Loading...
HomeMy WebLinkAboutContract 48098-CO4 CSC No.48098-CO4 FORT WORTH City of Fort Worth Change Order Request Project Name: Big Fossil Creek Parallel S.S.M-402A,Ph t&Haltom Clty Meter Slallon&Sewer Oulfali,Ph 3 City Sec No.; 1 48098 Project No.(s): 56006.700130-5740010,59607-0700430-5740010 DOE No, N/A Clly Proj.No.: 01303 Project Description: Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall,Phase 3 Contractor: Oscar Renda Contracting,Inc. Change Order# ® Dale: 7/8/2021 City Project Mgr.1 Walter Norwood City Inspector: I Jesse Reed Phone Number: 817-392-5026 Phone Number: 817-392-8362 i Dept. Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Totals Contract Time (Calender days Original Contract Amount $6,217,747.00 $263,408.00 $1,492,666.00 $7,973,721.00 330 Extras to Date $37,363.50 $492,349.20 $529,712.70 530 Credits to Date $19,626.25 $19,626.25 Pending Change Orders(in M&C Process) Contract Cost to Date $6,235,484.25 $263,408.00 $1,984,915.20 $8,483,807.45 860 Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 673 Revised Contract Amount $6,235,484.25 $263,408.00 $1,984,915.20 $8,483,807.45 1,533 Original Funds Available for Change Orders $398,700.00 $0.00 $0.00 $398,700.00 Remaining Funds Available for this CO $380,962.75 $380,962.75 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.40% I MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $9,967,151.25 4WSi iIFICATION(REASONS)FOR CHANGE ORDER The change order will provide an additional 673 days on the project for the time it took to conduct repairs to project junction structures to allow for coating of the roof and walls. Due to the size of the structures, heavy equipment had to be mobilized to the job site to remove the top of the vaults to allow for access. Due to the location of the project site in the floodplain,the contractor had to wait several months for the site to dry to conduct the-repairs. In addition by-pass pumping was necessary at each of the junction structure locations in order to conduct the repairs. I L-- It Is understood'and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both lime and money)for all costs arising out of,or incidental to,the above Change Order. ; oritractor's:C _parry Name . �Contractor Name '' Oscar Renda Contracling,Inc. Rudy V Renda1 1 —7117 12T Date_ act Manage r Emmirector Dept) Daley Construction Sypervisor WaterDept Date JuI 19,2021 Assistant City Attorney Date Assistant City Manager J Date Maim pma J u 126,2021 J........... _...._..__...-- -- CouncilAclion If Required) OFFICIAL RECORD M&C Number NIA M&C Date Approved CITY SECRETARY FT. WORTH, TX ` ' 'ate' Wo Pz-F m City of Fort Worth Change Order Additions Project Name Big Fossil Creek Parallel S.S.MA02A,Ph 1&Haltom City Meter Station&Sevier Outfall,Ph 3 City Sec No.: 48098 Project No.(s): 56006-700130-5740010,59607-0700430-5740010 DOE No. N/A City Proi.No.: 01303 Project Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall, Description Phase 3 Contractor Oscar Renda Contracting,Inc. Change Order:® Date: 7/8/2021 City Project Mgr. Walter Norwood City Inspector Jesse Reed ADDITIONS —TrEw DESCRIPTION DEPT Qty ' Unit Unit Cost Total i I I I i k i i i E I, i t i 3 i Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Page 2 of 4 Additions Sub Total l City of Fort Worth Change. Order Deletions Project Name 13[,FmllCreekNraCelS.S.11407APhIdHall Qm flelerSlaoon&SevierWWI,Ph3 city Sec No,: 1 48098 Project No.(s): 56006-700130-5740010,59607-0700430-5740010 DOE No, N/A City Proj.No.: 01303 Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall, Project Description Phase 3 Contractor Oscar Renda Contracting,Inc, — Change Order: ® Dale 7/8/2021 City Project Mgr. Walter Norwood City Inspector: [ Jesse Reed DELETIONS I fN DESCRIPTION DE►�T Qty Unit Unit Cost I T otal I l i Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Page 3 of 4 IDeletions Sub Total I MNVBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT i i Total $0.00 i k' I? 1 i f Page 4 of 4 3 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. , i Signature Name of Bmployee Title i >Z a dA� on 0 4 ATTEST: ��o°oo �o oo0 o� d Ronald P. z9 Gon /es {{{ 0 R-1d P.G.-I,,(Al2l mu os sa CDT) .0 0040, O O 00 o 0 00 Ronald Gonzales �� *o 04 �d Acting City Secretary �� 000000���a ; EXA a ' F OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX s I