HomeMy WebLinkAboutContract 42660COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 42.6(00 WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City ", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Vantage Fort Worth Energy LLC Authorized Signatory: C Barry Osborne Title: Land ect Name: Southcliff Drill Site Project Location:East of Granbury Rd, South of I -20 /SW Loop 820 Additional Streets: Block A Plat Case No.: NA Plat Name: Westcliff Addition Mapsco: 89Q Council District: 6 City Project No:01766 i Received by te: -_ CFA: 2011-047 DOE: 6702 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City, I -- i OFFICIAL RECORD ad" SECRETARY FT. WORTH, TX Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ( "Policy ") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ( "CFA ") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub - contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof. Water (AE X__, , Sewer (A -1) _X_, Paving (B) ! Storm Drain (B -1) , Street Lights & Signs (C) E. The Developer shall award all contracts for the construction of community facilities in accordance with Section 11, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: Combined CFA final Sept 12, 2008 2 i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and /or prequalified to perform water /waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100 %) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100 %) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer- awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre - Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City- 3 issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub - contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleued negligence of the City of Fort Worth, its officers, sert,ants, or employees. M. Developer will further require its contractors to indemnify, defend and Combined CFA final Sept 12, 2008 4 hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2 %) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4 %) and material testing fees equal to two percent (2 %) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pad in cash the total cost of streetlights or 11' the cite is not installing the streetlights, inspection fees equal to four percent (4 %) of 5 the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and /or suppliers are not paid for the costs of supplies and /or construction, the contractors and /or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Vantage Fort Worth Energy LLC CFA No.: 2011 -047 DOE No.:6702 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre- construction meeting. An itemized estimate corresponding to each project- specific exhibit is required to support the following information. Items $ 151,586.00 Developer's Cost A. Water and Sewer Construction $ 151,586.00 1. Water Construction $ 137,262.00 2. Sewer Construction $ 14,324.00 Water and Sewer Construction Total $ 151,586.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water /Sewer Inspection Fee (2 %) $ 3,031.72 D. Water /Sewer Material Testing Fee (2 %) $ 3,031.72 Sub -Total for Water Construction Fees $ 6,063.44 E. TPW Inspection Fee (4 %) $ - F. TPW Material Testing (2 %) $ G. Street Light Inspsection Cost $ H. Street Signs Installation Cost Sub -Total for TPW Construction Fees $ - Total Construction Fees: $ 6,063.44 Choice s_ Financial Guarantee Ontinn rhnnse nne 'd--t "" r,n Bond = 100% $ 151,586.00 Completion Agreement = 100% / Holds Plat $ 151,586.00 Cash Escrow Water/Sanitary Sewer= 125% $ 189,482.50 Cash Escrow Paving/Storm Drain r= 125% $ - Letler of Credit - 125 "i„ w 2 r expiration period $ 189 482 50 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this of De( -tMbC) , 20 " . CITY OF FORT WORTH - Recommended by: Water Department L� Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W Black Assistant City Attorney ATTEST: A d� /41'f% City Secretary ATTEST Signature (Print) Name: Combined CFA final Sept 12, 2008 day Transportation & Public Works Department Douglas Wiersig, PE Director Approved by City Manager's Office Fernando Costa Assistant City Manager NO M &C REQUIRED 0 � I Fort Worth Energy LLC Signature Print Name: & 3.