HomeMy WebLinkAboutContract 52577-A3 AMENDMENT NO. 3 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES NORTHWEST COMMUNITY CENTER STATE OF TEXAS CITY SECRETARY CONTRACT 52577-A3 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Brinkley Sargent Wiginton Architects, Inc., (Consultant) made and entered into City Secretary Contract No. 52577 (The Contract) which was administratively authorized, the 26th day of July, 2019, for Phase One, Programming, Schematic Design and Cost Estimating of the Northwest Community Center; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for Drainage Study Models and Report. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the Schematic Design, Design Development, Construction Documents, Bidding/Negotiations and Construction Administration Phases. The cost of this additional service is $739,750.00 including reimbursable expenses. The scope of services is described more fully in Brinkley Sargent Wiginton Architects, Inc. Amendment 1A - Proposal dated June 24, 2021 . 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However the total fee paid by the City shall not exceed a total of $1 ,164,777.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth,Texas Standard Agreement for Professional Services AMENDMENT Revision Date:7/1/2019 CITY SECRETARY Page 1 of 2 FT. WORTH, TX Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and g,�A administration of this contract, including By: Dana Burghdoff(M15,20 119:33CDT) ensuring all performance and reporting Name: Dana Burghdoff, AICP requirements. Title: Assistant City Manager Date: Jul 15, 2021 Approval Recommended: Name: Brian Glass Title: Architectural Services Manager Approved as to Form and Legality: By: Steve 19,202109:35 CDT) Name: Steve Cooke Title: Director, Property Management Dept. X By: 3Strong(Jull )211 Attest: Name: John B. Strong Title: Assistant City Attorney Contract Authorization: By: Ronald P.Gonzales(Jul 16,2 09:54 4ann�� M&C: 20-0241 Name: Ronald Gonzales aaF FORt GGoa p. °oo°0000 ry Title: Acting City Secretary O..0° pio 0 a oo o 6p d °o A °o �� °O00000° b VENDOR: nexASop Brinkley Sargent Wiginton Architects, Inc By: Stephe prings(Jun 25,200 12:52 CDT Name: Stephen Springs Title: Senior Principal Date: J u n 25, 2021 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Standard Agreement for Professional Services AMENDMENT Revision Date:7/1/2019 Page 2 of 2 Attachment"A" Amendment IA -Proposal June 24,2021 FORT WORTH NORTHWEST COMMUNITY CENTER SERVICES AND COMPENSATION 11.2.1 A/E BASIC SERVICES INCLUDED IN THE CONTRACT SCOPE OF WORK. A. BASIC A/E SERVICES(ONE LEVEL STRUCTURE): $662,422 (Based upon$7,807,595 construction budget) Basic Services Includes: • Architecture • MEP Engineering(SBE subcontract) • Structural Engineering(SBE subcontract) • All Services Noted Below • Fees to be billed monthly by percent as follows: i. Schematic Design 15% ii. Design Development 25% In. Construction Documents 35% iv. Bidding/Negotiations 5% v. Construction Administration 20% The budget may be adjusted from time to time by City of Fort Worth's authorization. The Architect will receive no adjustment in the fixed fee should the actual accepted construction bid amount vary from the budget and subsequently be approved by the city unless it is a result from additions to the program areas. Should the City increase the construction budget as a result of increased scope of work the Architect will receive a fee adjustment equal to 8.25%of the budget increase. SUPPLEMENTAL SERVICES IN ARE INCLUDED AS FOLLOWS: *indicates services provided by SBE subcontract. *CIVIL ENGINEERING (SITE ACCESS): "Site Access" civil engineering services is defined as those required to site provide culvert and roadway access to the project. These services include additional surveying, providing site horizontal control, drainage maps, paving plans, grading plans, storm water pollution prevention plan(SW3P),and related construction administration. ($67,000) Related as-built documents: ($3.600) Subtotal $70,600 EXCLUDED SUPPLEMENTAL SERVICES ARE AS FOLLOWS: TECHNOLOGY DESIGN: Low voltage design will be provided by Owner. Such systems include structured cabling, audio/visual,security and access controls. Owner shall provide timely design data and direction as required for design team to include raceway in the electrical documents. EQUIPMENT,FURNITURE SELECTIONS AND PROCURMENT: Assist in the selection,specification &procurement of equipment and furnishings is excluded. Fort Worth Northwest Community Center Exhibit C,Page i of 2 FOOD SERVICE DESIGN SERVICES: Food service design is excluded, pending possible scope to be determined. SUMMARY OF PROFESSIONAL FEES: Basic Professional Services $662,422 Supplemental Services $70,600 Reimbursable Allowance (estimated) $6,728 TOTAL AMENDMENT#IA $739,750 SCOPE OF WORK ASSUMPTIONS AND EXCLUSIONS 1. Location of project is in Northwest Community Park, as concluded during the conceptual design and programming phase. 2. Bidding and design will be executed using a single-phase construction approach and traditional CMAR procurement method. 3. Cost estimating services is excluded beyond review of estimates provided by CNIAR. Any re-design costs related to inaccurate estimates will be additional services. 4. Building size is approximately 20,000 sf, single story,as per approved program. 5. Anticipated design start is June of 2021. 6. Rezoning,if necessary,will be by Owner. 7. Fee excludes LEED or similar certification. 8. Contract Administrative site observation services are based on an average of twice monthly site visits and 13 months duration. 9. Geotechnical reports will be provided by the Owner. 10. Structural engineering services are based upon utilizing a pre-engineered frame structure for the gymnasium, and a structurally suspended foundation. Fort Worth Northwest Community Center Exhibit C,Page 2 of 2