Loading...
HomeMy WebLinkAboutContract 51923-FP1 FORTWORTH CSC No. 51923-FP1 WATER DEPARTMENT ENGINEERING AND FISCAL SERVICES ' I NOTICE OF PROJECT COMPLETION Cs s"1 q a 3 Regarding contract 51923 for Westside V Part 2 24&16-Inch Water Main as required by the Water Department as approved by City Council on 1/29/19 through 1bI&-C C-29014 the Director of die Water Department,upon the recommendation of the Sr. Capital Projects Officer,Capital Projects Delivery,Water Department,has accepted the project as complete. Original Contract Prices: $2,972,194.00 Amount of Approved Change Orders: $13,048.58 Ns 1 Revised Contract Amount: $2,985,242.58 Total Cost Work Completed: $2,975,692.58 Less Deductions: Liquidated Damages: 0 Days @$630.00/Day Other Deductions(see comments): Total Deduction Amount: $0.00 Total Cost Work Completed: $2,975,692.58 Less Previous Payments: $2,826,907.95 Final Payment Due $148,784.63 ,•�y rl J �o v � I E 2 Recommended for Acceptance Date Assistant Director, Water Department Christopher Ffarder(Aug 5,2021 14:31 CDT) Accepted Date Director, Water Department 067ha sblL i doff Dana Burghdoff ug9,202112:26CDT) City Manager Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 1 Project Name: %N"estsidc V Part 2—7 4&16-Inch Water Main DOE. Ns: Comments: Non-PO Voucher Retainage Only 5 6016--2060000--1003 78-RETAIN City Project Numbers 100378 DOE Number 1003 Contract Name Wcstside V Pert 2 24&16-Inch Watcr Main Estimate Number 16 Contract Limits Walsh Ranch and Morning Star Developments Payment Number 16 Project Type Water For Period Ending 4/15/2020 Project Funding Project Manager Qicrman City Secretary Contact Number 51923 Inspectors Johnson / Drake Contact Date 1/29/2019 Contractor Mountain Cascade ofTesas Contract Time 395 CD 11729 E FM 917 Days Charged to Date 194 CD Alvarado, 7'X 76009 Contract is .000000 Complete. CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded ----- --------------------------------- 1 56016-100378 $2,972,194.00 $0.00 $148,784.63 $148,784.63 Total Cost of Work Completed $2,975,692.58 Less 0 %Retained $0.00 Net Earned $2,975,692.58 Earned This Period $148,784.63 Retainage This Period $0.00 Less Liquidated Damages 0 Days « $0.00 /Day $0.00 LessPavemeut Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $2,826,907.95 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $148,784.63 Wednesday,April 15,2020 Page 5 of 5 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Conh•act Name Westside V Part 2 24& 16•Inch Water Main Conh•act Limits Walsh Ranch and Morning StarDcvclopntcnls Project Type Water City Project Numbers 100378 DOE Number 1003 Estimate Number 16 Payment Number 16 for Period Ending 4/15/2020 CD City Sccrctary Contract Ntmiber 51923 Contract Time 396:D Contract Date 1/29/2019 Days Charged to Date 194 Project lylanager Bicrman Conh•act is 100.00 Complete Conti-actor Mountain Cascade of Texas 11729EFM917 Alvarado, TX 76009 Inspectors Johnson / Drake Wednesday,April 15,2020 Page 1 of 5 City Project Numbers 100378 DOE Number 1003 Contract Name Westside V Part 2 24&16-Inch Water Main Estimate Number 16 Contract Limits Walsh Ranch and Morning Star Developments Payment Number 16 Project Tyre Water For Period Ending 4/15/2020 Project Funding Water Item Description ofltems Estimated Unit Unit Cost Estimated Completed Completed No. Qumrity Total Qumiit} Total --------------------------------------- 1 3311.0444 12"Water Pipe(Reslraine 5 LF $75.00 $375.00 5 $375.00 2 3311.0541 16"Water Pipe 1030 LF $80.00 $82,400.00 1030 $82,400.00 3 3311.0542 16"Water Pipe,CSS Backf 200 LF $219.00 $43,800.00 