HomeMy WebLinkAboutContract 56167 CSC No. 56167 DESIGN PROCUREMENT AGREEMENT FOR ANALYSIS AND REPORT ON FOREST HILL SEWER This DESIGN PROCUREMENT AGREEMENT("Agreement") is entered into by and between the City of Fort Worth, a home-rule municipal corporation of the State of Texas("City"), acting herein by and through, its duly authorized Assistant City Manager, and Holt Lunsford Commercial Investments,LLC,a Texas limited liability company ("Developer") acting by and through its duly authorized representative. City and Developer are referred to herein individually as a party and collectively as the parties. Recitals WHEREAS, Developer desires to obtain an analysis of approximately 12,500 linear feet of sanitary sewer main within the City of Forest Hill between Wichita Street and Salt Road, as more specifically depicted in Exhibit A which is attached hereto and incorporated herein by reference ("Project"); and WHEREAS, the analysis will support the determination of the remaining useful life and identification of the cleanouts for the sewer to assist Developer and the City in determining the viability of the sewer to support Developer private development; and WHEREAS, City desires to participate in the cost of the Project; and WHEREAS, City and Developer desire to enter into this Design Procurement Agreement for the Project; and WHEREAS, Developer has determined that Dunaway Associates, L.P. ('Design Consultant") should perform the Project based on demonstrated competence and qualifications to perform the Design Consultant services for a fair and reasonable price; and WHEREAS, City staff have reviewed the scope, fee and schedule for the Project and find them to be fair and reasonable; and WHEREAS, Developer will initially fund the costs of Design Consultant and City will reimburse Developer for the City's portion of the design up to a maximum amount of $61,379.07 and WHEREAS,Developer shall not earn a fee based upon the City's portion of the design fees paid to Design Consultant; NOW, THEREFORE, for and in consideration of the above recitals and the mutual covenants and agreements herein contained, the City and Developer agree as follows: OFFICIAL RECORD CITY SECRETARY Design Procurement Agreement for Analysis and Report on Forest Hill Sewer FT. WORTH, TX SECTION 1 GENERAL REQUIREMENTS 1.1 The Project will generally consist of engineering analysis, support, and CCTV inspection and condition assessment for sanitary sewer lines ranging in size from 12" to 36". The full scope of work is outlined in Exhibit "D". 1.2 Developer will retain Dunaway Associates, L.P. as the Design Consult for the Project pursuant to a written agreement attached hereto as Exhibit "B". 1.3 The Design Consultant shall provide a summary of the results of the CCTV inspection that includes a determination of the quality of the pipe and remaining useful life ("Report"). The City shall pay to Developer the City's Share of the costs for the Project in an amount not to exceed $61,379.07. City's total liability to Developer pursuant to this Agreement shall not exceed $61,379.07. Developer shall pay all other costs of Design Consultant. Upon completion of the Report, Developer shall submit to the City a copy of all invoices of Design Consultant and proof that Developer has paid Design Consultant in full for the Report. City shall pay the City's Share of the design costs to Developer within 30 days after receiving the invoices and proof that Design Consultant has been paid in full. 1.4 City shall have the ultimate right to approve or disapprove the Report. SECTION 2 TERMINATION 2.1 Termination. This Agreement may be terminated without cause by either party upon delivery of written notice to the other party of such intent to terminate. If this Agreement is terminated before completion of the Report by Design Consultant, City shall reimburse Developer for the work performed by Design Consultant in an amount not to exceed $61,379.07, minus Developer's share of the work performed, after delivery by Developer to City of copies of Design Consultant's invoices and proof of the amount paid by Developer to Design Consultant. 2.2 Ownership of Report. City shall own the Report and other documents and work product Design Consultant creates for the Project. In the event this Agreement is terminated, City shall have the right to enter into an agreement with Design Consultant to complete the Report for the Project. Developer shall include the City's ownership right and the City's right to enter into an agreement with Design Consultant to complete the Report in Developer's agreement with the Design Consultant. 2.3 Fiscal Funding Out. Notwithstanding anything to the contrary, if, for any reason, at any time during the term of the Agreement, the Fort Worth City Council fails to appropriate funds sufficient for the City to fulfill its obligations under this Agreement, the City may terminate the portion of the Agreement regarding such obligations to be effective on the later of. (i) delivery by the City to Developer of written notice of the City's intention to Design Procurement Agreement for Page 2 of 19 Analysis and Report on Forest Hill Sewer terminate or (ii) the last date for which funding has been appropriated by the Fort Worth City Council for the purposes set forth in this Agreement. SECTION 3 FORCE MAJEURE 3.1 If either Party is unable, either in whole or part, to fulfill its obligations under this Agreement due to acts of God; strikes, lockouts, or other industrial disturbances; acts of public enemies; wars; blockades; insurrections; riots; epidemics; public health crises; earthquakes; fires; floods; restraints or prohibitions by any court, board, department, commission, or agency of the United States or of any state; declaration of a state of disaster or of emergency by the federal, state, county, or City government in accordance with applicable law; issuance of a Level Orange or Level Red Alert by the United States Department of Homeland Security; any arrests and restraints; civil disturbances; or explosions; or some other reason beyond the Party's reasonable control (collectively, "Force Majeure Event"), the obligations so affected by such Force Majeure Event will be suspended only during the continuance of such event. SECTION 4 LIABILITY AND INDEMNIFICATION 4.1 DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL PROPERTY LOSS, PROPERTY DAMAGE AND/OR PERSONAL INJURY, INCLUDINGDEATH, TOANYANDALL PERSONS, OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED, IN CONNECTION WITH DEVELOPER'S OBLIGATIONS UNDER THE DESIGN SERVICES AGREEMENT, TO THE EXTENT CAUSED BY THE NEGLIGENT ACT(S) OR OMISSION(S), MALFEASANCE OR INTENTIONAL MISCONDUCT OF DEVELOPER, ITS OFFICERS, AGENTS, SERVANTS OR EMPLOYEES. 4.2 DEVELOPER AGREES TO DEFEND, INDEMNIFY, AND HOLD THE CITY, ITS OFFICERS, AGENTS, SERVANTS, AND EMPLOYEES HARMLESS AGAINST ANY AND ALL CLAIMS, LAWSUITS, ACTIONS COSTS, AND EXPENSES OF ANY KIND, INCLUDING,BUTNOT LIMITED TO, THOSE FOR PROPERTYDAMAGE OR LOSS (INCLUDING ALLEGED DAMAGE OR LOSS TO DEVELOPER'S BUSINESS AND ANY RESULTING LOST PROFITS) AND/OR PERSONAL INJURY (INCLUDING DEATH) THAT MAY RELATE TO, ARISE OUT OF, OR BE OCCASIONED BY (I) DEVELOPER'S BREACH OF ANY OF THE TERMS OR PROVISIONS OF THIS AGREEMENT; OR (II) ANY NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF DEVELOPER, ITS OFFICERS, AGENTS, ASSOCIATES, EMPLOYEES, CONTRACTORS(OTHER THAN THE CITY),OR SUBCONTRACTORS RELATED TO THE PERFORMANCE OF THIS AGREEMENT,EXCEPT THAT THE INDEMNITY PROVIDED FOR IN THIS SECTION SHALL NOT APPLY TO ANY LIABILITY RESULTING FROM THE SOLE NEGLIGENCE OF THE CITY OR ITS OFFICERS, AGENTS, EMPLOYEES, OR SEPARATE CONTRACTORS, AND IN THE EVENT OF JOINT AND CONCURRENT NEGLIGENCE OF BOTH DEVELOPER Design Procurement Agreement for Page 3 of 19 Analysis and Report on Forest Hill Sewer AND CITY, RESPONSIBILITY, IF ANY, SHALL BE APPORTIONED COMPARATIVELY INACCORDANCE WITH THE LAWS OF THESTATE OF TEXAS. NOTHING HEREIN SHALL BE CONSTRUED AS A WAIVER OF THE CITY'S' GOVERNMENTAL IMMUNITY AS FURTHER PROVIDED BY THE LAWS OF TEXAS. 4.3 Developer's agreement with the Design Consultant shall include a release and indemnity in favor of the City in substantially the following form: "DESIGN CONSULTANT SHALL INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH AGAINST LIABILITY FOR ANY DAMAGE CAUSED BY OR RESULTING FROM AN ACT OF NEGLIGENCE, INTENTIONAL TORT, INTELLECTUAL PROPERTY INFRINGEMENT, OR FAILURE TO PAY A SUBCONTRACTOR OR SUPPLIER COMMITTED BY THE DESIGN CONSULTANT OR DESIGN CONSULTANT'S AGENT, CONSULTANT UNDER CONTRACT,OR ANOTHER ENTITY OVER WHICH THE DESIGN CONSULTANT EXERCISES CONTROL." SECTION 5 INSURANCE 5.1 Developer shall maintain the insurance requirements set forth in Exhibit "C", which is attached hereto and incorporated herein for all purposes. 