. LQofla Johnson City Inspector Aaron Ybarra DUEVOS ITNI"t1ESCRl�'7i0N r 7,777, j' t31~Pi Qty:; Unit Uril6CosE Total II-4 14' MANHOLE IUNIT 2 Sewer 1 2.0001 EA I $6,000,001 $12,000.00 II-6 14'Drop MANHOLE 1UNIT 2 Sewer 1 1,001 EA 1 $71*200,001 $7,200,00 11-15 18"WATERLINE LOWERING 1UNIT 2 Sewer 1 3.001 EA 1 $7,900,001 $23,700.00 I1-24 IREMOVE4'SEWER VAULT IUNIT 2 Sewer 1 2.001 EA I $5; X001 $11,000.00 I1-37 ICDNSTRUCTIONALLOWANCE IUNIT 2Sewer 1 0.70751 LS 1 $40,000.001 $28,300,00 111-6 1REMOVE 10'CURB INLET IUNIT 4 Drainage 1 10.01 EA 1 $1,300,001 $3,900m 111-12 15X2 PDX CULVERT IUNIT 4 Drainage 1 135,001 LF 1 $360,001 $0,600,00 111-15 142"RCP,CLASS III IUNIT 4 Drainage 1 120,00 LF 1 $210,00 $251200.00 111-21 (CONSTRUCTION ALLOWANCE IUNIT 4 Dralnage 1 0,75 LS 1 $30,000,001 $22,50aoo I I I I L I I I I I I I 1 I I I I I I I I I I I I I I I I I I ! UNIT 1 Water IUNIT 2 Sewer I $82,200,001 IUNIT"3 Paving I IUNIT 4 Drainage I $100,200,00� (Deletions Sub Total $182,400,001 Page 8 of 4 M/VVBE Breakdown for this Change Order MWB1 Sufi mm A p Total Previous Change Orders DATA A. Total -AW Contract Compliance Manager By signing acknowledge thatl am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Denajohnson Name of Employee Project Manager Title a� FFOR 0 00000000 o�fi d ° ATTEST: ��o ° Ronal�I P Gonzales P ° . � 000 o o T. o ° o o o° Ronald Gonzales 0 O0pp°0 0 o Acting City Secretary �t<rfiXA$a� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 22, 2021 REFERENCE NO.: **M&C 21-0460 LOG NAME: 602018CIPY2C17CO2-STABILEW SUBJECT: (CD 9)Authorize the Execution of Change Order No. 2 in the amount of$322,639.00 and the Addition of 50 Calendar Days to a Contract with Stabile and Winn, Inc., for Combined Street Paving Improvements, Storm Drain and Water and Sanitary Sewer Main Replacements for 2018 Bond Street Reconstruction Contract 17 Project, for a Revised Contact Amount of$7,136,340.30 and Adopt Attached Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in the amount of$322,639.00 and the addition of 50 calendar days to City Secretary Contract No. 54212 with Stabile and Winn, Inc., for combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 and 18 project for a revised contract amount of$7,136,340.30; 2. Adopt the attached appropriation ordinance adjusting appropriations in the 2018 Bond Program Fund in the amount of$555,811.00 by increasing appropriations in the 2018 Bond Street Reconstruction Contract 17 and 18 project (City Project No. 101477), and decreasing appropriations in the Street Construction/Reconstruction/Rehabilitation programmable project (City Project No. PB0001) by the same amount; 3. Adopt the attached appropriation ordinance increasing appropriations in the Water and Sewer Capital Projects Fund in the amount of$109,950.00 transferred from available funds within the Water and Sewer Fund for the purpose of funding the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477); and 4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects fund by increasing appropriations in the 2018 Bond Street Reconstruction Contract 17 and 18 project (City Project No. 101477) for the amount of$212,689.00 and decreasing receipts and appropriations in the Drainage Improvements programmable