*'47 0s90AI-1- Title: 1I %+✓4if - IA"- l' - - OF V,, .3AL REC-(Jgo � ',r.:CrkETARY C.tTy FT . vj0RTj1, "TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment X Location Map X Exhibit A: Water Improvements X Water Estimate X Exhibit A -1: Sewer Improvements X Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit 13-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) FF� �O Pp �-1 INTERSTATE 20 O i � �O PROJECT- z-/-------------------------- - - - - -- L ---- - - - --/ WONDER DRIVE m 0 G) m WOOTEN DRIVE m OWNER /DEVELOPER: PELOTONN SOUTHCLIFF DRILL SITE VANTAGE ENERGY 11111 " N.T.S. WATER IMPROVEMENTS 16 INVERNESS CEAST 127E 107 5751 KROGER 6244 SUITE 185 PHONE 303- 386 -8600 KENEER 7- 76-33 PHONE 817- 562 -3350 DATE. SEPT 2011 / / / / / / / / / ./ • \• /' ' 1 mmnns ND Der CO LLC i A -,092. T209046008A / •\ INST�RTCT / r EX 6" W / / ,NESTCLIFF ADDji1ON BLOCK A / VOL. 38g -4 PT GE 34 / PRT C. / PAD SITE / (BV OTHERS) P/ / / WESTCLIFF ADDITION LOC BK A 34 VOL 38" 'v .0 1GE AUTOMATIC FLUSHER TO INCLUD -6"x2" REDUCER -2" WATER SERVICE -CLASS 'B'METER BOX - AUTOMATIC FLUSHING DEVICE EX I 1 � ---------------------- - - - - -- _- - -- -- - — - — - — - — - — - — - — - — - — - — - — - — - — - — i L__ / Fks„ X/ X x�' 2�0 / / BOUTH`NESTERN BELL ATT WE CK A ILOT T �D2t0 55448 / CR 'CT . X ``\ 'OND \ \ .RS) / /I / LEGEND 04 PROPOSED WATER LINE EXIST SEWER EXHIBIT A - WATER = EXIST WATER LINE X_X EXIST WATER LINE Ix TO BE REMOVED OWNER /DEVELOPER: PE LOTON 0 N-1 100 SOUTHCLIFF DRILL SITE VANTAGE ENERGY mu ".. -1 -1 1 WATER IMPROVEMENTS 161NVEN��Ewoo� co oi1zTE 107 s751KROCERDRIVE SUITE 185 KELLER. TX 76244 ^ GRAPHIC SCALE DATE. SEPT 2011 REV: 9/27/11 PHONE 303- 386 -8600 PHONE 817 562 3350 /. •�•� •�• NO DEV CO LLC / CHESAPFJ KE LA NO " \ 1GO" /• A INSi D 09046006 . /CD wESTCLIFF ADDITION BLOCK GE 34 VOL 3P RT C WESTCBLLOCKDA VOL. 36B -4A, T F, RTC CONNECT TO AUTOMATIC FLUSHE -4" SS SERVICE (FROM AUTOMAI DEVICE TO CLEANOUT AND F TO EX SS MANHOLE) -TWO WAY CLEANOUT - CONNECT TO EX SS MANHOLE Ammm IV mom 1 ­" ­`f EXHIBIT Al - WASTEWATER 0 11- 100 SOUTHCLIFF DRILL SITE WATER IMPROVEMENTS GRAPHIC SCALE DATE. SEPT 2011 REV. 9/27/11 )UTH`f'�ESTERN BELL ATi `NES LOCK i T 1 BLO A INS -. D21 0055446 C R C1 FRACUPOND �y EX6 "SS L- = = = = _-- - - - - -- LEGEND EXIST SEWER EXIST SEWER LINE TO BE ABANDONED EXIST SEWER LINE TO BE REMOVED OWNER / DEVELOPER: VANTAGE ENERGY 116 INVERNESS DRIVE EAST STE 107 ENGLEWOOD CO 80112 PHONE 303 - 386 -8600 EXIST WATER PELOTON 5751 KROGER DRIVE SUITE 185 KELLER,TX 76244 PHONE: 817 -562 -3350 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: VANTAGE SOUTHCLIFF WATER IMPROVEMENTS 9/27/2011 EXHIBIT A - WATER IMPROVEMENTS ITEM # CITY BID # QTY UNIT DESCRIPTION UNIT PRICE TOTAL 1 1 EA 48" x12" Tapping Sleeve and Valve (Designed by Hanson) $22,000.00 $22,000.00 2 00591 1,070 L.F. 12" PVC Water Line $38.00 $40,660.00 3 00579 55 L.F. Bore with 24" Casing Pipe & Spacers ( Min. Wall Thickness 0.375 ") $400.00 $22,000.00 4 00717 6 L.F. 12" Gate Valve & Box $1,587.00 $9,522.00 5 00546 3 EA Fire Hydrant Assembly (include 6" Gate Valve) $2,360.00 $7,080.00 6 00568 2.8 TON Cast Iron Fittings $3,600.00 $10,080.00 7 00837 2.4 CY Concrete Blocking -Type B $600.00 $1,440.00 8 1 EA Automatic Flushing Device $5,500.00 $5,500.00 9 00767 1 EA 2" Water Service (for Automatic Flushing Device setup) $866.00 $866.00 10 00566 1 EA Class B Meter Box (for Automatic Flushing Device setup) $500.00 $500.00 11 1 EA Connect to Ex. Sanitary Sewer (for Automatic Flushing Device $1,500.00 $1,500.00 12 00372 1,070 L.F. Trench Safety $1.00 $1,070.00 13 1 L.S. System Testing $1,000.00 $1,000.00 14 00547 1 JEA Remove & Salvage Ex. Fire Hydrant Assembly $800.00 $800.00 15 00567 611 1L.F. Remove Existing 6" Water Line $8.00 $4,888.00 16 2 JEA Cut & Plug Existing 6" Water Line $500.00 $1,000.00 17 00567 290 L.F. Remove Existing 4" Water Line $8.00 $2,320.00 18 1 EA Cut & Plug Existing 4" Water Line $500.00 $500.00 19 1,143 L.F. Silt Fence $2.00 $2,286.00 20 1 L.S. SWPPP Maintenance $1,500.00 $1,500.00 21 5 EA Inlet Protection $150.00 $750.00 TOTAL WATER IMPROVEMENTS $137,262.00 ITEM # CITY BID # QTY UNIT DESCRIPTION UNIT PRICE TOTAL 1 246 L.F. Remove Existing 6" Sanitary Sewer $8.00 $1,968.00 2 344 L.F. Abandon in Place- Existing 6" Sanitary Sewer $15.00 $5,160.00 3 00054 68 CY Fill Material- Flowable Fill— Install $70.00 $4,760.00 4 00356 1 EA Sewer Service -4 Inch- 2 Way Clean Out —Install $270.00 $270.00 5 00354 41 L.F. Sewer Service -4 Inch — Install $26.00 $1,066.00 6 1 EA Cut & Plug Existing 6" Sanitary Sewer $300.00 $300.00 7 00206 1 EA Remove Existing Sanitary Sewer Manhole $800.00 $800.00 TOTAL SEWER IMPROVEMENTS $14,324.00 SOuthchffWL CFA x1, 20110927_cfa 1 Of 1 9/27/2011