5.2 Developer shall require in its contract with Design Consultant that City is listed as an additional insured on Design Consultant's insurance policy. SECTION 6 NONDISCRIMINATION 6.1 Developer shall not engage in any unlawful discrimination based on race, creed, color, national origin, sex, age, religion, disability, marital status, citizenship status, sexual orientation or any other prohibited criteria in performing the services under this Agreement. SECTION 7 VENUE AND CHOICE OF LAW 7.1 Developer and City agree that this Agreement shall be construed in accordance with the laws of the State of Texas. If any action, whether real or asserted,at law or in equity, arises on the basis of any provision of this Agreement, venue for such action shall he in state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas— Fort Worth Division. SECTION 8 THIRD-PARTY RIGHTS AND ASSIGNMENTS Design Procurement Agreement for Page 4 of 19 Analysis and Report on Forest Hill Sewer 8.1 The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 8.2 Developer agrees that it will not subcontract or assign all or any part of its rights, privileges or duties hereunder without the prior written consent of the City, and any attempted subcontract or assignment of same without such prior consent of the City shall be void. SECTION 9 BINDING COVENANTS 9.1 Subject to the limitations contained herein, the covenants, conditions and agreements made and entered into by the parties hereunder are declared to be for the benefit of and binding on their respective successors,representatives and permitted assigns, if any. SECTION 10 INDEPENDENT CONTRACTOR 10.1 Developer shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the City. Developer shall have exclusive control of, and the exclusive right to control the details of the work performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, employees and subconsultants (or subcontractors). Nothing herein shall be construed as creating a partnership or joint venture between the City and Developer, its officers, agents, employees and subconsultants (or subcontractors),and doctrine of respondent superior has no application as between the City and Developer SECTION 11 AMENDMENTS, CAPTIONS, AND INTERPRETATION 11.1 Except as otherwise provided in this Agreement, the terms and provisions of this Agreement may not be modified or amended except upon the written consent of both the City and Developer. 11.2 Captions and headings used in this Agreement are for reference purposes only and shall not be deemed a part of this Agreement. 11.3 In the event of any dispute over the meaning or application of any provision of this Agreement, this Agreement shall be interpreted fairly and reasonably, and neither more strongly for or against any party, regardless of the actual drafter of this Agreement. SECTION 12 GOVERNMENTAL POWERS AND IMMUNITIES 12.1 It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. Design Procurement Agreement for Page 5 of 19 Analysis and Report on Forest Hill Sewer SECTION 13 AUTHORIZATION AND COUNTERPARTS 13.1 By executing this Agreement on behalf of Developer, the person signing below affirms that he or she is authorized to execute this Agreement and that all representations made herein with regard to the signer's identity, address, and legal status are true and correct. 13.2 This Agreement may be executed in several counterparts, each of which will be deemed an original, but all of which together will constitute one and the same instrument. SECTION 14 SEVERABILITY AND NO WAIVER 14.1 It is agreed that in the event any covenant, condition or provision herein contained is held to be invalid by any court of competent jurisdiction, the invalidity of such covenant, condition or provision shall in no way affect any other covenant, condition or provision, and does not materially prejudice either Developer or City in connection with the rights and obligations contained in the valid covenants, conditions or provisions of this Agreement. 14.2 The failure of either party to insist upon the performance of any term or provision of this Agreement or to exercise any right granted hereunder shall not constitute a waiver of that parry's right to insist upon appropriate performance or to assert any such right on any future occasion. SECTION 15 COMPLIANCE WITH LAWS 15.1 This Agreement is subject to all applicable federal, state and local laws, ordinances, rules and regulations, including, but not limited to, all provisions of the City's Charter and ordinances, as amended. 15.2 If City notifies Developer or any of its officers, agents, employees, contractors, subcontractors, licensees, volunteers, or invitees of any violation of such laws,ordinances, rules or regulations, Developer shall immediately desist from and correct the violation. SECTION 16 NOTICES 16.1 Notices to be provided hereunder shall be sufficient if forwarded to the other party by hand- delivery or via U.S. Postal Service certified mail, postage prepaid, to the address of the other party shown below: Design Procurement Agreement for Page 6 of 19 Analysis and Report on Forest Hill Sewer To the City: To Developer: Fort Worth Water Department Holt Lunsford Commercial Investments, LLC Attn: Attn: Jim Brice 200 Texas Street 5950 Berkshire Lane, Suite 900 Fort Worth, Texas 76102 Dallas, Texas 75225 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 And City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 SECTION 17 HEADINGS 17.1 The headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. SECTION 18 RIGHT TO AUDIT 18.1 Developer agrees that the City shall, until the expiration of three (3) years after final payment under this Agreement, have access to and the right to examine any directly pertinent books, documents, papers and records of the Design Consultant involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. 18.2 Developer shall include in its contract with the Design Consultant a right until the expiration of three (3) years after final payment under this Agreement, to have access to and the right to examine any directly pertinent books, documents, papers and records of Design Consultant involving transactions relating to this Agreement and the agreement between Developer and Design Consultant. The Design Consultant must agree that the City shall have access during normal working hours to all necessary Design Consultant facilities, and shall be provided adequate and appropriate work space,in order to conduct Design Procurement Agreement for Page 7 of 19 Analysis and Report on Forest Hill Sewer audits in compliance with the provisions of this section. The City shall give Design Consultant reasonable advance notice of intended audits. SECTION 19 PROHIBIT ON BOYCOTTING ISRAEL 19.1 Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The term 'boycott Israel" has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term "company" has the meaning ascribed to it by Section 2271.001 of the Texas Government Code. By signing this Agreement,Developer certifies that Developer's signature provides written verification to the City that Developer:(1)does not boycott Israel;and(2)will not boycott Israel during the term of this Agreement SECTION 20 SOLE AGREEMENT 20.1 This Agreement, including any exhibits attached hereto and any documents incorporated herein, contains the entire understanding and agreement between the City and Developer, and any lawful assign and successor of Developer, as to the matters contained herein. Any prior or contemporaneous oral or written agreement is hereby declared null and void to the extent in conflict with any provision of this Agreement. (Remainder of Page Intentionally Left Blank) Design Procurement Agreement for Page 8 of 19 Analysis and Report on Forest Hill Sewer IN WITNESS THEREOF, the parties have made and executed this Agreement to be effective on the date signed by the Assistant City Manager. CITY OF FORT WORTH: DEVELOPER Holt Lunsford Commercial Investments, LLC Dam ft47h Dana Burghdoff(A g 12,202116:24 CDT) By; Dana Burghdoff Name: Assistant City Manager Title: RECOMMENDED BY: Date: Christopher Hard (Aug 12,202113:51 CDT) Christopher P. Harder, PE Water Department Director APPROVED AS TO FORM AND LEGALITY: Richard A.McCracken(Aug 12,202115:16 CDT) Richard A. McCracicen Sr. Assistant City Attorney ��FORT��� ��*01-0�0410000000ATTEST: P"o�00Ronald P. Gonzales �� o d Ronald P.Gonzales(Aug 13,202111:42 CDT) s(T ��000000 ICY Ronald Gonzales ��SEX Asap Acting City Secretary AGREEMENT AUTHORIZATION: CONTRACT COMPLIANCE MANAGER By signing,I acknowledge that I am the pers on responsible for the monitoring and administrationofthis contract, including enduring all performance andreporting requirements. M&C: n/a Nafif Kasnir Y•Matt Kusnir(Aug 11,202111:33 CDT) — Name:Matthew Kusnir,PE n/a Engineering Manager,W/WW Planning and Horizontal Date approved: Asset Management Form 1295: n/a Design Procurement Agreement for p OFFICIAL RECORD