Loading...
HomeMy WebLinkAboutContract 38775-A3 Y Jr AMENDMENT No. 3 TO CITY SECRETARY CONTRACT No. WHEREAS, the City of Fort worth (CITY) and Kennedy Consulting, Ltd. , (ENGINEER) made and entered into City Secretary Contract No. 38775, the CONTRACT) which was authorized by M&C C-23596 on the 16th day of June, 2009 in the amount of $ 1, 465, 379; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 21, 154 . 05 which as administratively authorized on the 29th day of November, 2010, Amendment Number 2 in the amount of $121, 950 . 80 which as authorized by M&C # C-25348 on the 9th day of June, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Dirks Road Phase 2 from Bryant Irvin Road to Cranbury Road: and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 7, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $64, 400 . 00 . (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 672, 883 . 85 . 3 . All other provisions of the Contract, which are not expressly amended herei in full force and effect . OFFICIAL RECORD CITY SECRETARY Page IN FT. WORTH, TX 1 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Kennedy Consulting, Ltd. 0,80 6:0 Fernando Costa Kurt W. PZngst, P.E. Assistant City Manager Senior Associate of the General Partner DATE: �� /,s DATE: ( 0 /231 Z APPRO L RECOMMENDED: Douglas Wiersig, P. Director, Transportat ' n/Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: C - 7 4�Qq 3 Date : /J. 2 , f '7- Douglas W. Black Assistant City Attorney A � a� ATTEST: A' T'P 0 0 a 0 TodT-V A'00- Mary J. Ka e r � a�10600 o00A0C)$°°�o City Secretary lt�5O RECORD CITY SECRETARY Page - 2 - FT,WORTHS TX KENNEDY C[>NSULTiNG Suite 101 1871 Harroun Avenue McKinney,Texas 75069 TEL 972 547 1754 FAX 972 529 2294 June 7, 2012 Mr. Leon Wilson Jr., P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton St. Fort Worth, TX 76 102 Re: Dirks load—Bryant Irvin Road to Granbury Road City Project No. 00768, City Secretary Contract No. 38775 Proposal to provide: l} Add continuous lighting from proposed SH 121 to Granbury Rd. 2) Add relocation of~100 LF of 24-inch water line conflicting with proposed Dirks Rd. improvements. Dear Mr. Wilson: This letter is written in response to your request for Kennedy Consulting, Ltd. to prepare a contract amendment for additional engineering services to amend and/or develop additional construction documents for Dirks Road (East) due to the addition of continuous lighting from SH 121 to Cranbury Rd and relocation of—100 LF of 24-inch water line conflicting with the proposed Dirks Road(East) improvements. Kennedy Consulting, Ltd. will complete the following additional scope: Additional Project Sco a--Continuous Liahtiny. The contract amendment shall include the design a continuous lighting system for Dirks Road East from proposed SH 121 to Cranbury Road in accordance with Texas Department of Transportation (TxDOT) and City of Fort Worth standards. Additional Protect Scope::Water Line Relocation The contract amendment shall also include the relocation of City of Fort Worth's (City) water facilities that are in conflict with the proposed storm drain improvements for the Dirks Road East reconstruction. Approximately 100 LF of 24-inch water relocations are planned due to these conflicts. Total Compensation r wr4CA Mr.Leon Wilson Jr.,P.E.,June 7,2012 • Page 2 of 2 ICENNECN CONSULTUN- Kennedy Consulting, Ltd. proposes to provide the above mentioned services for the lump sum amount of$64,400.00 (see attached fee proposals for additional details). If you have any questions concerning this proposal, please do not hesitate to contact me 972-542-1754. Thank you for this opportunity. Very truly yours, Kennedy Consulting, Ltd <Y�f Kurt Aungst, P.E. Sr. Project Manager AL FUNDING BREAKDOWN SHEET City Secretary No. 38775 Amendment No. 3 Department Fund-Account-Center Amount 20 0295 531200 203230076830 $64, 400 . 00 Total : $64, 400 . 00 Page - 3 - • y City of Fort Worthy Texas Mayor and Counci omm unica ion COUN CIL. r Approved on 10/2/2012 DATE: Tuesday, October 02, 2012 REFERENCE NO.: **C-25893 LOG NAME: 20D I RKS ROAD AMENDMENT 3 SUBJECT: Authorize Execution of Amendment No. 3 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the Amount of$64,409.00 for the Design of Dirks Road from Bryant Irvin Road to Cranbury Road for a Total Contract Amount of$1,672,883.85 (COUNCIL DISTRICTS 3 and 6) RECOMMENDA'T'ION: It is recommended that the City Council authorize the execution of Amendment No. 3 to City Secretary Contract No. 38775, an engineering Agreement, with Kennedy Consulting, Ltd., in the amount of $64,400.00 for the design of Dirks Road from Bryant Irvin Road to Oranbury Road, thereby revising the total contract amount of$1,672,883.85. DISCUSSION: This Agreement is for design services associated with the construction of Dirks Road as a six lane divided principal arterial from Bryant Irvin Road to Oranbury Road. Phase I of the Project has been completed. This Amendment applies to the design for Phase II. The proposed Amendment is for additional design services associated with the relocation of an existing 24-inch waterline which is in conflict with proposed storm drainage box culverts and more efficient construction sequencing as well as the design of streetlights which were not included in the original design scope, The City Council approved an Engineering Agreement for this project with Kennedy Consulting, Ltd., on June 16, 2009, (M&C C-23596) in the amount of$1,465,379.00. Amendment No. 1 was administratively approved on November 29, 2010 in the amount of$21,154.05. Amendment No. 2 was approved by the City Council on December 13, 20117 (M&C C-25348) in the amount of$121,950.80. Funding for this Amendment will be provided from the 2007 Critical Capital Projects Fund. Kennedy Consulting, Ltd., proposes to perform these design services for a lump sum fee of$64,400.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. Kennedy Consulting, Ltd., is in compliance with the City's MNVBE Ordinance by committing to an additional 23 percent MNVBE participation on this Amendment No. 3. The City's goal on this Amendment is 23 percent. This project is located in COUNCIL DISTRICTS 3 and 6, Mapsco 102B, 1020 and 102D. FISCAL INFORMATION 1 CERTIFICATION: wrhe Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2007 Critical Capital Projects Fund. Logname: 20DIRKS ROAD AMENDMENT 3 Page ] of 2 FUND CENTERS: To F u nd/Accou nt/C enters FROM Fund/Account/Centers C295 531206 263230676830 $64.400.00 CERTIFICATIONS: Submitted for Ci ^ Manager's Office bX: Fernando Costa (6122) Oriainating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Dennis R. Ingram (2294) ATTACHMENTS 1. 00768 26DIRKS ROAD AMENDMENT 3.docx (CFW Internal) 2. 26DIRKS ROAD AMENDMENT 3 Compliance Memo (PW-00768 6129)r)df (CFW Internal) 3. 20DIRKSRD AMEND 2 MAP 60768.PDF (Public) Logname: 20DIRKS ROAD AMENDMENT 3 Page 2 of 2