Loading...
HomeMy WebLinkAbout(0048) Change Order #2_PM Signature.pdfDEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rock Creek Ranch/Tarleton State University Brewer Boulevard CONTRACT: CS#50944 (Pavinci, Dina a and Street Lights) CHANGE ORDER No: CFA # 2017-102 CITY PARTICIPATION: YES CITY PROJECT # 101459 DOE # WA WATER PROJECT# WA 2 SEWER PROJECT# WA FILE # K-2588 INSPECTOR: Julius McLaurin Phone No: 817-392-8306 PROJECT MANAGER: Debbie Wilhelm, PE Phone No: 817-392-2481 CONTRACT UNIT: CM0944 WATER SEWER PAVING DRAINAGE STREET LIGHTS 6 SIGNS CONTRACT Developer Cost City Cost Developer Cost City Cost Developer Cost WMSUBCTR.LP Developer Cost TSU anon City Cost PID Cost Developer Cost wM SUB CTR, LP Developer Cost TSU altos City Cost PID Cost Developer Cost WM SUB CTR, LP Developer Cost TSU Alton City Cost PID Cost DAYS ORIGINAL CONTRACT $0.00 $0.00 $0.00 $0.00 $288.905.02 $220,666.88 $1,725,805.60 $1,161.728.50 $93.051.66 $123,156.07 $830,344.51 $648,663.86 $34,039.35 $30.794.97 $228,658.16 $162,197.62 240 EXTRAS TO DATE $4.249.19 $12.116.73 $72.115.40 $63,818.99 $1,449.64 $0.0o $2,830.36 $0.00 11 CREDITS TO DATE CONTRACT TO DATE $0.00 $0.00 $0.00 $0.00 $293,154.21 $232,683.61 $1,797,921.00 $1,225,547.49 $93,051.66 $123,156.07 $830.344.51 $648.663.86 $35,488.99 $30,794.97 S231,488.52 $162,197.52 251 AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $0.00 $0.00 $0.00 $4,999.21 $26.330.90 $26,330,90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 95 REVISED CONTRACT AMOUNT $0.00 $0.00 $0.00 $0.00 $293,164.21 $237.682.82 $1,824.251.90 $1,251,878.39 $93.051.66 $123,156.07 $830,344.51 $648.663.86 $36,488.99 1 $30.794.97 $231,488.52 $162,197.52 346 TOTAL REVISED CONTRACT AMOUNT PER UNIT $0.00 $0.00 $3,606.967.32 $1,695,216.00 $459,970.00 REVISED COST SHARE Dev. Cost: $813,328.62 City Cost: $2,886,084.93 PID Cost: $2,062,739.77 TOTAL REVISED CONTRACT $5,762,153.32 Ynn wre di-tM fn -kn the fnllnwinn rhvnnne in fhn PAY ITEM # CRY BID ITEM# QUANTITY UNIT PAVING ITEMS ITEM DESCRIPTION UNIT PRICE TOTAL 0241.D4D2 (1) 1 199 SY Remove B MposeEndin Asphalt Pvmt Remove Asphalt Drive $7.00 $1393.00 3212.D302 (1) 9 465.15 SY 2AsPhaKPvmtTyPeD $65.00 $30234.75 3212.0501 (1) 10 465.15 SY 4- Asphalt PvMt Type B $81.00 $37677.15 3213.0102 (1) 11 105.4 BY 8' Reinf, Concrete Street Pavement $39.65 S4,179.11 3292.02 1) 30 5278 BY Seeds, Broadcast $1.00 $5,278.00 9999.0001 (1) 32 3 EA End of Road Barricade $1,500.00 $4,500.00 9999.0DD2 (1) 33 (170) LF e'PVC Condurtforfftre gas$ne $18.mSS7661.01 3305.0114 (1) 83 1 EA Manhole Adjustment, Ma'or w/cover 69vau6 13404.9999.0003 1) 85 6 EA Ree. Pay. Mrk T .1 or IELD $214.TOTAL CHANGE ORDER Participation Percentages: Developer City PID (1) Quantity fisted Is inside PID Inside PID 8.67% 45.665% 45.665% (2) Quantity listed is outside PID (WA to this change order) Non-PID 33.87% 66.13% 0% REASONS FOR CHANGE ORDER f. This is a reconciliation change order to quantify overruns and underruns 2. Added 6'YIELD'markings 3. An additional 95 calendar days have been requested for this project PID AND TPW DEPARTMENT PARTICIPATION FUNDS INVOLVED IN THIS CONTRACT Developers Share increasedby: $4.999.22 City Participation increasedby: $26.330.90 PID Participation increasedby: $26.330.90 RECOMMENDED: (Consulting Engineer Good 'I0R rall, ey: Name: Matt Saacke, PE Title: ProlectProiect Ennineer APPROVAL RECOMMENDED: (CFW-Sponsoring Department) Name: William Johnson Tide: Director. Transportation & Public Works RECOMMENDED: (CFW -'Contract Compliance Manager) Name: Debbie J. Willhelm Title: Project Manager APPROVED: (Developer Welton velopme &Management CLl By: w Name: ffTA-fO Title: APPROVED: (CFW -Assistant City Manager) ey: Name: Title: M&CNumber: 1 A M&C Date Approved: ^ /,A APPROVED: (Contracto Jackson on ction, Ltd. By: Name: eon Title: APPROVED AS TO FORM AND LEGALITY: (CFW - Assistant City Attorney) Name: Richard A. McCracken Title: Sr. Assistant City Attorney Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration ofthis contract, including ensuring all performance and reporting requirements. There are City Funds associated with this Contract