Loading...
HomeMy WebLinkAboutContract 55382-CO2 CSC No.55382-CO2 FORT WORTH City of Fort Worth Change Order Request Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382 Client Project#(s) CPN 101582 Project Description Paving,Traffic Signal&Illumination Improvements for North Beach Street&Basswood Boulevard Intersection Improvements. Contractor McClendon Construction Change Order# 2 Date 7/8/2021 City Project Mgr. Iskal Shrestha City Inspector William R.Roberson Contract Time Dept. TPW Totals (CD) Original Contract Amount $1,537,331.40 $1,537,331.40 252 Extras to Date $23,258.00 $23,258.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,560,589.40 $1,560,589.40 252 Amount of Proposed Change Order -$37,867.00 -$37,867.00 Revised Contract Amount $1,522,722.40 $1,522,722.40 252 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.95% MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,921,664.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER The change in Bid quantity and addition of Bid items resulted from the Engineer of Record(EOR)'s response to the contractor's request for information(RFI)numbers 6,7a, and 8. RFI 6 is about descoping the portion of the southbound paving from the contractor's contract.Per the contractor's RFI,the existing pavement is in good condition and recommended not to replace.I coordinated the contractor's request with FOR and TPW Street Service.TPW Street Service field verify the condition of the existing pavement.Per email from Juan Cadena(TPW Streets and Stormwater Operations),he agrees with the contractor's recommendation to leave the portion of the pavement as-is.FOR also agree with the contractor's recommendation. RFI 7a is about the Temporary Traffic Singal Phasing.The contractor installed the temporary Traffic Signal Phasing per Issue for Construction(IFC)document but TPW Transportation Management made the contractor to revised the plan,which required accommodation of the LED's and signal heads. RFI 8 is about using Off Duty Police Officer to control the traffic flow at the intersection.The project requires relocating the Oncor transformer from the existing pole to the new pole.The existing traffic signal cabinet doesn't have a BBU to run the signal while power is disconnected.When relocating the Oncor transformer,the existing traffic signal equipment will be out of the power source.The contractor recommended using Off Duty Police Officers to control traffic flow at this intersection while Oncor performs work because the intersection has two(2)major arterial roadways. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Contract Signature Date McClendon Construction Co.,Inc Justin Blair `a��"wa'���o Jul 13,2021 Inspector/Inspection Super v Date Project and Contract Compliance Manager Date on Ju114,2021 ��auaz��spn Ju114,2021 Date ject Officer Date issHte hoevedo.eE Jul 16,2021 Jul 16,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date /�iivohierw o. Jul 16,2021 .1,11111611 Ju119,2021 Assistant City Attorney Date JAssistant City Manager Date IlIIIII Ju 119,2021 Dana Fu✓ghdoff Ju120,2021 ouncil Action(if required) / M&C Number M&C Date Approved 0 ATTEST:�D�t�Gl�l � GD�l/t�GPif .p4��nn� Ronald P.Gonzales(Jul 21,202108:47 