Loading...
HomeMy WebLinkAbout(0077) M&C 20-0103City of Fort Worth, Mayor and DATE: 02/18/20 Texas Council Communication M&C FILE NUMBER: M&C 20-0103 LOG NAME: 80ARCADIA TRAIL PARK PLAYGROUND REPLACEMENTS AWARD CONTRACT SUBJECT Authorize Execution of a Construction Contract with L.J. Design & Construction, LLC, in the Amount of $567,289.24 for Replacement of Three Playgrounds in the Arcadia Park System and Provide for Additional Project Cost and Contingencies in the Amount of $128,525.00 for a Total Construction Cost of $695,814.24 (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council authorize the execution of a construction contract with L.J. Design & Construction, LLC, in the amount of $567,289.24 for the replacement of three playgrounds in the Arcadia Park System. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the award and execution of a construction contract with L.J. Design & Construction, LLC, in the amount of $567,289.24 for the replacement of three playgrounds in the Arcadia Park System. The FY2019 Capital Improvement Plan identified $250,000.00 each in the Park & Recreation Department (PARD) PayGo for playground replacements for three sites in the Arcadia Park System; Playground #2 8300 Island Park Drive, Playground #5 8251 Quachita Crossover and Playground #6 7812 Park Trails Drive. Total funding for these parks included in the FY2019 Capital Improvement Plan is $750,000.00. This project was advertised for bids on November 7 and 14, 2019 in the Fort Worth Star -Telegram. On December 5, 2019, the following bids were received and tabulated: Bidders Base Bid Bid Alternate 1Total L.J. Design & Construction, LLC ]$538,853.56 �$28,435.68 $567,289.24 North Rock Construction, LLC ]$622,682.82 �$44,533.81 $667,216.63 Northstar Construction, LLC �$659,950.00 $43,900.00 �$703,850.00 �Henneberger Construction, Inc $658,724.00 $56,855.00 ]$715,579.00 AUI Partners, LLC 1$760,361.50 ]E549:0:0: ]$821,910.50 Base bid improvements include the following: Demolition of existing playgrounds and installation of new playgrounds, concrete walks, concrete mow strips, ADA ramps, sub -drainage systems, topsoil placement, sod, wood fibar safety surface material and park benches. Alternate bid items include the following from Unit #4 of the bid proposal: Bid List Item No. 4-01 Playground #2 - Installation of concrete walks adjacent to tennis court. Bid List Item No. 4-02 Playground #5 - Installation of concrete walks adjacent to playground with three benches. Bid List Item No. 4-03 Playground #6 - Installation of concrete walks adjacent to playground with one bench. The additional annual cost to maintain these three Arcadia Park playgrounds will be $2,835.00. Funding for operations and maintenance will be allocated to the Park & Recreation Department's base budget beginning in FY2021. As of December 31, 2019, the cumulative total of additional maintenance costs for FY2021 is $37,836.00. Contract time is 90 calendar days and construction is anticipated to commence in March 2020 and be completed by June 2020. L.J. Design & Construction, LLC, is in compliance with the City's BIDE Ordinance by committing to 5% MBE participation on this project. The City's MBE goal on this project is 5%. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, in the General Capital Projects Fund Playground Repl. - Arcadia #2, Playground Repl. - Arcadia #5, and Playground Repl. - Arcadia #6 projects. Prior to any expenditure being incurred, the Park & Recreation Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office by. Fernando Costa 6122 Originating Business Unit Head: David Creek 5704 Additional Information Contact: Patrick Vicknair 5967