Analysis and Report on Forest Hill Sewer CITY SECRETARY FT. WORTH, TX EXHIBIT A �Z �F S �C aw � w i� W N N J J =a �z �a W I , LL o f P, 15 t" Design Procurement Agreement for Page 10 of 19 Analysis andReport on Forest Frill Sewer EXHIBIT B (AGREEMENT BETWEEN DEVELOPER AND ENGINEER) DUN WAY TO: Todd h+4nrchesarii Holt Wnsfwd Cornmercial wma cry No.P006085b05 5950 Corkshire Lane Suite 9w DaoffQ,Ta)= 75225 August 5,2021 rmachesani9hdnvnu0rd.C::: Reference: Proposal for Professional Services From: Wichita CCTV Sewer Review, Fort Worth, Texas Jonathan Russell,F.E. Todd— Engagement Manager Associate Principal Dunawo Associates, LLC Duna rs y { � pleased FO submit tfiis proposal for professlonal clvil services on the above-refe"ceod Project. used on f Q Baslemerway Location venU$ previous conversotlons, a befjeve the tol 5S0 Bailey Avenge owl SCOl7e Of sarrices will $Vita AQO n meet your eds e for this Project. Fort Worth,TXTb107 PromeofUndwrstaucPina The City of Fort Worth and Bolt Lunsford cve entering into a Design Prgcurement Agreement (DPA) to allow for City reimbursement of the cost to complete a CCTV Gt are wasting sewer line through ttre City of +Forest 119. This inspection is being completed to determine what improvements are necessary to increase capacity artid}or mainfain the e4sting sewer system. The services bekow include the CCTV provided by Ace Pipe Ckeclning and engineering report by Dunaway Associates. Exec_ylfive.Fee Summary 1. Closed ClmufitToI@Vislan (CCTV) Inspection.............$55,370 Lump Sum 2. Sewer CCTV Engineering Recommendations............$5,Mo Lump Surn 3. Manogerneni and ACE Pipe Cleaning Coordination.......,...—.......... ....................................$3,500 Lump Sum 1*101: Lump Svm Services $63,870.00 LU Dunaway proposes to provide the scope of work described below for a fee as shown above. Please find attached to this proposal our Standard Terms & Conditlom for professional services, which is also part of this proposal, dunamry.com Design Procurement Agreement for Page 11 of 19 Analysis and Report on Forest IEII Sewer DUN AWAY - Fro posalfof Profasslorial5ervioes WicNta CCTV Sewer Review,Fort Worth.Twos Page 2 DEfl�rl.1=D SCOPE OF IhWQ I- sed irc i TTv l snr;�topr}-Ace Pipe Clearing, Inc will provide the labor. equipment, Material, and supplies for fine cleaning orrd CCTV inspection on the project in accordance with the CCTV propasaf by Are Pipe Cleaning.This scope includes labor and equipment to perform CCTV inspection on approAmcitdY 15400 Fr of 12-36 inch sewer pipasi. 2. Sewer CCIV Englnee6noRecommendations - Dunaway will provide englnearing recommendations based off the design flaws requested by the City of Fort Worth, the conditions of the exis ng rncnholes, and eacisting pipe conditions vs the expected remalning He of the system. This report will include an Exhlbit depicting locatfom of known issues[is well as easement needs and severer improvement recommendations- 3. ManagernorLtand ACE Pbe CtearVinnC - DuncFwoy wilt mawge the contract for CCTV with ACE Pipe Cleaning and coordinate scheciaales to complete the scope of work prupased by ACE Pipe Cleaning. Dunaway w9l also coordfncrta access fc the sewer fine with City of Forest Hil and City of Fort Worth staff, Only those services spocificcrly mentioned in the$cope of Work section are offered os part of this proposal, ADDITIONAL 5ERVICEI(riot facluded In of000scal3 The fallowing is to list of some, but not necessarlly ON, Of the services that can he useful or regvired for a Project of this type.The listed sarvices have not been included In this proposal. Dunaway can provide or snub-consult many of these services if desired by the Client. If tlwe Client determines"of these servlices is desired, Dunaway oan either arnend this proposal to incorporate the desired service or setvlc_�; or recommend other actions fo cover the needs as expr%sed. }. Design of off-site public utifiiy exterfsiomis not included unless specifically list ted in the proposed scope of work. 2. Consfr,-K-,forl Slaking - This service Gan be provided, if requested, and w1I to cavIhormed under a separate proposal or included 1n this one at the Client's option. 3. Surveying services such as boundary surveys and ds-b-u t surveys and ease ments by sepurcate instrument ore not incWed cniess Specifically mentioned in the scope of work. 4. Design of off-site pub&--utilFty extensrons is Trot included unless specifically listed in the proposed Scope of work. 5. Sewer Easements by Sepordte Instrument is not included. -..__.. -- - - ---....--- -- - -------- -- dUMYrMYsom Design Procurement Agreement for Page 12 of 19 Analysis and Report on Forest Hill Sewer DUNAlllW Proposal for Proft-Aortal services Wichita CCTV Sewer Review, Fort worth,Tars Page 3 If this proposal meats with your approval, p6o..-e sign below, and return one copy to our of"os our notice to pros. d_We cppr&ck3te the opportunity to asslst you with this Project and look forwal%cf to h success. Respectfully submitted. DUNAWAY ASSOCtATLS, UC, AWe@d A Accepted a Texas limited liabilily company HOLT LUNSFQRD COMMERCIAL B'y' Darrell Howard. Jr., P, . Discipline Lead Rlr�rr7c = Tfi9e- . Dak Jon than Fussell.P.E. Engagement Manager i Associate Principal Attachment: Standard Terms&.Condlifons 17F�llQu GiPFo�_tiyGr.l�rty0ad0"iTyA-aa.mu�_45T�ti I4��11'$riYar HCNew Prarxa�fd'f,�1{�]Sdoc[ Design Procurement Agreement for Page 13 of 19 Analysis and Report on Forest Hill Sewer TAN DA RD TERMS & CONDITIONS Mg&140f2 ihme 4tvtidord Terms d Canditiu am gtd;ched to om lu*l,:orporalsd 15r1d Ih*Mmt CorrkoclL Tim Ems CdMmCk Sol~yy{b These Arondord Tamd,and Cmdlions,k.orr,rrmej£^alr #a'AVetmQ-rW hmfvi� I. bails ql Oxnpwr ahwi IT=lessicnd Sa&" be ru. NG Di has h:OTW Peffi%l. Wepi as pra'ide�dm 5ao934'1 .A lms rmni ft znd ta%-d upan illrrtM !, F"i4Nil XVK- Jha iGr11 I:: 1xv PeMorrrled by DUnamW canplelL,is kin_ s1,rr• %I%c,<z pu":Finay hasacnales. Aimlohm LAC under IM tworrrnl am d MCI 910rdard4rn,Aj6aRMStL�ue.lhh kjAKIia t Ki* 18r Elm hemlN at Iha CW". Hoeft omjukbe-d gypdahe]avwdMW ji kd"ey• FAMED Owl!caYe!UM ors IrpmrnCiWly"dunes AND H9NELIJU RAMSCHROUR on Iht port ar C r5o %Modulo. LLC ho5rcd anq I I kLY ElLL 4rTE parGan cr ~ft Mal a Pah Yo Us Ag"m W4 f�dM1n1sIralrrv......_.,,. ,,.,,.,.,,,.,...Mix- $IIW L%c r'�'�$' �n r�I 'Fed to any [orrboc7or, Itirurcai'rn�yih4ryy $llom-$k21J0 %Ac*nllac". suppler_ or IM ui Qfq, d6Gam NukXll i rq�bs prtrerd.._._.;95L10- VE M er1 v'k,g%r.s.L-1stTe'1.or sLro H&L of.5 by bf I I+ rn. F:ti^nri l.................---.............3135A4- 2' j0 w. CLoWs Illnll"la ha.ra.cr Covampk The Ckntam r�1 achric ............. ..............36J1_ • $143M such 09*01 E" 4hec and a$akci U-.B c�pnlroCj0ri. {�dur�Fnaar.. ...,,,,,,,.,,�_..__#I V.D11- $12&W hgWz)ftLAonls.aperric arNd affg "L 011ho 411hr,b.�l Pr[jacl En¢��ar„n ,.,,,,,.,,.,,_.—_$I�.ull• p OF4la Rre CAM t CUd"0 bf b+one*k>sur¢rce 6LVIhQ a{;''•�l gfreer_•---•--•-•-•-•-iLIF¢•¢[I- 1EIYk40 or attar o3w1ructtcrk 2mapl vAh rkft as Ih¢Ir Troy FBCtrfHC'�rflrc•a.___•--._._.._._..., I$iz.4D 1f2AiCrp hrnro IatFrapra3o*al prn,�kr?_tarKa.TheClentand h aal 5+�r°�u-•-•-•--•-----r#155 1D �I TI a P460" +macs. uC: ears, ihdl sv Bun+ry Party Ch]ai $Izsm- : IA6CID tiawfils ROMIher carrlrv�yoa, ir#G4 iU rYE Crtrd Sway Lp 7 $94J>0- $1MM RK09y Bak!A1"MI......... _T7MM #R",W 11amv r__._--_.__—__,,,.,,,,,,,,,$1ixim $DIM the Pr51a. AGerard prrgraaler 8vL41+X wega�te t. UC:l Ia d acW&AmWhiclhrtsm_��,.,#1�k1J}} $IlaA4 �ol�, ac:iF.P.r�r +y-�+o4 +asocktass uc. sErwh4"�rNaeP I��rs$ldwlelrcrflk� .,,,#$11 �12�D0 M41 dfnP7t"! �.d su4ccmagn1-+gr a OMW ttLonLa(Wkaq a WOW" $1 PEW eW*w pmKpv-Fc=nI D-RimW AzioCipli h 1C 4r hi or IEw- -ow -At,. tm releye 1ha ww-31 aw upm1 - $ mj* eNk1 01 D'Qk du*i mcd rcdpansriGx 4lrern............... $T3 4- WDD lndL%A . W I+v1 #sled 1a. Dwftietlan rrmKrrx OL%=p a Lersd $145Aa• 11G rna1hCH3b, 111DWeMit tettrOques ar PP1C aAji4 Crga hiorhW.......... $21SA*- $&Xh6 r4aexar5 for perlcrm�rr�, 1a�+fi,krr lrrG ar I n C:I firm rWra44r��aecvlM+e_.}7BD - T P tf:cfdhahrg a1 PWOffi a1 RV tiJ4k 01 Co+C# Ibn h Rt,�:v-rJ L.iono9erJEr�arfMa__.._._._..�34-�04- $'!`+200 aLca'Ur M WIh Iro COMA Ct %1eEh,trrerds and mW &W'91gn!j radna ro_rn Dr5aQIY priCoki7bcq rega Fed byanyreol0lm4 x—W. Vvmvedv Awxhlm LLC and h4 fw W 11. Llrntatbn of t&*W. jko-*re IkAeQl a,lerrt pemy11a7 by Wik- I h7"ctga_+rarfq IDaroeraha any K an"rcl001 low, OM r-01Ld1h4karrdFg wn' orw prvAUi or thk '=ryr curEWL kin cerllrachor cr affW dnJllr or R}er Apeem¢rl. H 1a told Whf h IIXi 4 ale �Tt�9�h�W)n lh IN4 wart a1 any he ilh D f esacbtee; LLC o-d �f daWk ed� or sale#r Grsesixc.Ttrp cla d eeaih�+re C;rrrerd LLi~Y adllcea. dbmla4 parvy+IL *ittuteei. cUerks ccdtr w i 1"SK)rrFle Ibr Ja6ale salsflr, and a d a.rna a+t�atblas. TLC Sadcursl,ltor&, a5d +w 115 IIr01 Ihb IMI"9-01 G-M"IYUWl b OW an 9?Hvrrk to C*nl and amNne ddrring 4.tt owgh CkerL'a D ajyej1Yr wlh Ihr award C::rYrc , 1h4 Or ur-dW 4;6LAI,for wj arrd dt ckWm.k ';.a4ki of L I : pd alk'�us Iran tha Ci4rr4 Pw+�wry taaaciaks. d13MQ2esxtrofscM,wa&Ks -a,ICr,i¢a,#k�4arrk aria L_C=Mdr}�rx„k.Y 45�nvh195 L1 s$u:�ca�sUlsrlGstG� UTf wvf Na3Aed la Its*Frlgrl-"p,plBaMer41 imm 4i kwkw niltd and shot W InVift addMrrol Ylsuredl ,indsr the �ureml Cori'ar.