HomeMy WebLinkAboutContract 42653COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT §
Contract No. 42(oS
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City ", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: Trinity Bell Apartments, LLC
Authorized Signatory: Marc Footlik
Title: President
Project Name: Trinity Bell Garden Apartments
Project Location: SEC of Trinity Blvd. & Norwood Dr.
Additional Streets: N/A
Plat Case No.: FS- 009 -078 Plat Name: Trinity Bell Garden
Mapsco: 67B Council District: 4 City Project No: 01392
To be completed
Received by: it
/ I I
CFA: 2011 -038 DOE: 6264, 651 1
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ( "Policy ") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ( "CFA ") as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub - contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City- approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X
Sewer (A -l) X , Paving (B) X , Storm Drain (B -l) X__, Street
Lights & Signs (C) _.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall he
administered in conformance with paragraph 8, Section 11, ofthe Police.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and /or
prequalified to perform water /waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100 %) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100 %) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer- awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may he required by the City.
�.
lo require its contractor to have fullv executed contract documents
submitted to the Cite to schedule a Pre - Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
L City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER. his contractors. sub- contractors. officers. agents or
employees. whether or not such injuries, death or damages are
caused, in whole or in part, bt, the alleged negligence of the Ott, of
Combined CIA final Sept 112008 4
Fort Worth, its officers, servants, or employees.
A Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the allemed neglikence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2 %) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4 %) and material testing fees equal to two percent (2 %)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4 %) of
the developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and /or suppliers
are not paid for the costs of supplies and /or construction, the contractors
and /or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12. 2008 6
Cost Summary Sheet
Project Name: Trinity Bell Garden Apartments
CFA No.: 2011 -038
DOE No.: 6264, 6511
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre- construction
meeting.
An itemized estimate corresponding to each project- specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Sub -Total
Developer's Cost
$ 44,826.00
$ 8,888.00
$ 53,714.00
$ 88,891.00
$ 35,551.00
$ 124,442.00
Total Construction Cost (excluding the fees):
$
178,156.00
Completion Agreement = 100% / Holds Plat
Construction Fees:
Cash Escrow Water/Sanitary Sewer= 125%
C. Water /Sewer Inspection Fee (2 %)
$
1,074.28
D. Water /Sewer Material Testing Fee (2 %)
$
1,074.28
Sub -Total for Water Construction Fees
$
2,148.56
E. TPW Inspection Fee (4 %)
$
4,977.68
F. TPW Material Testing (2 %)
$
2,488.84
G. Street Light Inspsection Cost
$
-
H. Street Signs Installation Cost
$
-
Sub- Total for TPW Construction Fees
$
7,466.52
Total Construction Fees:
$
9,615.08
Choice
amount trk one)
Bond = 100%
$ 178,156.00
Completion Agreement = 100% / Holds Plat
$ 178,156.00
Cash Escrow Water/Sanitary Sewer= 125%
$ 67,142.50
Cash Escrow Paving/Storm Drain = 125%
$ 155.552 50
Letter of Credit = 125% w/2 r expiration period
$ 222 695 00
7
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in quadruplicate, at Fort Worth, Texas this IZ day
of t)eC.2l(Ylber 20 11 .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi a ulal, EMBA, P.E.
Development Engineering Manager
Approve44s-7y Form & Legality:
z I
Doug Black l
Assistant City Attorney `
A ST:
(� SS} City Secretary
Trn & Public Works Department
ansportatio
lj ZJ �' �
Dougla . Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
O.
ATTEST Trinity Bell Apartments, LLC
0�.' k�v
Signature Signature
(Print) Name: Print Name: Marc Footlik
%-U _ z � Title: President
OFFICIAL RECORD
CITY SECRETARY
Combined CFA final Sept 12, 2008 8 FT WORTH, TX i
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
®
Location Map
®
Exhibit A: Water Improvements
®
Water Estimate
®
Exhibit A-]: Sewer Improvements
®
Sewer Estimate
®
Exhibit B: Paving Improvements
®
Paving Estimate
®
Exhibit 13-1: Storm Drain Improvements
®
Storm Drain Estimate
❑
Exhibit C: Street Lights and Signs Improvements
❑
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
IMPROVEMENT!
LOCATION
F 1 4
I X
KEY MAP
CONNECT TO EXISTING 16" DIA. WATERLINE
(EASTSiDE II PRESSURE PLANE)
FURNISH AND INSTALL
16"x8" TAPPING SLEEVE AND VALVE
�4" DOM. SERVICE WITH
Y DOMESTIC METER AND
;VAULT WITH BY-PASS
.9-00 !-.F . 4- Olk PVC WATERLINE
TRINITY E30ULEVARD
(120' R,O.W,)
15" STEEL SLEEVE
WITH SPACERS
8" VERTICAL BENDS
2 IRRIGATION SERVICE!
WITH 2" METER
. . ..... .. . ..... .. ..
7
41, DIA. PLUG 00 L F. 8" DIA. D.J. WATERLINE IN SLEEVE
.... . .. ....... ' -- L
L 52,00 L.F, 8" DIA, PW. WATERLINE QPEN CUT
I - 8" 01A, PLUG
jFUTURE DETECfOR C4CCK ------
(BY OTHERS)
LOT 1
- I- %l!- J! - 'A I LIT TIES G ,
"'! F
r
I �,�) r ) F--� I- I - i j, t X
Ile
j
LOT 1
- I- %l!- J! - 'A I LIT TIES G ,
"'! F
r
I �,�) r ) F--� I- I - i j, t X
>
ry
0
0
00
0
.:- REMOVE EXISTING 8" PLUG
1,CONNECT TO EXISTING
18" DIA.. WATERLINE
WOOD DUCK
DR.
(50' R,O,'N.)
60.00 Lf 8" DiA.
PVC WATERLINE
`t 8 "x4" MJ TEE
` 41 4" GATE VALVE
I 8"x'8" MJ TEE
1 8• GATE VALVE
11 - 8" GATE VALVE
10
3
-7
yL gun (n),
OVEMFNT
LOCATION
.................
.......... . .........
K E v MAP
LOI I
14" DOMESTIC SERVICE WITH
13" DOMESTIC METER AND
1. . ...... . IVALILT WITH BY-PASS
WA E,
)28.D0 L.F. 4" 01A. PVC
15' x 2 0/ 1 - 4 " Olk PL UC
W A T E/r',
Z,
, -, 128.00 L.F. 8' IA. PVWATERLINE k"-
,77 - - "_ _' - � / - " I - 8" DIA. PLUG
l -1 -
'FUTURE DETECTOR CHECK
(BY OTHERS)
-"5 L.F. 2" SERVICE
..... ......................... . . . .......... .
12" IRRIGATION SERVICE i
WITH 2*' METER
... ........ .
14
I l)i"\ - , :�� ; � C''I'_11 - [
'wd
MIA PR( M 1 1 u Y p D a Yp" i OH ws
t.1-1
i
t V ) PRt UFC 1 \3 M ;q
M11..'1
()I I HAT"-, 111
PITRIA 'ARI I AN IN WORDS PRICT MY N!
Apply MIS Namc MO Aw an inky bod
Am ii
AND AM V!,
1
Cwh po fw� LOU UK
OMM
Win >T
Rpe-Prestiure
KIM
NX Ell
I A
1 p
(ail
Bcx C:as<�
jIMPROVEMENT
LOCATION
'A
KE'f MAP
'INSTALL 10" DIA. PLUO LOT
FL.- 477.14
I CONM ELEV.STRUCT 85.60 STD. O 4' DIA. SS MANHOLE
10" FL.([N)• 477.12
110" FL(OUT)• 477.02
PRNISH AND INSTALL:
,57 L.F. 10" DIA. SOR-35,.-�-111.�--7----�-it--=--
1-1 -00 -0 -4 -OZ
AND IKJCT I I
ArAh
LOT 2
CONSTRUCT TO L.F. 10" DIA,
SDR-35 PVC SERVICE C 1,00Z
WITH PLUG AT EASEMENT LiNE
FL.(AT PLUG)• 478A6
. . . ..........
