HomeMy WebLinkAboutContract 53332-CO1 CSC No.53332-CO1
FORT WORTH City of Fort Worth
Change Order Request
Project Name:I Village Creek Biosolids Management and Beneficial Reuse Project City Sec No.: 1 53332
Project No.(s): 56017/0700430 DOE No. N/A City Proj.No.: 101961
Construction of new biosolids drying facility at Village Creek Biosolids Management and Beneficial Reuse Facility at
Project Description: 2501 Greenbelt Road
Contractor: Synagro of Texas-CRD, Inc. Change Order# 0 Date: 8/1212021
City Project Mgr. Suzanne Abbe City Inspector: I Nathan Gray
Phone Number: 817-392-8206 Phone Number: 817-991-0629
Dept. Sewer SRF Sewer City Totals Contract Time
p Funded Funded (Calender days)
Original Contract Amount $58,001,558.00 $58,001,558.00 913
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $58,001,558.00 $58,001,558.00 913
Amount of Proposed Change Order $96,445.00 $96,445.00 011
Revised Contract Amount $58,098,003.00 $58,098,003.00 924
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.17%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $72,501,947.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.1 covers the following:
The Village Creek Biosolids Management and Beneficial Reuse Facility(VCBMBRF)is adjacent to a Bell Helicopter heliport.Bell Helicopter
has requested that obstruction lighting be installed on top of each of the proposed 110 foot tall product storage silos that will be
constructed as part of the project due to its night flight training sessions that take place in the vicinity.Elevation differences between
VCBMBRF and the heliport are such that the FAA rules do not require obstruction lighting on the silos.Therefore,the contract does not
compel Synagro to install the lights as part of the negotiated design build price.To protect the City's asset from possible crashes,staff
recommends approval of Bell Helicopter's request for the City to install the lighting.This change order will allow Synagro to provide the
signed,sealed design as well as the installation of the obstruction lights.Replacement of any material component/corrective
i
maintenance over$1000 on the equipment authorized by this Change Order No.1 during the operational period of the contract will be
a pass through cost to the City,provided such a repair/replacement is not a result of negligence on the part of Synagro or any of its
subcontractors.
i
There are sufficient funds available in the project to pay for this change order.
I
In addition,staff recommends the approval of 11 additional calendar days for the change order for the winter storm event of February
2021.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractors Company Name Contractor Name Contractor Signature Date
Synagro of Texas-CRD, Inc. John Goodwin
Inspector Date Project Ma ger Date
8/12/2021 4 a- 8/12/2021
Director Water Dept) Date Con action Supervisor Date
�o 11e tf �e T Aug 24,2021
Assistant City Attorney Date Assistant City Manager Date
Dana 9urghdoff V\ug 27 2021
Council Action(If Required)
M&C Number NIA M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Village Creek Biosolids Management and Beneficial Reuse Project City Sec No.: 53332
Project No.(s): 56017/0700430 DOE No. N/A City Proj.No.: 101961
Project Construction of new biosolids drying facility at Village Creek Biosolids Management and Beneficial Reuse Facility at 2501
Description Greenbelt Road
Contractor Synagro of Texas-CRD, Inc. Change Order: 0 Date: 8 12/2021
City Project Mgr. Suzanne Abbe City Inspector FNathan Gray
ADDITIONS
ITEM UESCRIPTION DEPT Qty Unit Unit Cost Total
1 Silo obstruction lighting Sewer SRF Funded 1.00 LS $96,445.00 $96,445.00
Sewer SRF Funded $96,445.00
Sewer City Funded
Page 1 of 1 JAdditions Sub Total $96,445.00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Village Creek Biosolids Management and Beneficial Reuse Project City Sec No.: 1 53332
Project No.(s): 56017/0700430 DOE No. N/A City Proj.No.: 101961
Project Description Construction of new biosolids drying facility at Village Creek Biosolids Management and Beneficial Reuse Facility
at 2501 Greenbelt Road
Contractor Synagro of Texas-CRD, Inc. Change Order: F1 I Date 8/12/2021
City Project Mgr. Suzanne Abbe City Inspector: Nathan Gray
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Sewer SRF Funded
Sewer City Funded
Page 1 of 1 IDeletions Sub Total
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 1 of 1
FORT WORTH SYNAGR® ':14 r-7 NICHOLS i.\ TL
VCWRF
Biosolids Management Project
Change Request-01
8/12/2021 R2
Description of Change
Add obstruction lights to top of silo for Bell Helicopter. Using an unclassified fixture mounted out of the
envelope with sealoffs for the area
Cost Breakdown Summary
Cumulative
Subcontractor Materials+Labor OHP Subtotal Notes
ACME $ 55,457 $ 13,094 $ 68,550
15%OHP-ACME direct
Archer Western $ 10,283 $ 78,833 cost
Archer Western $ 2,365 $ 81,198 3%Insurance& Bonds
FNI Design $ 9,788 $ 90,986
Synagro $ 9,099 $ 100,084 Synagro OHP @10%
Customer Credit $ (3,639) $ 96,445 Synagro Credit @4%
Total Change Request $ 96,445
Additional Notes
1 No Schedule impacts
2 Use of single feed from electrical room&No SCADA feedback from lights.
3 Lights will be on emergency power
4 Replacement of any material component/corrective maintenance over$1000 on the equipment
authorized by this Change Order No. 1 during the operational period of the contract will be a pass through
cost to the City,provided such a repair/replacement is not a result of negligence on the part of Synagro or
any of its subcontractors.