CDT) A-O'q o 0000, � Ronald P.Gonzales,Acting City Secretary ��o°° °oQ%��� OFFICIAL RECORD 9�oo ° wo o=d CITY SECRETARY o oo a �� o°°00000000°° FT. WORTH, TX a�a�,�ExASbap FORTWORTH City of Fort Worth ' IT-- Change Order Additions Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382 Client Project# CPN 101582 Contractor McClendon Construction PM Iskal Shrestha Inspecto William R.Roberson Change Order Submittal# O2 Date 7/8/2021 ADDITIONS Unit Units o a emove Conc Curb and Gutter TPW 81.00000000 108 Temporary Signal Modification TPW 1.00000000 LS $1,742.05 109 Traffic Control with Off Duty Police Officer TPW 6.00000000 HR $500.00 3,000.00 TPW S5,552.00 Sub Total Additions 5,552.00 Change Order Additions Page 2 of 4 Puk L F�r 1 City of Fort Worth Change Order Deletions Project Name North Beach Street&Basswood Boulevard Intersection Improvements City Sec# 55382 Client Project# CPN 101582 Conlraclo McClendon Construction PM Iskal Shrestha Inspector William R.Roberson Change Order Submittal# O2 Date 7/8/2021 DELETIONS City Unit Unit Cost I ota Remove Conc.Hvmt "Conc.Pvmt Y "Recompoacted Subgrade SY TPW $43,419.00 �iub I ota eetions Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative Project Name: Beach Street& Basswood Blvd RFI #: 6 Project No. (CPN): C101582 Date Submitted: 6-14-21 Contractor: McClendon Construction Co., Inc. Response Needed by (NLT): 6-25-21 City Project Manager: Iskal Shrestha, PE Design Engineer: Pape-Dawson Engineers, Inc. RFI Title (Short Description): South Bound Beach Street Paving Attachments Image ❑ Document ❑ RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. N/A Drawing Sheet No. _20 & 25_ Drawing Detail Title: Other: N/A RFI Question or Clarification Needed: (Describe the issue and clearly state the question. Provide field data related to the issue, including street location, distance measurements and pictures if applicable.) Sheet 20 & 25 of the plans appear to show the existing curb to remain in place between station 223+48 to 222+00. If the curb is to remain, the concrete paving in this section also appears to be in good condition and could also remain in place saving the City a considerable amount of money. 1. Please clarify if we are to salvage the existing curb and pavement in this area. 2. If the curb remains in place, confirm the dimensions of the pavement to be left in place or how far off the curb we need to make the sawcut for removals. 3. If the curb remains, should we also salvage the existing concrete pavement?Approximately $50,000 savings. Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his knowledge of the project and existing conditions to assist with accelerating the response) 1. Leave both the curb and concrete pavement in place, replace the outer limits of southbound Beach Street outside of stations 223+48 to 222+00. Approximate Savings $50,000 2. Remove the full width of paving and curb to pour a new pavement section that is monolithic through the back of curb. Approximate quantity/cost increase $4,300 Does the Contractors Recommended Solution require a Change Order? : Yes ® No ❑ Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): Small increase in removal and paving quantities, or large decrease in removal and paving quantities. Is This RFI Stopping ALL work on the project? Yes ❑ No If yes, why was this issue not foreseen and sufficient response time provided? 