Loading...
HomeMy WebLinkAboutContract 54223-CO1 CSC No.54223-CO1 Ft-)R-r W_ n R-r H City of Fort Worth Change Order Request Project Name: Lake Arlington Lift Station City Sec No.: 54223 Project No.(s):l 56019107004301001480 NTP N/A _ City Proj.No.: 100995�-� Project Description: Construction of a new Sanitary Sewer Lift Station for the Lake Arlington Force Main Project Contractor: Bar Constructors Inc. Change Order# 0 Date: 6/29/2021 City Project Mgr.1 Pratima Poudyal City Inspector: Nathan Gray Phone Number: 817-392-6149 Phone Number: 817-392-4961 Dept. Unit I Lint=0tarlonunit II Water Alternate A•2 Totals Contract Time Calender days VIIl�l� -,-:.__ IAl Contract dl:l Amount Il ya,422,i 26.GG $72,565.00 1 $583,002.00 $10,077,693.00 48/ Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $$9,422,126.00 $72,565.00 $583,002.00 $10,077,693.00 487 Amounf of Proposed Change Order •$19,830.94 •$0.02 -$19 830.96 092 Revised Contract Amount $9,402,295.06 $72,564.98 $583,002.00 $10,057.862.04 579 Original Funds Available for Change Orders $201,654.00 $201,554.00 Remaining Funds Available for this CO $201,554.00 $201,554.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.20% MAXALLOWADLECONTRACTA41OUNT(ORIGINAL CONTRACT COST¢25%) $12,597,116.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.1 provides for the following: oThe installation of smaller motors for the three project pumps.The smaller motors were identified as being more efficient than the original pumps. o Credit for the difference between the original motors and the smaller motors. o Additional project expenses pending delivery of the smaller motors. o The installation of a 1-inch water service and meter box as required by Development Department. Staff concurs with the contractors request for 92 additional calendar days on the project for the time to manufacture and deliver the motors to the job site. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Cont=tDr Name Contractor m Date Bar Constructors Inc. Mike A ers C,1 i" ,(5 _;, Inspector Date ProjW Manapt 7/21/2021I 6 Z6 202 Duector Water Dept) Date 29gjWjJQ1111ffW&ter Dept) D h✓isfo h v a✓ v „s:ao10 1 JU128,2021 - ei aria ,liita,� 7' Assistant City Attorney Date Assistant Ci _ _ Date �f Aug 2,2021 doff Aug 6,2021 Council Action If Required) OFFICIAL RECORD M&C Number N/A M&C Date Approved CITY SECRETARY FT.WORTH, TX F�P,-r W6 R-r n City of Fort Worth Change Order Additions Project Nme P City Sec No.: 54223 e.Atlin_h Lift Station Project Nq.(s): 5601-9/07004301001480 DOEWT�N�_/A City Prof.No.: 10099 Project Gonstruaffon offs now Sanitary Sewer Lift Station f6r the Lake Arlihgton.Force Malb Project Dakriptibn Contractor Bar Constructors Inc. Change.order; i Date: C4.Pfojeot Mgr. Pratifna Poudyal City Inspector Nathan Gray ADDITIONS Tf .38 Variable Frequency Drive(500hp-VFDs) Unit I Lift Statio,h 3.00 EA $184,705.00 $55.4JI5.00 39 Switchgearj.PanelbDards,TransformeTs.(2400amp switchboard) Unit I Lift Station 1.00 LS $266,617.00 $256,617.00 40 Miscellaneous Electrical((00uced-wire,equipmenis) Unit i Lift Station 1,00 LS $216,021,95 $216,021.95 41. Additional Prqjqct-.Expanses Panding.Delimy of the Motors. Unit I Lift Station 1.00 EA .$31,122,06 $31,122.06 42 1-.inch Water Service with Meter acidBox -Unit 11 Water 1,00 EA $8,2591,62 $8,269:62 Unit Lift.Station $1,057,476-01 unit-11 water. $%2591M, Alternale A-2 Total Pagel of 3 Additions Sub To 5.63 F_ OR-r ` 'OR rti City of Fort Worth Change Order Deletions Project Name Lake Arlington Lift Station City Sec No.: 54223 Project No.(s): 5601910,70t}430I0t}.1480 DOE No. lV/A City Proj,No.: 100995 Project Description Construdon.of a new Sanitary Sewer Lift Station for the Lake Arlington Force Main Project Contractor Bar Construct=Inc. Change Order: Q pate 6l29I2021 City Project Mgr. Pratima Poudyal City Insoector: Nathan Gray DELETIONS ,;.k'rrw�lt;nr�sc�Ritz1'#ialit"-'" x{ 31 V4dable.Frequency Drive Unit I Lift Station 3.00 EA $189,800.00$569,400.00 32 Switchgear,Panelboards;Transformers Unit I Lift Station 10 1 LS $277,000.00 $277,000.00 37 Miscellaneous Electrical Unit I Lift Station 0.94411 L$ $245,000.00 $231,806.95 5 Concrete Pavement Repair Unit 11 Water 13.0344 1 SY $1.35.00 $1,759.64 6 1"Water Service Assembly Unit 11 Water 1.00 EA $6,600.00$6,500,00 i i i i i i i i i i i _ l Unit.[Lift Station $1,077,706.95 Unit 11 Water $8,259.64. Alternate A-2 Page.2 of.3 De'le0ons Sub Total $.1,085,966:w i MfWBE Breakdown for this Change Order Total❑ �'`Z:-i�'is�,s�iT`�412T✓�lif �`�'•.rl'S'>�(:�:~��}�.i'(��{�,7.�,j�.fi� t. =:'s'f:si'.ar{cM.tiG"s`i}`:.r'�"l 'i'•��-57' �#'V,,�,5'i :.X�ifi ]Fik,�.-1'f+�.• ��£?::<.!�'i . •Ili• :t Previous Change Orders „iYr},1f- :'}x?y"die„^::;vP, Y,.'t.%-�f;'^iti:�:fr�^ MiF�}%e _• •i�^."+%:t Total Page 3 of 3. Contract Compliance Manager By signing I acluiowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring allperforn-.ance and reporting requirements. Signature Pratima Poudyal,P.E. Name of Employee Project Manager Title a ATTEST: �� °FORT°�o�d a Ronald P Gonzales °o��� Ronald P.Gonzales(Aug 6,202111:14 CDT) _O °O Ronald Gonzales o o 0 Acting City Secretary °°o o° ,d j� 0000000o p ��SEX ASa�p OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX