HomeMy WebLinkAboutContract 43869 ciTy S ECRETAR 7
CONTRACT NO..
MEMORANDUM OF UNDERSTANDING BETWEEN
T'HE CITY OF WORT WORTH AND
FA1 RMOUNT NEIGHBORHOOD ASSOCIATION
This Memorandum of Understanding (the "Memorandum") is by and between Fairmount
Neighborhood Association ("Committee"), acting by and through Patti Randle, CID Liaison, and Sean
Lynch, President and CID Liaison, and the City of Fort Worth ("City"), a Texas home-rule municipal
corporation, by and through Fernando Costa, its duly authorized Assistant City Manager. (City and
Committee may be referred to herein individually as a"Party,"or collectively as the"Parties.")
SECTION 1
Purpose of MO U
1.1. Background. Community ID: Public rl in Neighborhoocis ("CID") is an initiative of
Fort Worth Public Art (Lily WPA") through which the City will assist community groups in generating
Public art projects that are specific and meaningful to each of the selected neighborhoods. Cornniit.tee
was awarded a CID project ("Project") based on the recommendation of the CID Review Panel and the
Fort Werth Art Commission.
1,212 Effect and Purpose. This Memorandum does not represent a binding obligation of
either of the Parl:ics. Specific approval of the }sort Worth City Council inay, be necessary to implement
the Project. This Memorandumn represents the intent of the parties to take necessary steps to implement
the Project. The remainder of this Memorandum describes the obligations and responsibilities of each of
the parties to effect the implementation of the Project_
SECTION 2
The Pro'ect
,t
2.1 The Site. The location for -the Project shall be Fairmount Park located at 4-341 511'
Avenue, Fort Worth, Texas 76104. The specific site shall be determined by the Artist, as hereinafter
defined, in consultation with the Corntnittee, and subject to the approval of C.ity's Parks and Community
Services Advisory Board, City's Art Commission, and City(collectively, the "Stakeholders"). The site is
located in Council District 9.
2.2 The Artist. The artist shal l be Bail Shaw of Fort Worth, 1'exas("Artist").
2.3 The Artwork. The artwork shall be designed by the Artist with input from the
Committee. The final design shall be Subject to review by the City for reasons of safety and security.
The final design shall be subject to the approval of the Fort Worth Art Commission ("Artwork").
2.4 The Budget. The Fort Forth Art Comniission has recommended a total budget amount
of up to $50,000, inclusive of design, engineering, materials, fabrication, transportation, installation, site
work, lighting, Artist's fee, and contingency, which shall be the City's contribution on this Project
pending City Council authorization. (See section 3.2.)
Section 3
Citv Responsibilities
3.i. Artist Contract. City shall enter into a contract(s) with AE-tist., which mayf be subject to
the authorization of the Fort Worth City Council, and the contract will be managed by the Guy's contract
MQu --°°
Fairmount Neighborhood Association
Page l of 4 1 OFFICIAL RECORD
CITY SECRETARY
-09 -12 P03 =02 IN
� 1 FT. WORTH, T
manager, which is the Arts Council of Fort Worth & Tarrant ['aunty ("Contract Manager") Committee
shall not be a party to any contract with Artist for the Project.
3.2. Additional Fundraising. The City and Contract 1~ miager shall not be responsible for
raising additional funds for the Project. Should Committee conduct additional fundraising for the Project,
Contract.Manager shall provide information about.CID, FWPA,and Artist to the Committee,as available.
(See Section 2.4. and Section 4.3.)
3.3. Artwork Maintenance. The Artwork shall become a part of C ity's Public Art collection,
and City shall maintain the Artwork in a manner consistent with its policies for the maintenance of items
in its Public Art collection.
3.4. Artwork Identification Plaque. FWPA shall provide a standard artwork identification
plaque to be instal led at the artwork project site.