project (City Project No. P00043) by the same amount. DISCUSSION: On June 23, 2020, Mayor and Council Communication (M&C 20-0457)the City Council authorized a contact with Stabile and Winn, Inc., in the amount of$6,771,551.30 for the combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 Project. The contract was subsequently revised by Change Order No. 1 in the amount of$42,150.00 administratively authorized February 22, 2021 that provided for the replacement of existing street light conduits that were encountered in direct conflict during roadway reconstruction on Irwin Street, Magnolia Avenue and Willing Avenue. Change Order No. 2 provides for replacement of the failed backfill material for sanitary sewer main on West Shaw Street from Gordon Avenue to 100 feet east of West Shaw/ Livingston Avenue intersection. The failed trench has caused pavement subsidence and creating a traffic hazard. Additionally, during construction, it was discovered that the existing storm drain was not located as shown on existing City records necessitating this Change Order for additional storm drain improvements. Appropriations for the combined street paving improvements, storm drain and water and sanitary sewer http://apps.cfwnet.org/ecouncil/Printme.asp?id=29009&print=true&DocType=Print 7/9/2021 main replacements for 2018 Bond Street Reconstruction Contract 17 Project will consist of the following: Existing Additional Fund Appropriations Appropriations Project Total* 2018 Bond Program - Fund $10,793,935.00 $0.00 $10,793,935.00 34018 Storm Water Capital Projects $711,369.00 $212,689.00 $924,058.00 Fund - 52002 Water& Sewer Capital Projects - $7,590,363.00 $109,950.00 $7,700,313.00 Fund 56002 Project Total 11 $19,095,667.00 $322,639.001$19,418,306.00� *Numbers rounded for presentation purposes. Approval of Recommendation No. 2 would adjust appropriations between a programmable project and convert the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477) into a static capital project. This action is needed as future funding for the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477) is anticipated from other funding sources and the scope of this project differs from that of the current programmable project. Business Equity: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget in the Water & Sewer Fund and in the capital budget for the Drainage Improvement project within the Stormwater Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Stormwater Capital Projects Fund and W&S Capital Projects Fund for the 2018 Bond Yr2 -Contract 17&18 project to support the approval of the above recommendations and execution of the change order to the contract. Prior to an expenditure being incurred, the Transportation & Public Works and Water Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity BudgetT Reference# moun ID ID Year (Chartfield 2) FROM Fund Department ccoun Project JPrograttivity Budget Reference # moun ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Dena Johnson (7866) http://apps.cfwnet.org/ecouncil/printmc.asp?id=29009&print=true&DoeType=Print 7/9/2021 ATTACHMENTS 1. 602018CIPY2C17CO2-STABILEW FID Table (WCF 06.14.21).x1sx (CFW Internal) 2. 602018CIPY2C17CO2-STABILEW Form 1295.pdf (CFW Internal) 3. 