-or'i gorora' iu Ar Q'rf CO_ee a a>aLcns, iv.�.iiJ-"j bur*r4f IrrrF>•d In 7M rr+op4 fr0ruk-ml errors as arK30o u.sUiicl)sadly KlSudnc'a Pdk-rr• Or 4r94d1 A COAIfact.a—rai1Y rxpraGs or Wrr•;gq 01 YTR 1-.amre4ffial(an. II fZ I,rrdanlWd Ph::t itch ARe•merr n-ar• DLAX-Tyr+rarcavbs.UC or C_mwaif bmQWft LL=b 91flze o, dkeclam pQlnrrc. ardFi3 % a■ be° 'i Ed ' Itng�1 ILrb t l arrd yTrTrrQrt {clra,�uy +ssvct0ti& LL1G's �+ibC'Oreu�mts a ors! tl shfl0 Gr5�4ft1!d on Ihgtcrrerhod al corn^_u attar.i5 Ihtvrt shad net amaipd■1► oortrp' tenrecsMad $QOW"1 'an x'r°rt paFarmad air abprMnXs Ir on E:y OWLaAlnr!rWhIee,%Lt WKWlhis AgM4rmarJ_ 30 dQN Of-t ` III. No C.rRMe�Gmropr&kMWIN"ruhr!3 nTf•alher VIL FOYMN'k and r' OW1. Clenl cecarrmcr h-F31 prompt ploti+s70r al INs agraarrrinl,n4111r$rp4dl f,b b�lrhle p`nmcr or f}rob � ,a-r� s I._ti's rwaleaa IL ah is In&aF W ror t0ft do na s:Ylrll IhSX 111:1 i iyiiir. al the Darr -kr."ar-k n t+ �F'i' d q� T51d .a,++�aree.lny re•4-lies lorpra�.kf�,y�4r.�*is inIa". chm to Ma I&A U 1" alher pats. regaldloss a Iha aW des l parr a1 eggs ti3 aq, SG d �s r'ralW4 d adx fa�+l v xdlelra ti waG rarrMnitlp{I bf I►r� dQ,Y al ddo d rwdc�.,c1 a0004nh p�sl a��+�So Bars C1k,4 or Cr_rlawm Jcmdakci LLQ lk-H i m moms&"6ite*dlpW4rtaesla1)tic sera or IZE aOU" Q a_XvrsU11Wk- Cl +ra .rnlbl d3mapes rl D9r n1oNh�. 6r Mrrurrram alouo}a W + rrdrl .GLA am ml L•N le b bss of sae and bus a +A*he-r tx ls+a•.at It•0 past=w arecWI pw rrrarlh prg11 Design Procurement Agreement for Page 14 of 19 Analysis and Report on Forest Hill Sewer STANDARD TERMS & CONDMONS &2&s W. CtxraMan vr5myli ■. II Cbw*.far"remaan.foe iD C&I ttdis.m theWb rmek iw44*0 Ik-e-1k:Id M the u.�ftpwi d pard9n -m ov, 3wak Aemclo j supplee,artdoperlecNtraMof4r{qu, LL04 Lw4 ■■+ANn 20dw3crl lwdeardaia.Nxhaaorf 9. All ram;:C ron4a4r h-,Kp*G teas pdd 131Eri. LLC hm " Ve io oeamg vrro4 on 1nff Mtmh!�IgrC6W&babdvbrlkhq.atfan1 Mko1q, 9"JKI h2-d C#er1 57a1 wdwo ark drip MrAml and m Pan l alien ore dw34eo;•1 acwol aril. Llur ar Assoelah-,LLt_I:r—Jogm of-Aw•ioes,and • F¢ wffkm rQI arrarad m a pall ul Gunr"ny shell CeFcndandYh¢rM 0 bkgW." Anockfjty LLC! Aftb hMas.LLnrrxna7sr.ni,-.w. %eCAgnl may.al Iran axi aches!aryl.army L.i.*M p Ica share MN 44 appal.corWacl dkactMr• ilh tfW ItIi.F"y iar Fnia-i IJ.n•rrr V AMCtles. LLLi CMIan45-:5r 1*MA 9-r-h PwAzaS Cr lh--Wl I)Lnuy-Qf AssaCk*m LLC CJH 5'r.1 use l:"I.Lra%vM AunCbW.UC Ih4OW1 Yr ■XII OOrrhods ae mode INDLuh Eu r *4*ti ied•Mlh pre-n-nm purl d4w4*1koIkm. In -aacInhA LLC.v mvke aita al HN wl b-i the&eel 1114 PrCOC-1 1 NVW-A&d.Oknl seal oeD pa4 ended fo Ree nN omar,nf al such apnlr +r the cost ai rgmWcWifk [rid shay) nmaeaomw appraPfttQ car acl Iwrm GM omalbu 7Ip� as Durmmn rerwmm ttrr"k, 3m4r%l N*km pokV of IN-0')"Klr sled whh buulprl, sctwdL4a 4r 4 1;.9 d arygbioh WQ wp k*. k Legal �4chrsl. NY. QwikellcFw Gvmawaat raid T4r�v v"�1' n w rI ph * W5 la Rae oft" A4=1014n, LLB seal not to MEN"d U.Q+4CLj1A vny prcuIIn-x ce I Arfrgdrrr 0.h the aw&M k jd anllon 4 domKnarlt Thal wwil miji F■ Mi oalretq. rocassarr I* wirrie the prrfrrrra leers or fd pvamrdeeeag ar---dhe Ihw W!'rL■ncit al cafrr$ians k}.I -..A.H-s,Fre-cl rg pulY h any such Wlk.%9.34 whose a QUmc* N6t,-wf Asa_+ckrles. LLC camel be w11l:ad la co k�-1 ai}��or;p■Ik■terd sums Q$Wdn. due. pus remonul:Ao alxaw(i ra4ti tcL"cosh and aiher MMaaC111110 r.—,d4r Acured try the paVa" lflrl. fuyNwFwd. Nelhw party 18 Wa +efa"ft!rl shbl poly h c�)mKfun uIh su-h rDNctim arias Irarsdar. WL4QI c■r"q 4e%any GIs or etudes under or hleresl h Iris A 14WO 1.it JdnQ bul nDl Y>rarflm4 10 XL dkpvl►bvrvkrloa and runrrgmhmrt_ h Hia wens rV bIL n-roN.rs Irlbl cx*die K*mvraas Hmf rrwbe duos wHKC A 6r pudkxl1hercol,k dkr orl IW-Cienl.CLinF and rrnVyr Ilse Pr17 w0en monsanf el Ih# +tea p+sfr. favno+WJ%+ suleErr;LLC!%yHWAl4)iAW1. frece7Mafthe 54fxmklcr 9 W 9-4GSrWIr ak 4MrfP31y bfi h t--W bkfrnwk A=krlw AC cMrlerrplol5d by iha O6rrH.rW1 rte M 9era'drr ii 141%K& 1 (00I W ip resolve iha rrudlar wif ti 40 d jy oe{aplod bwkbwa prcdk;e.shill real 46 cm0srad an br of "'.0 cdbd is l}arc" Azca:I71W. uCb m*wrmn I kvpurfxm of Ihb&Wmerre 1. 4�1'lw khr+ r-eso~Dr n-■r maiw ii nw alhaned wHhfn b0doys. nfr Patt'rrW IWr-inaLo-lhb. greamra in ukqeWrrtiouc. U=Wd noe %Mh -Ok'rdMWi Indcaled h " IwrrYro is err w}�■r.wrl sh_ar sprcMc1lrhS2,:1 m Yh h. JY1Z& lual BMQ9 X- Tk*Kb�-"k4r, w yrd ak o4- ..A p'4dVc4 jhoudrq bLA nai nk MMHX*kWk h ai elloru ra rasob-a anyoagUft 1FIo1 ace rMh k1[0 soRwtm pmworra arrd akbd 4µ rb■i8 dkr N the cImUn and emllucs4m 0 ■he Pro}eal a <:r <jrrr dve cdp" prgpaad tk' Ckm4 `uy Lela,■Mna ttr carnplall3n 0 Itb FraJeci.M Clem and AmcbW LLC ror ih: prc oel re nan " G-f -W b hlW. %W gu'ac M d all OISDJO5 ProPerry ar P uY-A3F Anu ejks. LLC and tmhwQao IIA-rA KgMv oA iA or rok"q la wii Euvrr.'a}'AmwIb 4■.LLC shill Ielah all varriffon Aq%W bn1 or *ra he ccl ihW tsa iwWllltd Io Yew.sld4lglrr-urrd olher reserved r phiy aklu " rr4kadr q media l la n,rimer Ma WW f r+"1 uGjIy wee ■he Cepyrlp hk v me appmona ik olhmvma. Yhw Cianl ana Glrr V An ivies. LL-C hw&w anma fa V4iv*Q w. rnt■dlcllon p►m*w Ph DL94AWA.Y ASMCIATEL &LC ZRd%L PiDepmFy. all agrrocrrr4n4n +rah F3+sndml ConlMO)4} Cnd HDID HARlv(U5 AND(DEFEND 1Mk CnT OF Fan arts}nkAlonkrelohadrorIh5Pn lCciarwi!w ft�A! She M AQA14$1 LMLliY NOR ANY GAKOGE 1■dbpwK:kmF coa lrarlae and nMlo11s flea No C°WED V OR RMULT"Gi FKGMh AN .4j�'T OF Wb aAM&M n1440M ffOA460 h dclipermenh NCAlUNCF, bUHq■pf q TORT. FAELLKILIAL •■N■h Ihet s-L�lrr.relari,■ulXxwmA1Qr1s.P-Apbm and h9CvE91Y WIFIZINGEF IM. CQ FALW ro F+uY A ktdaa in Pwebv p4crddbg iar prod-alkn ae ran 5MCCtCWACrQ;! OR SUI■ UM 03WA TED 6Y pVmn malhaa br dhpm ieeokllYo-i Lml~ 0,ij OLRf.4WAY .�" IAWS. LLC ON D114AWAY D<xlWh,qFilwseagRembnlL. AMQVArL$. UV$ AGEM. CCMSr1LFANr LY UR C3NF0w'P. OR ANDTAIM F%IM QNPr mrHiLm Xa iurreylrg Ileymlaliarm Lorud S"eo M the Stole al DUNS VEAT A150ELATE5,LLF-VEI CLSFS COHrROL - TCuCS b NQL60.e4l" Ilee bMM&arnd al Paoamslan l b. mgpG. Tht .t$ibdrtwra Is tea arrrte DV&Qw and Land Surva�%m. 141J s Inlaa%,I. t� 47 rrcroilyF~11-ePaUn 11111MgMCI%1W AUiryrl.TW1h W41.i 4nft le number 151:0 4&}77-g3. sLgW rruAlff M CIS AWeernanr and riaF Lid CurKrway Anmkrlaa, LLC "my fire hegmr'x. WrKlir■p i p9n and lrrure la Iha Car lYM ai NO p*409 010IM1100 hveFa and Ihnt nspaelhia mFil:A rNIx4Pmiullum. FhrKrom I WG r !'L`fYI wrolklnALE16M hair-vr•-r- smarrdaplgrrr, G. C2W1>n"QWA• TAA k0 ,,,,er 5ta1 br execulyd XI1F. IlrFel&U-i br bVenum Cdr" eh■]gW uMkir mar w1h ma 41 rK"ie:aa-c -rurlt cwls.ash a Wl.0 r:■he Ckra's preiecr VMKr o: %-tkh -4'19r1 to r:Ao[urad. LhA, 14, YMayr. A. F■rs nr W ftK*rtk+J In 2% AdrrsIrl3rd" Fes: wmllufaarrybeL:noIr. ii,kmreril. Ili-V¢P� N , "L . ioti, h-HO rr M prep", 4*1ek 0. Gavemrra law serf VW11 re nix,a' r,¢rl 'try posmaae. FadFs'C-MMur. carrRr yl r 7clds Iat bo QPYRMQQ ay. gmd ro-jsrled In occrxdanco Design Procurement Agreement for Page 15 of 19 Analysis and Report on Forest Hill Sewer WNAWW STANDARD TERMS & CONDITIONS }agr i cir a w4h Ihb Hrtolnnlluc Iwm a1 m#Rate 01}e.�aAd bla pinks hsalo and a3f4+l I th.9 Yeas for ad P be kl Taa1 G W .1 1 KaL E. One lmnre slrsled In No WPYLO I—Q-*I it w&culled trr toih p� ++4W900=Yom Ihodais4rF.aCrOM*i. F. Frra hrblydh_ DrerouW A LW1,31ek LLC Pm the Alit to 3h Maalravp aw"d FrdK,arrr! 60 ,uc TW hF:l[a 4r the prafroMbn of 1ha PHO9 40 (P OF8Ck5d of 6LFKT y 45-o olprk LC ftmigh ezi mhh0.pvbF[relabrc, bnaehura■0+ O*w n Nkrp rr.Mo OLL i A� additr c phoIca be rrxNd In fhq Nkm.IPe CFw tgers to pm M rmxar obW ip�y%the Woocp_ {� VkQ 01 Foy WMN shill ha+a a rW uA&�a 44q"Krl a+ IN" 0 VeM r%r Wo RprTW% uB�fiY IInk Acm enxrA.hx the-Cty I hava act&+ I¢a'rd I"dohs to nmmraarrr cfi)KHF pert dolls. wcumwal; MDW OM I Kca DC Eu-avAw ,s.ss--,iak LL1C In-c-Im kanmcsons N96ih1 U,11,h Ag,-umanl aril Ih+e OPA bohv&Gm the CiIy trx: I la L.imkDd r_arr+ngrad,The CHy 3 flna�eaccesl durYg s*or n5ces133ry G610�vRr A2Vc k LLC kzAllm.and shd t o prpw d@d gdoquo1a oftd appmpd3Fo wat spacq,In areW 10� k-:;i audit h canplianca „all ry om'vW ra 41*A sr� TFr C314 sh[.lg6Q DUr-,ar .kzo-yorak uc. :g Wk" o(fob45e PO"01 lPbWK l+d ud1s. K Duna*w Asioci3k4 I I C Wrd 60 the City aF Fort Waih 4X On 4WIL rd 'm_rad on Mmawgy Az"__'a4k4C'aWK91V sso•mos p llcr. dU r5 a1�1O'f Ica r}r Design Procurement Agreement for Page 16 of 19 Analysis and Report on Forest Hill Sewer EXHIBIT C 1.01 Duty to Acquire and Maintain. Developer shall ensure that a policy or policies of insurance are procured and maintained at all times, in full force and effect,to provide coverage of the types and amounts specified herein, naming the City as an additional insured as set forth herein, and covering all public risks related to this Agreement. The insurance required hereunder may be met by a combination of self-insurance and primary and excess policies. 