25' SS E S M T
_..:... L.-_.._.-_ .._.- _.- _.- _.._.._----- _. -_.._.
�
ilO.GO Lf. 10" DIA. SDR-35
I PVC 0 0.40/
- - - - - - - - - - - - - -
-27 SS-----
- I-) - A L -8698
fr
CNN CT TO EXISTING 27" DIA- I I,CONSTRUCT ST,-), 5' DIA. OFFSET
SS LINE BY CORING I SS MANHOLE
10" FL.(IN)- 476,72 RIM CL'r'V,- 486-20
27" FL,(EXIST)- 476.00 (VERIFY), :10" FL.(!N)• 476.86
'10" FL.(OUT)• 476.76
ttiA I-)
<a @- j1! ; i,
Sjohn,
2§S
PIT,
01-( PINUN
(T VOW, "A i W
»C
@C22TLLY
MD 11101clis
\1' ki 1 1 [A IN, 'A
K"na 1 HhI !win
2a
PW mOW
kist-O
1;oihf
�-:ik P" 1
01« ''!i 1 '-'1 1 1 WP �
SF%V[ MANIh Q 11
"All KINJIFAVIN .1W
««H R I A di I L W,
1 wokv, +
pvr bah
<a @- j1! ; i,
Sjohn,
It it 1 11 It
LOT 1
r ,��,•cE aF r q eJ
� 5 •' 1
t : *.1
KEITH M. HAM TON
�.A::............:•.
87384
ltc` -- CENS,.•��C�r
ATCF
I.
Ij
li
li
I,
le
f!
le
I�
I
I
I�
1
�..JL
� 111
I _
�1
I II
I II
I II
I II 1
I II j
\ 1
• --t —1
c
0
;.o
oo
�c
r
�rn
Q
CONSTRUCT DRIVEWAY
PER CITY OF FORT WORTH
DRIVEWAY DETAIL
CONSTRUCT DRIVEWAY
PER CITY OF FORT WORTH
DRIVEWAY DETAIL
i
i
I PAVING LEGEND
I
I
I
t
I
i
I
I
I
TRINITY BELL
z
SCALE 1" ° 100'
0 50 100
GARDENS
COMMUNITY FACILITIES AGREEMENT
17—f 7 FORT WORTH, TEXAS
Dtt7 PAVING PLAN - EXHIBIT B
C O N S U L T I N G S-RllT 2 O• 2
o.. ° vmnaenuxomi- ww.a.. mn.u.-ivlrwas.
awrnmr•o .on rs.1m®ymwwr
.oe(grswr w�s.«r
CFA 171.001 PAVING 2.dgn 8/5/2011 1:56.56 PM
TRINITY BOULEVARD
o.w.)
CONSTRUCT DRIVEWAY
PER CITY OF FORT WORTH
DRIVEWAY DETAIL '
,o• a.o.w.
CONSTRUCT CONCRETE
A.D.A. RAMP
i
f
I
I
CONSTRUCT CURB & GUTTER
PER CITY OF FORT WORTH
DETAIL I� i
p \\111
I
� U
ti I
-- -- --- -- --- --1
I
WOOD DUCK DR.
CONSTRUCT DRIVEWAY
PER CITY OF FORT WORTH
DRIVEWAY DETAIL
{P�E OF TEX\
*. .
.. ...............................
KEITH M. HAMILTON
I..................
EN.SE.;C�1�� C
I'
i�
li
li
i�
II
--------------
7 `
Pos
G�fII�J lG��L,I� ®G�
CC a N S U l T i N 6
.