200 $43,800.00 4 3311.0544 16"Water Pipe(Restraine 735 LF $120.00 $88,200.00 735 $88,200.00 5 3311.0545 16"Water Pipe,CSS Backf 210 LF $233.00 $48,930.00 210 $48,930.00 6 3311.0651 24"DIP Water 3910 LF $145.00 $566,950.00 3910 $566,950.00 7 3311.0652 24"DIP Water,CSS Bacldi 65 LF $230.00 $14,950.00 65 $14,950.00 8 3311.0654 24"DIP Water(Restrained 2637 LF $180.00 $474,660.00 2637 $474,660.00 9 3311.0655 24"DIP Water,CSS Backli 60 LF $263.00 $15,780.00 60 $15,780.00 10 3305.1107 42"Casing By Other Than 565 LF $1,213.00 $685,345.00 565 $685,345.00 11 3305.2007 24"Water Carrier Pipe 565 LF $145.00 $81,925.00 565 $81,925.00 12 3312.3005 12"Gale Valve I EA $3,200.00 $3,200.00 1 $3,200.00 13 3312.3006 16"Gate Valve w/Vault 2 EA $17,000.00 $34,000.00 2 $34,000.00 14 3312.3008 24"Gale Valve w/Vault 10 EA $28,000.00 $280,000.00 10 $280,000.00 15 3312.1002 2"Combination Air Valve 1 EA $9,000.00 $9,000.00 1 $9,000.00 16 3312.1004 4"Combination Air Valve 4 EA $12,000.00 $48,000.00 4 $48,000.00 17 3312.6002 6"Blow Off Valve 1 EA $12,500.00 $12,500.00 1 $12,500.00 18 3312.6003 8"Blow Off Valve 4 EA $13,000.00 $52,000.00 4 $52,000.00 19 3312.0106 Connection to Existing 16 1 EA $4,000.00 $4,000.00 1 $4,000.00 20 3312.0108 Connection to Existing 24 1 EA $6,000.00 $6,000.00 21 3311.0001 Ductile Iron Water Fittings(CON 1) 13.44 TO $2,705.00 $36,355.20 13.44 $36,355.20 22 0241.1118 4"-12"Pressure Plug 1 EA $1.400.00 $1,400.00 1 $1,400.00 23 0241.1106 16"Pressure Plug I EA $1,500.00 $1,500.00 1 $1,500.00 24 0241.1109 24"Pressure Plug 2 EA $2,100.00 $4,200.00 2 $4,200.00 25 0171.0101 Construction Staking I LS $16,000.00 $16,000.00 1 $16,000.00 26 0171.0102 As-Buill Survey I LS $1,500.00 $1,500.00 1 $1,500.00 27 3305.0110 Utility Markers 1 LS $500.00 $500.00 28 3305.0112 Concrete Collar 22 EA $200.00 $4,400.00 22 $4,400.00 29 3305.0103 Exploratory Excavation of 9 EA $1,000.00 $9,000.00 9 $9,000.00 30 3305.0109 Trench Safely 8852 LF $1.00 $8,852.00 8852 $8,852.00 31 3110.0101 Site Clearing I LS $10,000.00 $10,000.00 1 $10,000.00 Wednesday,April 15,2020 Page 2 of 5 City Project Numbers 100378 DOE Number 1003 Contract Name Westside V Part 2 24&16-Inch Writer Main Estimate Number 16 Contract Limits Walsh Ranch and Morning Star Developments Payment Number 16 Project Type Water For Period Ending 4/15/2020 Project Funding 32 3123.0101 Unclassified Excavation b 100 CY $12.00 $1,200.00 33 3123,0103 Borrow by Plan 600 CY $14.00 $8,400.00 34 3124.0101 Embankment by Plan 100 CY $14.00 $1,400.00 35 321 1.0113 8"Flexible Base,Type A, 10858 SY $12.00 $130,296.00 10858 $130,296.00 36 3231.0211 Barbed Wire Fence,Metal 100 LF $12.00 $1,200.00 100 $1,200.00 37 3231.0306 16'Gate,Steel 2 EA $1,500.00 $3,000.00 2 $3,000.00 38 3292.0400 Seeding,Hydromulch 32331 SY $1.00 $32,331.00 32331 $32,331.00 39 3292.0500 Seeding,Soil Retention B 930 SY $2.00 $1,860.00 930 $1,860.00 40 3213,0101 6"Cone Pwnt 342 SY $85.00 $29,070.00 342 $29,070.00 4I 3137.0105 Medium Stone Riprap,grow 733 SY $80.00 $58,640.00 733 $58,640.00 42 3125.0101 SWPPP >_I acre 1 LS $1,300.00 $1,300.00 1 $1,300.00 43 9999.0000 Seeding 150 SY $5.00 $750.00 44 9999.0000 Fertilizer I AC $300.00 $300.00 45 9999.0000 Reinforced Concrete Pipe 30 LF $120.00 $3,600.00 60 $7,200.00 46 9999.0000 Safety End Treatment 2 EA $4.200.00 $8,400.00 4 $16,800.00 47 9999.0000 Barricades,Signs,and'fra 6 MO $1,500.00 $9,000.00 4 $6,000.00 48 9999.0000 Temporary Erosion Control I LS $20,000.00 $20,000.00 1 $20,000.00 49 9999.0000 Intersections,Driveways, 110 SY $80.00 $8,800.00 110 $8,800.00 50 Relocation ofexisting 3-inch reuse line(CO#1) 