1.02 Types and Amounts of Coverage Required a. Commercial General Liability: (1) $1,000,000.00 per occurrence, $2,000,000.00 aggregate, including coverage for the following: (i) Premises Liability; (ii) independent contractors; (iii) products/completed operations; (iv) personal injury; (v) contractual liability; (vi) explosion, collapse, and underground property damage b. Property Damage Liability: (1) $1,000,000.00 per occurrence C. Umbrella Policy (1) $5,000,000.00 d. Environmental Impairment Liability (EIL) &/or Pollution Liability (1) $2,000,000 per occurrence (2) $5,000,000 aggregate e. Automobile Liability: (1) $1,000,000.00 Each accident on a combined single-limit basis f. Worker's Compensation: (1) As required by law g. Employer's Liability: (1) $1,000,000.00 per accident 1.03 Revisions to Required Coverage. At the reasonable recommendation of the City's Risk Manager, the City may at any time revise insurance coverage requirements and limits required by this Agreement. Company agrees that within ten (10) days of receipt of written notice from the City, all such revisions requested by the City will be implemented. The policy or policies of Design Procurement Agreement for Page 17 of 19 Analysis and Report on Forest Hill Sewer insurance shall be endorsed to provide that no material changes in coverage, including, but not limited to, cancellation, termination, non-renewal, or amendment, shall be made without thirty (30) days' prior written notice to the City. 1.04 Underwriters and Certificates. The insurers for all policies must be licensed and approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, prior written approval of the City's Risk Management Division is required. Within ten(10) business days following execution of this License, Developer shall ensure that City is furnished with certificates of insurance signed by the respective companies as proof that the types and amounts of insurance coverage required herein have been obtained. In addition, Developer shall, on demand, provide the City with evidence that it has maintained such coverage in full force and effect. 1.05 Deductibles. Deductible or self-insured retention limits on any line of coverage required herein shall not exceed$25,000.00 in the annual aggregate unless the limit per occurrence or per line of coverage, or aggregate is otherwise approved by the City. 1.06 No Limitation of Liability. The insurance requirements set forth in this section and any recovery by the City of any sum by reason of any insurance policy required under this License shall in no way be construed or affected to limit or in any way affect Company's liability to the City or other persons as provided by this Agreement or law. 1.07 Umbrella or Excess Liability. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 1.08 Additional Insured. The City, its officers, employees and volunteers shall be named as an Additional Insured on the Automobile and Commercial General Liability policies. 1.09 Waiver of Subrogation. The insurance shall include a waiver of rights of recovery (subrogation) in favor of the City of Fort Worth. 1.10 Copies of Policies and Endorsements. City shall be entitled, upon request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms,conditions, limitati ons, or exclusions in order to comply with the requirements of this Agreement except where policy provisions are established by law or regulations binding upon either of party or the underwriter on any such policies. 1.11 Certificate of Insurance. Developer shall submit to the City a certificate of insurance evidencing all required insurance coverage and any applicable endorsements. Design Procurement Agreement for Page 18 of 19 Analysis and Report on Forest Hill Sewer EXHIBIT D (Attache d) Design Procurement Agreement for Page 19 of 19 Analysis and Report on Forest Hill Sewer CCTV Analysis and Inspection contract Scope of work: The scope of work covered by these specifications consists of engineering analysis and support, furnishing all equipment, materials, labor,technical support services, supervision, and incidental items necessary to perform detailed pipe condition assessment for sanitary sewer sizes 12"to 36"; including determination of the quality of pipe and the remaining useful life. Closed-circuit television inspection technologies shall be utilized to assess the condition of the sanitary sewers as appropriate by Fort Worth. Selected equipment shall be capable of inspecting sewer lines of various shapes, sizes, and materials; including circular, egg-shaped, etc. with lengths of up to 1,500 linear feet. The work will be completed within the City of Forest Hill city limits. Engineer is expected to regularly coordinate with Forest Hill staff on any access issues and keeping staff regularly updated on location and progress.The work product provided must be approved by the City of Fort Worth.The Engineer is expected to coordinate on the detailed analysis with Fort Worth staff. During the camera and cleaning phase Engineer and Engineer's sub-contractor will be expected to regularly coordinate with Fort Worth on progress and appropriate details for the submittals.The primary point of contact for each City is as follows: Roberto Duenes: rduenes@foresthilltx.org, 817-798-2174 Mark Shell: Mark.Shell@fortworthtexas.gov, 817-944-3718 Intent: The proposed inspection work is intended to provide condition assessment and accurate lateral identification in support of a future sewer upsizing and improvement project. An engineering report should be provided that includes the findings as well as analysis and an estimated "remaining useful life" of the pipeline segments observed.As part of this work,the Engineer will be required to coordinate with the City of Fort Worth and City of Forest Hill personnel as needed. Activities: The Engineer will be required to work with and coordinate with City of Fort Worth staff, outside consultants, other agencies, and sub-contractors.The work will conform with City of Fort Worth specification Section 33 0131 (attached). Among the services that will be required are: • Full sewer cleaning before inspection • CCTV Inspection (condition and connectivity) • Inspection Data Processing and Reporting • Locating of Sewers and Structures • Technical Support • CCTV Review Spreadsheet Preparation The specification provided is standard and unmodified from the standard Fort Worth specification library. Many aspects, especially related to pre-and post-construction do not apply to this project. For line sizes 24" and larger, if necessary,the camera may float down the line if pipe is less than half full.All other details related to quality and workmanship outlined in the specification apply. Any questions related to scope clarity should be addressed in writing from the City of Fort Worth. Deliverables: Engineer is required to produce an engineering report that includes the findings as well as analysis and an estimated "remaining useful life" of the pipeline segments observed. All data collected during the CCTV inspection must also be delivered electronically to both Fort Worth and City of Forest Hill. 33 0131-1 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 1 of 10 1 SECTION 33 0131 2 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A- Section Includes: 6 1. Requirements and procedures for Closed Circuit Television(CCTV)Inspection 7 of sanitary sewer or storm sewer mains 8 2. For City Capital Improvement Projects,which include sanitary sewer 9 rehabilitation projects,a Post-CCTV is required. Pre-CCTV for mains will be 10 project specific and noted on the plans. 11 3. For new development sanitary sewer installation,a Post-CCTV is required. 12 4. For all City Capital Improvement Projects and new development sanitary sewer 13 installation, a Final Manhole CCTV is required. 14 5. Final-CCTV will be project specific, and would include major collector,arterial, 15 County,Railroad, and TXDOT projects that include extensive paving, 16 structures,drainage, and grading activities 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include,but are not necessarily limited to: 20 1. Division 0—Bidding Requirements, Contract Forms, and Conditions of the 21 Contract 22 2. Division 1—General Requirements 23 3. Section 33 03 10—Bypass Pumping of Existing Sewer Systems 24 4. Section 33 04 50—Cleaning of Sewer Mains 25 5. Section 0132 16—Construction Progress Schedule 26 1.2 PRICE AND PAYMENT PROCEDURES 27 A- Pre-CCTV Inspection 28 1. Measurement 29 a. Measurement for this Item will be by the linear foot of line televised for CCTV 30 Inspection performed prior to any line modification or replacement determined 31 from the distance recorded on the video log. 32 2. Payment 33 a. The work performed and materials furnished in accordance with this Item and 34 measured as provided under"Measurement"will be paid for at the unit price 35 bid per linear foot for"Pre-CCTV Inspection". 36 1) Contractor will not be paid for unaccepted video. 37 3. The price bid shall include: 38 a. Mobilization 39 b. Cleaning 40 c. Digital file CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-2 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 2 of 10 1 B. Post-CCTV Inspection 2 1. Measurement 3 a. Measurement for this Item will be by the linear foot of line televised for CCTV 4 Inspection performed following repair or installation determined from the 5 distance recorded on the video log. 6 2. Payment 7 a. The work performed and materials furnished in accordance with this Item and 8 measured as provided under"Measurement"will be paid for at the unit price 9 bid per linear foot for"Post-CCTV Inspection". 10 1) Contractor will only be paid for video that is accepted in writing by Water 11 Department. 12 3. The price bid shall include: 13 a. Mobilization 14 b. Cleaning 15 c. Digital file 16 C. Final-CCTV Inspection 17 1. Measurement 18 a. Measurement for this Item will be by the linear foot of line televised for CCTV 19 Inspection performed following repair or installation determined from the 20 distance recorded on the video log. 21 2. Payment 22 a. The work performed and materials furnished in accordance with this Item and 23 measured as provided under"Measurement"will be paid for at the unit price bid 24 per linear foot for"Final-CCTV Inspection". 25 1) Contractor will only be paid for video that is accepted in writing by Water 26 Department. 27 3. The price bid shall include: 28 a. Mobilization 29 b. Cleaning 30 c. Digital file 31 D. Final- Manhole CCTV Inspection 32 1. Measurement 33 a. Measurement for this Item will be per each manhole,junction structure, 34 televised for CCTV Inspection performed following repair,manhole coating, 35 final adjustments to grade, and/or installation determined on the video log. 36 2. Payment 37 a. The work performed and materials furnished in accordance with this Item and 38 measured as provided under"Measurement"will be paid for at the unit price bid 39 per each for"Final-Manhole CCTV Inspection". 40 1) Contractor will only be paid for video that is accepted in writing by Water 41 Department. 42 3. The price bid shall include: 43 a. Mobilization 44 b. Cleaning 45 c. Digital file CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-3 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 3of10 1 1.3 REFERENCES 2 A Reference Standards 3 1. Reference standards cited in this Specification refer to the current reference 4 standard published at the time of the latest revision date logged at the end of this 5 Specification,unless a date is specifically cited. 6 2. City of Fort Worth Water Department 7 a. City of Fort Worth Water Department CCTV Inspection and Defect Coding 8 Program(CCTV Manual). City of Fort Worth Water Department CCTV 9 Inspection Log. 10 B. Definitions 11 1. Pre-CCTV—CCTV Inspection performed by Contractor on existing mains prior 12 to any line modification or replacement. 13 2. Post CCTV—CCTV Inspection performed by Contractor following installation 14 of new mains but before completion of other infrastructure(i.e. streets, 15 sidewalks, final grading, etc.) 16 3. Final CCTV—CCTV Inspection performed by Contractor on mains and 17 manholes after all construction is complete. Includes CCTV of the manholes 18 (including grade rings,casting, etc.)after street construction, final grading, and 19 manhole coating,if the coating is required. 20 C. Final Manhole CCTV—CCTV Inspection performed by Contractor on manholes and/or 21 junction structures,after all construction is complete. Includes CCTV of the manholes/ 22 (including grade rings,casting, etc.)after street construction, final grading, and 23 manhole coating,if the coating is required. 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A Coordination 26 1. Sanitary Sewer Lines 27 a. Meet with City of Fort Worth Water Department staff to confirm that the 28 appropriate equipment, software, standard templates,defect codes and defect 29 rankings are being used,if required. 30 2. Storm Sewer Lines 31 a. Meet with City of Fort Worth Transportation/Public Works Department staff to 32 confirm that the appropriate equipment, software, standard templates,defect 33 codes and defect rankings are being used,if required. 34 B. Schedule 35 1. Include Pre,Post,Final Manhole, and Final CCTV schedule as part of the 36 Construction Progress Schedule per Section 01 32 16. 37 2. Allow time for City review(2 weeks minimum—Notification needs to be send 38 out to Project Manager,City Inspector,&Field Operations). Post-CCTV can be 39 scheduled and submitted for review after each sewer main construction has been 40 completed. 41 3. If CCTV is accepted by City Project Manager,proceed with work If rejected, 42 coordinate with City per Part 1.4 A CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 01 31-4 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 4 of 10 1 1.5 SUBMITTALS 2 A- Submittals shall be in accordance with Section 01 33 00. 3 B. All CCTV submittals shall be submitted to the City Inspector to be uploaded to 4 common location for review and comment by Water Operations and Inspections. 5 Alternatively, the Inspector can provide Contractor access to upload directly to common 6 location. Inspection and Water Operations staff shall be notified when CCTV upload is 7 completed. 8 C. If inspected with Infrastructure Technologies IT Pipes Software per CCTV Manual 9 provide video data per the CCTV Manual. Provide additional copy of video in video 10 file MP4 with fL264 code—Advanced Video Coding and compression standard. 11 D. If inspected with other software provide video data in video file MP4 with fL264 code— 12 Advanced Video Coding and compression standard. 13 E. Inspection Report shall include: 14 1. Asset 15 a. Date of Inspection 16 b. City 17 c. Project Name(Address accepted if project name does not exist) 18 d. Main Number—as shown on drawings or GI S ID(If Available) 19 e. Upstream Manhole Station—as shown on drawings or GI ID(If Available) 20 f. Downstream Manhole Station—as shown on drawings or GI S ID(If Available) 21 g. Pipe Diameter 22 h. Material 23 1. Pipe Length 24 j. Mapsco Location Number 25 k. Date Constructed 26 1. Pipe Wall Thickness 27 in. Grade percentage 28 n. Inspector Name 29 2. Inspection 30 a. Inspection Number(i.e. 1st,2nd,etc...) 31 b. Crew Number 32 c. Operator Name 33 d. Operator Comments 34 e. Reason for Inspection 35 f. Equipment Number 36 g. Camera Travel Direction is Upstream to Downstream—Deviation will require 37 written justification,with the exception of stubouts&abandonment plugs that 38 will always be recorded from the downstream side. 39 h. Inspected Length(feet) 40 1. Work Order Number(if required) 41 j. City Project Number(if required) 42 k. City Contract Name 43 1. DOE/TPW Number(if required) 44 in. Consultant Company Name 45 n. Consultant Contact Name 46 o. Consultant Contact Phone Number 47 p. Contractor Company Name CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-5 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 5 of 10 1 q. Contractor Contact Name 2 r. Contractor Contact Phone Number 3 F. CCTV overlay screen shall include (opening text to CCTV inspection) 4 a. Date of inspection 5 b. City Name 6 c. City Project number 7 d. Project name 8 e. Main number 9 f. Upstream SS Manhole (or Plug)station 10 g. Downstream SS Manhole station 11 h. Diameter 12 i. Grade/Slope 13 J. Material 14 k. Length 15 1. Contractor 16 in. Inspectors name 17 n. Travel direction 18 o. Date Construction 19 1.6 INFORMATIONAL SUBMITTALS 20 A Pre- and Post CCTV submittals 21 1. CCTV video results shall be submitted to City that can be uploaded to shared 22 common location by the inspection staff,upon confirmation that the submittal is 23 complete(partial submissions are not accepted,except in special situations that 24 are approved by the Water Department).For pre-CCTV submittals,approval of 25 the submittal shall be provided by the Project Manager prior to construction 26 start when connecting to existing sewer. 27 2. Alternatively, the Inspector can provide Contractor access to upload directly to 28 common location. Inspection and Water Operations staff shall be notified when 29 CCTV upload is completed in order to confirm submittal is complete. Inspection 30 Report(separate report file for each individual shall be submitted to Inspector or 31 directly uploaded to shared common location. 