CFA 171 -001 PAVING 1.dgn 8/5/2011 1.57:09 PM
PAVING LEGEND
�^ 6' THICK CONCRETE PAVEMENT V/ rJ BARS
od
od
1' THICK CONMT( SIDEVALC If r! UK
o N8' O.C.E.N.
(Y
Q
z LOT 1 N
CONSTRUCT 4' WIDE
4" THICK CONCRETE
SIDEWALK
CONSTRUCT CONCRETE SCALE t° • 100
2 - A.D.A. RAMPS o so 100
I � ,
CONSTRUCT 4' WIDE
4" THICK CONCRETE
SIDEWALK
CONSTRUCT STANDARD CONCRETE
CURB AND GUTTER WITH 36'(FACE TO FACE)
WIDE ASPHALT CROWNED PAVEMENT
WITH 21 CROSS SLOPES
CONSTRUCT ASPHALT TRANSITION
TO EXISTING ASPHALT PAVEMENT
� IWITH 18" WIDE CONCRETE RIBBON CURBS
IOU '
M•) TRINITY BELL GARDENS
COMMUNITY FACILITIES AGREEMENT
FORT WORTH, TEXAS
PAVING PLAN — EXHIBIT B
i H[!T 1 OF 2
Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an
estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately
estimate the cost of the project, or any part thereof.
HAMILTON DUFFY, P.C.
8241 MID - CITIES BLVD., #100
NORTH RICHLAND HILLS, TX 76182
PAVING IMPROVEMENTS TO SERVE
TRINITY BELL ADDITION
CITY OF FORT WORTH, TEXAS
DOE # 6511
ENGINEER'S PROJECT NO 171 -001
STATEMENT OF PROBABLE CONSTRUCTION COST
8/10/2011
ITEM
NO.
ITEM DESCRIPTION UNIT PLAN
QTY.
UNIT
PRICE
TOTAL
COST
Paving Improvements
1
4" Concrete Sidewalk incl. Ramps
SF
2,806
$4.00
$11,224.00
2
Type A Ramp
EA
3
$400.00
$1,200.00
3
6" Concrete Driveway Approach
SY
630
$36.00
$22,680.00
4
7" Concrete Curb and Gutter
LF
670
$18.00
$12,060.00
5
2" Type D Surface Course over existing milled pvmt.
SY
1,110
$18.00
$19,980.00
6
5" Type B Base Course
SY
475
$27.00
$12,825.00
7
8" Crushed Limestone Flexbase (Item 208)
SY
679
$6.00
$4,074.00
8
18" Concrete Ribbon Curb
LF
53
$16.00
$848.00
9
Pavement Markings and Buttons
LS
1
$1,500.00
$1,500.00
10
Traffic Conctrol
LS
1
$2,500.00
$2,500.00
Total Paving Improvements
$88,891.00
ESTIMATED SUBTOTAL
CONTINGENCY (0 %)
TOTAL CONSTRUCTION
$88,891.00
$0.00
$88,891.00
Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an
estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately
estimate the cost of the project, or any part thereof.