COST PROPOSAL#
OWNER: Synagro WORK DESCRIPTION:
Cost to add obstruction lights to top of silos for Bell Helicopter.Using a
class 1 Div 2 rated fixture vdth sealoffs for the area.
ENGINEER Freese and Nichols Time Extension-0 days
This change notice Includes all labor,material and supervision to
CONTRACTOR: ARCHER WESTERN CONTRACTORS,LTD complete the scope of work.We reserve the right to correct this
1411 GREENWAY DR change order for errors or omissions.This price Is good for
IRVING,TX 75038 acceptance Wthln 10 days from the date of reclept.
Bid Item Description Oty Unit Unit/Price Labor Material Equipment Subcontractor Totals
LABOR
0.00 MH $0.00 50.00 $0.00
0.00 MH $0.00 $0.00 $0.00
0.00 MH $0.00 $0.00 $0.00
MATERIAL
0.00 LS $0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
EQUIPMENT
SUBCONTRACT
ACME 1.00 LS 1 $68 550.04 1 $68 550.04 $68 550.04
MISCELLANEOUS REMS
if
TOTALS: 0.00 $0.00 $0.00 $68 550.04 $fib 550.04
Labor Burden @ 55%of Labor $0.00 $0.00
Small Tools @ 15%of Labor $0.00 $0.00
Safety Supplies @ 7.5%of Labor $0.00 $0.00
EOE 50%of Equipment $0.00 $0.00
TOTAL DIRECT COSTS: $68,550.04
OHBP at 15% $10 282.51
Insurance and Bonds at 3% $2 364.98
Subtotal: 1 $0.00 $81,197.52
TOTAL AMOUNT THIS COST PROPOSAL SUMMARY............................... $81,198
Archer Westem Construction,LLC Date Synagro Date
City of Ft Worth VCWRF
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
PROJECT: VCWRF Bio Solids
Work performed by:
JOB NO.
( ) General Contractor ( X ) Subcontractor CONTRACTOR: Archer Western
If subcontractor,give Co.name:ACME ELECTRIC COMPANY PCM#:
CPR#: 1D
Time Extension(if any): RFI#:
ASI#:
1
Description of Change: Add obstruction lights to top of silos for Bell Helicoptor.
Using a class I Div 2 rated fixture with sealofl's for the area.
ADDITIONS AND/OR[CREDITS] EXTENSION
A B C D E
Description Quantity Unit Cost/Unit Material Labor Equip. Trans. Storage
Obstruction Lights 2 EA $4 560.00 $9 120.00 $300.00 $91.20 $0.00
3/4" AL Conduit 250 LF $10.45 $1 275.00 $1 325.00 $12.75 $0,00
3/4" Grounding Bushing 8 EA $27.73 $84.96 $136.00 $0.85 $0.00
1 5/8" SS Unistrut 100 LF $213.77 $19 200.00 $1 985.00 $192.00 $0.00
3/8" Beam Clamp 34 EA $78.56 $2 244.00 $404.60 $22.44 $0.00
Stainless Hardware 60 EA $68.10 $3 600.00 $450.00 $36.00 $0.00
1"PVC 350 LF $6.02 $768.60 $1 330.00 $7.69 $0.00
1"Female Adapters 6 EA $13.75 $7.20 $75.30 $0.00 $0.00
1"PVC Coated AL 90 3 EA $38.65 $90.00 $25.95 $0.00 $0.00
12"XITM"Nema 4X SS Box 1 EA $1 437.00 $1 230.00 $207.00 $0.00 $0.00
#10/4C. XHHW Tray Cable 300 LF $37.45 $9 000.00 $2 235.00 $0.00 $0.00
Subtotals $46 619.76 $8 473.85 $0.00 $362.93 $0.00
Line I: Enter total of Columns A+B+C+D+E $55,456.54
Line 11: Enter 49%of Col B for Workman's
Comp. Social Security, and like taxes $4,152.19
Line III: Enter total Col E(Storage) $0
Line IV: If Line I indicates an ADD, Enter 15%of Line I.
If Line I indicates CREDIT, enter-0- $8,941.31
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet $68,550.04
SIGNATURE: DATE:
CONTRACTOR/SUBCONTRACTOR
SIGNATURE: DATE:
GENERAL CONTRACTOR
k
%
! § §\§aR§ (
_ !
\ /
)� )kƒa■5 ( }
� ` \
@ , / k
� k
. ■
� | | �
$ !
� |
f�
\ \ ( k
� cc 2&) Q
k R
Contract Compliance Manager
i
By signing T acknowledge that am the person responsible
fbr the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer,Capital Project Delivery
Title
dq'�°F�R r 4 a
ATTEST: �A,o° °o Q
6.
S °4d
0,vo 0 0 If
° o° d
° °* CY
Ronald Gonzales °o° °o
�y
Acting City Secretary �Ij °OOpp0°° o
�11 nEXASoA -
I
I. I
I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
I