1 LS $8,593.38 $8,593.38 1 $8,593.38 51 Beggs Entrace Gate Upgrade(CO/11) I LS $2,180.00 $2,180.00 1 $2,180.00 52 Lowering oFBOTOC under Pond(CO#1) 1 LS $9,200.00 $9,200.00 1 $9,200.00 -------------------------------------- Sub-Total of Previous Unit $2,985,242.58 $2,975,692.58 -------------------------------------- Wednesday,April 15,2020 Page 3 of 5 City Project Numbcrs 100378 DOE Number 1003 Conti-act Name WestsideV Part 24&IG-Inch Water Main Estimate Number IG Contract Limits Walsh Ranch and Morning Star Developments Payment Number IG Project Type Water For Period Ending 4/15/2020 Project Funding Contract I11fo1•111ation Summary Originnl Couh•act 1\1nount $2,972,194.00 Change Orders Change Order Number 1 $13,048.58 Total CoutractPI-ice $2,985,242.58 tc In I I Total Cost of Work Completed $2,975,692.58 Contr1c,, t Less D %Retained $0.00 Dare Net Earned $2,975,692.58 a -//-� I h!!j?,Cction SUP rvis99r Earned This Period $1,18,784.63 G -Date [on 5 o l�� Retainage This Period $0.00 Sc 5 � �IIIL rG�r o Project Miriam Less Liquidated Damages N/A Days r@ /Day $0.00 Date LessPavement Deficiency $0.00 Asst.DircctorlfPW Less Penalty $0.00 ��t�' HOB Less Previous Payment $2,826,907.95 Christopher wI,IAu^5202114:31 CDT) Date y Director/Conlracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Paynrcrrt $148,784.63 Wednesday,April 15,2020 Page 4 of 5 FORTWORTH rev 03/05/07 WATER ENGINEERING &FISCAL SERVICES FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:16 NAME OF PROJECT: Westside v Part 2, 16&24 Water Main PROJECT NO.: 100378 CONTRACTOR: Mountin Cascade CITY PROJECT PERIOD FROM.04/01/20 TO: 04/15/20 FINAL INSPECTION DATE: 12/30/19W WORK ORDER EFFECTIVE:4/8/2019 CONTRACT TIME: 3 q S 0 wo QQ co DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. S. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 PERIOD PREVIOUS PERIOD 94 TOTALS TO DATE 1 94 'REMARI(S: /'. CONTItXeTOR DATE INSPECTOR DATE Capital Projects Delivery,Water Department The City of Fort Words •1000 Throckniorton Street•Fort Worth,'TL 76012-6311 (817)392-4477 •Fax:(817)392-8,160 FORTWORTHREV:02/20/07 Capital Projects Delivery, Water Department PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Nacre of Contractor Project Name Mountain Cascade Westside V Part 2, 16&24 Water Main IJ'ater Eagiueering luspector DOE Number Carmen F Drake JN(rter Engirneering Inspector Project Manager Water ❑Waste Water ❑Storm Drainage ❑Pavement Ralcesh Chaubey Initial Contract knount Project Difficulty 2,972,194.00 +Change Order 13,048.58 @ Simple Q Routine O Complex Final Contract Amount Date $2,985,242.58 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Slandard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 2 8 4 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 1 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 1 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y r1 20 20 TOTAL ELEMENT SCORE(A) 339 BONUS POINTS(25 Maximunt)(B) TOTAL SCORE(TS) 339 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] x 100%) 339 / 443 = 76% Performance Category Good <20%=I radequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature Inspector Signature Contractor Signature Inspector's Supervisor CONTRACTOR'S COMMENTS Capital Projects Delivery,Water Department The City of Fort Wordt •1000 Throcicrnorton Street-Fort Worth,T1'.76012-6311 (817)392-4477•Fax:(817)392-8460 FORTWORTHREV:02/22/07 Capital Projects Delivery,Water Departtneiit CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: Name of Contractor Project Name Mountain Cascade Westside V Part 2, 16&24 Water Main