32 B. Additional information that may be requested by the City 33 1. Listing of cleaning equipment and procedures 34 2. Listing of flow diversion procedures if required 35 3. Listing of CCTV equipment 36 4. Listing of backup and standby equipment 37 5. Listing of safety precautions and traffic c ontrol measures 38 1.7 CLOSEOUT SUBMITTALS 39 A Final CCTV shall not be completed until all manholes and surface covers are set to final 40 grade. All as built changes to plan and profile drawings (redlines),are required to be 41 reflected on the final CCTV inspection information. Final CCTV shall not be 42 completed until all as built corrections have been made. 43 1. Final-CCTV submittals CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-6 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 6 of 10 1 a. CCTV video results shall be submitted to City that can be uploaded to shared 2 common location by the inspection staff,upon confirmation that the submittal 3 is complete(partial submissions are not accepted,except in special situations 4 that are approved by the Water Department). Alternatively, the Inspector can 5 provide Contractor access to upload directly to common location. Inspection 6 and Water Operations staff shall be notified when CCTV upload is completed 7 in order to confirm submittal is complete. Sanitary sewer video file(s)in MP4 8 with 1-1.264 code Advanced Video Coding and compression standard 9 b. City Project Number displayed within text of sanitary sewer video. 10 c. Construction Plans identifying the line segments that were videoed. Include I I cover sheet, 1 digital copy of the redlines (Contractor to upload into Accela or 12 BIM 360), overall line layout sheet(s), and plan and profile sheet(s). 13 1) One(1) 11"X 17"copy 14 d. Sanitary sewer line segment from drawings match line segments on Inspection 15 Report. Recommend some minimum guidance for standardization of line 16 segment submittals,to include proper identification of Project:name,CPN, line 17 identification and stations,as well as format(e.g. PDF?)and minimum 18 annotations required to explain deviations from policies as specified in this 19 document, or any anomalies that are considered within tolerance. 20 e. Inspection Report(separate report file for each individual shall be submitted to 21 Inspector or directly uploaded to shared common location. 22 f. Allow two(2)weeks to review before requesting final inspection. After review 23 by the City Inspector and Water Field Operations,if applicable a combined set 24 of punch list items will be submitted to the Contractor for correction. 25 g. 26 1.8 J. CCTV SPEADSIIEET LOG IN EXCEL FORMAT MAINTENANCE MATERIAL 27 SUBMITTALS [NOT USED] 28 1.9 QUALITY ASSURANCE [NOT USED] 29 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 30 1.11 FIELD [SITE] CONDITIONS [NOT USED] 31 1.12 WARRANTY [NOT USED] 32 PART 2 - PRODUCTS 33 A Equipment- 34 1. Closed Circuit Television Camera 35 a. The television camera used shall be one specifically designed and constructed 36 for sewer inspection. Lighting for the camera shall be suitable to allow a clear 37 picture of the entire periphery of the pipe. The camera shall be operative in 100 38 percent humidity/submerged conditions. The equipment will provide a view of 39 the pipe ahead of the equipment and of features to the side of the equipment 40 through turning and rotation of the lens. The camera shall be capable of tilting 41 at right angles along the axis of the pipe while panning the camera lens through 42 a full circle about the circumference of the pipe. The lights on the camera shall 43 also be capable of panning 90-degrees to the axis of the pipe. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-7 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 7 of 10 1 b. The radial view camera must be solid state color and have remote control of the 2 rotational lens. The camera shall be capable of viewing the complete 3 circumference of the pipe and manhole structure,including the cone-section or 4 corbel. The camera lens shall be an auto-iris type with remote controlled 5 manual override. 6 2. Video Capture System 7 a. The video and audio recordings of the sewer inspections shall be made using 8 digital video equipment. Avideo enhancer may be used in conjunction with, 9 but not in lieu of,the required equipment. The digital recording equipment shall 10 capture sewer inspection on USB drive,with each sewer segment(from 11 upstream manhole to downstream manhole)inspection recorded as an individual 12 file in MP4 with H.264 code format. 13 14 b. The system shall be capable of printing pipeline inspection reports with 15 captured images of defects or other related significant visual information on a 16 standard color printer. 17 c. The system shall store digitized color picture images and be saved in digital 18 format on a USB drive. 19 d. The system shall be able to produce data reports to include, at a minimum,all 20 observation points and pertinent data. All data reports shall match the defect 21 severity codes outlined in the City's CCTV manual(electronic copy available 22 on Water Department's website— 23 http://fortworthtexas.gov/water/wastewater/CCTV Manual. 24 25 e. Camera footage, date&manhole numbers shall be maintained in real time and 26 shall be displayed on the video monitor as well as the video character 27 generators illuminated footage display at the control console. 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION 32 A General 33 1. Prior to inspection obtain pipe and manhole asset identification numbers from 34 the plans or City to be used during inspections. Inspections performed using 35 identification numbers other than the line number(or existing sanitary sewer 36 main/lateral) and station numbers from plans or from assigned numbers from the 37 City will not be accepted. 38 2. CCTV Inspection shall not commence until the sewer section to be televised has 39 been completely cleaned in conformance with Section 33 04 50. 40 3. CCTV Inspection shall not commence until the sewer section to be televised 41 has been completely cleaned in conformance with Section 33 04 50. (Sewer 42 system should be connected to existing sewer system and should be active) 43 4. A final CCTV Inspection of newly installed sewers (not yet in service)shall not 44 commence until completion of the following items: CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-8 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 8 of 10 1 a. Manhole final grade is set(after street paving,under Final CCTV,Final 2 Manhole CCTV) 3 b. Manhole lining is complete(after street paving,under Final CCTV, Final 4 Manhole CCTV) 5 c. Sewer main is cleaned 6 d. Sewer air testis complete 7 e. Vacuum test of manholes 8 f. Installation of all lateral services and completion of low pressure testing of all 9 new services 10 g. All sewer main and manhole work is complete 11 Once reviewed and accepted by Water Field Operations the sewer system should be 12 connected to existing sewer system and ready for use upon final acceptance of the 13 project. 14 5. Temporary Bypass Pumping(if required)shall conform to Section 33 03 10. 15 B. Storm Sewer Lines 16 1. Coordinate with City of Fort Worth Transportation/Public Works Department 17 for CCTV equipment and cleaning requirements. 18 2. Inspection(CCTV) 19 C. General 20 1. Use manual winches,power winches,TV cable, and power rewinds that do not 21 obstruct the camera view,allowing for proper evaluation. 22 D. Pipe 23 1. Begin inspection immediately after cleaning of the main. 24 2. Move camera through the line in either direction at a moderate rate, stopping 25 when necessary to permit proper documentation of the main's condition. 26 3. Do not move camera at a speed greater than 30 feet per minute. 27 4. During investigation stop camera at each defect along the main. 28 a. Record the nature,location and orientation of the defector infiltration location 29 as specified in the CCTV Manual. 30 5. Service connections,Pan the Camera to get a complete overview of service 31 connection including zooming into service connection Include location(i.e. 1 32 o'clock, etc...)See photos 17 thru 23 for examples 33 6. Joint defects,Include comment on condition, signs of damage, etc... Note 34 offset and/or separation at a joint. Includes joints where one pipe is not 35 correctly aligned with the connecting section of pipe causing a lip that could 36 impede flow or a section of pipe that is aligned but has pulled apart horizontally 37 and may not connect to the other section of pipe. See Photos 24 thru 29, 35,36 38 for examples 39 7. Notate visible pipe defects such as cracks,broken or deformed pipe,holes, 40 offset joints, obstructions, sags or debris (show as%of pipe diameter). If debris 41 has been found in the pipe during the post or final-CCTV inspection, additional 42 cleaning is required, and pipe shall be re-televised. See Photos 1 thru 12 for 43 examples 44 8. Notate Infiltration/Inflow locations. See Photos 13, 20 for examples 45 9. Notate Pipe material transitions. See Photos 30 for example CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131-9 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 9 of 10 1 10. Notate other locations that do not appear to be typical for normal pipe 2 conditions. For example,locations could include conflicts between the replaced 3 main with other utilities (including paving and storm sewer),causing pipe 4 deflections, sags, etc.holding water. This could also include any damage to the 5 main and/or services after the main has been replaced. These locations could 6 occur between the Post-CCTV and Final-CCTV submittals. See Photos 31 thru 7 34 for examples 8 11. Note locations where camera is underwater and level as a%of pipe diameter. 9 Camera underwater—Point in which the camera lens is 100%submerged 10 underwater and/or 50%of the pipe's diameter. Camera emerged—Point in 11 which the camera lens has emerged from being underwater. Severity is 12 described in ranges by linear feet. This would include pipe deflections causing 13 a considerable increase(Le. double or more)in the depth of flow in the pipe (to 14 at least between 1/3 to'/z of the pipe diameter). See attached example photos at 15 the end of this Specification showing the depth changes in%full of pipe. See 16 Photos 14 thru 16 for examples. 17 12. Provide accurate distance measurement. 18 a. The meter device is to be accurate to the nearest 1/10 foot. 19 13. CCTV recording segments are to be single continuous file item. 20 a. A single segment is defined from manhole to manhole. 21 b. Only single segment video's will be accepted and preferably include manhole 22 inspections (manhole to manhole). 23 c. Individual manhole inspection will require written justification, included under 24 the Final-CCTV bid item. 25 14. Pre-Installation Inspection for Sewer Mains to be rehabilitated 26 a. Perform Pre-CCTV inspection immediately after cleaning of the main and 27 before rehabilitation work. 28 1) No cleaning equipment in the main during CCTV. 29 2) Water shall be present(or flowing)while recording CCTV to confirm 30 system functionality. 31 b. If,during inspection,the CCTV will not pass through the entire section of main 32 due to blockage or pipe defect, set up so the inspection can be performed from 33 the opposite manhole. 34 c. City Project Manager(PM)shall review and may consult with Sewer Projects 35 Reporting and Operations (SPRO), and provide comments on identified defects. 36 Contractor shall present proposed repair method(s)for approval by the City 37 PM,before proceeding with construction. 38 d. Provisions for repairing or replacing the impassable location are addressed in 39 Section 33 3120, Section 33 3121, Section 33 3122 and Section 33 3123. 40 15. Post-and Final Installation Inspection 41 a. Prior to inserting the camera,flush and clean the main in accordance to Section 42 33 04 50. Water should be present/flowing during the recording operation,to 43 demonstrate the functioning of the installed system. 44 16. Documentation of CCTV Inspection 45 a. Sanitary Sewer Lines 46 1) Follow the CCTV Manual(CCTV standard manual supplied by City upon 47 request)for the inspection video, data logging and reporting or Part 1.5 E of 48 this section. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 33 0131 -10 CLOSED CIRCUIT TELEVISION(CCTV)INSPECTION Page 10 of 10 1 b. Storm Sewer Lines 2 1) Provided documentation for video,data logging, and reporting in 3 accordance with City of Fort Worth Transportation/Public Works 4 Department requirements. 5 E. Manhole 6 1. Final Manhole CCTV Inspection recording segments,will reveal condition of 7 manhole in its entirety,including corrosion protection if applicable. Camera 8 should pan the entire manhole while lowering to include complete view of 9 invert. This requirement applies to new manhole installations and rehabilitated 10 manholes after epoxy lining installed, if applicable. 11 2. Notate Infiltration/Inflow locations for Pre-construction CCTVrecordings. 12 3. Post-Installation CCTV Inspection is only done after all construction is 13 complete. 14 F. . 15 3.4 REPAIR /RESTORATION [NOT USED] 16 3.5 RE-INSTALLATION [NOT USED] 17 3.6 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 18 3.7 SYSTEM STARTUP [NOT USED] 19 3.8 ADJUSTING [NOT USED] 20 3.9 CLEANING 21 A- See Section 33 04 50. 22 3.10 CLOSEOUT ACTIVITIES [NOT USED] 23 3.11 PROTECTION [NOT USED] 24 3.12 MAINTENANCE [NOT USED] 25 3.13 ATTACHMENTS [NOT USED] 26 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson Various—Added requirements for coordination with T/PW for Storm Sewwr CCTV 4/29/2021 J Kasavich Various—Alternative to CCTV Manual,modified submittal detail requirements 29 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised April 29,2021 1, Photo 1 Flow Depth Acceptable CONFLICT1 • Photo 2 Flow Level Acceptable CONFLICT 22 1 t rli Photo 3 Flow Level Acceptable } ¢4� r 1111812019 J 1 Photo 4 Flow Level is elevated. } f Photo 5 Flow Elevated but below 1/3 capacity. No action required } Photo 6 Flow above 30%. Potential Sag or debris. i L03253f�$ .A8$+ _' M712 147 f 1 Photo 7 Offset Joint Example h1FL1T IJIVIH: "1 r. + DIVIH: '17+4'1 i possibletip AD Photo 8 Flow appears to be stagnant �h1FL1T IJIVIH: "1�+� DIVIH: '17+�'1 Photo 9 Debris evident. Clean and Re-CCTV prior to submittal • = 1 4 I - F 1 t Photo 10 Debris evident. Clean and Re-CCTV prior to submittal. �h1FL1T IJIVIH: "1�+ DIVIH: '17+ i a TOh1FL1 T U IVIH: '17+ D IVIH: T,I Inspection abandoned, End unre -f w AM EIVD RIJ •` t•` Photo 12 Survey was not completed. Take corrective action and • PhotoPotential Infiltration/Inflow location • M PFO i i i 1 Photo 14 Water level approaching submerging camera. Record beginning of level increase and note the point at which the water level returns to normal.Corrective action will be required. • 1 i19 7:36:09 1 Photo 15 Camera submerged. Note beginning point of increase level and the end of the increased depth. Corrective action will be required CONFLICT 62 LIRTAT. WiM= 1 FOW W. Photo 16 Camera submerged. Note beginning point of increase level and the end of the increased depth. Corrective action will be required Photo 17 Service Tap. Note the location and position of tap in relation to the sewer main. Repair required? { ti .: � r 4 1 + Photo 18 CCTV should include view of service line. Retake CCTV Video? r F f Photo 19 Service tap holding water. Corrective action required. k r 'r� I r ' 4 ' Photo 20 Service tap is installed incorrectly. Also is a point of potential Photo 21 Proper Shot of Sewer Tap Rosedale y ■ + ■ ■ ■ • . . .•� a .� Photo 22 Debris in service line. Corrective action required w Photo 23 Service tap at proper location. t � -t - r� y PhotoDamage to liner.Repaired is required. { y { 5 y � x 1111112019 1 + Photo 26 Damage to Liner. Repair is required. t x- #: IF 91 PhotoDamage. Repair required. + 7 PT PTE - ` r F + * �• PhotoDamaged Liner. Damage to be repaired. �h1FL1T O IJIVIH: 07+ 7 DIVIH: �6+09 t 1 f y Damaged.Photo 29 Liner repaired. Rosedale s ' : ■ 303 #-8 1 ' Z ■ 1 t ■ ■ Cx t �°� . ■ inch Photo 30 Change of material. Note change on CCTV log. Repair required? Rosedale + ■ + ! ' i i r4 • ri ■ ' 69 Line K ■ UICI Photo 31 Beginning of potential impact from adjacent utilities Repair required? Rosedale # y ■ a i ' ■ 1 ; ■ ■ ■ ■ to 12 + 00 inch Photo 32 Continuation of impact from adjacent utilities Repair required? Rosedale + ■ + i 303. ■ 1 i ■ ■ ■ ■ to 12 + 00 ■ 0 Photo 33 Continuation of impact from adjacent utilities Repair required? Rosedale # + ■ a ! ' ■ 1 ; ■ ■ ■ ■ to 12 + 00 i i i ■ ■ inch Photo 34 End of impact for potential impact from adjacent utilities. Repair required? Wnstr + • Ax- 0 + 00 w35 - IL 1 o Photo 35 Short Joint installed(not a closure piece)does not comply with specification Repair required? 14' Downstream t 1 + 35 1 1 _ -a J , . Photo 36 Short piece installed with wye inserted does not comply with design f� Y�- lIn a 3• • l j +�+ K C= l= _ ♦ Lr) 2 r ■ r J m f Q o = �-- LJ cz M m + ■ qr-4 r �•- A CT) o U. .-� C\j + %-, = L] Cv w dw L y .4-IVA cn 1 1 - y f a ' ,1 4 i a .y� � h ir41 rag I ,� r ► I y r r r 7 •X- 1 1 .. • � 'Q�+mil�. ■ F • . FA to • `� �'� � rr r I •■I~ �ti j $lei • 1 ;I ' rill .. •_. ? t dL 44 Lw Y li�l • �� ��� � Cl -C C:) u A-, Cc M C= -%:1 CD Q •— i 0) z cn 4-) CL M LO C_] 0 C:) CN] C:) C\] C ) C� C\] C: + r...� C7 C:) f j nn! Ili•} }cal .+Ff J4 4�} sk �a �t►lu y i t � 1 ! a 1 r• T, C ►• �"'4 40 IL M • + w G �'-• . rr C rl 4^. s' 0 G 17 C► r - t r 4' _uw co s r4 ry u T - r r: I t left to w o r* 14 CD so M R Cy 3 , 1 ' � tiJ � � �� r L.L.. C�. en C W-4 u .. a V-4 cc Ld7 co a r O LL ... mm J U J 4 G7 .-+ C7 Ck] r- C%3 cr) 41 t + Lo M i :4 e JitlEll , "1J � s tpi let 1 • r � � r 7I� NO j 4 93 410. a i Ar i rt r rN� _ r r' � •` } n r� '' �. : . +-i M l.n - - CO CD C) C . CC z f m L.r) m . W--1 CM C) M CM �+ LO CD C\7 LCT) - ' - ,~ J "-) ULL r f , •� R I 1 I 1 j r ] 1 4 �� 41