HomeMy WebLinkAboutContract 55342-CO1 CSC No.55342-COI
FORT WORTH City of Fort Worth
Change Order Request
Project Name:1 Emergency-Pavement Repairs of Multiple Water Main Breaks City Sec No.: 55342
Project No.(s): N/A M&C: N/A City Proj.No.: N/A
Project Description: Emergency-Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze
Contractor: Texas Materials Group, Inc.dba Texas Bit Change Order# Date: 6/30/2021
City Project Mgr. J.Chris Underwood City Inspector: I David Johnson
Phone Number: 817-392-2629 Phone Number: 817-392-8455
Dept. Water Totals Contract Time
(Calender days)
Original Contract Amount $750,000.00 $750,000.00
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $750,000.00 $750,000.00
Amount of Proposed Change Order $70,000.00 $70,000.00
Revised Contract Amount $820,000.00 $820,000.00
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(if necessary) $70,000.00 $70,000.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 9.33%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591.) 1$937,500.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
Change Order No. 1,authorized by the attached June 30, 2021 memorandum, provides additional funding in the amount of$70,000.00 as
supplement to the February 23,2021 memorandum which authorized City Secretary No.55342 with Texas Materials Group, Inc.dba Texas
Bit in the amount of$750,000.00 for pavement repairs for multiple water main breaks for the February 2021 deep freeze event. Based upon
the pavement repairs conducted,funding in the amount of$70,000.00 is necessary to compensate Texas Materials Group, Inc.dba Texas Bit
for additional work performed.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
Contractor's Company Name Contractor Name Contractor Signature Date
Tager+ Ildll IAA!'(;1.111j�, . I iln•i fill inl I -- — -- I 1 t l .fit I.�
Date Project Manager Date
Director(Water Dept) Date onstruction Supervisor(Water Dept) Date
hrisYopher�iarder ' . Jul 19,2021
r:=
Assistant City Attorney - Date Assistant City Manager Date
g� Pu126,2021 a�a8u Ju126 2021
zsz�, 3aon ,
Council Action(If Required) OFFICIAL RECORD
M&C Number N/A M&C Date Approved N/A CITY SECRETARY
FT.WORTH,TX
FORT VVO Rrr H City of Fort Worth
Change Order Request
Project Name: Emergency-Pavement Repairs of Multiple Water Main Breaks City Sec No.: 55342
Project No.(s): N/A M&C: N/A City Proj.No.: N/A
Project Description: Emergency-Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze
Contractor: Texas Materials Group, Inc.dba Texas Bit Change Order# u Date: 6/30/2021
City Project Mgr. J.Chris Underwood City Inspector: I David Johnson
Phone Number: 817-392-2629 Phone Number: 817-392-8455
Dept. Water Totals Contract Time
(Calender days)
Original Contract Amount $750,000.00 $750,000.00
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $750,000.00 $750,000.00
Amount of Proposed Change Order $70,000.00 $70,000.00
Revised Contract Amount $820,000.00 $820,000.00
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(if necessary) $70,000.00 $70,000.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 9.33%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1$937,500.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
Change Order No. 1, authorized by the attached June 30, 2021 memorandum, provides additional funding in the amount of$70,000,00 as
supplement to the February 23, 2021 memorandum which authorized City Secretary No. 55342 with Texas Materials Group, Inc.dba Texas
Bit in the amount of$750,000,00 for pavement repairs for multiple water main breaks for the February 2021 deep freeze event. Based upon
the pavement repairs conducted,funding in the amount of$70,000.00 is necessary to compensate Texas Materials Group, Inc.dba Texas Bit
for additional work performed.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date u
Inspector Date Project Manager Date
Director(Water Dept) Date Construction Supervisor(Water Dept) Date
Assistant City Attorney Date Assistant City Manager Date
Council Action (If Required)
M&C Number N/A M&C Date Approved N/A
FCC RT WO RT H City of Fort Worth