Maier Engineering Inspector Project Manager Carmen F Drake 100378 DOE Number Project Difficulty Tjpe of Contract Simple Q Routine Q Complex 2)Water ❑Waste Water ❑Storm Drainage ❑Pavement Irniifal Contract,1lmomu Final Contract knount 2,972,194,.00 $2,985,242.58 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs I I mowiedge And/Or Problem Resolution ADMINISTRATION 2 AvailabiIity of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Tnnetrame III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature Inspector Signature Inspector's Supervisor INSPECTOR'S COMMENTS Capital Projects DeiiveLy,N1ter Department The City of Fort Worth•1000 Throclunorton Street•Fort Wort1i,TX 76012-6311 (817)392-4477•Fax:(817)392-8,160 ��R`1I' WORTH WATER ENGINEERING&FISCAL SERVICES PIPE REPORT FOR: PROJECT NAME: Westside V part 2, 16&240 Water Main PROJECT NUMBER: 100378 DOE NUMBER: WATER PIPE LAID SIZE TYPE OF PIPE LF 24 Class DIP 250 6675 LF 24 Class DIP 250 42 steel casing 565 LF 16 Water PVC 2105 24=7240 LF 16=2105 Total=9,345 LF FIRE HYDRANTS: 0 VALVES(16" OR LARGER) 12 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: 43 Desities Every 200 LF NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: WATER ENGINEERING&FISCAL SERVICES The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-4477•Fax:(817)392-8460 L-) C7r�iT Wo RT 1LI City of Fort Worth CITY SECRETARY III CONTRACT NO. 51Ra3-clot Change Order Request r ProjeCC j<Iame: Westside V Part 2,16 and 24 Inch Water Main City Sec No.: 51923 —� n' `Probe-"c .(s): 56016/06004301001780 DOE No. N/A CityProj.No.:l 100378 Project Description: Installation of 16 and 24-Inch in West Fort Worth to connect a pump station and elevated storage lank. Contractor: Mountain Cascade of Texas,LLC Change Order# Date: 8/5/2019 City Project Mgr.1 Rakesh Chaubey City Inspector. I Carmen Drake Phone Number: 817-392-6051 Phone Number: 817-392-8347 Dept. Water Totals Contract Time (Calender days) Original Contract Amount $2,972,194.00 $2,972,194.00 365 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,972,194.00 $2,972,194.00 365 Amount of Proposed Change Order $13,048.58 $13,048.58 030 Revised Contract Amount $2,985,242.58 $2,985,242.58 395 Original Funds Available for Change Orders $148,610.00 $148,610,00 RemainingFunds Available for this CO `✓�•J1�T + $148,610.00 $148,610.00 ..•••••.!y Additional Funding(if necessary) f�� 0;' CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.44°o MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $3,7'15,242.'CIA Ca'. JUSTIFICATION(REASONS)FOR CHANGE ORDER .` Change Order No.1 will provide for the following: • Compensation for additional BOTC lowering to provide additional vertical separation between the bottom of a pond that was encountered during construction and the project water.The original BOTC design could have adversly impacted the bottom of the pond. a � • Relocation of a conflicting 3-inch reuse line. ..; • Replacing the entrance gate to satisfy a impacted property owner. Staff concurs with the contractor's request for 30 additional calendar days on the change order. n: I b It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represent ymen in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name I- Contra tor.Name t � pat Mountain Cascade of Texas,LLC A 1MC( ,f(OG ' Inspector .Dale Pr ' ct Manager Date , '4e-fa14Mt Directo Water Dept) /Date Co*auction Supervisor Water d,pt Date Ass st n Clly Attorney Date Ass'stant City M Hager Date Council Action I If Required) M&C Number NIA M&C Date Approved NIA FOP,-r WbP,-rj-j[ City of Fort Worth Change Order Additions Project Name Westside V Part 2,16 and 24-Inch Water Main City Sec No.: 51923 Project No.