Contract No.
FORT WORTH(D Date Received 1u128,2021
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: TAVOLO PARK-HARRIS PARKWAY
City Project No.: 102618
Improvement Type(s): Water ❑x Sewer ❑x
Original Contract Price: $276,687.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $276,687.00
ZZ1.1-Z'5�d�
Les Foster(Jul 22,2021 11:19 CDT) Jul 22,2021
Contractor Date
Vice President
Title
Mario Sinacola&SonsExcavating, Inc.
Company Name
Curtis Hworth(Jul 22,202111:58 CDT) Jul 22,2021
Project Inspector Date
Y�e���•E• J u l 26,2021
YogYog Pate�202115:07 CDT)CDT)
Project Manager Date
Evelyn Roberts on behalf ofTgnie M Jul 27 2021
Evelyn Roberts on behalf of Janie M(Jul 27,202113:26 CDT)
CFA Manager Date
Jul 27
Dana Burghdoff(Jul 27,20 4:39 CDT) ,2021
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY
Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name:TAVOLO PARK-HARRIS PARKWAY
City Project No.: 102618
City's Attachments
Final Pay Estimate 0
Change Order(s): ❑ Yes 0 N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 120 WD Days Charged: 146
Work Start Date: 9/21/2020 Work Complete Date: 6/21/2021
Completed number of Soil Lab Test: 365
Completed number of Water Test: 16
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
PARTIAL PAYMENT REQUEST
Contract Name TAVOLO PARK-HARRIS PARKWAY
Contract Limits
Project Type WATER
City Project Numbers 102618
DOE Number 2618
Estimate Number 1 Payment Number 1 For Period Ending 7/21/2021
Project Funding
W
City Secretary Contract Number Contract Time 90 WD
Contract Date Days Charged to Date 146
Project Manager NA Contract is 100.00 Complete
Contractor MARIO SINACOLA&SONS EXCAVATING
10905 RESEARCH RD
FRISCO, TX 75033
Inspectors OWEN / HOLLINGSWORT
Wednesday,July 21,2021 Page 1 of 4
City Project Numbers 102618 DOE Number 2618
Contract Name TAVOLO PARK-HARRIS PARKWAY Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER For Period Ending 7/21/2021
Project Funding
WATER
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
1 8"WATER PIPE 2543 LF $53.00 W4,779.00 2543 $134,779.00
2 8"GATE VALVE 7 EA $1,350.00 $9,450.00 7 $9,450.00
3 FIRE HYDRANT 5 EA $4,500.00 $22,500.00 5 $22,500.00
4 DUCTILE IRON WATER FITTINGS 1.51 TN $6,000.00 $9,060.00 1.51 $9,060.00
W/RESTRAINT
5 TRENCH SAFETY 2613 LF $5.00 $13,065.00 2613 $13,065.00
6 8"WATERLINE LOWERING 8 EA $8,500.00 $68,000.00 8 $68,000.00
7 CONNECTION TO EXISTING 4"-12"WATER 1 EA $2,750.00 $2,750.00 1 $2,750.00
MAIN
8 AUTOMATIC FLUSHER 1 EA $6,500.00 $6,500.00 1 $6,500.00
9 6"WATER PIPE 70 LF $46.00 $3,220.00 70 $3,220.00
10 6"GATE VALVE 5 EA $950.00 $4,750.00 5 $4,750.00
11 TESTING 2613 LF $1.00 $2,613.00 2613 $2,613.00
Sub-Total of Previous Unit $276,687.00 $276,687.00
Wednesday,July 21,2021 Page 2 of 4
City Project Numbers 102618 DOE Number 2618
Contract Name TAVOLO PARK-HARRIS PARKWAY Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER For Period Ending 7/21/2021
Project Funding
Contract Information Summary
Original Contract Amount $276,687.00
Change Orders
Total Contract Price $276,687.00
Total Cost of Work Completed $276,687.00
Less %Retained $0.00
Net Earned $276,687.00
Earned This Period $276,687.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $276,687.00
Wednesday,July 21,2021 Page 3 of 4
City Project Numbers 102618 DOE Number 2618
Contract Name TAVOLO PARK-HARRIS PARKWAY Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER For Period Ending 7/21/2021
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / HOLLINGSWORT Contract Date
Contractor MARIO SINACOLA&SONS EXCAVATING Contract Time 90 W
10905 RESEARCH RD Days Charged to Date 146 W
FRISCO, TX 75033 Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $276,687.00
Less %Retained $0.00
Net Earned $276,687.00
Earned This Period $276,687.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $276,687.00
Wednesday,July 21,2021 Page 4 of 4
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
June 30, 2021
Mario Sinacola &Sons Excavating, Inc.
