Loading...
HomeMy WebLinkAboutContract 54453-PM1CSC No. 54453-PM1 I _ �I�T +�RTH« � �� � � � Cit of FortWorth Y Standard Construction Specification Documents � ^ � � �1 Adopted September 201 1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 00 TABLE OF CONTENTS Division O1 - General Requirements 01 1] 00 Summar of Work O1 25 00 Substitution Procedures O1 31 19 Preconstruction Meetin O1 3l 20 Proiect Meetin�s Ol 32 33 O1 33 00 O1 35 l3 O 1 45 23 01 50 00 O1 55 26 O1 57 ] 3 O1 58 13 O 1 60 00 Ol 66 00 Ol 71 23 Preconstruction Video Submittals Special Project Procedures Testing and Inspection Services Temporary Facilities and Controls Street Use Pennit and Modifications to Traffic Control Storm Water Pollution Prevention Plan Temporary Project Signage Product Requirements Product Storage and Handlin Requirements Construction Siakin� and S Last Revised l 2/20/2012 07/Ol /201 1 08/17/2012 07/O 1 /2011 07/O 1 /20l 1 12/20/2012 12/20/20l 2 03/09/2020 07/0 ] /2011 07/O ] /201 ] 07/O 1 /2Q I 1 07/O 1 /2011 03/09/2020 07/O 1 /2011 02/14/2018 C1TY OF FORT WORTH Pm & Drng Lnprovements ACN— Nor•1h Beach St STANDARD CONSTRUC7�ION SPECIFICATION DOCUMENTS City Project No. 102655 Revised March 9, 2020 Division 00 - General Conditions i.act Rn.�.�p�l 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 O1 74 23 Cleanin 07/O1/20l l Ol 77 19 Closeout Re uirements 07/Ol/20l l 01 78 23 O eration and Maintenance Data l2/20/2012 Ol 78 39 Pro�ect Recard Documents 07/O1/201 I Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn://fortworthtexas.�ov/tpw/contractors/ or I�tt �s:;f� . . s.�'€�r�rjrc����k����a�. cr�-1P��a`�cil��s€ss��-c�sr` Division 02 - Existin Conditions 02 41 l3 Selective Site Demolition 02 4l 14 Utili RemovaUAbandonment 02 4l l5 Pavin� Removal Division 03 - Concrete 03 30 00 Cast-ln-Place Concrete 03 34 13 Controlled Low Stren�th Material 03 80 00 � Modifications to Existing Concrete Structures Division 26 - Electrical 26 OS 00 Common Work Results for Electrical 26 OS 10 Demolition for Electrical S stems 26 OS 33 Racewa s and Boxes for Electrical S stems 26 OS 43 Under round Ducts and Raceways far Electrical Svstems Division 31 - Earthwork 31 10 00 Site Clearin 31 23 16 Unclassified Excavation 31 23 23 Borrow 3l 24 00 Embankments 31 25 00 Erosion and Sediment Control 3 l 3 7 00 � Ri Division 32 - Exterior Im rovements 3-�-8-1.....�..�----- ��rrt���t--I'��rrg-- 32 O1 l8 Tem ora As halt Pavin 32 O] 29 Concrete Pavin Re air 32 l l 23 Flexible Base Courses 32 1 1 29 Lime Treated Base Courses 32 12 16 As halt Pavin 32 12 73 Asphalt Paving Crack Sealants CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9. 2020 Last Revised l 2/20/2012 12/20/2012 02/02/2016 l 2/20/20l 2 I 2/20/20l 2 l 2/20/2012 1 1 /22/2013 l 2/20/2012 l 2/20/20l 2 07/O 1 /201 l 12/20/20l 2 O 1 /28/20l 3 O 1 /28/2013 O l /28/2013 12/20/2012 12/20/2012 12/20/2012 l 2/20/2012 12/20/2012 12/20/2012 12/20/2012 12/20/2012 Pav & Drng hnprovemenls ACN— North Beach SI City Project No. 102655 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 Division 33 - Utilities CITY OF FORT WORTH Pav & Drng Improvements AC;�� - �'orlh Beach St STANDARD CONSTRUCTION SPEC(FICATION DOCUMENTS Ciry ProjectNo. 102655 Revised March 9. 2020 Division 34 - Transportation 34 41 20.O1 I Arterial LED 34 4l 30 Aluminum Si ns 34 41 50 Single-Mode Fiber 34 71 ] 3 Traffic Control Luminaires Cable 06/ 15/2015 11/12/2013 02/26/2016 11 /22/2013 C[TY OF FORT WORTH Pav & D�ng Im�rovenaenls ACN— North Beuch St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. ]02655 Revised March 9, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICA7'ION DOCUMENTS Page 4 of 5 00 00 00 STANDARD CONSTRUCTION SPECIFICA'IION DOCUMENTS Page 5 of 5 Appendix GC-4.01 Availability of Lands GG4.02 Subsurface and Physical Conditions ��:9� GR-01 60 00 Product Requirements END OF SECTION � �1 � r-, ^-, � --, � r---, C1TY OF FORT WORTH Pav & Drng Impr•ovemenls ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. ]02655 Revised March 9. 2020 00 os � o - � MAYOR AND COUNCIL COMMUN[CATION (M&C) Page 1 of 1 ] 2 3 4 5 6 7 8 9 ]0 11 l2 13 14 15 16 17 18 19 20 21 22 23 24 SECTION 00 OS 10 MAYOR AND COUNCIL COMMUNICATION (M&C) �1�.4'�C'Jd7�?�C'7": �`��i' ��OYti7"tt�'It�)C3c`L{}?IC'Ptl t'.i"C'Ct!�l�lt'1, 1`C'ft?�'L"€' i�f4`�7c:Fi,re' fiA7f�Y°��I�Lt`�'[' 1�#'t1�1 if7L t.e'�J�3Y°C)t�E'C� _1�l<� C' �rr il�c� c;rt� �x�•�� r,#'tltc� p� r j;:>t�l. :1?c� C anwer[ .sf,crll ,'�e or� I;lar;� �-u�;er, % END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July l. 201 I Pav & Drng Improvements ACN— North Beaeh S! City Project No. 102655 000s�s-� ADDENDA Page 1 of 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SECTION 00 OS 15 ADDENDA (�1.ssc��a�f�T�.�r°: �'�sr �`�rat�•c��� L�oc�ua�rE3nt c�r�c���r�tti��r, �z3�r������ ihis t�ca�� t�rP�� r�,t�lcrc�t� >��ith c��t�t� c-rr�der�r�s:� is,�arc�ci ciur�ra�� I�ic��7i�zg, j END OF SECTION CIT�' OF FORT WORTH STANDARD CONSTRUC7ION SPECIFICATION DOCUMENTS Revised .luly 1, 20] 1 Pav & Drng hnproven7ents ACN — Norlh Beach St Ciry ProjectNo. ]02655 00 �l2 43 DAP - BID PROPOSAL Page I of S SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application UNIT PRICE BID N BEACH STREET - PAVING & DRAINAGE Project Item Infonnation Bidder's Proposal Bidlistltem Specification Unit of Description Bid Quantity Unit Price Bid Value No. Section No. Measure PAVING IMPROVEMENTS 1 0241.0500 Remove Fence 02 41 13 LF 354 $4.00 $1,416.00 2 9999.0000 Place 7-Strand Barb Wire Fence 00 00 00 LF 2,485 $6.00 $14,910.00 3 9999.0001 Place 16' Swing Gate 00 00 00 EA 1 $2,500.00 $2,500.00 4 0241.1100 Remove Asphalt Pvmt 02 41 15 SY 726 $12.00 $8,712.00 5 9999.0002 Remove Gravel Road 00 00 00 SY 839 $6.00 $5,034.00 6 3123.0101 Unclassified Excavation b Plan Cut Per Plan 31 23 16 CY 68,033 $3.75 $255,123.75 7 3123.0103 Borrow by Plan (Fill Per Plan) 31 23 23 CY 412 $6.00 $2,472.00 8 3125.0101 SWPPP >_ 1 acre 31 25 00 LS 1 $22,500.00 $22,500.00 9 3213.0105 10" Conc Pvmt 32 13 13 SY 3,909 $64.00 $250,176.00 10 3211.0502 8" Lime Treatment (Concrete Pavement) 32 11 29 SY 4,141 $4.00 $16,564.00 11 3211.0400 Hydrated Lime (Concrete Pavement) 32 11 29 TN 89 $185.00 $16,465.00 12 3212.0503 6" Asphalt Base Type B 32 12 16 SY 1,904 $36.00 $68,544.00 13 3211.0502 8" Lime Treatment (Asphalt Pavement) 32 11 29 SY 1,999 $4.00 $7,996.00 14 3211.0400 Hydrated Lime (Asphalt Pavement) 32 11 29 TN 30 $185.00 $5,550.00 15 3292.0400 Sod, Hydromulch, Seeding 32 92 13 SY 29,432 $1.00 $29,432.00 16 3291.0100 Topsoil 329119 CY 614 $18.00 $11,052.00 17 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 2 $500.00 $1,000.00 �$ 3305.0108 Miscellaneous Structure Adjustment 33 05 14 EA 1 (Fire Hydrant) $500.00 $500.00 19 3305.0111 Valve Box Adjustment 33 05 14 EA 4 $500.00 $2,000.00 20 3441.4108 Remove Sign Panel and Post 34 41 30 EA 4 $200.00 $800.00 21 9999.0003 6" CONDT PVC SCH 40 (T) 00 00 00 LF 1,482 $30.00 $44,460.00 22 9999.0004 4" CONDT PVC SCH 40 (T) 00 00 00 LF 1,482 $20.00 $29,640.00 23 9999.0005 2" CONDT PVC SCH 40 (T) 00 00 00 LF 901 $12.00 $10,812.00 24 3471.0001 Traffic Control 34 71 13 MO 3 $2,500.00 $7,500.00 25 9999.0006 Connect to Exist Pavement 00 00 00 EA 1 $1,000.00 $1,000.00 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 PAVING IMPROVEMENTS $816,158.75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFlC4TION DOCUMENTS - DE\'ELOPER.4WARDED PROIECTS Form Version Mac 22 3019 00 -l2 43_Bid Proposal_DAP 0o az as DAP - BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID N BEACH STREET - PAVING & DRAINAGE Bidder's Application Project Item Infonnation Bidder's Proposal Bidlistltem Specification Unitof No. Description Bid Quantity Unit Price Bid Value Secuon No. Measiue STORM DRAIN IMPROVEMENTS 1 3341.0201 21" RCP, Class III 33 41 10 LF 79 $55.00 $4,345.00 2 3341.0205 24" RCP, Class III 33 41 10 LF 476 $60.00 $28,560.00 3 3341.0305 33" RCP, Class III 33 41 10 LF 157 $90.00 $14,130.00 4 3349.5001 10' Curb Inlet 33 49 20 EA 4 $3,400.00 $13,600.00 5 3349.0001 4' Storm Junction Box 33 49 10 EA 2 $5,000.00 $10,000.00 6 3137.0103 Large Stone Riprap, grouted (Drop Structures) 31 37 00 SY 515 $85.00 $43,775.00 7 3137.0104 Medium Stone Riprap, dry 31 37 00 SY 276 $75.00 $20,700.00 8 9999.0007 Sloped Headwall, 33" Opening 00 00 00 EA 1 $4,500.00 $4,500.00 9 9999.0008 Sloped Headwall, 2-24" Opening 00 00 00 EA 2 $5,500.00 $11,000.00 10 3305.0109 Trench Safety 33 05 10 LF 712 $1.00 $712.00 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 STORM DRAIN IMPROVEMENTS $151,322.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATIO�' DOCUMENTS - DEVELOP[R AN'ARDED PROJECTS Fomi Version Ma}-'-'2. 2017 0012 43_Bid Proposal_DAP 00 J2 43 DAP - BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID N BEACH STREET - PAVING & DRAINAGF. Bidder's Application Pr�ject Item Infonnation Bidder's Proposal Bidlistltem Specification Unitof No. Descnp[ion Bid Quantiry Unit Price Bid Value Section No. Measure PAVING MARKINGS & SIGNAGE IMPROVEMENTS 1 3217.0001 4" SLD Pvmt Marking HAS (W) 32 17 23 LF 347 $2.00 $694.00 2 3217.0002 4" SLD Pvmt Marking HAS (Y) 32 17 23 LF 1,287 $2.00 $2,574.00 3 3217.0003 4" BRK Pvmt Marking HAS (W) 32 17 23 LF 71 $2.00 $142.00 4 3217.0004 4" BRK Pvmt Marking HAS (Y) 32 17 23 LF 322 $2.00 $644.00 5 3217.0201 8" SLD Pvmt Marking HAS (W) 32 17 23 LF 73 $4.00 $292.00 6 3217.2103 REFL Raised Marker TY II-A-A 32 17 23 EA 32 $4.00 $128.00 7 3217.2104 REFL Raised Marker TY il-CR 32 17 23 EA 2 $4.00 $8.00 8 3217.1002 Lane Legend Arrow 32 17 23 EA 4 $350.00 $1,400.00 9 9999.0009 Instali "End Of Roadway" Type III Barricade 00 00 00 LF 92 $30.00 $2,760.00 10 9999.0010 Install Alum Sign Ground Mount - ACN Standard 00 00 00 EA 2 $1,400.00 $2,800.00 11 9999�0011 Install Alum Sign to Street Light Pole - 00 00 00 EA 3 ACN Standard $850.00 $2,550.00 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 PAVING MARKINGS 8 SIGNAGE IMPROVEMENTS $13,992.00 Clil' OF FORT N'ORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AW.4RDED PROJECTS Fortn Version Ma} 22. 2U19 00 �2 �3_Bid Proposal DAP r 00 32 43 DAP-BIDPROPOSAL Pace3 of5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID N BEACH STREET - PAVING & DRAINAGE Project Item Infonnation Bidlist I[em No Description Bidder's Application Bidder's Proposal Specification Unit of Section No. Measure B�d Quantity Unit Price Bid Value 1 2605.3001 1 1/4" CONDT PVC SCH 80 (T) 26 05 33 2 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 3 3441.1405 NO 2 Insulated Elec Condr 34 41 10 4 3441.1408 NO 6 Insulated Elec Condr 34 41 10 5 3441.1409 NO 8 Insulated Elec Condr 34 41 10 6 3441.1410 NO 10 Insulated Elec Condr 34 41 10 7 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 34 41 20 8 3441.1502 Ground Box Type B, w/Apron 34 41 10 9 3441.3411 Reconnect Conductor 34 41 20 10 9999.0012 Furnish/Install Powder Coat Black Type 18 Pole 00 00 00 11 9999.0013 Furnish/Install Powder Coat Black Type 33A Arm 00 00 00 12 9999.0014 Furnish/Install Powder Coat Black LED Lighting Fixture (133 watt ATB2 Cobrahead) 00 00 00 13 9999.0015 Pedestal w/ Transocket 00 00 00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 LF LF LF LF LF LF EA EA EA EA EA EA EA 1500 1730 150 1500 4450 1475 4 3 1 4 5 5 1 $11.00 $12.00 $3.00 $3.00 $3.00 $3.00 $1,200.00 $850.00 $1, 000. 00 $3,200.00 $600.00 $800.00 $7,500.00 $16,500.00 $20,760.00 $450.00 $4,500.00 $13,350.00 $4,425.00 $4,800.00 $2,550.00 $1,000.00 $12,800.00 $3,000.00 $4,000.00 $7,500.00 95,635. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fomi Version Ma�� 22. 2019 UO 42 d3_Bid Proposal_DAP OU 4? $3 DAP-BIDPROPOSAL Page 5 of i SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID N BEACH STREET - PAVING & DRAINAGE Project Item Infonnation Bidlis� Item No. Description Bid Summary PAVING IMPROVEMENTS STORM DRAIN IMPROVEMENTS PAVEMENT MARKING & SIGNAGE IMPROVEMENTS STREET LIGHT IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTR4CT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUM17ENT5 - DEVELOPER AW ARDED PROlECTS Form Version Mac 22 2UI'J Bidder's Application Bidder's Proposal Specification Unit of Section No. Measure Bid Quant�ry Unit Price Bid Value Total Construction Bid $816,158.75 $151,322.00 $13,992.00 $95,635.00 $1,077,107.75 B� : ��G K �I.,�� ; �,� TITLE: �S� C DATE: END OF SECTION rtb Norking days aTter the date Nhen the UO 42 43_Bid Proposal_D.4P 00 45 12 - 1 PREQUALIFICATION STATEMENT Page 1 of 2 1 2 SECTION 00 45 12 PREQUALIFICATION STATEMENT 3 Each Bidder for a City procurement is required to complete the information below by 4 identifying the prequalified contractors and/or subcontractors whom they intend to utilize for 5 the major work type(s) listed. 0 � s 9 10 11 12 13 14 15 16 17 18 Major Work Prequalification Contractor/Subcontractor Company Name Type Expiration Date Concrete <15/000 SY l.,`� YIQ� �S� ��1��C�1'i �-��_ . � � Z � Z ` , Street Light Improvements e,pV1Q.�-S.�2.. W115.�1t��A(1 �j.��L. . � � �- 2. �2,� Asphalt Paving Con/Recon � � � � <Zs,000 sv C,ov� G- se-R, �'%k.c�?n `I�( �.R '�-l7 Z� � CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pov & Drng Improvements ACN — North Beach St City Project No. 102655 Revised July 1, 2011 004512-2 PREQUALIFICATION STATEMENT Page 2 of 2 � � 1 2 3 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. 4 BIDDER: 5 0 � 8 9 10 11 12 13 14 15 16 17 18 G�n G-�r r�S� i���.�Q Bv: �I `� � � Company (Please Print � � �? � � � �L`�,,���" Signature: ��� � �_ Address �P � � �,1 1lr) (�T_ Titie: —��C`o �� City/State/Zip (Please Print) Date: n'1 ���7D END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Pav & Drng Improvements ACN — North Beach St City Project No. 102655 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 2 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its empioyees employed on City 5 Project No. 102655. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 0 10 11 12 13 14 CONTRACTOR: ` :�' '�,5���\A� `n.� � (%. gy; .�l���—� •�� l �l r1 Company (Please Print) 'G"�, �� � `u- �'� Signature: �� � � � .-� Address 15 �P�.�uyf���-��C,��_ Title:r��_���r�� 16 City/State/Zip (Please Print) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 THE STATE OF TEXAS COUNTY OF TARRANT § § BEFO E ME, the undersigned authority, on this day personally appeared � known to me to be the person whose name is subscribed to the foregoin instrument, and ackn�wledged to me that he/she executed the same as the act and deed of ��r�(� Qn for the purposes and consideration therein expressed snd in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this O( J" " day of Jun-2 20 �O ���``PY AU�ij K A M R A H O E R i G � SP,.., B i� :2:•' �: Notary Pubiic, Staie .nf 7exas Notary Public in an r the State of Texas ;9 �+;� Comm. Expires 08-15-2023 ��'a,°,;,�`�� Notary iD 13213162-8 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pov & Drng Improvements ACN — No�th Beach St City Project No. 102655 Revised July 1, 2011 005243-1 Developer Awarded Project Agreement Page 1 of 6 1 SECTION 00 52 43 2 AGREEMENTTHIS AGREEMENT, authorized on ��2� 20 ZJ is made by and between the 3 Developer, Hillwood Alliance Services, LLC, a Texas limited liability Company, authorized to do 4 business in Texas, and (�r;��,����jr ��� (�. , authorized to 5 do business in Texas, acting by and through its duly authorized representative, ("Contractor"). 