1 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative RFI Response: Does Response Require Change Order Proposal : Yes ❑ No ❑ Contractor's Response: Change Proposal (if Applicable): Construction Allowance to be used Work Item Description Unit Quantity Unit Price Total Total Proposal Amount: $ Total Additional Days: 0 City PM Status: Accepted ® Rejected ❑ City PM Comments: 2 rdPAPE-DAWSON Request for Information ENGINEERS Response Form Project Name: Beach Street& Basswood Blvd RFI #: 6 Version #: 2 Project No.: 101582 Response Needed by(NLT): 6/25/2021 City Project Manager: Iskal Shrestha, PE Response Date: 7/9/2021 Design Firm: Pape-Dawson Engineers, Inc. Response Author: Mark Spear, P.E. RFI Title: South Bound Beach Street Paving Attachments Image ❑ Document RFI Response: Agree with the contractor's recommendation to leave both the curb and concrete pavement in place and replace the outer limits of southbound Beach Street. Limits of pavement removal is specified on revised plans and to be removed at panel joints. Does Response Require Change Order Proposal: Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Spec Section # Work Item Description Unit Quantity Unit Price Total 0241.1000 Remove Conc Pvmt SY -353 $20.00 $(7,060.00) 0241.1300 Remove Conc Curb and Gutter LF 81 $10.00 $810.00 3213.0106 11" Conc Pvmt SY -353 $95.00 $(33,535.00) 9999.0001 8" Recompacted Subgrade SY -353 $8.00 $(2,824.00) Total Proposal Amount: $(42,609.00) Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: S1N3W3AO0 JdW1 NOU33S213M OOOMSSVO ONb' HOb'3e a u Y w O 0Z Oz �g wQw \\\\\ O - X J > W>W poolIt - m " � y> F :w: •��y�1 p QW - �� =mom w wC •. :d:M o��u�1, +n QA W _ 0 0 dW U WHO F O'• :V:� U�Z� ��� '41� K z O_d' m08 Q GNU MINI �o a z any—, c�/1 QU mZ v 2 son Wnan mHar a ant 11H onto to How Instill" 111 ininsHow won agog;to a onto to gavial" malwaa His- Ad s=_=_=_s__„sns_aaaaaaaaaaaaaaaaa=asses -_- s=aaaae_ve_e________________es=_-_=as��sas __essssss ss..a � g a B n a �e c�xolz�t _ Ms alai," A �Q - §Smo 111111 Q41 HU 2 3 .l4 8831e1 nil! il.MW9Q :uo P WId fi�P'40G9119—S11tl13�\eVw45�o!a cez\e�!�ez\ufii.ep az\W\G0\«s\%l>Ka+a\s<!u S1N3W3A021dHI NOI 33S2131N1 OOOMSSVO ONV HOb'38 a _ N U N n z ( o ai ` zo HIZ VI to \\\\\\\ O X J Q> W w W m o'er Of�> o 0 0 *.:OC R o - c� C', W o aw �°�� z •C5•� Z.Q� wOz LLJ °v°(0 6:6 � � 4Ch a z o-� moo J I���1 �-�� �p ap �W 0 0 oQ oQ� o 4 a� mof U) QU Z Q K� - z' O - m o n > m m m N N N N O O O p O O a M M M z I r v M M M pp o a +00 y m ^ o ^ o o ^ na m w ;�� / 0 m^ + Uo dl dl dl dl dl N Z / /// en en en en ell en w N N = 0o M 0. 0 u m Q O xp OJy / /� O n S / t S 0- 00 00 Vey �fzr� •.\ '/ / 2-)a 00 ��� / \ 0 00 d� w w I m w Z O 0 / (/\/�\ U a0 Q M / m 0. x V I m 0 r Y o I gr- - & / n 6�ti rw OmW / h firm ^_ / a N 0 / 0 co Q N G OZOZ19VZ :ao PaRald fi•vnaeeu9-monn vo\•�«9s�o!a cez\e�!e ez\ufiiep a2\W\da\0.9\%l>ra+a\S<ea S1N3W3A021dHI NOU33S2131N1 OOOMSSVO ONV HOb'38 a 0 0 oN z p O OZ �z wW>W o a o 0 m of ��> as ,:d,N\I _ aW - �~ 3 0 0� :W: '•�`Jy+l "cpi OW _ o dw a z o :d: o':W I� mow_ Wz _ - 3 ¢ ao ov c=.o i^ �o OL o O� mc)0 ow 0 qf/�— °ioZ az ~m �_ N W i II,Ys ?