Paving and Storm Drainage Improvements
TRINITY BELL GARDENS
Lot 1, Block 1
DOE NO. 6511
CITY PROJECT NO. 01392
UNIT III: PAVING
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following items) (DNo. refers
to related items in the Part D Special Conditions:)
Item Approx. Unit Item Description Unit Price Total
No. Quantity Measurement "D" Item reference Amount
1 2,806 SF 4" CONCRETE SIDEWALK
INCL. RAMPS
Dollars &
Cents per Square Foot $4.00 $11,224.00
IA 3 EA Type A Ramp
Dollars &
Cents per Each
$400.00 $1,200.00
2 630 SY 6" CONCRETE DRIVEWAY
APPROACH
Dollars &
Cents per Square Yard $36.00 $22,680.00
3 670 LF 7 CONCRETE CURB AND
GUTTER
Dollars &
Cents per Linear Foot $18.00 $12,060.00
B -1
4 1110
SY
2" TYPE D SURFACE
COURSE OVER EXISTING
PAVEMENT TO BE MILLED
& PROPOSED PAVEMENT
$18.00
$19,980.00
Dollars &
Cents per Square Yard
5 475
SY
5" TYPE B HMAC
PAVEMEMNT
Dollars &
Cents per Square Yard
$27.00
$12,825.00
6 679
SY
8" CRUSHED LIMESTONE
FLEX BASE (ITEM 208)
Dollars &
Cents per Square Yard
$6.00
$4.074.00
7 53
LF
18" CONCRETE RIBBON
CURB
Dollars &
Cents per Linear Foot
$16.00
$848.00
8 1
LS
PAVEMENT MARKINGS &
BUTTONS
Dollars &
Cents per Lump Sum
$1,500.00
$1,500.00
9 1
LS
TRAFFIC CONTROL
Dollars &
Cents per Lump Sum
$2,500.00
$2,500.00
TOTAL AMOUNT BID PAVING $88,891.00
IS
CONSTRUCT CONCRETE SET CONSTRUCT COP
18" FL.- 491,21 18" fL.• 489.$6
I CONSTRUCT CONCRETE SET C
18" FL.- 491.50
--- - - - - -. _; — -- — -- -- - — .......... — - --
TRINITY BOULEVARD
(120' R.0 w.)
T
I
I
I
O N I
w
K�V
N � r
W UI ([
zV
K
°a
cod
O-
3
Of
0
Z
(-50 SO, Fr.
10'X 10' R.O.W.
DEDICATION _ . T ---------------
FURNISH AND INSTALL IIF
45.00 L.F. 18" RCP 8
STORM DRAIN PIPE 0 0.50 . S
T(Z)bw
Ag
C O N S U L Y 1 N O
iooplam wMa...•
CFA 171 -001 STORM 1.dgn 8/5/2011 1.56:22 PM
0
SCALE 1" • 100'
0 50 100
N
TRUCT CONCRETE SETI
L -• --- -- - - - - -- --- - - - - --
H AND INSTALL
L.F. 18" RCP
DRAIN PIPE 0 0.507
LOT 1
TRINITY BELL GARDENS
COMMUNITY FACILITIES AGREEMENT
FORT WORTH, TEXAS
STORM DRAIN PLAN - EXHIBIT B -1
SILET . Off` 2
SCALE 1" - 100'
0 50 t00
N
TRINITY BOULEVARD 4ul.LU L.r. [4-- GLAJb t� rccr ANU 43 J.T.KULK rarrcAr
(120' R.O.W.) STORM DRAIN PIPE 0 0.40 24" FL.• 481.44
- aeG oma � — — — — — —
4'x4' DROP INLET — �3 % I ti I I
THROAT ELEV.• 485.80 a �� I N I I
24 FL.- 483.67
24"08" WYE AND el
4.62 L.F. 18" DIA. RCP
STORM PLUG AT EASEMENT DRAIN 00LNE
18 "FL.• 482.38
LOT 1
' ����E of rExgst
�*
/ KEITH M. H1MIL /
87384 ' TRINITY BELL GARDENS
t���0,1ONAI_ENG' t� COMMUNITY FACILITIES AGREEMENT
FORT WORTH, TEXAS
G�II,�lG��LZ'�C�C�J
d ®����%v �� STORM DRAIN PLAN - EXHIBIT B -1
c o N s u L- T t N a
mc...weaurtrt.mo. wNeW - m/tuco.....w. S r-. C C r 2 o � 2
CFA 171 -001 STORM 2.dgn 8/5/2011 1:56:06 PM
Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an
estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately
estimate the cost of the project, or any part thereof.
HAMILTON DUFFY, P.C.
8241 MID - CITIES BLVD., #100
NORTH RICHLAND HILLS, TX 76182
STORM DRAIN IMPROVEMENTS TO SERVE
TRINITY BELL GARDENS
CITY OF FORT WORTH, TEXAS
DOE # 6511
ENGINEER'S PROJECT NO 171 -001
STATEMENT OF PROBABLE CONSTRUCTION COST
811 012 01 1
ITEM
NO.
