HomeMy WebLinkAboutContract 48098-CO4 CSC No.48098-CO4
FORT WORTH City of Fort Worth
Change Order Request
Project Name: Big Fossil Creek Parallel S.S.M-402A,Ph t&Haltom Clty Meter Slallon&Sewer Oulfali,Ph 3 City Sec No.; 1 48098
Project No.(s): 56006.700130-5740010,59607-0700430-5740010 DOE No, N/A Clly Proj.No.: 01303
Project Description: Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall,Phase 3
Contractor: Oscar Renda Contracting,Inc. Change Order# ® Dale: 7/8/2021
City Project Mgr.1 Walter Norwood City Inspector: I Jesse Reed
Phone Number: 817-392-5026 Phone Number: 817-392-8362
i
Dept. Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Totals Contract Time
(Calender days
Original Contract Amount $6,217,747.00 $263,408.00 $1,492,666.00 $7,973,721.00 330
Extras to Date $37,363.50 $492,349.20 $529,712.70 530
Credits to Date $19,626.25 $19,626.25
Pending Change Orders(in M&C Process)
Contract Cost to Date $6,235,484.25 $263,408.00 $1,984,915.20 $8,483,807.45 860
Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 673
Revised Contract Amount $6,235,484.25 $263,408.00 $1,984,915.20 $8,483,807.45 1,533
Original Funds Available for Change Orders $398,700.00 $0.00 $0.00 $398,700.00
Remaining Funds Available for this CO $380,962.75 $380,962.75
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.40% I
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $9,967,151.25
4WSi iIFICATION(REASONS)FOR CHANGE ORDER
The change order will provide an additional 673 days on the project for the time it took to conduct repairs to
project junction structures to allow for coating of the roof and walls. Due to the size of the structures, heavy
equipment had to be mobilized to the job site to remove the top of the vaults to allow for access. Due to the
location of the project site in the floodplain,the contractor had to wait several months for the site to dry to
conduct the-repairs. In addition by-pass pumping was necessary at each of the junction structure locations in
order to conduct the repairs.
I
L--
It Is understood'and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both lime and money)for all costs arising out of,or incidental to,the above Change Order.
; oritractor's:C _parry Name . �Contractor Name ''
Oscar Renda Contracling,Inc. Rudy V Renda1 1 —7117 12T
Date_ act Manage r
Emmirector Dept) Daley Construction Sypervisor WaterDept Date
JuI 19,2021
Assistant City Attorney Date Assistant City Manager J Date
Maim pma J u 126,2021
J...........
_...._..__...-- --
CouncilAclion If Required) OFFICIAL RECORD
M&C Number NIA M&C Date Approved
CITY SECRETARY
FT. WORTH, TX
` ' 'ate' Wo Pz-F m City of Fort Worth
Change Order Additions
Project Name Big Fossil Creek Parallel S.S.MA02A,Ph 1&Haltom City Meter Station&Sevier Outfall,Ph 3 City Sec No.: 48098
Project No.(s): 56006-700130-5740010,59607-0700430-5740010 DOE No. N/A City Proi.No.: 01303
Project Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall,
Description Phase 3
Contractor Oscar Renda Contracting,Inc. Change Order:® Date: 7/8/2021
City Project Mgr. Walter Norwood City Inspector Jesse Reed
ADDITIONS
—TrEw DESCRIPTION DEPT Qty ' Unit Unit Cost Total
i
I
I
I
i
k
i
i
i
E
I,
i
t
i
3
i
Sewer Unit 1
Sewer Unit 2
Sewer Unit 3
Page 2 of 4 Additions Sub Total
l
City of Fort Worth
Change. Order Deletions
Project Name 13[,FmllCreekNraCelS.S.11407APhIdHall Qm flelerSlaoon&SevierWWI,Ph3 city Sec No,: 1 48098
Project No.(s): 56006-700130-5740010,59607-0700430-5740010 DOE No, N/A City Proj.No.: 01303
Big Fossil Parallel Relief Sanitary Sewer,Phase I,Haltom City Meter Station,Phase 3,Haltom City Sewer Outfall,
Project Description Phase 3
Contractor Oscar Renda Contracting,Inc, — Change Order: ® Dale 7/8/2021
City Project Mgr. Walter Norwood City Inspector: [ Jesse Reed
DELETIONS
I fN DESCRIPTION DE►�T Qty Unit Unit Cost I T otal
I
l
i
Sewer Unit 1
Sewer Unit 2
Sewer Unit 3
Page 3 of 4 IDeletions Sub Total
I
MNVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
i
i
Total $0.00
i
k'
I?
1
i
f
Page 4 of 4
3
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements. ,
i
Signature
Name of Bmployee
Title
i
>Z a
dA� on
0 4
ATTEST: ��o°oo �o oo0
o� d
Ronald P. z9 Gon /es {{{ 0 R-1d P.G.-I,,(Al2l mu os sa CDT) .0 0040,
O O
00 o 0
00
Ronald Gonzales �� *o 04 �d
Acting City Secretary �� 000000���a
;
EXA a
' F
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
s
I