¢ `n �ylf �p op �W a < ~o¢ �Q� o� Mu LU V1 Q Z Q F- - 3H�Y1SId 3S3NIH� (sus,'s�uo-z13,�a� w Ol .sL 3.vM w �rki�iwt-N 3HNHISI� 3Hovlsid353f d OSNIS rxa� eo szs= z¢O JIj1V211 "" c 10 AS a z s �z / o o ®I NNNI " "I cx zrzlz tl <=^w W � �UiK US_ UrOp xs g NN3 Nlz o qq 5 W >o ow a io W �w dim rv� oow_ moMnm y C .0 ID Fz fL m O M o0 o I I;z U I I �~�_� wRi nN� tVV J N6 Q � ViwS �m� N 3 a o z �.�.R R p N —_ _ _ ro �n w v}i _� - H• 3 z _ Win iu�ia o o Z. z - a -o a000 o r ioIi w C oho N; enxwxa- O I I r O j0 z ti ti ti ti U o 1 1 = Noss o w N•m 0 wC H N e•I rl rl — I rvm ==r r O w o z a a v v I w Im �,„x�aas .a v 0 0 0 0 O J o wa nu, zocUwzo, xx�sa �a -, -.- Z 1 1 € Illj J xo� 6�oo,z.,�v r O m 3 3 w r r O K Q 0. t: H a mZ¢ w c z E n w a = 3 °C >u u aid ""ry 3,j 1 a>o =gym u 0 Q 0 0 �°s s a 2 "31-1 i vvvv �"�� 1 � 1 iI `oQw �N= 0 0 0 0 zabdo°` om I w o� ¢_O E E E E °"Is d3a J > v v v v � I < o<n 0 0 0 o a 311, I o J z f a o H m o m LL= O z R Om N N N N _ 3 xaU g� _M ¢u o°? w b I zxom o>¢ 1, or0 zar�n a " 11331Nrld,` 12 OZOZ19VZ :Uo PaRald fi•vnaeeua-ran«vs.wa cez\e�!eez\ufil..p a2\W\da\0.9\elvfmU�S<ea .w:al.:n �Uex•uoz'a Um<loU S1N3W3A021dHI NOU33S2131N1 OOOMSSVO ONV HOb'3e o a_ Y o ? p O UZ H o �O pZ W o 88 d' i - C7 (n� Z N m Z N 0_W w ~ `> , ~ O N C0 H o a �� owM **:¢i...�'��1 W - - _ O� Omo Ea o c� a o z <^ o a ¢ :¢ '•.1i f rc Q - of U S m a- ¢ �f QW O p aW �o O o o O O o p0 (d;••• '.d: O2lyff mow � Z - - 3 Z Qp_o0 Ov o O O O 1Z O O Ofn� .Cn:m N•.JI z -_ ¢ Off' wco ¢ a a a �z O: '00 W:¢/ �' s �� - - p Z F-d mOOc� �w ah N 0 ��� fj�'. :� .�tp"i op W o �Q 0� a az� f s•'••, '¢'•, •'OF a F m' �� Ocn mm b W c� a �N� ff1\ : PPS w, ��� " zU zm v 1 O ¢ ��\\�\��� 3 a V1 Q Z w zxm LU Q of Of - v I 00+LZ — o c N93„9l Pnn'O al LZ 0 4 n h h �n tc40: IIo a �s '01 ono K. O CO n <F I N !y M O Z w \ I o W b n g8 0 F �a �� W M z8Ljwm`c7 rcH-. FW �Nma � �iN / a °1 Q o I Z m w = a C D > cw v a < �� m U a o m z « E CAo r U = I r9+i w n li a 12 �N ~� I� �N !n d I I O ei m c7 W s;lp,x F I _-- C w H <� N 00 rl !�!��$F�5 W Jl O O O U idrc� aTc I O O O O a 0 O w a w r - 2 O ¢ - �w O �UzQ z� w} �wzo3 I ,l•LL I o 3a w V ?t ooa oio boo ,BBC ro-x3 -ow�< O mo rto '�a ;3a woo<~ d_ F 0 oJ4�w o LLI Y a o woo x mza �� uwio�w,~w„ 4 ``y' �� o!n> > o N 3 a z QOO N F jO Nw0 CPO m32 OOmO �� 02 tj2Z~ I ♦+ (j0 > -d¢ a¢� yo 0000Y N�� Q� Y I ¢r03w <O� w < O <�[L Kt�/1 O _ K�Z�d O Zm2w�w I �10 Z�¢Hr Z o� .=o.00 Noo oo-z�`-^=o �� I 8 F=-J E �J3 a 0 3 Fo yUU sin iow vlti I $Fc K -1oor < ooz oQz 3o o<�a rn F3 QO JoOzxrz w w ��< wNJ a o� WQ� �Noz �a� <, o ��� .� zm�za m3<n �wF�<Qoa3o o ��.� I m 1 owr�w o �ww< �� Nw-83 omom=Nwiw i� o =oa�o= m �zz�F I c��m �� w a3�3r coo 1 <o duty =k' doN�� a m m-z Si Ow aw w-¢<�¢,.IzO 3uii3 nzugl< O w zo • i/i gm I I I OZOrZ w rO NNZ<NN�w Mm[OVmN �O Q O�rN pO M�O OQmOw ^� I I rZ�Z ...�.�.�.. W FZ<Q<W�Kz �� VIF�3 iIN 3U I Jtl I Km<Zw m����m Z N? N < o.m�?¢¢Kw �w�3¢�wm a� zwij�vii�mi 0 4 I •a.. wow 3 x O Im ¢rOF� O F NO�=2 i� ^ oW of I FO�z w ism$ d ^ gym I Ohm J� wm iI <� < WUw - �o `pep' } —w ooF 3a�� � 9NLL X H —<S< � ��m < 1F191 Zl IJ w _oFw ^oo"wE o O uoo OZOZ19VZ P-11-ld 6^P OOG9ll9- aee45 uoltl f'>'Z\!u,]>'Z\ufiiep 02\W�GO\l49\el a.U�S sl!] Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative Project Name: Beach Street& Basswood Blvd RFI #: 7a Project No. (CPN): C101582 Date Submitted: 6-24-21 Contractor: McClendon Construction Co., Inc. Response Needed by (NLT): City Project Manager: Iskal Shrestha, PE Design Engineer: Pape-Dawson Engineers, Inc. RFI Title (Short Description): Temporary Signal Changes Attachments Image ❑ Document ❑ RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. N/A Drawing Sheet No. Drawing Detail Title: Other: N/A RFI Question or Clarification Needed: (Describe the issue and clearly state the question. Provide field data related to the issue, including street location, distance measurements and pictures if applicable.) 1. As discussed in our meeting on 6-16-21, update the temporary signal plans per Traffic Managements request and provide the revised plan or red lines for review. Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his knowledge of the project and existing conditions to assist with accelerating the response) Upon review of the revised plan, changes to the previously installed temporary signal will be needed to accommodate the LED's and signal heads that were added. Does the Contractors Recommended Solution require a Change Order? : Yes ® No ❑ Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): Additional cost due to labor and material needed to add/replace/reconfigure the heads per the changes. Is This RFI Stopping ALL work on the project? Yes ❑ No If yes, why was this issue not foreseen and sufficient response time provided? 1 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative RFI Response: Does Response Require Change Order Proposal : Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Construction Allowance to be used Work Item Description Unit Quantity Unit Price Total Temporary Signal 1 LS $1,742.00 1,742.00 Modifications Total Proposal Amount: $1,742.00 Total Additional Days, 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: 2 rdPAPE-DAWSON Request for Information ENGINEERS Response Form Project Name: Beach Street& Basswood Blvd RFI #: 7a Version #: 2 Project No.: 101582 Response Needed by(NLT): 6/28/2021 City Project Manager: Iskal Shrestha, PE Response Date: 6/28/2021 Design Firm: Pape-Dawson Engineers, Inc. Response Author: Peter Hsu, P.E. RFI Title: Temporary Signal Changes Attachments Image ❑ Document RFI Response: We have reviewed the proposed phasing and signal head changes by City of Fort Worth Transportation Management on the temporary traffic signal plans. We agree with the proposed changes and have updated the plan sheets. Does Response Require Change Order Proposal: Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Spec Section # Work Item Description Unit Quantity Unit Price Total Temporary Signal Modifications 1 LS $1,742.00 $1,742.00 Total Proposal Amount: $1,742.00 Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: S1N3W3AOadWl NOli33Sa31N1 OOOMSSVB ONV H3V38 z w n p ( U Y O Z �~ N w o m w a x w �ti`"}p• 00 o• 111� o �W p� �p� a o r z ¢ w jo: '} Q -P< �,p QW o dw Um� z¢ an O w w Z O cZD N Q 11�: :w:M \ {V� _ 3 ¢ ZO ¢O �vwi O o m w in z a z 1`'6: ^ �p Oz O� wOZ rQ O d p r