602018CIPY2C17CO2-STABILEW funds availability.docx (CFW Internal) 4. 602018CIPY2C17CO2-STABILEW Map.pdf (Public) 5. 602018CI PY2C 1 7CO2-STAB I LEW Waiver.pdf (CFW Internal) 6. 602018CIPY2C17CO2-STABILEW 34018 AO21(r2)r.docx (Public) 7. 602018CIPY2C17CO2-STABILEW 52002 AO21(r4)r.docx (Public) 8. 602018CIPY2C17CO2-STABILEW 56002 AO21(r3).docx (Public) 9. Stabile & Winn SAM.pdf (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=29009&print=true&DocType=Print 7/9/2021 0 W W N N A A A A A A A A W W N N p 00 an�^-pyy Ul Ul Ul Ul (n Ul In Ul Ul Ul Ul Ul Ul Ul W W ye N N O) Ol N N N N N N N N O1 O1 A A N O O O O Co O O O O O O O O O O O �••� O O O O O O O O O O O O O O N F� N N N N N N 00 0. J n � . N O O O O O O O O O O O O O O N N V V N N N N N N N N V V N N "� O O O O O O O O O O O O O O O O O O O lD O O O O O O O O O O A A A O A A A A A A A A A A w W W W N W W W W W W W W W W O O O O w to w to lDD lAD w w ko y Ul Ul Ul In In Vn Un Ul Ul N N a) O N N N N Ol C O O O O O O O O O O O O O O O O O O C -O F- C C v F C C -D z o �C:) 0 Z z o O Z z O 0 0 o w � O A A O A a -V O A A A O m W V J m m W J m m W V V CD J c -D o z o 00 N V O O 00 r- C)CD l0 l0 l0 N N N N N N N N N N N N lD LO LO CD C:) CD (DO O O O 0 0 O O lD l0 lD N N N N N N N N N N N N LD LO lO 00 00 O O O 0 n FO F• O LO LW in N I--� N N t/T N N F� F-� Ul F, N O F-� N F, N �. N H N F_. O O In N lD D lI'I N lD N N N N Ql 1-0MMMDl w w 00 00 Ul co W 00 00 Ul Ln tD co O OO lD co lD Oo l0 lD O O O r� O b O O O 6 O O O 6 O b CD C, 0 0 C)O O O O O O O O C) CD O O C) O O 70 OO 'V OO 7u W C w � w v W w W C w 77 m -0 m F� W 'O W (D c O c (D C z C (D C O C (D C z C (D C O C o c W e < Q O O_ < O_ (n O.. < O. O O_ < O_ N Q < Q O O_ F' O_ O SZ Qq O Oq (D n V Oq (D Oq O Mo (D Oq � Oq (D Oq O Oq A Oq O Oq c .O-r W rt C h nl M c M W .O+ C rOr m rt C ram+ W rOt V O-r (D C: ID D v D D n D 0 � (D D n (D D v A D a Oh a (D h a (D h a (D h a D h a m a o a < o a o < O a < o 0 0 < a o < o Z3 - o = c o m o C o °O o °q D z a v c 0 a c z a v c a c z a c a v c cn �. 3 M A (D cn -+. (D A �. (D cn M. (D �. (D m rt 3 A V °+ A m Cuh 3 x J °+ A m rt 3 °+ 3 Cl p W (D V O• m M �• Dl (D V O• O n p' D1 (D O N O 6 O_ O_ O- O. O_ O- O_ U O_ Z D � � o C (D D n D n D D D(D n n (D n D� (D n h, r+ rr rr It Q o Q o Q o n o Q o a o f+ O .y' O rr O rr O f-r 3 O O -n O -+' O -" O -t' O O O O O O O O O O O C)O 3 O 3 O 3 O 3 O 3 3 --h --h h F F� W W Ul Ul Ul Ul N Ql N N O O O O O O O O N N N N O O O o N V N N O O O o O O O O W W W W Ln Ul A A V V l0 lO A A to Ul O O N N 0 O O 0 F F O o O O F N O O O z A A A N V V V m V V V nl n 0 O O C 0 0 o z 00 V 00 N 00 00 00 O O O O O O w lO l0 w l0 lO lO �D LD LD �D ID LD N C) N N F- O N N lO N N Ol lO O m 00 Ul 0p 00 UD O lO LD O O CD o 1 1 A w C m O 0 rD C z C "O _0 < O. Ln Q 0°M m rD n n rD n O O - _0 r(D < 0 0 F N o o W W A rD N N V QJ A N N V O N rP rr 3 O w W C LO LD Q _h fl O h O 3 O 0 3 Signature: GIG/�GZ�9w/�M Signature: C �1 o4 Priscilla Ramirez(Jul 14,202116:18 CDT) 5 ,—S&O Email: Priscilla.Ramirez@fortworthtexas.gov Email: allison.tidwell@fortworthtexas.gov Signature: Signature: Email: Vania.Soto@fortworthtexas.gov Email: Norma.Sauceda@fortworthtexas.gov Signature: Email: cheryl.howe@fortworthtexas.gov