HomeMy WebLinkAboutContract 54533-CO2 CSC No.54533-CO2
FORT WORTH City of Fort Worth
Change Order Request
Project Name: mergency esponse- an ary ewer an Water am Replacementon Streetfrom Union Pacific Railroad c Bonnie City Sec No.: 54533
Brae Avenue
Project No.(s): N/A DOE No. N/A CityProj.No.:l 102735
Project Description:
Emergency Sanitary Sewer and Water Main Replacement on NE 28th Street from Union Pacific Railroad ROW to Bonnie
Brae Avenue
Contractor: William J.Schultz,Inc.,dba circle C construction Co. Change Order# Date: 7/8/2021
City Project Mgr.1 Leon Wilson City Inspector: I Paul Gieger
Phone Number: 817-392-2387 Phone Number: 817-223-2258
Dept. Water Unit 1 Sewer Unit 2 Totals Contract Time
(Calender days)
Original Contract Amount $1,100,000.00 $610,000.00 $1,710,000.00
Extras to Date $895,375.00 $144,618.00 $1,039,993.00
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,995,375.00 $754,618.00 $2,749,993.00
Amount of Proposed Change Order -$24.30 $94,000.00 $93,975.70
Revised Contract Amount $1,995,350.70 $848,618.00 $2,843,968.70
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 66.31%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,137,500.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
This Change Order No.2 authorized by the attached memorandum on July 1,2021 which supplements the September 21,2020 emergency
memorandum-resulting in City Secretary Contract No.54533 with William J.Schultz, Inc.,dba Circle C Construction Co,for emergency
services to replace sanitary sewer and water main on NE 28th Street from Union Pacific Railroad right-of-way to Bonnie Brae Avenue. This
change order will provide additional sewer funding for increased work scope as described in the supplement memorandum no.2 dated July
1,2021.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
William J.Schultz,Inc.,dba circle C construction co. Teri Skelly 718'2�D21
InApector Date Project Manager Date
1 u3 e`v 0-1.-`,j.)v —J- $- 2
Director Water Dept Date Const ction Supervisor Water Dept Date
Jut 9,2021 — 7 — 2/
Assistant City Attorney Date Assistant City Manager Date
u 119,2021 —8—JAd u 121 2021
Council Action(If Required) OFFICIAL RECORD
M&C Number N/A M&C Date Approved
CITY SECRETARY
FT. WORTH, TX
FO RT WO n2 F H City of Fort Worth
Change Order Additions
Project Name Emergency Response-Sanitary Sewer and Water Main Replacement on NE 28th Street from City Sec No.: 54533
Project No.(s): N/A I DOE No. N/A City Proj.No.: 102735
Project Emergency Sanitary Sewer and Water Main Replacement on NE 28th Street from Union Pacific Railroad ROW to
Description Bonnie Brae Avenue
Contractor William J. Schultz, Inc.,dba Circle C Construction Co. Change Order:=2 Date: 7/8/2021
City Project Mgr. Leon Wilson City Inspector Paul Gieger
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
3 Additional Water Scope for CO2 Water Unit 1 1.00 LS -$24.30 -$24.30
(HMAC Pavement Repair,Milling,and Traffic Control at$140,575.70)
(Less$140,600 of 12"Water Pipe CSS Backfill Not Utilized)
($140,600-$140,575.70=-$24.30)
3 Additional Sewer Scope for CO2(Various Overruns) Sewer Unit 2 1.00 LS $94,000.00 $94,000.00
Water Unit 1 ($24.30)
Sewer Unit 2 $94,000.00
Page i of 1 Additions Sub Total $93,975.70
FORT WORTH City of Fort Worth
Change Order Deletions
City Sec No.:Project Name 54533
Project No.(s): N/A I DOE No. N/A City Proj. No.: 102735
Project Description Emergency Sanitary Sewer and Water Main Replacement on NE 28th Street from Union Pacific Railroad ROW to
Bonnie Brae Avenue
Contractor William J. Schultz, Inc.,dba Circle C Construction Co. Change Order: EE Date 7/8/2021
City Project Mgr. Leon Wilson City Inspector: Paul Gieger
DELETIONS
ITEM DESCRIPTION DEPT CIty Unit Unit Cost Total
Water Unit 1
Sewer Unit 2
Page 1 of 1 IDeletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 1 of 1
I
I
I
- I
Contract Compliance Manager
By signing Z aclwowledge that S am the person responsible
i
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
p
I
Signature
i
Leon Wilson, Jr.
i
Nance of Employee
Project Manager
I
Title
a �
C o 000, A
,0000 �
ATTEST: 0�° °P.
000
g Z d
Ro na Id P.Gonzales(J u 121,2 11:400 O
00000 add j
0000°° .O
Ronald Gonzales ��4.Q r 0000 o
Acting City Secretary
I
I
I
I
I
i
i
OFFICIAL RECORD
CITY SECRETARY
I
FT. WORTH, TX 1
I
I
INTEROFFICE E MEM]0
Date: July 1,2021
To: Dana Burghdoff,Assistant City Manager
From: Chris Harder,P.E.,Water Director
Via: Doug Black,Senior Assistant City Attorney
Cynthia Garcia,Assistant Director,Purchasing
Subject: SUPPLEMENT NO.2 TO 9/21/2020 MEMORANDUM/CITY SECRETARY CONTRACT
NO.54533
This memo is submitted to request authorization for additional funding for emergency services outlined below,at an
increased construction cost of approximately:$94,000.00(Sewer:$94,000.00):
On September 4,2020,Water Field Operations responded to a sanitary sewer overflow(SSO)on sewer lateral L-3021
located on NE 28"'Street west of Bonnie Brae Avenue. Follow up investigation revealed that a TXDOT contractor,
while adjusting a sanitary sewer manhole at the NE 2811 Street/Williams Place intersection prior to repaving NE 281
Street,had inadvertently pour concrete into the manhole,which flowed in L-3021. The concrete traversed through L-
3021 and into other connecting sewer laterals, thereby significantly reducing their capacity, causing the overflow.
Under the September 21,2020 Emergency Authorization Memorandum(copy attached),William J.Schultz,Inc.,dba
Circle C Construction Company("Circle C") was engaged for the replacement of the sanitary sewer mains ( CSC
54533)with emergency engineering/design performed by Kimley-Horn and Associates, Inc., ("ICHA")under CSC
54532. To facilitate the repairs certain water lines were also required to be relocated.
The emergency work was estimated to be$1,922,475.00: Construction:$1,710,000.00(Water:$1,100,000.00;Sewer:
$610,000.00);Engineering:$212,475.00(Water:$148,728.00;Sewer:$63,747.00).
On March 23, 2021, Supplement No. 1 was approved for increased water and sewer quantities: Construction:
$1,039,993.00(Water:895,375.00;Sewer:$144,618.00).
As construction approaches completion, it has been determined that additional quantities necessitating Supplement
No.2 with a cost increase in the amount of$94,000.00 are necessary for the sewer work.
A confirming M&C will be circulated to ratify the above contracts after the work has been fully performed.
f
APPROVED FOR EMERGENCY PROCUREMENT:
ChnLogv� 6gtaIg
Christopher H rder(lull,202117:11 CUT)
Recommended:
rder,P.E.,Director,Water Department C�
Approved as to form and Legality: UOhck(2u12,2021 11M C01)
D uglas W.Black,Sr.Assistant City Attorney
Approve:
Cynthia Garcia,Assistant Director,Purchasing
Chris karder(forl
cM,Hr�p«l(rd:,wa 11m Coll
Approve:
Dana Burghdoff,Assistant City Manager