Section 4
Committee Res onsibilities
4.1. Committee Liaison. Committee appoints the following person as the liaison who will be
the point of contact for the City ("Liaison"):
Sean LNrnch ___...._
1601 College Avenue
Fort Worth,TX 76104
Phone: 8 173 879--0089
Ernail:sean.lyncli825((-�,.ginail.coi-n
Alternate Committee Liaison:
Patti Randle
1208 Magnolia Avenue, Suite 228 _ --
Fort Worth TX 76104
Phone:_(81„7 69-9881
Email: atti a� attirandle.com
4.2. Liaison Duties. The Liaison shall coordinate community meetings regarding the project
and shall be responsible for relaying Project infon-nation to and from the community and City.
4.3. Additional Fundraising by Committee. Should Committee condLict additional
fundraising for the Project,Committee shall coordinate with the Contract Manager with regard to timeline
prior to commencing requests for donations. All fundraising must be complete and all funds must be
received before Arl.ist commences design. Additionally, when requesting donations, Committee shall
request funds on behalf of the Committee, and not on behalf of FWPA,the Arts Council of Fort Worth &
Tarrant County, or the City of Fort worth_ All donations to support the Project must be accepted and
appropriated by City Council. Donor recognition shall be coordinated with the Contract Manager for
inclusion on the plaque with additional expense covered by the Committee. (See Section 2.4. and Section
4.3.)
4.4. Input on Artwork Designs. The Committee shall have the opportunity to review
conceptual and final designs of the Artwork,and small be given no more than 30 days to offer any input or
comments regarding the designs to Contract Manager. Donors shall not have the authority to approve
Artist's design.
MOU
Fairniount Neighbor-hood Association
Page 2 of 4
4.5. Unveiling Ceremony. Committee, at its sole cast and expense, shall plan acid execute a
ceremony at which the Artwork is unveiled for viewing by the community.
Section 5
Timeline
City and Committee agree that the following timeline represents the intention of the parties as to
the progress of the Project,and each Party acknowledges that the timeline is subject to delays.
DATE ACTION
October 2011 City Council action regarding the Fort North
Public Art FY 2012 Work flan
Se tember 2012 Artist selected based on a specific ro osa)
November 2012 Memo of Understanding signed by Committee and
Contract signed by artist,.
October 2012 Presentation of proposal to City staff, and
c:ommunit roup for input
January 20 13 fort Worth Art Commission reviews Artist's final
design and makes recommendation to City Council.
February 2013 Council action regarding the Artist's contract for
implementation
March -A ri1 2013 Artist placed cinder commission contract
The parties agree to make every ellOrt to hive the Project fully implemented within one calendar year
from the date of the execution of the Artist's commission contract.
N401]
Fainnount Neighborhood Association
Page 3 of 4
20 l 2.
EXECUTED this day of
�5
CITY OF FORT WORTH FAIRMOUNT NFICJJBORHOOD ASSOCIATION
B _ ..,... ,. � By:
Fernando Costa Sean Lynch
Assistant City Manager President and CID Liaison
B .
r
r
Patti Randle
CID I.iaison
APPROVED AS TO FORM
AND LEGALI'T'Y:
'Eyler F. Wallach
Assistant City Attorney
ATTESTED BY:
Mary J. Kayser
City Secretary
Contract Authorization:
No M&C needed
MUU
Fairmount Neighborhood Association
Page 4 of 4
EXECUTED this day of ACC' 52012.
CITY OF FORT WORTH FAIRMOUNT NEIGHBORHOOD ASSOCIATION
By: By:
Fernando Costa Sean Lynch
Assistant City Manager President and CID Liaison
By:
Patti Randle
CID Liaison
APPROVED AS TO FORM
AND LEGALITY:
Tyler.E:" allach
Assistant City Attorney
ATTESTED BY: F '44
0"00000."'4 p
%
a p Y
a 0.
fVary J. ys ¢ •0 a
p
City Secret 00 d0 pr
�C pQ�o pt3
ao0aQO
Contract Authorization:
No M&C needed
MOU OFFICIAL REC
Fairmount Neighborhood Association ���
Page 4 of CITY SECRETARY
FTe WORTH, TIC
-- �.