p Q o 0 1�. .w• 0 �V r p Z -0 z o = 3 ¢ U Ni IDS'•.. :�7 O ¢ =3'r Qa .. v�i m Z '�' o= o zQ = o `i' Ili# 7'Q w` �W -�` o ¢ ~¢ �cnw o J O O K O a W J > Z O `�\\���• . Opp :i < of of¢N w w H U d c7 U VI > >o E E a ��o dd �mw r 3 Q n n O N Q U Z ai Of o , a o Q O bs OON(� o < O wZ O� mM F m 0 O O J O zNrU<F, ~o V M 53 d O��w� Z Ll b� V1rOwmQ U� N •'$n Nd Qp ZO �� Q— a, w�0- KZ<JpM Vi rr0 aw Z w ~Q U N U K Q K _ >_�a an Q O K, Q mVI Z p w KNH H=VIUOU HQ CN N 1 I I1 pia N a a� 1\ � ,8£l OOD m D o o ••••• 0 0 00 o � 00 O O O � I'7• 4 0 Z3U_ 3 Z> O O N O ....•.• O ZWU� •.•.•.•••••••• ' • O O N •... •..• •• ' '• o OZ Jo 1S HOV19N 1S....15 HJ .... ..o o w a .... .... o N •.r 9 U O m m ti a ,6b1 O O U H d O Z U>O m O Z K D � J Q 7 LnN nF O O U 66 w � Z ti Z U y N W r i x�Q O a N S a a 0114 � O m °00 O M = n F � H A X-A-x x 3, 1 Cl) .......... .. � _ W w O v �a a o OZOZ/91/Z .uo Pallold - 3raoesus\•��a!•le �! ra eoi\•I«vs.a!e cez\!I^!e ezW I••a az\ao\ee\Ils\•hNo,��s s!!e ya:a!.:n -x Z tzaz V <wa S1N3W3AOadWl NOli33Sa31N1 OOOMSSVB ONV H3V38 Z w N O U Y w \ �U 0 0 # :••b'.� 0 < O y HM m ao ofw> ¢ r v p < a ¢ w joj '} c wE<I� �p Q41 0 dw Um� zm <^ O w w z O cZ7 N ¢ ��: :w:M �\ ���` W� 3 Q ZO ¢O min o o m w in z a z rt :�:^ �O �z O� wOZ r¢ 0 0 o ¢ o :w• 4� z moo v o o o a w J > z o ����• p p s o ¢ o Q co w H U 0_ 0 U > � > L� 3 ¢ o H � VI -a: z m 3 a s O d Q U Z m � Of a o = M (n H w M m O O N U m N 80 O N O Z Z ¢ r v II ab .zl .ot O zONrU<��nyowm¢ �a ¢ 0, �b.W v w ¢O¢ K v U_¢N a a� y a" Q� l-ozxa 0 a .... ........ .... .. . 00 H 13 N 6. ........ .... ... a o M o � ?.. 1 . ' 0 0 ............. o ... .... .. .... 1S.. . .�is Ho o .. . N 6bl — w O N Z U> O Z w U m U z K p�K U� �VI K O O J > w OOOO V r Z U wNw z ¢ �h U'K V ��✓✓ Z a a �z ¢ O N ro ®O® a ^ Z N a O O O r O O OO® > m ¢ m r a o ? b N in M m 1 1 op .zl OOO a npz ¢ N a O OZOZ/91/Z .ao Pallold raoesua\•��a!•�e •! ra eoi\•�«vs.a!e cez\!�^!e ezW i••a az\ao\ee\«s\•��No,��s s!!e ya:a!.:n wxz:z tzaz W-m<wa S1N3W3AOadVll NOli33Sa31N1 OOOMSSVB ONV H3V38 z w (n O U Y N U Ld<bj \ � o m w a x w �ti`"}p• :� o• ,,I� o p� Ups a o r Oz ¢ w �"o. :}:Q W:aj yrc QW mo o dw Umo- zN �n O W w Z O cZ7 N ¢ ���: :w:M \ ° {V _ 3 Q Z O Q O �^ O J Of MOC o m w in z a z r: ^ �z _ wOz ¢ wD 25 o z U IUD z vI N Y ##•; ••Q� w- 4W _�o �J F V) p fn o o oIn a w ~ > > z o �\\\\���• rc rc wo ¢ O Q N w w H U d c7 U > o > 3 a F O m w �mw r a Q N Z UTO! Of o , a o = M (n H w M m O O N O II z N r < ~o a a aos�W� z� 6 � �nrowm¢ oa U N d Q p Z O U a3a O K N ¢O N r O K ¢ K �'0, �b'N'nm v c0 rp c� pUz¢��a oNn l4 l9- VI w > Ca �. l4 WO¢Jp ZO,r mm0 s¢ -\1 0 fr�N 0 LJ [Q44� I ..... .... ..m O O ....... .... .. o 0 ........ .... ... a � M ? ..... a o O HOVIOV39 N 1S HO .. ��1S HO ...O .. ... ... o........... . 0 0 � � 0 �� •JNLL51X3 N f V � ,6b1 IOlz z o> rc ¢ J ¢O Z K NNW ¢w w m Ln Ln Wwo� z Z N O d N o as Z V1 r p M r u < m m a c o O 0 o � � OO® > ri F- m m F a O n Ol ,ll _ m OOO a z 6 L' a 0 n v ../91/Z .ua Psllald raoesus\•��a!