(s): 56016/06004301001780 DOE No. N/A City Proj.No.: 100378 Project Installation of 16 and 24-inch in West Fort Worth to connect a pump station and elevated storage lank. Description Contractor Mountain Cascade of Texas,LLC Change Order:= Date: 8/5/2019 City Project Mgr. F Rakesh Chaubey City inspector Carmen Drake ADDITIONS DEPT QtY Unit Unit Cost Total 50 Relocation of existing 3-inch reuse line Water 1.00 LS $8,593.38 $8,593.38 51 Beggs Entrance Gate upgrade Water 1.00 LS $2,180.00 $2,180.00 52 Lowering of BOTOC under Pond Water 1.00 LS $9,200.00 $9,200.00 i I a ,j Water $19,973.38 Page 2 of 4 Additions Sub Total $19,973.38 Fc>P.-- ' WoP,-r m City of Fort Worth Change Order Deletions Project Name Westside V Part 2,16 and 24-Inch Water Main City Sec No.: 51923 Project No.(s): 5601610600430/001780 1 DOE No. = City Proj.No.: 100378 Project Description Installation of 16 and 24-inch in West Fort Worth to connect a pump station and elevated storage tank. Contractor Mountain Cascade of Texas,LLC Change Order: FI-1 Date 8/5/2019 City Project Mgr. Rakesh Chaubey City Inspector: FCarmen Drake DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 21 Ductile Iron Water Fittings w/restraints Water 2.56 TN $2,705.00 $6,924.80 l II I Water $6,924.80 Page 3 of 4 Deletions Sub Total $6,924.80 9 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO i Total $0.00 i Previous Change Orders u co# DATE AMOUNT i� it I� 'i , Total $0.00 { i tl f I + I I I J I I � I b Pi Page 4 of 4 �' Contract Compliance Manager By signing I aol mowledge that I am the person responsible for the monitoring and administration of this contract including • ensuring ail performance and reporting requirements. Signs e 1 i Name of Employee All<cT iAl4�lh Title i AFFIDAVIT STATE OF TEXAS COUNTY OF JOHNSON Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Andrew L. McCulloch,Vice President Of Mountain Cascade of Texas, LLC, known to me to be a credible person,who being by me duly sworn,upon his oath deposed and said; That all persons,firms, associations,corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in Rill; That there are no claims pending for personal injury and/or property damages; On Contract described as; Westside V -Part 2-24& 16-Inch Water Main BY Andrer . McCulloch,Vice President Subscribed and sworn before me on this date 6th of April,2020. WANDA SUE JARRELL =°1 �6':Notary Public.State of TeXOG "r pp Comm.Expires 06-29.2020 y tb tc Notary iD_11.952407 J t n County,Texas CONSENT OF SURETY ONVN13R o TO FINAL PAYMENT ARCHITECT 0 AIADQCuinwnt G707 CONTRACTOR 0 SURMY O Bond No. 070208522 OTHER O TO ONVNER: ARCHITECT'S PROJECT NO.: (Narna a»daddnw) City of Fort Worth 200 Texas Street CONTRACT'FOIL: Fort Worth,TX 76102 P110JEC'r: CONrRACTOAXED,January 22,2019 (NunrearreladJrrn� Westside V-Part 2-24&16 Inch Water Main,City Project No. 100378 In sct;ordi nce with the provisions of the Contract between the Ownerand the Contractoras indimteti above,the (Jason naarr and artdiraof,57rrr:r�) Liberty Mutual Insurance Company 175 Berkeley Street Boston,MA 02116 SURF,TY, on bond of (/attar na+ueand adiLuaq(Cwrl,wstu+) Mountain Cascade of Texas LLC 11729 East FM 917 Alvarado,TX 76009 CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of Its obligations to anwitnatuoandadrlmc;ofoewe) City of Fort Worth 200 Texas Street Fort Worth,TX 76102 OWNRR, as set forth In said Surety's bond. 1N NYHTNESS WHEREOF,the Surety has hereunto set its band on this date. April 6,2020 f/+uva in