ITEM DESCRIPTION UNIT PLAN
QTY.
UNIT
PRICE
TOTAL
COST
Storm Drain Improvements
1
18" RCP
LF
136
$27.00
$3,672.00
2
24" RCP
LF
407
$38.00
$15,466.00
3
4' Drop Inlet
EA
1
$2,071.00
$2,071.00
4
18" Safety End Treatment
EA
4
$1,158.00
$4,632.00
5
24" Concrete Headwall
EA
1
$1,410.00
$1,410.00
6
12" Thick Rock Rip Rap over 6" Bedding
SY
45
$50.00
$2,250.00
7
Seeding and Erosion Control
LS
1
$5,000.00
$5,000.00
8
Trench Safety
LS
1
$300.00
$300.00
9
Traffic Control
LS
1
$750.00
$750.00
Total Storm Drain Improvements
$35,551.00
ESTIMATED SUBTOTAL
CONTINGENCY (0 %)
TOTAL CONSTRUCTION
$35,551.00
$0.00
$35,551.00
Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an
estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately
estimate the cost of the project, or any part thereof.
UNIT N: STORM DRAINAGE
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following items) (DNo. refers
to related items in the Part D Special Conditions:)
Item Approx. Unit Item Description Unit Price Total
No. Quantity Measurement "D" Item reference Amount
1 136 LF 18" CL IV RCP
Dollars &
Cents per Linear Foot
$27.00 $3,672.00
2 407 LF 24" CL IV RCP
Dollars &
Cents per Lineal Foot $38.00 $15,466.00
3 1 EA 4'x4' Drop Inlet
Dollars &
Cents per Each $2,071.00 $2.071.00
4 4 EA 18" SAFETY END
TREATMENT
Dollars & $1,158.00 $4,632.00
Cents per Each
5 1 EA 24" CONCRETE HEADWALL
Dollars &
Cents per Each $1,410.00 $1,410.00
6 45 SY 12" Thick Rock Rip Rap over
6" Thick Bedding
Dollars & S50.00 $2.250.00
Cents per Square Yard
I3 -3
7 1
8 1
9 1
LS SEED OR SOD ALL AREAS
DISTURBED WITHIN RIGHT -
OF -WAY INCLUDING 6" TOP
SOIL & TEMPORARY
IRRIGATION
Dollars & $5,000.00 $5,000.00
Cents per Lump Sum
LS TRAFFIC CONTROL
Dollars &
Cents per Lump Sum $750.00
LS TRENCH SAFETY
_Dollars &
Cents per Lump Sum $300.00
TOTAL AMOUNT BID STORM DRAINAGE $35,551.00
TOTAL AMOUNT BID PAVING $88,891.00
TOTAL AMOUNT BID STORM DRAINAGE $35,551.00
GRAND TOTAL AMOUNT BID $124,442.00
B -4
$750.00
$300.00
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
®
Location Map
®
Exhibit A: Water Improvements
®
Water Estimate
®
Exhibit A -l: Sewer Improvements
®
Sewer Estimate
®
Exhibit B: Paving Improvements
®
Paving Estimate
®
Exhibit B -l: Storm Drain Improvements
®
Storm Drain Estimate
❑
Exhibit C: Street Lights and Signs Improvements
❑
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
J
~
TERR
TI
BER CRE
>-
CU
LU
DO A D
JANE
n
m
CHA LEN
r
KEL
BURF
RD
v=
Q
E
LE
w
a
3
OLLOWA
-i
oz
z
a
HIGHWAY 10
F
UIMIT
I�
.0
U)
HURST
I
w
_..
TR E
m
FORT WORTH
O
O
O
3
It
°
TRINITY BLVD
� \ER ge,P
LOCATION MAP
N.T.s,
MAPSCO NO. 67-B
COUNCIL DISTRICT # 5
FW- COVERSHEET.dgn 4/29/2010 8:59:47 AM