•Ie •! ra eoi\•I«vs•o!e cez\!I^!e ezW I••a az\aa\ee\IIs\•hNa,a��s<!!a ya:a!.,n -x Z tzaz V-m<Ioa S1N3W3AOadWl NOli33Sa31N1 OOOMSSVB ONV H3V38 z w n O c U ` Y o w O OZ �~ N ' w \ U1 0 0 # i•b3 0 a >� '•Y NAM -_ m of ao ow> a r QWz �zz ¢ wmQd � ' o Q¢ - z a z z Q ZO amp � an z oz o 3 ¢ N �s''•. :�: o QZ ':a O ¢ cn=cnr as .. o o o a w J > z o ��\\���• p p o- Q N U U w w H o_ 0 0 > o > 1 3 a � of dd �mw r 3 Q n n O 0- Z C z m _` o , a o = M (n H w M m OONU m zz, � wzO�N�Q mM m� OOJ p� II zN-csi<F ~o a a RES z� 6�� �nrowmQ oa p Li Nd w ~aUNU�K Q(Y� ozQd<Or o2n �)a cfl cfl in0 MM < 9 6 wma iaaoo�, �mz tI" 11 zm =��uou N0a � pia w .a£l DOS 0 a .. O O O O O � ? ....... � O l4 0 r�iU � 3z> •.. •� ' 0 .............. .......• l4 • • 0 ~ N O...• ......• z o &o� O O O A A A o oZ�� —> 1S HO ..�1sH 3 _ Uowa .... .. �... o - -- V M N ,6b1 z z 0o w o Zz J w . UK OOO® > z zw m0 ZK Uw F-N a < 0� w o n3 nr n Ln N N z 6 m rn a z� z - o N U ®O® N z U H ¢ c a � o N J m , OO® > N z O w � a O OO �aa OZOZ/91/Z .uo Pallold .P a15 drv3l 0oZ0U9\.wa anu �! ra eoi\•�«vs�o!e cez\!�^!e ezW i••a az\ao\ee\«s\•��Na,a��s<!!a ya:a!+:n wa9Z:Z'LZOZ <1oa S1N3W3AOadWl NOli33Sa31N1 OOOMSSVB ONV H3V38 z w cn O U Y o w O OZ �~ 3 w o o .Qom' •.�ti 1 to to _ F m <o J> ¢ R o m w a x w �ti�}• '_•� •O' 11� o 4 _ _ = d Opp �D[ a o rIm a ¢ w jo. '}.Q w.<I �p Q'W o a- UmO- zm <\ O W w Z O cz7 N ¢ 11�: :w:M \ Wz - 3 ¢ ZO QO min o m w n z a z Ir6; :�:^ �o �� oo LLJ r¢ moo z o = 3 ¢ U ni IIS'•.. :�7 o QZ ':a O ¢ =�'r ¢a .. vzi m Z o= o z¢ _ � �l�#•' :•P w- 4W -"` o ¢ �¢ cnw o J o 0 0 o a w J > z o ��\\���• E p p :� � o� G ¢N w � w H U d U U > o > 3 a Of d d z ch 3 Q n n U COZ U Z m _` o , a o x M m x H w M OONO m Zpr � a Q w H ¢M VlL JrO W m¢ �� Q � K����� VIM U Nd Qp V !n U KKEw�_Q wH L-S N� �a¢N3;4 r00o r7 .m a zm �Nn� cp cp w �?¢N�ar ainM ca 9 6 9 6 w�<ozOr Imo 2¢¢ p w <nH Hx VI¢UOU H VI¢ a a� 1\ � , M f o o m O 0 o M 0 3z� o V m �oN o �1\ z U r �/ N O U��VI •• o o ooWo 1SHO . 15 H'J U.w d .... .... N Z-OZO ,6b1 z z Oo w o r¢ J ZO wUK OOO® > z ¢ mQ VOZIN Fn 3 N - a =o n z w z Ln N N F a z NI O N U a ®O® a N z o0 ¢ O a � m , o > N J g OO® a N Z O � a O OZOZ/91 Z .uo Pal4old IS drv3l 00Z0U9\.wa anu �! ra eoi\•I«vs�a!e cez\!I^!e ezW I••a aZ\a\ee\Ils\-lMo\�s-!!e ya:a!+-n wa9Z:Z'IZOZ <laa S1N3W3AOadWl NOli33Sa31N1 OOOMSSVB ONV H3V38 Z w cn U U Y o w O OZ 11~ N '�1��T\\ Z z O r of w L\ � o U # i••b3 0 a 0 3 r o o "y: �: '•Y NAM -_ m ao ofw> a o m w a 2 w ��`}p 00 o I� o �W = a p� �p� a r CA z ¢ w jo: '} Q w:<I �p QW o dw Um� zv n o w m '�' vp-i z w a z ,IM r �oWz 3 ¢ z0 wl0z >LD a o z o 3 ¢ U nl �1`r''• '�7 o Qz ':a O ¢ =�'r ¢ .. v�i m z '�' o= o Z¢ _ o `i' 1��#•' .•Q D w- 4W -�` o ¢ �Q ru)LL, p o o o a w J > z o ��\\���• p p Q N w w U o_ U U V) > OO o- O m W 3 Q n n U N Z C z m o , x H w M Q Z w- Or� M N O O N O "V11 mZUr � zU5 NrU¢< ~o oos�w� ¢"' nrowm¢ �a U Nd Qp L-S MO �a QN3Q r�o �?¢d�aY pNM wO��ZOr �m0 ¢ O 2¢¢ .a£l OO s ea l► a �[i Q a 0 G� o � o M 9 0 1RA • o HOtl39 N 1S HT 1SHJ 3 c .... .... ... Q N V M U O K > ,6p l 3 V¢ Z Z W O p 3Z5;W 7 ¢ wU O V Z O O> ZwUw mZ r� p�CC U� xN �O - U In Ln N N o M r w N� K ZW O Z a 00 a p o m 0 c O O Z - m a � � a � z v o OZOZ/91/Z .uo Pal101d •P OIS drv3l OOZ0U9\.��anu •! ra eoi\•�«vs•o!e cez\!