Change Order Additions
Project Name Emergency-Pavement Repairs of Multiple Water Main Breaks City Sec No,: 55342
Project No.(s): N/A = DOE No.[:N= City Proj, No.: N/A
Project Emergency-Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze
Description
Contractor Texas Materials Group, Inc. dba Texas Bit Change Order:= Date: 6/30/2021
City Project Mgr, J.Chris Underwood City Inspector David Johnson
ADDITIONS
DEPT Qty Unit Unit Cost Total
2 Additional Work Performed Water 1.00 LS $70,000.00 $70,000.00
Water $70,000.00
Page 2 of 4 Additions Sub Total $70,000.00
FORT W"wrm City of Fort Worth
Change Order Deletions
Project Name Emergency-Pavement Repairs of Multiple Water Main Breaks City Sec No.: 55342
Project No.(s): N/A DOE No. N/A City Proj. No.: N/A
Project Description Emergency-Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze
Contractor Texas Materials Group, Inc.dba Texas Bit Change Order: M Date 6/30/2021
City Project Mgr. J.Chris Underwood City Inspector: David Johnson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Page 3 of 4 Deletions Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $000
Page 4 of 4
INTEROFFICE MEMO
Date: July 1,2021
To: Dana Bmghdoff,Assistant City Manager
From: Chris Harder,P.E.,Water Director
Via: Doug Black,Senior Assistant City Attorney
Cynthia Garcia,Assistant Director,Purchasing
Subject: SUPPLEMENT NO.2 TO 9/21/2020 MEMORANDUM/CITY SECRETARY CONTRACT
NO.54533
This memo is submitted to request authorization for additional funding for emergency services outlined below,at an
increased construction cost of approximately:$94,000.00(Sewer:$94,000.00):
On September 4,2020,Water Field Operations responded to a sanitary sewer overflow(SSO)on sewer lateral L-3021
located on NE 28"'Street west of Bonnie Brae Avenue. Follow up investigation revealed that a TXDOT contractor,
while adjusting a sanitary sewer manhole at the NE 28"Street(Williams Place intersection prior to repaving NE 2811,
Sheet,had inadvertently pour concrete into the manhole,which flowed in L-3021. The concrete traversed through L-
3021 and into other connecting sewer laterals, thereby significantly reducing their capacity, causing the overflow.
Under the September 21,2020 Emergency Authorization Memorandum(copy attached),William J.Schultz,Inc.,dba
Circle C Construction Company("Circle C") was engaged for the replacement of the sanitary sewer mains( CSC
54533)with emergency engineering/design performed by Kimley-Horn and Associates,Inc., ("KHA')under CSC
54532. To facilitate the repairs certain water lines were also required to be relocated.
The emergency work was estimated to be$1,922,475.00: Construction:$1,710,000.00(Water:$1,100,000.00;Sewer:
$610,000.00);Engineering:$212,475.00(Water:$148,728.00;Sewer:$63,747.00).
On March 23, 2021, Supplement No. 1 was approved for increased water and sewer quantities: Construction:
$1,039,993.00(Water:895,375.00;Sewer:$144,618.00).
As construction approaches completion, it has been determined that additional quantities necessitating Supplement
No.2 with a cost increase in the amount of$94,000.00 are necessary for the sewer work.
A confirming M&C will be circulated to ratify the above contracts after the work has been fully performed.
I
APPROVED FOR EMERGENCY PROCUREMENT:
CC l-iL,94 L
ChHmph.,H rtltt)lu11,202117.11 COT)
Recommended:
C"rder,P.E.,Director,Water Department
Approved as to forin and Legality: Ww`(1u13'207i1MCDn
Douglas .Blacly Sr.Assistant City Attorney
Approve:
Cynthia Garcia,Assistant Director,Purchasing
Chris Harder(far)
Approve: o x. blue T.>m1„�mn
Dana Bu ghdoff,Assistant City Manager
Contract Compliance Manager
By signing I acknowledge that I am the person responsible'
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
S ignaturre
Name of Employee
��. �l�e���i��n Its 9 �� •
Title
Al ooi0000000.r�a�
00
d
0
ATTEST: �O'p4 d
Ronald P Gonzales 000
0 o 0 d
Ronald P.Gonzales(Ju127,202109:35CDT) O o
O OOO �d f
00000000 A
Ronald Gonzales ���1Z rEXAsoAp C
Acting City Secretory ��naa4b
)
i
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
E
u
i
L
' 1
E
L
r