6 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree 7 as follows: _ 8 Article 1. WORK 9 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 10 Project identified herein. 11 Article 2. PROJECT 12 The project for which the Work under the Contract Documents may be the whole or only a part 13 is generally described as follows: 14 Pavinq Drainape & Street Liphtinp /mprovements to serve North Beach Street 15 Article 3. CONTRACT TIME 16 3.1 Time is of the essence. 17 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 18 Documents are of the essence to this Contract. 19 3.2 Final Acceptance. 20 The Work will be complete for Final Acceptance within { 90 } �JofK�� days the date 21 when the Contract Time commences to run as provided in Paragraph 12.04 of the 22 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 23 3.3 Liquidated damages 24 Contractor recognizes that time is of the essence of this Agreement and that Developer 25 will suffer financial loss if the Work is not completed within the times specified in 26 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 27 of the Standard City Conditions of the Construction Contract for Developer Awarded 28 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 29 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 30 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 31 that as tiquidated damages for delay (but not as a penalty), Contractor shall pay CITY OF FORT WORTH Pav & Drng Improvements ACN—North Beach St STANDARD CONST�UCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 6 32 33 34 Devetoper pollars ($ ) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. 35 Article 4. CONTRACT PRICE 36 Developer agrees to pay Contractor for performance of the Work in accordance with the 37 Contract Documents an amount in current funds of One Million seventv seven thousand one 38 hundred and seven dollars and seventv five cents Dollars ($1,077,107.75). 39 Article 5. CONTRACT DOCUMENTS 40 5.1 CONTENTS: 41 A. The Contract Documents which comprise the entire agreement between Developer 42 and Contractor concerning the Work consist of the following: 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal documents (projectspecific) b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Form (If required) 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 58 4. Supplementary Conditions. CITY OF FORT WORTH Pav & Drng Improvements ACN—North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Projec! No. i02655 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 6 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued, become an incorporated part of the Contract 67 Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 73 � -� � � � �, CITY OF FORT WORTH Pav & Drng Improvements ACN —North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised June 16, 2016 005243-4 DeveloperAwarded ProjectAgreement Page 4 of 6 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed by 78 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 79 this contract. This indemnification provision is specifically intended to operate and be 80 effective even if it is alle�ed or proven that all or some of the dama�es being sought 81 were caused, in whole or in part, by any act, omission or ne�ligence of the city. This 82 indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision 91 is specifically intended to operate and be effective even if it is alleged or proven that all 92 or some of the damages being sought were caused, in whole or in part, by any act, 93 omission or negligence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 98 the Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Develo�pr and �ontr�ctor each binds �tself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. CITY OF FORT WORTH Pav & Drng Improvements ACN —North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised lune 16, 2016 005243-5 Developer Awarded Project Agreement Page 5 of 6 106 107 108 109 110 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CO NTRACTO R. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date") CITY OF FOR.T WORTH Pav & Drng Improvements ACN—North Beacn St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. IG2555 Revised June 16, 2016 005243-6 Developer Awarded Project Agreement Page 6 of 6 134 Contractor: Developer: �__ •�l � r By: � gY: (Sigi ure) ' nature) �- - I���gse�l � 1�I�lr� ��� �`�c��� (Printed Name� (Printed Name) Titl�� e� ` � e �� Title: F.x���e v;��� �d Company Name: Company name: Address: Address: ►1 I e►. �J �� �� 1 Y . _ � � � �_.l _ �. :. ` � .r.i City/State/Zip: City/State/Zip: - � ���`I��l��� ��%F Wor_�__T���'�' �-1 z.���� Date Date `� �2O �� CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARCED PROJECTS Revised June 16, 2016 Pav & Drng Improvements ACN —North Beach St City Project No. 102655 � 00 61 13 - 1 PERFORMANC"c 80ND Page 1 of 2 Bond No. 0232084 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 THE STATE OF TEXAS COUNTY OF TARRANT § § SECTION 00 51 13 PERFORMANCE BOND § KNOW ALL BY THESE PRESENTS: That we, Conatser Construction TX, L.P. , known as "Principal" herein and Berkley lnsurance Company a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the One Million, Seventy Seven Thousand, One FIundred penal sum of, Seven and 75/100------------------------------------------- Dollars ($ 1,077,107.75 ), )awful money ofthe United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severatly, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the �_ day of ��l.V 20�, which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, 20 equipment labor and other accessories defined by law, in the prosecution of the Work, including 21 any Change Orders, as provided for in said Contract designated as ALLIANCE CENTER NORTH — 22 NORTH BEACH STREET, City Project No. 102655 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal shail 24 faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 25 perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall 28 be and become null and void, otherwise to remain in full force and effect. CITY OF fORT WORTH STAlVDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Gav & Drng Improvements ACN — North Beach SY City Project No. 102655 � 006113-2 PERFORMANCE BOND Page 2 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and ali liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the ____�_day of � �/ Zp ��_, �Q. ATTEST: � (Principal) Secretary Wit ess as to rincipai ` itness as to Surety PRINCIPAL: Conatser Construction TX, L.P. , BY: Signatu e Brock Huggins, President Name and Title Address: 5327 Wichita St. Fort Worth, TX 761 19 SU R ETY: Berkley Insurance Company BY: � �,.,���. °7't vz�. -, Signature Robbi Morales, Attorney-in-fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214/989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obiigation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Pav & Drng Improvemenis ACN — North Beach Si City Project No. 102655 006114-1 PAYMENT BOND Page 1 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SECTION 00 61 14 PAYMENT BOND THE STATE OF TEXA5 COUNTY OF TARRANT § § § Bond No. 0232Q84 KNOW ALL BY THESE PRESENTS: That we, Conatser Construction TX, L.P. known as "Principal" herein, and Berkley Insurance Company ,a corporate surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound untQ the City of Fort Worth, a municipai corporation created pursuant to the laws of th State f Texas, known as "City" One Million, Seventy Seven�ousancP herein, in the penal sum of One Hundred Seven and 75/100---------------------------- Doliars ($ 1,077,107.75 ), lawful money of the United StaTes, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum weil and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 'Z day of _,���LL/ 20�_, which Contract is hereby referred to and 19 made a ' part hereof for all purposes as if fully set forth herein, to furnish all materials, 20 equipment, labor and other accessories as defined by law, in the proSeCution of the Work as 21 provided for in said Contract and designated as ALLIANCE CENTER NORTH — NORTH BEACH 22 STREET, City Project No. 102655. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall 24 pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of 25 the Texas Government Code, as amended) in the prosecution of the Work under the Contract, 26 then this obligation shall be and become null and void; otherwise to remain in full force and 27 effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas 29 Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the 30 provisions of said statute. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFlCATION DOCUMENTS pav & Drng lmprovements ACN —Ncrth 8each St RevisedJuly 1, 2011 Cfty Projett No. 102b55 00 61 14 - 2 PAYMENT BOND Page 2 of 2 1 IN iIVITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the � day of 3 1 20 7-�i` . 4 PRINCIPAL: Conatser Construction TX, L.P. 5 6 7 8 9 10 11 ATTEST: � (Principal) Secretary itne as to 'ncipal ATTEST: �-7� �' (Surety) Secretary �' {' -�/" �1� ess as to Surety BY: � 4 � ---- Signature Brock Huggins, President Name and Title Address: 5327 Wichita St. Fart Worth, TX 76119 SURETY: Berkley Insurance Company BY:;.= �'��...uc._ �i�2 � ��� Signature Robbi Morales, Attorney-in-fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 2�4�989-0000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. if Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CIIY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pov & Drng lmprovements ACN— North Beach St Revised luly 1, 2011 City Project No. 102655 00 61 19 - 1 1 2 3 4 5 6 7 MAINTENANCE BOND Page 1 of 3 Bond No. 0232084 SECTION 00 61 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § Thdt W2 Conatser Construction TX, L.P. , known as 8 "PrinCipal" herein and Berkley lnsurance Company 9 10 11 12 13 14 15 16 17 a corporate surety �sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporatio OneeM 11 op�Se entyt�e en ThWou° nt�e State of Texas, known as "City" herein, in the sum of One Hundred Seven and 75/100-------------------------- Dollars ($_1,077,107.75 ), lawful money ofthe United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severaily, firmly by these presents. 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the � day of �_SVIy , 20 i, which Contract is hereby 20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 21 materials, equipment labor and other accessories as defined by law, in the prosecution of the 22 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 23 the "Work") as provided for in said contract and designated as ALLIANCE CENTER NORTH — 24 NORTH BEACH STREET, City Project fVo. 102655; and 25 26 WHEREAS, Principal binds itseif to use such materials and to so construct the Work in 27 accordance with the plans, specifications and Contract Documents that the Work is and will 28 remain free from defects in materials or workmanship for and during the period of two (2) years 29 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 30 CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Pov& Dmg ImprovementsACN—North Beach St Revised July 1, 2011 City Project No. 102655 00 61 19 - 2 I 2 3 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the City of the need therefor at any time within the Maintenance Period. 4 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 5 any defective Work, for which timely notice was provided by City, to a completion satisfactory 6 to the City, then this obligation shall become null and void; otherwise to remain in full force and 7 effect. 0 9 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 10 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 11 be repaired and/or reconstructed with al! associated costs thereof being borne by the Principal 12 and the Surety under this Maintenance bond; and 13 14 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shail lie in 15 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 16 Worth Division; and 17 18 19 20 21 22 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY Of FORT WORTH STANDARD CO NSTR UCTIO N SPEGfICATION DOCUMENTS Pav & Dmg �mprovements ACN — Norih Beach Sf Revised luly 1, 2011 City Project No. 102655 006119-3 MAINTENANCE BOND Page 3 of 3 1 iN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 2- day of �( 3 ,20��. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Z4 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ATTEST: (Principal) Secretary Wi n ss as to incipal ATTEST: ',-.�' -„-� � c�c ,-�- (Sur ty) Secretary ����`� it ess as to Surety PRINCIPAL: Conatser Construction TX, L.P. . BY: Signatu e Brock Huggins President Name and Title Address: 5327 Wichita St. Fort Worth, TX 76119 SURETY: Berkley Insurance Company BY: C._.���r.., J�2 .,, Signature Robbi Morales, Attorney-in-fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dal(as, TX 75244 Telephone Number: 214/989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STAN DAR D CO NSTR UCTIO N SPECI FICATION DOCU ME NTS Pov & Orng lmprovemen [s ACN — North Beach St Revised Ju�y 1, 2011 City Project No. 102655 No. BI-7280j POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The waming found elsewhere in this Power of Attomey affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly orgaaized and existing under the laws of the State of Delaware, having its principal o�ce in Greenwich, CT, has made, constituted and appointed, and does by these presents make, canstitute and appoint: Ricardo J, Rey�:a; Dorr E. Cor�tell; Soplri�rie Hu�rter; Robbi Mora/es; Kel[y A. Westbrook; Tina McEtivan; Jvsleua A. Snu�rders; or Tonie Petra�tek of Anrr Risk Services Soutl�west, Irrc. of Datlas, TX its true and lawful Attomey-m-Fact, to sign its narne as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and OQ/1Q0 U.5. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principa) office in their own proper persons. This Power of Attamey shall be consfr-ued and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adapted at a meeting of the Board of Directors of the Company he]d on January 25, 2010: RESOLVED, that, with respect to the Surety business written hy Berkley Surety, the Chairman of the Board, Chief Executive �' Officer, President or any Vice President of the Company, in conjvnction with the Secretary or any Assistant Secretary are -� hereby authorized to execute powers of attomey authorizing and qualifying the attomey-in-fact named therein to execute � bonds, underhakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and � revoke any power of attomey previously granted; and further � RESOLYED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or � other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner �,� and to the extent therein stated; and fiuther RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further " RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any _ power of attorney or certification thereof authorizing the execution and deliveiy of any bond, undertaking, recognizance, or other suretyslup obligation of the Company; and such signature and seal when so used shall have the same force and effect as y though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any — person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at ihe time wben such insti-uments shall be issued. °4 IN WIThlESS WHEREOF, lhe Cot any lias caused these presents to bc signcd and attcsted by its appropriate ofEicers and its corpoialc sonl hcrcunt� �ffued this�day of M �l,� , o � q . Attest: � Berkle Tnsurnnce Compan (Seap E3y � r py Tra . Lede an Je e fter � Executive Vice President & Secretaiy en o i �esident WARIVINC: THIS POWER INVALID IF NQT PRINTED ON BLUE "BERKLEY" SECtJR1TY PAPER. STATL OB CONNECTICUT ) ) ss: COUNTY Or FATR�'TGLD ) �rii Sworn to befnre me, � NotAry Public in the Slute of Gannecticut, ihis2� day of I Q, by rrn s. t.ederman and Jeffrey M. Iiaftcr �vho �tre sWol'n to mc to be lhe Executivc Vice Prc 'de and Secreta�y, n thc Senior Vice Presicient, respectively, of Berkley Ins�u•ance Compaft�pARIA C. FiUNDBAKEN � � NOTARY PUBLIC _ .0 � � ����'-�tp MY COMMISSION EXPIRES ota�y Public, State ofConnecticut APRIL 30, 2019 CCIiTIl�1CA'1'C I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY C�RTIFY that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to �vhich this Power of Attorney is attached, is in futl force and effect as of this date. Given under my hand and seal of the Compeny, this day of (Seal) m ent . Forte � IMPORTANT NOTICE To obtain information or make a complaint: You may call Berkley Surety Group, LLC and its affiliates by telephone for information or to make a complaint: BERKLEY SURETY GROUP, LI..0 Please send all notices of claim on this bond to: Berkley Surety Group, LLC �$66) 768-3534 412 Mount Kemble Avenue, Suite 310N Morristown, NJ 07960 Aftn: Surety Claims Deparfinenf You may contact the Texas Department of lnsurance fo obtain information on companies, coverages, rights or compfaints at: 1-800-252-3439 You may write the Texas Department of insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-maii: ConsumerProtection(cr�tdi.state.tx.us PREMIUM OR CLAiM DiSPUTES: Should you have a dispute concerning your premium or about a claim you should contacf your agent or Berk{ey Surety Group, LLC first. If fhe dispute is not resolved, you may contact fihe Texas Department ofi Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condifion of the attached documenf and is given to comply with Texas legaf and regulatory requirements. � 00 6] 25 - 1 CERTIFICATE OF INSURANCE Page 1 of 1 1 2 3 4 5 6 7 8 9 10 ]l 12 13 14 15 16 17 18 19 20 21 22 23 24 SECTION 00 61 25 CERTIFICATE OF INSURANCE ��S�se�i�tlil�r�: f��'a�r� f�c�ra�*���c�c�tl)c��•r�na����� c�.�c�c�trlir�ra, a^������r����: ihi���la:rt,r�= r�aac� �°z:��Ir���c° �4�i�1a s1r��ac�c�r�d .�dC'�>KL? �:'��tificat�� r>��Irzsz�r�c�r�ce fo�-rar.i' END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised .luly L 20ll Pav & Drng Ina/�rai�e�nents ACn'— North Beach St Cit�� Project No. ] 02655 � � STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS � � � � -� � � � CITY OF FORT WORTH STANDARD CITY CONDITIONS—DEVELGPER AWARDED PRO.TECTS Revised: February 08, 2012 � STANDARI� CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1— Definitions and Terminology ......................... 1.1 Defined Terms ............................................. 1.2 Terminology ................................................. .............................................................1 .............................................................1 ............................................................. 5 Article 2 — Preliminary Matters ..................................................................................... 2.1 Before Starting Construction .................................................................... 2.2 Preconstruction Conference ..................................................................... 2.3 Public Meeting .......................................................................................... Article 3— Contract Documents and Amending ........................................................... 3.1 Reference Standards ................................................................................. 3.2 Amending and Supplementing Contract Documents .............................. Article 4— Bonds and Insurance ............................................................................ 4.1 Licensed Sureties and Insurers .......................................................... 4.2 Perfonnance, Payment, and Maintenance Bonds ............................. 4.3 Certificates of Insurance .................................................................... 4.4 Contractor's Insurance ....................................................................... 4.5 Acceptance of Bonds and Insurance; Option to Replace ................. ................................. 6 ................................. 6 ................................. 6 ................................. 6 ................................. 6 ................................. 6 ................................. 6 ...................... ...................... ...................... ...................... ...................... ...................... Article 5 — Contractor's Responsibilities ...........................................................................................................13 5.1 Supervision and Superintendent ....................................................................................................13 5.2 Labor; Working Hours ...................................................................................................................13 5.3 Services, Materials, and Equipment ..............................................................................................14 5.4 Project Schedule .............................................................................................................................14 5.5 Substitutes and "Or-Equals ' ..........................................................................................................14 5.6 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) .......................................17 5.7 Concerning Subcontractors, Suppliers, and Others ......................................................................17 5.8 Wage Rates ....................................................................................................................................18 5.9 Patent Fees and Royalties ..............................................................................................................19 5.10 Laws and Regulations ....................................................................................................................20 5.11 Use of Site and Other Areas .......................................................................................................... 20 5.12 Record Documents .........................................................................................................................21 5.13 Safety aiid Protection .....................................................................................................................21 5.14 Safety Representative ....................................................................................................................22 5.15 Hazard Communication Programs ................................................................................................ 22 5.16 Submittals .......................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee ............................................................................ 23 CITY OF FORT WORTH STANDARD CITY COND1TiONS—DEVELOPER AWARDED PROJECTS Revised: Pebruary 08, 2012 n 5.18 Indemnification ............................................................................................................................24 5.19 Delegation of Professional Design Services .................................................................................25 5.20 Right to Audit : ............................................................................................................................... 25 5.21 Nondiscrimination ..........................................................................................................................26 Article6— Other Work at the Site ......................................................................................................................26 6.01 Related Work at Site ...................................................................................................................... 26 Article 7 — City's Responsibilities ......................................................................................................................27 7.1 Inspections, Tests, and Approvals .................................................................................................27 7.2 Limitations on City's Responsibilities ..........................................................................................27 7.3 Compliance with Safety Program ................................................................................................. 27 Article 8— City's Observation Status During Construction .............................................................................. 27 8.1 City's Project Representative ........................................................................................................27 8.2 Authorized Variations in Work ..................................................................................................... 28 8.3 Rejecting Defective Work ............................................................................................................. 28 8.4 Determinations for Work Performed ............................................................................................ 28 Article9— Changes in the Work ........................................................................................................................ 28 9.1 Authorized Changes in the Work ..................................................................................................28 9.2 Notification to Surety ....................................................................................................................29 Article 10 — Change of Contract Price; Change of Contract Time ................................................................... 29 10.1 Change of Contract Price ............................................................................................................... 29 10.2 Change of Contract Time .............................................................................................................. 29 10.3 Delays .............................................................................................................................................29 Article 11 — Tests and Inspections, Correction, Removal or Acceptance of Defective Work ........................ 29 11.1 Notice of Defects ...........................................................................................................................29 11.2 Access to Work .............................................................................................................................. 29 11.3 Tests and Inspections .....................................................................................................................29 11.4 Uncovering Work ..........................................................................................................................30 11.5 City May Stop the Work ................................................................................................................ 31 11.6 Correction or Removal of Defective Work .................................................................................. 31 11.7 Correction Period ...........................................................................................................................31 11.8 City May Correct Defective Work ................................................................................................32 Article12 — Completion ...................................................................................................................................... 33 12.1 Contractor's Warranty of Title ......................................................................................................33 12.2 Partial Utilization ........................................................................................................................... 33 12.3 FinalInspection ..............................................................................................................................33 12.4 Final Acceptance ............................................................................................................................ 33 Article13 — Suspension of Work ....................................................................................................................... 34 13.01 City May Suspend Work . .............................................................................................................. 34 Article14 — Miscellaneous ................................................................................................................................. 34 CITY OF FORT WORTH STANDARDCITY CONDIT'IONS— DEVELOPER AWARDED PROJECTS Revised: February 08, 2012 14.1 Giving Notice ............................................................................ 14.2 Computation of Times .............................................................. 14.3 Cumulative Remedies ............................................................... 14.4 Survival of Obligations ............................................................. 14.5 Headings .................................................................................... ......................... 34 ......................... 3 5 ......................... 35 ......................... 35 ......................... 35 � r, f-, � � � � CITY OF FORT WORTH STANDARD CITY CONDITIONS — DE V ELOPER A WARDED PROJECTS Revised: February 08, 2012 r 00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.1 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Communiry Facilities Agr�eement (CFA) A Contract between the Developer and the Ciry for the Const�uction of one or more following public facilities within the City public right-of- way or easement.• Water, Sanitary Sewer Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easenzent on a recorded plat. 8. Contract—The entire and integ�^ated written document incorporating the Contract Documents between the Developer, Contractor, and/or Ciry conceYning the Work. The Contract supersedes prior negotiations, representations, or ag�^eements, whether written or oral. 9. Contract Documents—Those items that make up the contract and which must include the Agreement, and it's attachmenCs such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement C1TY OF FORT WORTH STANDARDCONS7'RUCTION SPEGFICATION DOCUMENTS Revised: February 08, 2012 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non-Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond £ Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by Ciry) k. General Conditions l. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Ghange Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor—The individual or entity with whom Developer has entered into the Agreement. ll. Day or day — A day, unless othe��ise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the Ciry of Fort Worth 13. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 r 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 15. Final Acceptance — The written notice given by the City to the Developer and/or Coniractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. 16. Final Inspection — Inspection carried out by the Ciry to ver� that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirement.s A part of the Contract Documents between the Developer and a Contractor. - 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and order�s of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens—Charges, securiry interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 2 L Non-Participating Change Order A document, which is prepared for and reviewed by the Ciry, which is signed by Contractor, and Developer and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contr�act Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order A document, which is prepared for and approved by the Ciry, which is signed by Contractor Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contr�act Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project—The Work to be performed under the Contract Documents. 26. PYoject Representative—The authorized representative of the Ciry ��ho will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a. m. and ending at 6: 00 p. m., Monday thru Fi�iday (excluding legal holidays). CITY OF PORT WORTH STANDARDCONSTRUCTION SPECIFICATIOIV DOCUMENTS Revised: February 08, 2012 00 73 ] 0- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion o f the Work will be judged. 30. Schedule of Submittals A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 3 L Site—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights-of-way, pe�mits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Wor1� and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachnzent or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 DD) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontracto�� An individual or entity having a direct contract with Contractor or with any other Subcontr°actor for the performance of a part o f the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data o�� information which are spec f cally prepared or assembled by or for Contractor and submitted by Contractor� to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions,from the Ciry and/or Developer and to actfor the Contractor. 37. Supplementary Conditions—That part of the Cont�^act Documents which amends or supplements the General Conditions. 38. SupplieN A manufactuNer fabricator supplier, distributor, materialman, oN vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contr�actor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such,facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, stof•m water, other liquids or chemicals, or tr�a�c or other control systems. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMI�NTS Revised: February 08, 2012 � 0073 10-5 Standard City Conditions Of The Construction Contract For DeveloperAwarded Projects Page 5 of35 40. Weekend Working Hours — Hours beginning at 9: 00 a. m. and ending at 5: 00 p. m., Saturday, Sunday or legal holiday, as approved in advance by the City. 41. Work—The entire construction or the various separately identifiable parts thereof required to be p�ovided under the Contract Documents. Woi�k includes and is the i�esult of performing or providing all laboN, services, and documentation necess�zry to produce such constr�uction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and incorpoNating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contr�act purposes, in which weather or other conditions not under the control ojthe Contr�actor will peNmit the performance of the principal unit of work undern�ay for a continuous period of not less than 7 hou�s between 7 a. m. and 6 p. m. 1.2 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: The ward "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged priar to City's written acceptance. C. Furnish, Install, PeNform, Provide: 1. The word "Furnish" ar the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARDCONSTRUC"I ION SPECIFICATION DOCUMENTS Revised: Februar� 08. 2012 00 73 ] 0- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.1 Before Starting Conslr�uction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non- Participating Change Orders occur. 22 Preconstrz�ction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.3 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3— CONTRACT DOCUMENTSAND AMENDING 3.1 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of Developer, Contractor, ar any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.2 Amending and Supplementing Contr�act Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-. Participating Change Order. CITY OF FORT WORTH STANDARDCONSTRUCTION SPGCIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 ] 0- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4— BONDS AND INSURANCE 4.1 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.2 Performance, Payment; and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds sha11 remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to d� b>>s_ness is te_rminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECiFICATION DOCUMGNTS Revised: Februarv08.2012 00 73 l0- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 43 Certificates oflnsurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirery, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for warkers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided sha11 not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of35 are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.4 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labar Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of ar result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be lial�le: l. claims under workers' compensation, disability benefits, and other similar employee benefit acts; CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 00 73 10- ] 0 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10of35 2. claims far damages because of bodily injury, occupational sickness ar disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability 1) $100,000 eachaccident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any autd', defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 r� 00 73 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of35 maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: none �4's�ite the E�a€ne o1'tlte raiiroad con�pnr�4. ([f'3ii�n:, ilteiz w�'ite 32one; 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a"Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: none l�i.nt�,a� lin�it, provid:d by id�ilroad Co�npany� (Ifa�t�r�.. tia�i�i£e «oa�ej b. Each Occurrence: : none l;ntvr li«:ifti proriti:d l�y Fi�ilroad t t��npany ([f��one, w�3�ite na��e) CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATIONDOCUMEI�TS Revised: February 08, 2012 � 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractar shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Wark to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.5 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractar shall provide to the City such additional information in respect of insurance CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 ] 0- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of35 provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.1 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.2 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons ar the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal ho�idays request must be made by noon two Business Days prior to the legal holiday. CITY OF FORT WORTH STANDARDCONSTRUCTION SPEC[FICATION DOCUMENTS Revised: February 08, 2012 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 5.3 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorparated into the Work shall be as specified ar, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.4 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time may only be made by a Participating or Non-participating Change Order. 5.5 Substitutes and "Or-Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification ar description is intended to establish the type, function, appearance, and quality required. Unless the specification ar description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an"or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph S.OS.A.I, a proposed item of material or equipment will be considered functionally equal to an item so named if: CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: Febmary 08, 2012 r� 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph S.OS.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section O1 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that spe�ified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; CITY OF FORT WORTH S7'ANDARDCONSTRUC7'lON SPECIFICATION DaCUMENTS Revised: February 08, 2012 00 73 ] 0- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or ProceduNes: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractar may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph S.OS.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs S.OS.A and S.OS.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will advise Contractor in writing of its determination. D. Special GuaranCee: City may require Contractar to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemn� and hold harmless Ciry and anyone directly oi� indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs S.OS.A.2 and S.OS.B. Whether or not City �pprove� a sL�bstitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City far the charges for making changes in the Contract Documents. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 r-. 00 73 10- ] 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of35 F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.6 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.7 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: ❑ Required for this Contract. (Checl, lhiw �ros ifi��ere is ar�E� Cily �'ai7icipation j � Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debatment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: C1TY OF FORT WORTH STANDARDCONSTRUCTION SP6CfFICATION DOCUMENTS Revised: February 08, 2012 00 73 ] 0- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.8 Wage Rates ❑ Required for this Contract. ❑X Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty fo� Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and Ciry Determination of Good Cause. On receipt of information, including a complaint by a warker, concerning an alleged violation of 2258.023, Texas Government Cade, by a Cor.tractor or Subcontra�tor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 10- ] 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Requis•ed if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11 th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a pariy in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.9 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemn� and hold harmless Ciry, fi�om and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Wo�•k or resulting f�om the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. CITY OF FORT WORTH STANDARDCONSTRllCTION SPECIFICATION DOCUMENTS Revised:February 08,2012 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Wark knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Wark. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractar of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractar shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Parag�^aph 5.18, Contractor shall indemn� and hold harmless Ciry, f�om and against all claims, costs, losses, and dan2ages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is procee�ing in a manner unsatisfactory to the City or Developer, if the CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMINTS Revised: February 08. 2012 r 0073 10-21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nar permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These recard documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Wark. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. CITY OF FORT WORTH S7'ANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 0 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or properiy, or to the protection of persons or properiy from damage, injury, or loss; and shall erect and maintain all necessary safeguards far such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractar, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. CITY OF FORT WORTH STANDARDCONSTRUCTION SPEC►FICATION DOCUMENTS Revised: February 08. 2012 � 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. Ciry's Review: City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, iechniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section O1 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorparated in or accompanying the SubmittaL City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Wark that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE ANll BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOU HT WERE CAUSED. IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Wark or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed ar certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals perfortned by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing Ciry funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 0 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor far the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Departinent of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 196=� as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 6— OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractar prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other wark with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do atl cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08. 2012 � 00 73 10-27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.1 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.2 Li�nitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractar to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. 73 Compliance ��ith Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8— CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.1 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representati�ve will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Docutnents. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFiCATION DOCllMENTS Revised: February 08. 2012 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 City's Project Representative will not be required to make e�iaustive or continuous inspections on the Site to check the quality or quantity of the Wark. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.2 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.3 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authoriry to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. 8.4 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9— CHANGES IN THE WORK 9.1 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documei�ts (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time ar Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH S�ANDARDCONSTRUCTION SPECtFICATION DOCUMENTS Revised:February 08,2012 r-+ 0073 ]0-29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 9.2 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.1 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order or a Non- Participating Change Order 10.2 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order or a Non- Participating Change Order 10.3 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ll.l Notice ofDefects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.2 Access to Work City, independent testing labaratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.3 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICAT►ON DOCUMENTS Revised: February 08, 2012 0073 ]0-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereo� to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, ar approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval priar to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") far any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the ea�tent possible, with Contractar; 2. Should any Testing under this Section 11.03 D result in a"fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or tl�e work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.4 Uncovering Work A. If any Wark is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. CITY OF FORT WORTH S1�ANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 10-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 11.5 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.6 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor sha11 pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of wark of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.7 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph S.lO.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to slzch correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under ihis Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.8 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an ea�tension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMLNTS Revised: February 08, 2012 � 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of35 ARTICLE 12 — COMPLETION 12.1 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment wi11 pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.2 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Wark that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready far its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.OS.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Wark to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.3 Finallnspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.4 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � 00 73 ] 0- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request ai1 extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work far an indefmite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.1 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIF]CAT10N DOCUMENTS Revised:February 08,2012 � 00 73 10- 35 Standard City Conditions Of The Construction Contract For DeveloperAwarded Projects Page 35 of 35 1. delivered in person to the individual ar to a member of the firm or to an officer of the corporation for whom it is intended; ar 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.2 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of airy such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.3 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 14.4 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.5 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT �1'ORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revised: February 08, 2012 � o>>>oai SUMMARY OF WORK Page 1 of 3 1 2 3 GENERAL SECTION O1 11 00 SUMMARY OF WORK 4 SUMMARY 5 A. Section Includes: 6 l. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0- Bidding Requirements, Contract Forms, and Conditions ofthe Contract 11 2. Division 1- General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Docwne��ts 1. Wark is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included ou the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises ]. Coordinate uses of premises u��der direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights-of-way as provided for in tlle ordinances of the City, as shown in the Contract Documents, or as may be specifically autho��iaed in writing by the City. a. A reasonable amount of tools, materials, and equipment for constructio�� purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Pav & Dnag lmprove�nents ACN— North Beach Sl STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised April 7, 2014 o> >> 00-2 SUMMARY OF WORK Page 2 of 3 1 2 3 4 5 6 7 8 9 10 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried ou in such manner as not to interfere with the operation of the railroad. All Wark shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. B. Work within Easements l. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all otl�er types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, ar other, either as owners or occupants, whose land or interest i�� land might be affected by tl�e Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution ofthe Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence wark within easements, including removal, temporary closures and replace�ne��t, shall be subsidiary to the various items bid iu the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 7, 20 ] 4 Pav & Di�ng Improvements ACN - North Beach St City Project No. ] 02655 O1 11 00-3 SUMMARY OF WORK Page 3 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 112 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE � ■I � CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. ]02655 Revised April 7, 2014 r— o�zsoo-i DAP SUBSTITUTION PROCEDURES Page 1 of4 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 ]0 11 12 13 14 15 16 17 18 l9 1.2 SECTION O1 25 00 SUBSTITUTION PROCEDURES A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "ar-equals". B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. No 2� separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Request for Substitution - General l. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, ar catalog numbers, provided said products are "or-equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or otl�er factors beyond control of Contractor; or, CITY OF FORT WORTH Pav & Drng Improveme�ats ACN— Norih Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised August 30, 20] 3 012500-2 DAP SUB5TITUTION PROCEDURES Page 2 of4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 9 10 11 12 l3 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Submit 3 copies of each written request for substitution, including: a. Documentation l) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's (iterature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical require�nents 4) Productexperience a) Location of past projects utilizing product b) Name and telephone number ofpersons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated witl� proposed product 5) Samples a) Provide at request of City. b) Samples become the property ofthe City. c. For construction methods: ]) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. C1TY OF FORT WORTH Pav & Di�ng /mprovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO.IECTS City Project No. 102655 Revised August 30, 2013 r- 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 1 2 3 4 5 6 7 8 1.6 9 1.7 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In tl�e Developer's opinion, acceptance will require substantial revision ofthe original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 13 14 15 16 17 18 19 20 21 22 23 24 25 A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as far product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USED] 28 29 30 END OF SECTION CITY OF FORT WORTH Pav & Drng Irnproveinents ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO.IECTS City Project No. 1026�5 Revised August 30, 2013 o�zsoo-a DAP SUBSTITUTION PROCEDURES Page 4 of 4 1 2 3 4 5 6 7 8 9 10 [[I 12 13 ➢4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your coi�sideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other C. Differences between proposed substitution and speci D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone _ Recommended Recommended Not recommended Received late By Date Remarks item? For Use by City: Approved City Date Rejected CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St S'TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPERAWARDED PRO.�ECTS City ProjectNo. 102655 Revised August 30, 2013 � 01 78 39 - 1 DAP Preconstruction Meeting Page 1 of 3 1 2 3 PART 1 - GENERAL 4 11 SUMMARY 5 6 7 8 9 10 11 12 13 1.2 14 15 16 17 1.3 18 1.4 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SECTION O1 31 19 PRECONSTRUCTION MEETING A. Section Includes: 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification l. No construction schedule required unless reyuested by the City. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers atte��ding meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. The meeting will be scheduled and administered by the City. 1. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants wl�o so request by fully completing the attendance form to be circulated at the beginning of the meeting. 2. Attendance shall include: a. Developer and Consultant b. Contf-actor's project manager c. Contractar's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request C1TY OF FORT WORTH Pav & Drng Improve»7ents ACN— Nor•th Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER A WARDED PROJECTS City Project No. 102655 Revised April 7, 2014 01 78 39 - 2 DAP Preconstruction Meeting Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 �� 28 29 30 31 32 33 34 35 36 37 38 39 40 e. Other City representatives f. Others as appropriate 3. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Lettzr for Waste Material 1. Ii�surance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with tl�e City's representative for operations of existing water sy stem s v. Storm Water Pollutioi� Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments � CITY OF FORT WORTH Pnv & Cr�aghnprovements ACN— North Beach St STANDARD CONSTRUCT►ON SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS Ciry Project No. 102655 Revised April 7, 2014 017839-3 DAP Preconstruction Meeting Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 112 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 13 14 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Pav & L'rng Improve�nents ACN— North Beach Si STANDARD CONSTRUC1lON SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO.IECTS City Project No. ]02655 Revised April 7, 2014 013120-1 PROJECT MEETINGS Page l of 3 SECTION 0131 20 PROJECT MEETINGS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Wark and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of tl�e Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed far this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings tl�roughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre-Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present p�-ojected schedule, including coi�struction start date b. Answ�: a��y construction related questions 2. Meeting Location a. Location of �r�eeting to be determined by the City. 3. Attendees CITY OF FORT WORTH Pov & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised.luly ].2011 r-� Ol 31 20 - 2 PROJECT MEETINGS a. Contractor b. Project Representative c. Other City representatives C Page 2 of 3 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre-construction conference. b. in no case will construction be allowed to begin until this meeting is held. Progress Meetings Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. Additional progress meetings to discuss specific topics will be conducted on an as- needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Co��tractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to i��vite or the City may request d. Engineer's representatives e. City's representatives £ Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off-site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Mai��tenance ofquality standards 1. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on otl�er contracts of the Project n. Review Record Documents o. Review monthly pay request CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 20ll Pav & Drng Improvements ACN — North Beach St City Project No. 102655 013120-3 PROJECT MEETINGS Page 3 of 3 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. l) Additional meetings may be held at the request of the: a) C ity b) Engineer c) Contractor 7. Meeting Locatiou a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. i.5 SUBNIITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSiJRANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USEDJ 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE '-'1 i C1TY OF FORT WORTH Pav & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised July 1, 201 l � 01 33 00- ] DAP Submittals Page 1 of 8 1 2 3 PART1-GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 ]6 SECTION 0133 00 DAP SUBMITTALS A. Section Includes: 1. General methods and requirements of submissions applicable to the following Wark-related submittals: a. Sl�op Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 l. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate pay�nent will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or witl�in the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (ifrequired) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication fl Delivery Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Pav & Drng Improvemenls ACh'— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O] 3300-2 DAP Submittals Page 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. A. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross-reference identafication numbering system in the following �r�a��ner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers O1-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number wouid be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) ofthat particular shop drawing B. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcoi�tractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Co��tractor's Company name b. Signature of submittal reviewer c. Certification Stateme��t 1) `By this submittal, 1 hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." C. Submittal Format 1. Fold shop drawings larger than 8'/2 inches x 11 inches to 8'/2 inches x 1 1 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet l ) Description of Packet 2) Contractor Certification b. List of items / Table of Co��tents c. Product Data /Shop Dra�vings/Samples /Calculations CITY OF FORT WORTH Pav & Drng b�aprovements ACN— No�9h Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r-. O1 33 00- 3 DAP Submittals Page 3 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 D. Submittal Content 1. The date of submission and the dates of any previous submissions 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Ideutification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps E. Shop Drawings l. As specified in individual Wark Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Specia) wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: l) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main �r�embers and lines of the structure b. Where correci fabrication of the Wark depe��ds upon field measurements Provide such measurements and note on the drawings prior to submitting for approval. F. Product Data 1. For submittals of product data for products included on the City's Standard Product List, ciearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) CITY OF FORT WORTH Pav & Drng /n7proi�ements ACN—North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]026>5 Revised April 7, 2014 O 1 3 3 00- 4 DAP Submittals Page 4 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1) Such as the �r�anufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs 7) Standard wiring diagrains 8) Printed performance curves and operational-range diagrams 9) Production ar quality control inspection and test reports and certifications 10) Mill reports 1 l) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: l) Sections of manufactured or fabricated Work 2) S�nall cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic sy�nbols a��d units of Work to be used by the City for independent inspection and testing, as applicable to tl�e Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish confonnity. 3. Complete project Work, materiais, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the C ity. b. Shop Drawings l) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 l�ard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data CITY OF FORT WORTH Pav & Drng lmprovenaents ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 10265� Revised April 7, 2014 r O1 33 00- 5 DAP Submittals Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies far all submittals d. Samples l) Distributed to the Project Representative Hard Copy Distribution (if required in lieu of electronic dist►-ibution) a. Shop Drawings l) Distributed to the City 2) Copies a. 8 copies for mecha��ical submittals b. 7 copies for all other submittals c. If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to tlie Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 26 3. Distribute reproductions of approved shop drawings and copies of approved 27 product data and samples, where required, to the job site file and elsewhere as 28 directed by the City. 29 a. Provide nu�nber of copies as directed by the City but not exceeding the 30 number previously specified. 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Pennitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains respousible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Wark in a safe manner. CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS OEVELOPER AWARDED PROJECTS Ciry Project No. 102655 Revised April 7, 2014 O1 33 00- 6 DAP Submittals Page 6 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 4. lf the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change iu Co��tract Price or time for perfonna��ce, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a. When returned under this code the Coi�tractor may release the equipment and/or material for manufacture. b. Code 2 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a. The Contractor may release the equipment or material for ma��ufacture; l�owever, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combi��ation ofcodes is assigned when notations and comments are extensive enough to require a resubmittal ofthe package. a) b) c) The Contractor may release the equipment ar material for manufacture; however, all notations and comments must be incorporated into the final product. This resubmittal is to address all comments, omissions and non-confonning items that were noted. Resubmittal is to be received by the City within l 5 Calendar Days of the date of the City's transmittal requiring the resubmittal. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. Resubmittals a. Handled in the same manner as first submittals l) Corrections other tl�an requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked Submittals for each item will be reviewed no more than twice at the City's expense. l) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City withi�� 30 Calendar Days for all such fees invoiced by the City. CITY OF FORT WORTH Pav & Drng Impr•ovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r 01 33 00- 7 DAP Submittals Page 7 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Mock Up units as specified in individual Sections, include, but are not necessarily lim ited to, compiete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or wl�en directed. 24 M. Qualifications 25 If specifically required in other Sections of these Specifications, submit a P.E. 26 Certification for each item required. 27 28 29 30 31 32 33 34 35 36 37 38 39 G] � c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle tl�e Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to ��ot review submittals dee�ned partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. When the shop drawings have been co�npleted to the satisfaction ofthe City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. Each submittal, appropriately coded, will be returned within 30 Calendar Days followi��g receipt of submittal by the City. L. Mock ups N. Request for Information (RFI) l. Contractor Request for additional informatiou a. Clarification or interpretation of tl�e contract docu�roents b. When the Contractor believes there is a conflict between Contract Documents c. When the Coi�tractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 40 1.5 SUBMITTALS [NOT USED] 41 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 42 1.7 CLOSEOUT SUBMITTALS [NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH Pav & Drng hnprovenaents ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 01 33 00- 8 DAP Submittals Page 8 of 8 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 6 7 8 9 PART 2— PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Da}'s moditied to Calendar Da� s � � CITY Of FORT WORTH Pav & Drng /mpr nvements ACN— Norlh Beach St STANDARD CONSTRUCTION SPEQFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 � 0135I3-1 SPEC]AL PRO.IECT PROCEDURES Page 1 of 8 � 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 16 l7 18 19 SECTION 0135 13 SPECIAL PROJECT PROCEDURES A. Section Includes: l. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Contro] k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0— Bidding Requirements, Contract Forms and Conditions of tl�e Contract 22 2. Division ]— General Requirements 23 3. Section 33 l 2 25 — Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 A. Measurement and Payment ]. Coordination within Railroad permit areas a. Measurement 1) Measurement for this Item will be by lu�np sum. b. Payment ]) The work performed and materials furnished in accordance with this Item will be paid for at tl�e lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) AdditionalInsurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2. Railroad Flagmen CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20. 2012 Pav & Drng lnrproveinents ACN— North Beach SI City Project No. 1026�5 O1 35 13-2 SPECIALPROJECTPROCEDURES Page 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 a. Measurement l) Measurement for this Item will be per working day. b. Payment l) The work performed and materials furnished in accordance with this Item will be paid for each working day that Railroad Flagmen are present at the Site. c. The price bid shall include: 1) Coordination for scheduling flagmen 2) Flagmen 3) Other requirements associated with Railroad 3. All other items a. Work associated with these Ite�ns is considered subsidiary to the various Items bid. No separate payment wil) be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 l. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this ] 8 Specification, unless a date is specifically cited. 19 2. Healtl� and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 2l 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 26 27 28 29 30 31 32 Wl�en work in the right-of-way which is under the jurisdiction ofthe Texas Department of Transportation (TxDOT): a. Notify the TeXas Departme»t of Transportation prior to commencing any work therein in accordance with tl�e provisions of the pennit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Tra»sportation B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor a»d the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of suffrcient size meeting all OSHA requirements. 39 3. Equipment operating within ] 0 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage-type of guard about the boom or ann 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF PORT WORTH Pav & Drng lmprove�nents ACN— North Beach St STANDARD CONSTRUCT]ON SPECIFICATION DOCUMENTS City Project No. 102655 Revised December 20, 2012 r- 01 35 13 - 3 SPECIAL PROJECT PROCEDURES Page 3 of 8 l 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 a Q c. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de-energize the lines, or raise or lower the lines No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program ]. Provide and follow approved Coufined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Air Pollution Watch Days 1. General a. Observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". b. Typical Ozone Season 1) May 1 through October 31. c. Critical Emission Time 1) 6:00 a.m. to 10:00 a.m. 2. Watch Days a. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. b. Requirements ]) Begin work after 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. 2) However, the Coutractor may begi» work prior to ] 0:00 a.m. if: a) Use of motorized equipment is less than 1 hour, or b) If equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. E. TCEQ Air Permit 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. F. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 l�ours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section O1 31 13 G. Water Department Coordination CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Pav & Drng Improvemenls ACN— North Beach St City Project No. ] 02655 O1 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2. Coordinate any event that will require co�mecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischie� and the Contractor will be prosecuted to tl�e full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. H. Public Notification Prior to Beginning Construction Priar to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number fl Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre-construction notificatioi�' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20. 2012 Pav & Drng hnprovements ACN— North Beaeh SI Ciry Project No. ] 02655 r 013513-5 SPECIAL PRO.IECT PROCEDURES Page 5 of 8 1 2 3 4 5 6 7 8 9 ]0 11 12 13 14 ]5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the ii�terruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exl�ibit B. d. Deliver a copy of the temporary interruption notification to the City inspectar for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspectar. J. Coordination with United States Army Corps of Engineers (USACE) l. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. K. Coordinatiou within Railroad Permit Areas At locations in the project where coi�struction activities occur in areas where railroad pennits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. 3. Railroad Flagmen a. Submit receipts to City for verification of working days that railroad flagmen were present on S ite. L. Dust Control Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. M. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Pav & Drng /mprovemenls ACN— North Beach St City Project No. 102655 Ol 35 13 - 6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USEDJ 7 1.11 FIELD [SITEJ CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS (NOT USED] 10 PART 3- EXECUTION [NOT USED] ffl 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4.B — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safery, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit l3 � � CITY OF FORT WORTH Pav & C; .ng I�nprovements ACN— North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CiTy Project No. ]02655 Revised December 20. 2012 � O1 3513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 2 3 4 5 6 7 s 9 10 11 ]2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: EXHIBIT A (To be printed on Contractor's Letterhead) ' THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mf. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20. 2012 Pav & Drng Improvemenls ACN— Nordh Beach St Ciry ProjectNo. ]02655 013513-8 SPECIALPROJECTPROCEDURES Page 8 of 8 � 2 EXHIBIT B FORT WORTH Dete: �oE no. xxxx Pro)ect I�ame: I�O'rICE OF TEMPORARY WA7'ER SERVICE INTERRLiPTIOi�I DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUTAUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR � 4 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20_ 2012 Pav & Drng hnprovemertts ACN — North Beach SI Ciry Project No. 102655 r^ 01 78 39 - 1 DAP Testing and Inspection Services Page 1 of 2 1 2 3 PART 1 - GENERAL 4 11 SUMMARY 5 6 7 8 9 10 11 SECTION O1 45 23 TESTING AND 1NSPECTION SERVICES A. Section Includes: l. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Coutract Forms and Conditions of the Contract 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 14 15 16 17 18 19 20 21 22 23 24 25 A. Measurement and Payment l. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is respo��sible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance wiil not be issued by Ciry until all required payments far testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Testing l. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be perfonned by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, ar another form of distribution approved by the City. CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O1 78 39 - 2 DAP Testing and Inspection Services Page 2 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ]) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) l copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) l) Tests performed by City a) Distribute l hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perfonn work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 110 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 25 26 27 28 29 30 i.ii FiELn �siTE� coN�ITroNs �NOT USEn� 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Pai� & Drng hnprove��aents ACN—North Beach Sl STANDARD CONSTRUCTION SPEQFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r o� so oo- i DAP Temporary Facilities and Controls Page 1 of 4 1 � 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 SECTION O1 50 00 TEMPORARY FACILITIES AND CONTROLS A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily liinited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 18 L2 PRICE AND PAYMENT PROCEDURES 19 20 21 22 1.3 23 1.4 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 A. Measurement and Payment I. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities l�aving jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. ]) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor person��el and City's Project Representaiives. c. Coordination l) Contact City ] week before water for construction is desired CITY OF FORT WORTH Pav & Drng hnprovements AC,ti'— ,�'orth Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 1026�5 Revised April 7, 2014 O l 50 00- 2 DAP Temporary Facilities and Controls Page 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. Provide power for ligliting, operation of equipment, or other use. b. Electric power service includes te�nporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at coinpletion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materiais in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duratio» or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH Pav & Dr�ig Inaprovements ACN—North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 O1 50 00- 3 DAP Temporary Facilities and Controls Page 3 of4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 CG 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 l. Contractor is responsible for maintaining dust control tlirough the duration of the pro j ect. a. Contractor remains on-call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD (SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE-INSTALLATION 3.7 FIELD [oa] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 311 CLOSEOUT ACTIVITIES A. Temparary Facilities QTY Or FORT WORTH Pav & DrnglmprovementsACN—North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O 1 50 00- 4 DAP Temporary Facilities and Controis Page 4 of 4 1 1. Remove all temparary facilities and restore area after completion of the Work, 2 to a condition equal to or better than prior to start of Work. 3 3.12 PItOTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] � 7 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE `3 ^—� r-, � � �--, --, � CITY OF FORT WORTH Pm� & Drng Impr-ove�nents ACN— North Beuch St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r� 017839-1 DAP Street Use Permit and Modifications to Traffic Control Page l of 3 1 2 3 SECTION O1 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 l. Administrative procedures far: 7 a. Street Use Permit g b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 13 14 15 16 17 18 19 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forins and Conditions of the Contract 2. Division l— General Requirements 3. Section 34 71 l 3— Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to tl�e current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 7l 13 and submit to City for review. 1) Allow minimum ] 0 working days far review of proposed Traffic Control. B. Street Use Pennit l. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECT City Project No. ]02655 Revised April 7, 2014 017839-2 DAP Street Use Permit and Modifications to Traffic Control Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control l. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. ]) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street tJse Permit, such that construction is not delayed. D. Removal of Street Sign l. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage ]. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards l. Traffic Control Standards can be found on the City's Buzzsaw website. 27 1.5 SUBMITTALS [NOT USED] 28 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 29 1.7 CLOSEOUT SUBMITTALS [NOT USED] 30 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 31 1.9 QUALITY ASSURANCE [NOT USED] 32 33 34 35 36 37 38 1.10 DELNERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 112 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION GTY OF FORT WORTH Pav & Drng /mprovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECT City Project No. 102655 Revised April 7, 2014 r O17839-3 DAP Street Use Permit and Modifications to Traffic Control Page 3 of 3 r"+ r-� r� � �� �--� � � � � ^-r � CITY OF FORT WORTH Pav & Drng /mprove�nents ACN- North Becch St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECT Cit�� Projecl No. 102655 Revised April 7, 2014 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 1 2 SECTION O1 57 13 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 A. Section Includes: 1. Procedures for Storm Water Poliution Preve��tion Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1— General Requirements l3 3. Section 31 25 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 16 17 18 19 20 A. Measurement and Payment l. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than l acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 23 24 25 26 27 28 29 30 31 32 33 A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards l. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Stor�n Management (iSWM) Technical Manual for Construction Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Pav & Drng Invprovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO.IECTS City Project No. 102655 Revised July 1, 201 1 015713-2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 2 3 4 5 6 7 8 9 ]0 11 12 13 ]4 15 16 l7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3l 25 00 and Drawings. 2. l to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Co�nplete SWPPP in accordance with TCEQ requirements l) TCEQ Small Construction Site Notice Required under general permit TXR 150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send l copy to City Department of Transportation and Public Works, Enviromnental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3l 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete S WPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (8l7) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control i�� accordance with: a) Section 31 25 00 b) The Drawings c) TXR] 50000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Terminatiou can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (8l7) 392-6088. 40 1.5 SUBMITTALS 41 42 43 44 45 46 47 A. SWPPP Submit in accordance with Section O1 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Depart�nent of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Pav & Drng /naprovements AC�'— North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Ciry Project No. ]02655 Revised ,Iuly l, 2011 O] 57 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 - 1 B. Modified SWPPP 2 1. If the SWPPP is revised during constructio��, resubmit modified SWPPP to the City 3 in accordance with Section Ol 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2- PRODUCTS [NOT USED] l2 PART 3- EXECUTION [NOT USED] 13 14 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 15 , � C1TY OF FORT WORTH Pav & Drng hnprovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Ciry Project No. 102655 Revised July ], 2011 SECTION O1 58 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 A. Section Includes: l. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Farms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment l. Work associated with this Item is considered subsidiary to tl�e various Items bid. No separate payment will be allowed for tl�is Item. 1.3 REFERENCES [NOT USEDj 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 21 OWNER-FURNISHED �ox] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July L 2011 Pav & Drng Improvements ACN — North Beach St City Project No. 102655 O1 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) ar better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD �oa] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 311 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include paintii�g and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Pav & Drng Improvements ACN— R�nrth Beoch St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised July 1, 201 1 r-. � � n � � 0 --, --� --� � � CITY OF FORT WORTH STANDARD CONSTRUCTION SPGCIFICATION DOCUMENTS Revised July 1. 201 1 O1 58 13 - 3 TEMPORARY PRO.IECT SIGNAGE Page 3 of 3 Pav & Drng Improvements ACN — North Beach St City Project No. 102655 Ol 78 39- 1 DAP Product Requirements Page 1 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SECTION O1 60 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: ]. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification ] . None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division ] — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USEDJ 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is located on Buzzsaw as follows: 1. Resources\02 - Construction Documents\Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section O1 33 00 for submittal requirements of Product Data iucluded on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE (NOT USED] GTY OF FORT WORTH Pav & Drnglmprovements ACN— Norlh Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPERAWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 r—� O1 78 39- 2 DAP Product Requirements Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 E CITY OF FORT WORTH Pav & Drng Improvenaents AC�'—;1'orth Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPERAWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 O 1 66 00- 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SECTION O1 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARI' A. Section Includes: ] . Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division ] — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 1.3 1.4 1.5 1.6 A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED) ADMINISTRATIVE REQUIREMENTS [NOT USED] SUBMITTALS [NOT USED] ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Pav & Drng /mprovements ACN— North Beach S7 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O 1 66 00- 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 7 B 8 9 10 11 12 � 6. Provide manufacturer's instructions for storage and handling. Handling Requirements l. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimu�n inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arra��ge storage to provide easy access for inspection. 22 23 24 25 26 27 28 29 4. Restrict storage to areas availabie on construction site far storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off-site storage and protection when o��-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 3g Project Representative. CITY OF FORT WORTH Pav & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O1 66 00- 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD �oa] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non-Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED) 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH PaL & DrT�g Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 O1 66 00- 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 ,-, � ,.� --, r, -, �, � � 2 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 017123-1 CONSTRUCTION STAK►NG AND SURVEY Page 1 of 8 SECTION O1 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: l. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division l— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment l . Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and tl�e materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the fonn of "cut sheets" using tl�e City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As-Built Survey a. Measurement 1) Measurement for this ltem shall be by lump su�n. b. Payment 1) The work performed and the materials furnished in accardance with this Item shall be paid for at the lump sum price bid for "As-Built Survey". CITY OF FCRT WORTH Pov& Drng ImprovementsACN—North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised February 14, 2018 r� 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" sl�all be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. Tl�e price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as-built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As-built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Stakin� — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/ar right of way if indicated on the plans. 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — O l 71 23.16.01_ Attachment A_Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (�I) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A.The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, ifrequired, shall be in accordance with Section O] 33 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH Pav & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised February 14,2018 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plaus do not indicate grid or ground coordinates. 2. Submit "Cut-Sheets" conforming to the standard template provided by the City (refer to O1 71 23.16.01 — Attacliment A— Survey Staking Standards). 1.7 CLOSEOUT SUBNIITTALS B. As-built Redline Drawing Submittal I. Submit As-Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to Ol 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as-buiit and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as-built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSL]RANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Constructio�� Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. C 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re-stake far any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re-stake the deficient areas. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Docu�nents. b. For construction methods other than open cut, the Ccntractor shall perform construction survey and verify control data including, but not limited to, the following: ]) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH Pav & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised February l4, 2018 r 01 71 23 - 4 CONSTRUCT]ON STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of ]ine and grades to establish the location of the pipe. 4) Submit to the City copies of field notes used to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to begi�ming each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 OS 23 and/or 33 OS 24), immediately notify the City and correct the installation in accardance with the Contract Documents. C As-Built Survey .. Required As-Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as- built surveying. b. It is the Contractor's responsibility to coordinate the as-built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains l2" and under in diameter, it is acceptable to physically measure depth and mark the ]ocation during the progress of construction and take as-built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. General a. The Contractor shall provide as-built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub-outs, dead-end li»es (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non-gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater—NotApplicable CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 14, 2018 Pav & Drng Improvements ACN — North Beach St City Project No. 102655 O 1 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 The Contractar shall provide as-built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: l ) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) b) c) d) e) fl g) h) i) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire hydrants Valves (gate, butterfly, etc.) Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED) 1.12 WARRANTY PART 2 - PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant co��trol points, points of curvature and points of i��tersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line�and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the harizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut slieets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRl Shapefile (.shp) C1TY OF FORT WORTH Pov & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised February 14, 2018 r-� O1 71 23 - 6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and harizontal data iied to original project control and benchmarks, and shall include feature descriptio��s PART 3 - EXECUTION 3.1 INSTALLERS A.Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree ofprecision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific reyuirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed ] .0 ft. tolerance. b. Harizontal alignment on a structure shall be within .0.1 ft tolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than O.OSft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0. ] ft tolerance fro�n a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. I. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre-established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIF1CATlON DOCUMENTS Revised February 14,2018 Pav & Drng Improvements ACN — Norti� Beoch St Clty Project No. 102655 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A.If the Contractor's work damages or destroys one or mare of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restoratio��s. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD �oR] SITE QUALITY CONTROL A.It is the Contractor's responsibility to maintain all stakes and co��trol data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change ar relocate stakes ar control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time dee�ned necessary. 2. Checks by City personnel or 3�d party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH Pov & Drng Improvements ACN — North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102655 Revised February 14, 2018 r-� � � r-, � � 0 --, �--, � 017123-8 CONSTRUCTION STAKWG AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under ].3; modified 1.6; added l.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2— PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue texf'; revised measurement and payment sections far Construction Staking and As-Built Survey; added reference to selection wmpliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as-built survey "during' and "after" construction; and revised acceptable digital survey file format CITY OF FOR i WORTH STANDARD CONSTRUCTION SPECIF]CATION DOCUMENTS Revised February 14, 2018 Pav & Drng Improvements ACN — North Beach St City Project No. 102655 017423-1 DAP CLEANING Page 1 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 SECTION O1 74 23 CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification l. None. 1.2 1.3 1.4 1.5 1.6 1.7 1.8 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division ] — General Requirements 3. Section 32 92 13 — Hydro-Mulching, Seeding and Sodding PRICE AND PAYMENT PROCEDURES A. Measurement and Payment ]. Work associated witii this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. SUBMITTALS [NOT USED] ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] CLOSEOUT SUBMITTALS [NOT USED] MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleani��g wastes in containers specifically designed for those materials. CITY OF FORT WORTH Pav & Di•ng /mprovements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 017423-2 DAP CLEANING Page 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 l9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [oa] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED) 3.4 APPLICATION [NOT USEDj 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General ]. Prevent accumulatiou of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operatio��s to comply with laws and safety arders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil ar paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Pav & DrvrglmproveinentsACN—A�orth Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 017423-3 DAP CLEANING Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3� 39 40 6. Handle �naterials in a co��trolled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. B. Intermediate Cleaning during Construction l. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. Clean signs, ►ights, signals, etc. 3.11 CLOSEOUT ACTNITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Pav & Drng /mprovements AG'��— 11'orlh Beach St STANDARD CONSTRUCTION SPEQFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 r�- 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION � r, r, � � � � � � 3 CITV OF FORT WORTH Pav & Drng Improve�nents ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 0����9-i DAP CLOSEOUT REQUIREMENTS Page 1 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SECTION O1 77 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification l. None. 1.2 1.3 1.4 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Co�ltract 1. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Pa>> & Di-ng hnprovements ACN— North Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r� 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 0 PAT 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Recard Documents in accordance with Section O1 78 39 11 2. Operation and Maintenance Data, if required, in accordance with Section O 1 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 0 ] 74 23. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 .� C. FinalInspection 1. After final cieaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion ofthis inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective ar incomplete. 2. Upon receiving writte�� notice from the City, immediately undertake the Wark required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, i�� the presence of tl�e Contractor, will make a subsequent Final Inspection ofthe project. 4. Provide all special accessaries required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first ]ubrication ofthe equipment c. Initial fill up of all chemicai tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for init�al start-up a��d operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Pav & Drng ImprovementsACN— Nor�th Beach St STANDARD CONSTRUCTION SPEQFICATION DOCUMENTS DEVELOPER AWARDED PROIECTS City Project No. 102655 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1. Once the City Project Representative finds the Work subseyuent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Co��tractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD �oa] SITE QUALITY CONTROL [NOT USED] • 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Pav & Drng lmprovemenls AC.�"— North Beach SI STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 �^ 01 78 23 - I Operation and Maintenance Data Page 1 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SECTION O1 78 23 OPERATION AND MAINTENANCE DATA PART1-GENERAL 1.1 SUMMARY 1.2 1.3 1.4 1.5 A. Section Inciudes: ]. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment ]. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. SUBMITTALS A. Submittals shall be in accordance with Section Ol 33 00. All submittals shall be approved by the City priar to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8'/� inches x I 1 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Pav & Drng /mprovements AGh'— North Beach S[ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 01 78 23 - 2 Operation and Maintenance Data Page 2 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 e. f. Drawings 1) Provide reinforced punched binder tab, bind in with teXt 2) Reduce larger drawings and fold to size of text pages. Provide fly-leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manuai 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupmgs. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or ii�staller 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifyi�7g symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings far different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Pav & Drng/mprove�nentsACN—.North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 � 017823-3 Operation and Maintenance Data 1 3 4 Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, far architectural products, applied materials and finishes: g a. Manufacturer's data, giving futl information on products 9 l) Catalog number, size, composition 10 2) Colar and texture designations 11 3) Information required for reordering special manufactured products 12 b. instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 1 g a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures l) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut-down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Bescription of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed colar coded piping diagrams CITY OF FORT WORTH Pav & Drng bnprovemen[sACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 Ol 78 23 - 4 Operation and Maintenance Data Page 4 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 c. d. g� h. i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications As installed color coded wiring diagrams Operating procedures l) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking Manufacturer's printed operating and maintenance instructions List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 34 35 36 37 A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 r-� 017823-5 Operation and Maintenance Data Page 5 of 5 � -, � � � 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] � 7 : END OF SECTION CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Cih Project No. 102655 Revised April 7, 2014 � 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Page i oi4 1 2 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1.1 SUMMARY SECTION O1 78 39 PROJECT RECORD DOCUMENTS A. Section Includes: l. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification ] . None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division l— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request far Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 30 31 32 33 34 35 36 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other pocuments where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Pav & Drng Improvements ACN— A%or-th Beach S! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. ]02655 Revised April 7, 2014 ,-� 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of4 � 3. To facilitate accuracy of records, make entries within 24 l�ours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future ►nodification of the Work to proceed without lengthy and S expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements g l. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded ]0 data to the final Project Record Documents. I 1 2. In the event of loss of recorded data, use means necessary to again secure the data 1� to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER-FURNISHED �oa] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 co�nplete set of all Documents comprising tl�e Contract. 23 B. Final Record Documents 24 l. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 3l 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Docume»ts with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Pav & Drrrg Improvements ACN— North Beach SI STANDARD CONSTRUCTION SP6C1F1CATION DOCUMENTS—DEVELOPER AWARDED PROJECTS City Pro.ject No. ]02655 Revised April 7, 2014 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 ]2 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 2. Preservation a. Considering the Contract coinpletion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be perfonned, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a"cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In soine cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is detennined by the Contractor, subject to tl�e City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. l) Final physica] arrangement is determined by the Contractor, subject to the City's approval. 2) Sl�ow, by symbol or note, the vertical location of the Item ("under slab", "i�� ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specificatioi�s. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents l. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a"cloud" around the area or areas affected. CITY OF FORT WORTH Pav & Drng Improvements ACN— North Beach St STANDARD CONSTRUCTION SPECIFICATION DOCUMEN"CS — DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7. 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ]6 17 18 19 20 21 22 23 24 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other pocuments a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, otl�er than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION DATE � NAME 4/7/2014 � M.Domenech Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Pav & Drng Impirovements ACN— North Beaclf St STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 102655 Revised April 7, 2014 Approval Spec No.Classsification Manufacturer Model No.National Spec Size Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 11/28/18) 9/28/2018 33 05 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD)MHRC #220605 ASTM A48 AASHTO M306 **24" Dia 9/28/2018 33 05 13 Manhole Cover Neenah Foundry NF-1274-T91 ASTM A48 AASHTO M306 32" Dia 9/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry NF-1743-LM (Hinged)ASTM A48 AASHTO M306 32" Dia 9/28/2018 33 05 13 Manhole Frame Neenah Foundry NF-1930-30 ASTM A48 AASHTO M306 32.25" Dia 9/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry R-1743-HV ASTM A48 AASHTO M306 32" Dia 4/3/2019 33 05 13 Manhole Frames and Covers SIP Industries ++2279ST ASTM A48 AASHTO M306 **24" Dia 4/3/2019 33 05 13 Manhole Frames and Covers SIP Industries ++2280ST ASTM A48 AASHTO M306 32" Dia ++ Portions of this product is not made within the United States CITY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS DEPARTMENT STORMWATER MANAGEMENT DIVISION STANDARD PRODUCT LIST **Note: All new development and new installation mahnole lids shall meet the minimum 30-inch opening requirement as specified in City Specification 33 05 13. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Updated: 04/03/2019 * From Original Standard Products List Click to Return to the Table of Content 1