�^!e ezW i••a az\ao\ee\«s\•��No,��s s!!e +,a wa-Z-LZOZ W-m<�00 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative Project Name: Beach Street& Basswood Blvd RFI #: 8 Project No. (CPN): C101582 Date Submitted: 6-23-21 Contractor: McClendon Construction Co., Inc. Response Needed by (NLT): TBD City Project Manager: Iskal Shrestha, PE Design Engineer: Pape-Dawson Engineers, Inc. RFI Title (Short Description): Oncor Traffic Control Attachments Image ❑ Document ❑ RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. N/A Drawing Sheet No. Drawing Detail Title: Other: N/A RFI Question or Clarification Needed: (Describe the issue and clearly state the question. Provide field data related to the issue, including street location, distance measurements and pictures if applicable.) 1. The project requires relocating of the Oncor transformer from the existing pole to the new pole. Relocating the Oncor transformer is not in our scope of work. The existing traffic signal cabinet does not have a BBU to run the signal while power is disconnected. When relocating the Oncor transformer, the existing traffic signal equipment will be out of the power source. How do you want to control the traffic flow while Oncor is relocating the transformer? Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his knowledge of the project and existing conditions to assist with accelerating the response) The intersection has two (2) major arterial roadways. The use of 4 way stop signs for a prolonged period is not advisable. We recommend using Off Duty Police Officer to control traffic flow at this intersection while Oncor performs work. Does the Contractors Recommended Solution require a Change Order? : Yes ® No ❑ Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): Final charge will be based on actual amount of time officers are onsite, with a 4-hour minimum charge. Oncor Estimated the power will be disconnected for 4-6 hours. Is This RFI Stopping ALL work on the project? Yes ❑ No If yes, why was this issue not foreseen and sufficient response time provided? 1 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative RFI Response: Does Response Require Change Order Proposal : Yes ❑ No ❑ Contractor's Response: Change Proposal (if Applicable): Construction Allowance to be used Work Item Description Unit Quantity Unit Price Total Traffic Control with Off Hour 6 $500.00 $3,000.00 Duty Police Officer Total Proposal Amount: $3,000.00 Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: 2 rdPAPE-DAWSON Request for Information ENGINEERS Response Form Project Name: Beach Street& Basswood Blvd RFI M 8 Version M 1 Project No.: 101582 Response Needed by(NLT): 6/28/2021 City Project Manager: Iskal Shrestha, PE Response Date: 6/28/2021 Design Firm: Pape-Dawson Engineers, Inc. Response Author: Peter Hsu, P.E. RFI Title: Oncor Traffic Control Attachments Image ❑ Document ❑ RFI Response: We have reviewed RFI #8 and is in agreement that using Off Duty Police Officer to direct traffic is appropriate when Oncor disconnects power to the existing controller cabinet to relocate the transformer from existing pole to new pole Does Response Require Change Order Proposal: Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Spec Section # Work Item Description Unit Quantity Unit Price Total Traffic Control with Off Duty Police Officer Hour 6 $500.00 $3,000.00 Total Proposal Amount: $3,000.00 Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: