HomeMy WebLinkAboutContract 56234 Received Date: 08/30/2021
Received Time: 3:09 PM
Developer and Project Information Cover Sheet:
Developer Company Name: Skyline Prairie Homes, LP
Address, State,Zip Code: 2121 N. Pearl St., Ste 300 Dallas,Texas 75201
Phone &Email: (832) 444-9382, DLSAOialaHoldings.com
Authorized Signatory, Title: Clay D. Likover, President of the GP
Project Name: North Cowtown Crossing -Paving &Drainage
Brief Description: Water, Sewer
Project Location: 20/171 acres at 8600 Harmon Rd.
Plat Case Number: Not Provided Plat Name: North Cowtown Crossing
Mapsco: Not Provided Council District: 2
CFA Number: CFA21-0041 City Project Number: 1031961 IPRC21-0021
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement FT.WORTH,TX
Rev.2/21
City Contract Number: 56234
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and Skyline Prairie Homes, LP
("Developer"),acting by and through its duly authorized representative. City and Developer are referred to
herein individually as a"party"and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as North
Cowtown Crossing Paving&Drainage ("Project");and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities"or"Improvements"); and
WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land,pay
fees or construction costs, or meet other obligations that are not a part of this Agreement.; and
WHEREAS,the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exist between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement FT.WORTH,TX
Rev.2/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
0 Exhibit A: Water
❑ Exhibit A-1: Sewer
0 Exhibit B: Paving
❑ Exhibit B-1: Storm Drain
❑ Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans,the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth,Texas Page 3 of 16
Standard Community Facilities Agreement
Rev.2/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth,Texas Page 4 of 16
Standard Community Facilities Agreement
Rev.2/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2)to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth,Texas Page 5 of 16
Standard Community Facilities Agreement
Rev.2/21
11.
Easements and Rights-of-Way
Developer agrees to provide,at its expense, all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS,AGENTS AND EMPLOYEES FROMALL SUITS,ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT
OF AN Y INJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCL UDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OFANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQ UENCE OF ANY FAIL URE TO
PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS,SUB CONTRACTORS, OFFICERS,AGENTS OR EMPLOYEES,EXCEPT
TO THE EXTENT THAT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN
WHOLE OR IN PART, BY THE GROSS NEGLIGENCE (BUT NOT ORDINARY
NEGLIGENCE), BAD FAITH OR WILLFUL MISCONDUCT OF THE CITY OF FORT
WORTH,ITS OFFICERS, SERVANTS, OR EMPLOYEES:
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS:
13.
Right to Enforce Contracts
City of Fort Worth,Texas Page 6 of 16
Standard Community Facilities Agreement
Rev.2/21
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties given by the contractors,whether express or implied.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a parry by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office Skyline Prairie Homes, LP
City of Fort Worth 2121 N. Pearl St.
200 Texas Street Suite 300
Fort Worth, Texas 76102 Dallas, Texas 75201
With copies to:
City of Fort Worth,Texas Page 7 of 16
Standard Community Facilities Agreement
Rev.2/21
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three (3)years after final payment under the contract,have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants,officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
City of Fort Worth,Texas Page 8 of 16
Standard Community Facilities Agreement
Rev.2/21
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer,nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document;therefore any rule of contract construction or interpretation that would
City of Fort Worth,Texas Page 9 of 16
Standard Community Facilities Agreement
Rev.2/21
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company"has the meaning ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and(2) will not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
No amendment,modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
28.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City, it being understood, however, that Developer may
engage contractors and subcontractors to perform the actual work contemplated by this Agreement. Any
attempted assignment or subcontract without the City's prior written approval shall be void and constitute
a breach of this Agreement.
29.
No Third-Party Beneficiaries
City of Fort Worth,Texas Page 10 of 16
Standard Community Facilities Agreement
Rev.2/21
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
30.
Compliance with Laws, Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
33.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder,and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas Page 11 of 16
Standard Community Facilities Agreement
Rev.2/21
34.
Cost Summary Sheet
Project Name: North Cowtown Crossing -Paving &Drainage
CFA No.: CFA21-0041 City Project No.: 103196 1PRC No.: IPRC21-0021
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 157,425.00
2. Sewer Construction $ 164,685.00
Water and Sewer Construction Total $ 322,110.00
B. TPW Construction
1. Street $ -
2. Storm Drain $ -
3. Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 322,110.00
Estimated Construction Fees:
C. Construction Inspection Service Fee $15,750.00
D. Administrative Material Testing Service Fee $1,617.00
E. Water Testing Lab Fee $300.00
Total Estimated Construction Fees: $ 17,667.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 322,110.00
Completion Agreement= 100%/Holds Plat $ 322,110.00
Cash Escrow Water/Sanitary Sewer= 125% $ 402,637.50
Cash Escrow Paving/Storm Drain = 125% $ -
Letter of Credit= 125% $ 402,637.50 X
City of Fort Worth,Texas Page 12 of 16
Standard Community Facilities Agreement
Rev.2/21
IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
Skyline Prairie Homes, LP
b i-BteAGuJa>�
Dana Burgndott( ig 30,20 15:04 CDT) By: Ojala Skyline Prairie Homes GP, LLC,
Dana Burghdoff its General Partner
Assistant City Manager
Clay D.L' ver(Aug 30,2021 11:46 CDT)
Date: Aug 30,2021 Clay D. Likover, President
Recommended by: Date: Aug 30,2021
Ljl-�L allgef
Evelyn Ro erts(Aug 30,202112:36 CDT)
Evelyn Roberts/Jennifer Ezemack
Project Assistant
Planning and Development
Approved as to Form&Legality:
Ric�A.McCracken(Aug 30,202112:53 CDT)
Richard A. McCracken Contract Compliance Manager:
Sr. Assistant City Attorney
M&C No. By signing, I acknowledge that I am the person
Date: responsible for the monitoring and
administration of this contract, including
Form 1295: ensuring all performance and reporting
requirements.
ATTEST:
Ronald P.Gonzales(Aug 30,2 15:1 ) Janie Scarlett Morales
Ronald P. Gonzales �-`t Foar 4� Development Manager
Acting City Secretary �aadv~ °0o �,pg0
o
Zd
00 04
aa�a0 nEX oo54 XY
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement FT.WORTH,TX
Rev.2/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
0 Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Attachment 2—Phased CFA Provisions
❑ Attachment 3 — Concurrent CFA Provisions
0 Location Map
0 Exhibit A: Water Improvements
❑ Exhibit A-1: Sewer Improvements
0 Exhibit B: Paving Improvements
❑ Exhibit B-1: Storm Drain Improvements
❑ Exhibit C: Street Lights and Signs Improvements
0 Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 14 of 16
Standard Community Facilities Agreement
Rev.2/21
ATTACHMENT"I"
Changes to Standard Community Facilities Agreement
City Project No. 103196
None
City of Fort Worth,Texas Page 15 of 16
Standard Community Facilities Agreement
Rev.2/21
City of Fort Worth,Texas Page 16 of 16
Standard Community Facilities Agreement
Rev.2/21
00 42 43
DAP-BID PROPOSAL
Pagel of3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UHT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 3292.0201 Utility Service Surface Restoration Seeding 3292 13 SY 450
- -- -- - --- — $2.00 $900.00
2 3305.0003 8"Waterline Lowering_ 33 0512 EA 2 $9,500.00 $19,000.00
3 3305.0109 Trench Safety 33 05 10 LF 375 $1.00 $375.00
4 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2 $5,000.00 $10,000.00
5 3311.0241 8"Water Pipe 3311 10,33 LF 170 $110.00 $18 700.00
6 3311.0251 8"DIP Water 3311 10 LF 52 $170.00 $8,840.00
7 3311.0441 12"Water Pipe 3311 10,33 LF 152 $100.00 $15,200.00
8 3312.0001 Fire Hydrant 33 12 40 EA 2 $5,000.00 $10,000.00
9 3312.2203 2"Water Service 33 12 10 EA 2 $3,500.00 $7,000.00
10 3312.2803 6"Water Meter and Vault 33 12 11 EA 1 $30,000.00 $30,000.00
11 3312.3002 6"Gate Valve 33 12 20 EA 2 $1,150.00 $2,300.00
12 3312.3003 8"Gate Valve 33 12 20 EA 2 $1,500.00 $3,000.00
13 3312.3005 12"Gate Valve 33 12 20 EA 2 $2,500.00 $5,000.00
14 3312.3103 8"Cut-in Gate Valve 33 12 20 EA 1 $8,000.00 $8,000.00
15 3312.4107 12"x 8"Tapping Sleeve&Valve 33 12 25 EA 2 $7,555.00 $15,110.00
16 13471.0001 Traffic Control 13471 13 MO 1 $4,000.00 $4,000.00
TOTAL UNIT I:WATER IMPROVEMENTS1 $157,425.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Bid Proposal-Water Sewer
00 42 43
DAP-BID PROPOSAL
Page 2 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UM u PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 3201.0614 Conc Pvmt Repair, Residential 3201 29 SY 323 $180.00 $58,140.00
2 3292.0201 Utility Service Surface Restoration Seeding 32 92 13 SY 290
$7.00 $2,030.00
3 3301.0002 Post-CCTV Inspection 3301 31 LF 415 $4.00 $1,660.00
4 3301.0101 Manhole Vacuum Testing 33 01 30 EA 5 $226.00 $1,130.00
5 3305.0109 Trench Safety 33 05 10 LF 415 $1.00 $415.00
6 3305.0112 Concrete Collar 33 05 17 EA 3 $200.00 $600.00
7 3305.0113 Trench Water Stops 33 05 15 EA 1 $1,600.00 $1,600.00
8 3305.0203 Imported Embedment/Backfill,CLSM 33 05 10 CY 20 $125.00 $2,500.00
9 3331.3311 4"Sewer Service,Reconnection 3331 50 EA 3 $2,400.00 $7,200.00
10 3331.4115 8"Sewer Pipe 3311 10,33 LF 150 $90.00 $13,500.00
11 3331.4115 8"Pressure Sewer Pipe 33 31 20 LF 118 $85.00 $10,030.00
12 3331.4116 8"Sewer Pipe,CSS Backfill 3311 10,33 LF 30 $240.00 $7,200.00
13 3331.4208 12"Sewer Pipe 3311 10,33 LF 117 $150.00 $17,550.00
14 3339.0001 Epoxy Manhole Liner 33 39 60 VF 10 $345.00 $3,450.00
15 3339.0003 Wastewater Access Chamber 33 39 40 EA 1 $3,500.00 $3,500.00
16 3339.1001 4'Manhole 33 39 10,33 EA 4 $5,920.00 $23,680.00
17 3339.1002 4'Drop Manhole 33 39 10,33 EA 1 $7,500.00 $7,500.00
18 3471.0001 Traffic Control 13471 13 M0 1 $3,000.00 $3,000.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $164,685.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Bid Proposal-Water Sewer
00 42 43
DAP-BID PROPOSAL
Page 3 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UM u PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS $157,425.00
UNIT II:SANITARY SEWER IMPROVEMENTS $164,685.00
Total Construction Bid $322,110.00
This Bid is submitted by the entity named below:
BIDDER: BY:Troy L.Jackson
Jackson Construction,Ltd.
5112 Sun Valley Drive
Fort Worth,Texas 76119 TITLE: President
DATE: July 12,2021
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 50 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Forth Version May 22,2019 Bid Proposal-Water Sewer
0 250 500 1000 N
NE W ® E
UME DEER LA
IASATERADMIONFKI-SEQ4
O.O.E.Na s966 1 inch = 500 ft.
FLE N0.W-1255
ATER PROJECT NO.P192-OOMS2151510
WER PROJECT NO.P172-M72131510 N01*Cowt,="Cvmft
X-19314 Lot 2.Sk 3
WIND DANCER TRAR.
PMOJECf SI?E
wHIrEFEAn�RwE
----- ll11 - M #, IT I TI T �1 IT
rEcoWTRAR
_ — TTT
PARRTRUST I
-1
PARRn LANE WEST FORK RANCH96 PARR71CUBi
WEST FORK RANCH85 I_ D.O.E.a 23 �' I '� WEST FM RANCH GA
O.OE No,7251 WATER PROJECT N0.P295-60215026 FLE NO,W-2424
FILE N0.X-22742 - SEWER PROJECT N0.P27 5-70 21 3021k WATER PROJECT N0.BMI-0500430-100472-001580
WATER PROJECT N0.P295-902150233983 CITY PROJECT N0.026M SEVER PROJECT NO.SHM-0700430-100472-001390
SEWER PROJECT N0.P275-702130233883 X-23175 / CITY PROJECT N0.10D472
CITY PROJECT NO-023M.AHORN LANE X-23781
I I I I I 7 TOFOSA DRNE
- CHIFW LANE I r I
I
PARR TRUST
wESTFORKRANCH
- - HOISTMWAY PHAMM
O.O.E.N0.74U
FLE N0.W-74W
WATER PROJECT NQ P285-902150298253
SEWER PROJECT N0.P275-70 21 3028 8 28 3
CITY PROJECT NO.0240.7
X-23175
ty�
PARRTRUST
WESTFORKRANCH
PHASEMI
DARa0NA DRNE 0.0.E N0.7338
FILE N0.W-2340
/j- WATER PROJECT N0.P265-802150240383
`8 SEVER PROJECT N0.P275-702130240383
CITY PROJECT N0.02403
'Fy,+ X-22857
SENEFOI.WAY
PARR TRUST
WESTFORKRANCH
PHASE 2A
D.O.E.N0.68"
FILE N0.W-2227
RED WRANG(O WATER PROJECT N0.P285-602150121283
7RNL SEWER PROJECT N0.P275-702130191283
CITY PROJECT N0.01212
X-21895 _
MAN ACNE
OWNER
I T-I I l4 NTP35, LP
500 Throckmorton Street
YPLACE Suite 900
PROJECT5ITE Fort Worth, Texas 76102
Telephone: (817) 236-6100
I Contact: Steve McKeever
CANCHWISTIW
VICINITY MAP DEVELOPER
City Project No. 103196 Skyline Prairie Homes, LP
NORTH COWTOWN CROSSING 2121 North Pearl Street
IVSPIARS (LOT 2, BLOCK 3) Suite 300
Dallas, Texas 75201
ENGINEERING&SURVEYING MAPSCO NO. 20N Telephone: (214) 865-7926
,.�E`N "��"TGUMNaF000100075~:� CITY COUNCIL DISTRICT NO. 2 Contact: Daniel Smith
Growing:G\2020 JOBS\20-164 The Standard at Harmon Fbmes\AOMIN—ENGINEERNG\CFA and Spec Books\Water Sewer\CFA\W SS CFAawg Sawa By: rbomett Save Tme:6/21/2021 1:6Fa41e PWy: tbamett Plot Date: 6/25/2021 2:14 Pm
0 250 500 1000 N
= LITRE DEER LANE 3 W ® E
LASATERADDITIONPH.r-SM4 1 inch = 500 ft.
aaE.Na 3966 SNMH=705.79
ALE Na W12W
ATER PROJECT Na P162-060162151510
TIER PROJECT N0.P172-M72131510
North Ca1V2.S Cro999g
X-19314 Let 2.Blk 3
WIND DAN=W WATER LEGEND
I �� I
Ex Water lne
8"W-1 V,W 8
Prop.Water Nan
LI I I I I I I m® )WMH=695.52 12N W 2
4a W J:7TITIT
3
la — f OLD PECOS 71UU1
I I I m PARRTRUST I
11 PARk — WEST FORK WwCH96O.O PARRTRUBt
WEST FORK KANCH0 — FILE
No,E. 7�66 QQ
O.O.E.N0.7281 FV.E N0.v-2l93 WESTFORKRANCH9A
FILE N0.X-22742 _ ACT N0.P255-60215026 FIE N0.W-2424
WATER PROJECT N0.P265-60215027368J SEVER PROJECT N0.P27 5-70 21 302& WATER PROJECT N0.59901-0900430-100472-001580
SEVER PROJECT N0.P275-7021 50 233WT CITY PROJECT N0.02M SEVEN PROJECT N0.59607-0700430-100472-001360
CITY PROJECT NSO 00-V LANE / X-23175It x / / CITY PROJECT N0.100472
Qq X-23781
I I I I I A �� TOPOSA DRIVE
— Ti
CHFM LANE I r I
a� I
I
/ PARR TRUST
WESTFORKRANCH
— - HOISTEWWAY PHASESA
O.O.E.NO,7466
FILE N0.W-74N
WATER PROJECT N0.P265-002150268263
SEVER PROJECT NO,P275-70 21 3026 6 28 3
CITY PROJECT N0.02403
X-2J175
I I t I lit
PARKYN ST
WEST FIM IKANCH
PHASE4A
SARZONA DRNE O.O.E.N0.7338
FILE Na W-2340
,y WATER PROJECT N0.P265-602150240J6J
`8 SEVER PROJECT N0.P275-702130240J63
tY CITY PROJECT NO,024W
X-22657
SMWM WAY
PARR TRUST
WESTFMRANCH
PHASE?A
D.O.E.N0.68"
FILE Na W-2227
RED DRA S" WATER PROJECT NO,P285-602150121283
71GUL SEVEN PROJECT N0.P275-702130191283
CITY PROJECT N0.01212
II X-21895 _
ILOHAH LANE
OWNER
I I I T NTP35, LP
— I 500 Throckmorton Street
— GELMYPLACE E-6 W Suite 900
Fort Worth, Texas 76102
Telephone: (817) 236-6100
Contact: Steve McKeever
E-B"W
CANCM STREET
City Project No. 103196 NORTH COWTOWN CROSSING Skyline Prai e0 HEmes, LP
(LOT 2, BLOCK 3) 2121 North Pearl Street
IVSPIARS Suite 300
EXHIBIT A Dallas, Texas 75201
ENGINEERING&SURVEYING Telephone: (214) 865-7926
'MC P-d,SMIu100 . MmTX751M . 9MA2UX" WATER IMPROVEMENTS Contact: Daniel Smith
TONENe F2121 • TOASNaFMU100 • N1N MWIV21114a
Drawing:G\2020 JOBS\20-164 The Standard at Harmon Fbmes\A➢MIN-ENGINEERNG\CFA and Spec Books\Water Sewer\CFA\W SS CFAawg Sawa By: rbomett Save Tme:6/21/2021 1:0 1e&Wy: tbamett Plot Date: 6/25/2021 2:15 PM
LITTLE PEEK LANE 0 250 500 1000
LASATERADDtt1ON PH.1-SEC.4 N
O.O.E.NQ 39H
FILE Na W-1255
WATER PROJECT N0.P162-0601621 ma2-070172131510 SEWER PROJECT NO.P1 7
Wow X-19314 "°t''„ ;°"'"° 1 inch = 500ft. W E
_ wwooANcoETRAa. ,
~ WASTEWATER LEGEND S
Ex Sanitary Sew
xnatE FEfilNffll LANE �J'S-1
Prop.SanitarySuer Main
11 1 T I T I TT n IT I T `"
- - - - - <
T�i PARRikUST gDP�EWS7KAIL � -
PARKT1amT LMlE NIESTFM RANCH SaoD.O PARRTRUSf
WEB,FP0MRANCHft FILE Na 7486RANCH SA
O.O.E.Na 7281 PROJECT
N0. 265-O I WEST FORKNO,W-2424
FIE NO.X-22742 _ WATER PROJECT Na P26S-8021502E FILE NO,W-2424
WATER PROJECT N0.P285-602150233893 ��PROJECT NO.P275-702130261 WATER PROECT Na 59601-0600430-100472-001580
ar PROECT N0.02808 SEWER PROJECT NO,59607-0700430-100472-001380
SEWER PROJECT JE P275-702130233883 s X-27175 / CITY PROJECT 100472
CITY PROJECT
NCI 159 / \` /// X-23761
61
K-2DRAFIOROKN LANE
TOPOSAPME ITFMI
-
- - CHIFORD LANE ,, � I
I
1
PARR TRUST
WES'MIMRANCH
HOLSII W WAY_ PH
� O.D.O.E.NO.74E.Na 74e6
FILE NO,W-7466
WATER PROJECT NO P285-802150268283
SEWER PROJECT Na P27S-702130288287
CITY PROJECT Na 02403
x-23175
PARR TRUST
NIESTF=KANCH
PHASE4A
SARMNA MWE O.O.E.NO.7336
FILE Na W-2346
WATER PROJECT NQ P265-602150240383
`8 I SEWER PROECT N0.P275-70 21 302 4 0 7 83
CITY PROJECT N0.02403
X-22657
SEN81M WAY 1J
PARRT IM
WEST FORK RANCH
Fie d22i
RED DRANf>w8 WATER PROJECTNO,P265-SM1 501 91 28 3
VAL SEWER PROJECT Na P275-702130121283
II CITY PROJECT NO,01012
X-21895
iLOHAN I LANE
nr
I I
GELMYFLACE OWNER
_ it 6.5-3 NTP35, LP
—( 500 Throckmorton Street
I I I I I I Suite 900
CANCWSTREE1`- Fort Worth, Texas 76102
(� MW
N�FORxRA►uai = Telephone: (817) 236-6100
I� PHASEMP Contact: Steve McKeever
MOM N0.W24
ME NQ W-2186 UU
City Project No. 103196 NORTH COWTOWN CROSSING Skyline Prai e0 HEmes, LP
(LOT 2, BLOCK 3) 2121 North Pearl Street
IVSPIARS Suite 300
EXHIBIT A-1 Dallas, Texas 75201
ENGINEERING TX75M -SURVEYING SANITARY SEWER IMPROVEMENTS Telephone:tt:(Daniel$65-7926
Smith
765 avar RWJ,5ub100 ar10.T%FiOF 972A22.007f
TONENe F2121 • TOIPSNa M0043100 • IYNI VWIVfYN[CIt1
Drawing:G\2020 JOBS\20-164 The Standard at Harmon Fbmes\A➢MIN-ENGINEEERNG\CFA and Spec Books\Water Sewer\CFA\W SS CFAawg S—d By: rbomett Save Tme:6/21/2021 1:0 1e&Wy: tbamett Plot Date: 6/25/2021 2:16 PM