10950 Research Road
Frisco,Texas 75033
RE: Acceptance Letter
Project Name:Tavolo Park-Harris Parkway
Project Type: Paving,water, Drainage and Steet Lights
City Project No.: 102618
To Whom It May Concern:
On June 21, 2021 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 29, 2021. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 29, 2021,which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6826.
Sincerely,
Y�re�PateG, P.E.
Yog h Pate,2021 15:07 CDT)
Mitch Holmes P.E., Project Manager
Cc: Curtis Hollingsworth, Inspector
Billy Owen, Inspection Supervisor
Edwin Rodriguez, Senior Inspector
Victor Tornero P.E., Program Manager
Peloton Land Solutions, Consultant
Mario Sinacola &Sons Excavating, Inc, Contractor
Pate Ranch Commercial, LP, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.8/20/19
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: TAVOLO PARK-HARRIS PARKWAY
PROJECT NUMBER: 102618
DOE NUMBER: 6/30/2021
WATER
PIPE LAID SIZE TYPE OF PIPE LF
WATER 8" PVC 2543
WATER 6" PVC 70
FIRE HYDRANTS:5 VALVES(16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES-PASSED
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
0 The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
BILLS PAID AFFIDAVIT FOR CONTRACTOR
State of Texas §
County of Collin §
BEFORE ME, the undersigned authority, on this day personally appeared Les Foster, known to me to be
a credible person and officer of Mario Sinacola&Sons Excavating Inc. and who,being duly sworn, upon
his oath declares and acknowledges as follows:
1. I am a duly authorized agent of Mario Sinacola & Sons Excavating Inc., which has authorized
me to make this affidavit, and all of the recitations herein are true and correct.
2. Pursuant to Public Development Project No. 102618 between City of Fort Worth, and Mario
Sinacola& Sons Excavating Inc. has supplied materials and performed labor in connection with
the construction of improvements on real property owned by City of Fort Worth for Tavolo Park-
Harris Parkway in the City of Ft. Worth. ("the improvements").
3. Mario Sinacola & Sons Excavating, Inc. has actual knowledge that all bills owed by
(Developer/Owner) to Mario Sinacola & Sons Excavating Inc. for materials supplied or labor
performed in connection with the improvements have been fully paid and satisfied.
4. Mario Sinacola& Sons Excavating Inc. has actual knowledge that all bills owed by(Contractor)
to others for materials supplied or labor performed in connection with the improvements have
been fully paid and satisfied.
5. Mario Sinacola& Sons Excavating Inc.has actual knowledge that there are no claims or liens for
materials supplied or labor performed in connection with the Public Development Contract.
6. Mario Sinacola& Sons Excavating, Inc. further warrants that should any claim or lien be filed for
material supplied or labor performed in connection with the Public Development Contract,
(Contractor) will immediately furnish a bond pursuant to Texas Property Code Sections 53.236
through 53.238 for release of each the claim or lien, obtain settlement of any claim or lien, and
furnish the City of Fort Worth written full release. Mario Sinacola & Sons Excavating_Inc.,
agrees to fully indemnify and hold harmless the City of Ft. Worth, from any and all costs that
may occur by reason of such claims or liens.
EXECUTED this 2?of July,2021.
Mario Siyja4aQla& s Excavating,Inc.
By
NA : Les Foster
TITLE: Vice President,Officer
STATE OF TEXAS
COUNTY OF COLLIN
This instrument was acknowledged before me on July 21,2021,by Les Foster,Vice President,Officer of
Mario Sinacola& Sons Excavating,Inc a Michigan corporation, on behalf of said corporation.
IVAN VASQUEZ
f§ %Notary Public,State of Texas Ivan Vasquez,NOTA Y P 1
Comm.Expires 05-12-2025
+� • .
�i���o�++��� Notary ID 128784010
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document G707
Bond Na107276863
PROJECT:
(name, address)Tavola Park-Harris Parkway-Utility and Paving Improvements Project No. 20430
TO (Owner) TX
PATE RANCH LAND,L.P.AND CITY OF FORT ARCHITECT'S PROJECT NO:
WORTH
CONTRACT FOR:
10210 North Central Expressway Tavolo Park-Harris Parkway-Utility and Paving Improvements
Project No.20430
Dallas TX 75231
�I CONTRACT DATE:
CONTRACTOR:MARIO SINACOLA&SONS EXCAVATING, INC.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
1hare insert name and address or Surety Company)
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
One Tower Square
Hartford CT 06183 , SURETY COMPANY
On bond of (here insert name and address of Contractor)
MARIO SINACOLA&SONS EXCAVATING, INC.
10950 Research Road
Frisco TX 75034 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
PATE RANCH LAND, L.P.AND CITY OF FORT WORTH
10210 North Central Expressway
Dallas TX 75231 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this 21st day of July,2021
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Surety Company
Attest,
4101)tl)
r€��
(Seal). Signature of Authorized Representative
So hinie Hunter Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
Travelers Casualty and Surety Company of America
TRAVELERS St.
Casualty and Surety Company
St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and
St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein
collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Sophinie Hunter of
DALLAS . Texas their true and lawful Attorney(s)-in-Fact to sign, execute, seal and
acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of
the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed,this 21st day of April,
2021.
1�1 'IV A4, - -
�� GYVT S
i'iasrroM. :
f
State of Connecticut
By:
City of Hartford ss. Robert L.Rane , emor Vice President
On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior
Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the
purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF,1 hereunto set my hand and official seal. ��4a,pp,,���•.
My Commission expires the 30th day of June,2026
PUS If: 1
< f Anna P.NGwik,Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of
the Companies,which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President,any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint
Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizanees, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may
remove any such appointee and revoke the power given him or her;and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or
any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED, that the signature of each of the following officers- President, any Executive Vice President, any Senior Vice President,
any Vice President, any Assistant Vice President,any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to Attorneys-in-
any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneyle 0 Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of
Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed
and certified by such facsimile signature and facsimile seal shall be valid and binding nn the Company in the future anywith respect to any bond or
understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a
true and correct copy of the Power of Attorney executed by said Companies,which remains in full force and effect.
Dated this 21st.w�-'day of July 2021
G�
Kevin E. Hughes,Assi tant Secretary
To verify the authenticity of this Power of Attorney,please call us at 1-800-421 3880.
Please refer to-the above-named Attorneys)-in-Fact and the details of the bond to which this PowerofAttorney is attached.
IMPORTANT NOTICE
TO OBTAIN INFORMATION OR MAKE A COMPLAINT:
You may contact Travelers Casualty and Surety Company of America , for information or
to make a complaint at:
Travelers Bond
Attn: Claims
One Tower Square, S102A
Hartford,CT 06183
1-800-328-2189
You may contact the Texas Department of Insurance to obtain the information on
companies, coverages, rights or complaints at:
Texas Department of Insurance
P.O. Box 149104
Austin, TX 78714-9104
(800)252-3439
ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and
does not become a part or a condition of the attached document and is given to comply
with Section 2253-021, Government Code, and Section 53.202, Property Code, effective
September 1, 2001.