thdmanadr.dareaud)var,) Liberty Mutual Insurance Company (�aFnr{j By: AN (STyrai r oJaulLa9zrQ up) r lati 1 i 111 Attest. (sew): Bradley N.Wrigh Atto ney-in-Fact (P�r'urer!uw u e u,nJ r(rJa) Surety Phone No. 617-357-9500 G707 1994 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy, or validity of that document. State of California County of San Francisco ) On 2,0 D before me, S. Nicole Evans, Notary Public (insert name and title of the officer) personally appeared BRADLEY N. WRIGHT--------------------------------------------------- who proved to me on the basis of satisfactory evidence to be the person(a)whose name(s)is6avec subscribed to the within instrument and acknowledged to me that he/s'hwt ey.executed the same in his/�reetltF e*authorized capacity *,and that by his/beathek signature(s) on the instrument the person(4), or the entity upon behalf of which the person(s)acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ANS WITNESS my hand a/d official seal. s MICoi E Caiilo y• •�•_",�1'r�,,� Notary Public-Calilornia _-'ui•: %� i San Francisco Counly z /� y ;� •,w,,}„,� Commission 11 217 197 7 My Coil) Expires rlec I 1 2U20 Signature (Seal) i i THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in fife manner and to the extent herein staled. Certificate No.8190939 Liberty Mutual Insurance Company The Ohio Casually Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casually Insurance Company is a corporation duly organized under the laws of the Slate of New Hampshire,[fiat Liberty Mutual Insurance Company is a corporation duly organized under the laws of the Slate of Massachusetts,and West American Insurance Company is a corporation duly organized under the laws of[he Slate of Indiana(herein collectively called the*Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Carolyne Emery S.Nicole Evans-Frances M Murphy-Bradley N.Wright all of the city of San Francisco -state of CA each individually if[here be more than one named,its true and lawful allorney-indacl to make,execute,seal,acknowledge and deliver,for and on its behalf as surely and as its act and dead,any and all undertakings,bonds,recognizances and otter surely obligations,In pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of[he Companies have been affixed thereto this 281h day of August 2018 �t.v,[+rcv sr�q? �yt.,Fastrria, F�:,o+stnrq.;. 'C3� The Ohio Casualty Insurance Company W Liberty Mutual Insurance Company o West merican Insurance Company Q By: STATE OF PENNSYLVANIA ss David M.Carey,Assistant Secretary � COUNTY OF MONTGOMERY � 61 On This 281h day of August 2018,before roe personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance u F- a) Company,The Ohio Casually Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute The foregoing instrument for the purposes �,�, 0.2 therein contained by signing on behalf of the corporations by himself as a duly authorized officer. C LLJ M 48 > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written, O d Sr, PAST COMMONWEALTH OF PENNSYLVANIA �''C C-6 rp psou vrF-0�C<f Notnrial Soil �/,, , 1 -4 t_ '+ �3' F a Pnslnlin,Nclory Public By: �LC•�-a✓ 00 ` or- innTvip.,hlonigomary County Toresa Paslelia,Notary Public ` ssion Expires March 26.7021 -4:0 4- +SY0 J�p Mombur.Ponnsylynoi,ALsm)otion of Nolarios 0 E 0 tv +rar vu tl , C This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casually Insurance Company,Liberty Mutual rn c tD Insurance Company,and Wes[American Insurance Company which resolutions are now in full force and effect reading as follows: C o' a+ai cM ZM w ARTICLE 1V-OFFICERS-Section 12.Power ofAltorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject 0 c a; to such limitation as the Chairman or the President may prescribe,shall appoint such atlorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, 0,c acknowledge and deliver as surely any and all undertakings,bonds,recognizances and other surely obligations. Such allorneys-indacl,subject to the limitations set forth in[heir respective 'p E+6 powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so ar O L executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or allorney-in-fact under > the provisions of[his article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such pourer or authority. s c ARTICLE XIII-Execution of Contracts-SECTION 5.Surely Bonds and Undertakings.Any officer of the Company authorized for that purpose in waiting by the chairman or the president, and subject to such limitations as the chairman or[he president may prescribe.shall appoint such atlorneys-infact,as may be necessary to act in behalf of the Company to make,execute, E M o seal,acknowledge and deliver as surely any and all undertakings,bonds,recognizances and other surely obligations. Such attorneys-in-fact subject to the limitations set forth in their o0 Z respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so 0 0 executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attorneys-in- fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surely any and all undertakings,bonds,recognizances and other surely obligations. Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casually Insurance Company, Liberty Mutual Insurance Company, and Was[American Insurance Company do hereby certify thal the original power of attorney of which the foregoing is a full,true and correct copy of the Pourer of Attorney executed by said Companies,is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this `! day of ' >>/r 20 4{Y IP7S(;', LNiSVN V rung, / . 0 1Jlu n 1912 3 ` 1991 n By. S ',� Renee C.Llevre ssislanl Secretary d "n.v.,:,• q\ � or,:nn�`';,F ,:any 1' 361 of 400 LMS 12a73 022017 n FORT WORTH a� rw Y Ls June 11,2021 Mountain Cascade of Texas 11729 E FIVI 917 Alvarado,TX 76009 Re:Acceptance Letter Project Name: Wcstside V Part 2 24&16-Inch Water Main Project Type: Water Project Asp: 100378 DOE.X2: N/A Contract.l�s: 51923 Dated: 1/29/2019 Gentleman: On December 30,2019 a final inspection was made on the subject project. There were punch list items identified at the time. The punch list items were completed on . The final inspection and the corrected punch Est items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the Cite. The warranty period will start on December 30,2019,which is the date of punch list completion and will extend for(2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance,please feel free to contact me at(817)392-6054 Yours Truly, Tony Sholola,P.E.,Assistant Director,Water Department TS / cc: Chris Harder,P.E.,Director,Water Department Laura Wilson,P.E.,Deputy Director,Water Department Captain Michael Shuns,Fire Department Bill Lundval,Sanitary Sewer Systems Superintendent,Water Department Cesar Zavala, Water Systems Superintendent,Water Department Rakesh Chaubey,Project Manager David R Johnson,Inspection Supervisor,Capital Projects Delivery,Water Department Carmen Dnke,Inspector,Capital Projects Delivery,Water Department Jenifer Tatum,P.E.Kimly Horn,Consultant Mountain Cascade of Texas,Contractor File WATER DEPARTMENT ENGINEERING AND FISCAL SERvias THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH,TEXAS 76102 817-392-8240 * FAX 817-392-8195 �'3 Printed an recycled paper