HomeMy WebLinkAbout(0122) FY 2020 - TxDOT Green Ribbon Program Application.pdfTexas
l7lepartment
of Transportation
DEADLINE: 5/17/2019 5:00 PM
APPLICATION
GREEN RIBBON PROGRAM FY2020
GREEN RIBBON PROGRAM COORDINATOR:
Kimberly Phillips White, RLA ASLA PMP
FTW District Landscape Architect
z5U1 S.W. Loop UZU at Mccart Avenue
Fort Worth, Texas 76133
City/Local Entity Name: City of Fort Worth
Title: Municipality - Park and Recreation Department
Address: 4200 South Freeway #2200
City: Fort Worth
(Print) Agreement Signer: Clinton Wyatt
Proj. Manager/Consultant: Todd Buckingham / Freese and Nichols, Inc.
Address: 4055 International Plaza, Suite 200
City: Fort Worth
EMAIL:
KIMBERLY.PHILLIPS.WHITE(a)TXDOT.GOV
Send PDF via email (Application & Attachments)
AMOUNT REQUESTING: $400,000.00
Tel: 817-392-5763
Email: clinton.wyatt@fortworthtexas.gov
Code: 76115
Title: District Superintendent
Tel: 817-735-7517
Email: todd.buckingham@freese.com
Zip Code: 76109
Will this be let as a Local Government Project Yes or No: No
Is this local entity (or consultant) certified in TxDOT's Local Government Project Procedures (LGPP) Yes or No: Yes
CSJ or Project #: N/A Highway:1 US 377
Project Limits From: Clayton Road
Project Limits To: Horne Street
SCOPE OF WORK
Scope of work should be detailed enough to explain location, size and concept of the project.
The scope of the work includes multi -layer landscape planting and irrigation enhancements within the TxDOT right-of-way of US 377
/ Camp Bowie Boulevard in the City of Fort Worth. This historic corridor is adjacent to a 6 mile stretch of Camp Bowie that is a
thoroughfare and destination for thousands of residents and home to hundreds of businesses. The enhancement areas are located
(see location map) between Clayton Road and Horne Street (excluding Hilldale Road to Bryant Irvin Drive) in the median of the
six -lane divided roadway. Currently, the medians between Hilldale Road to Bryant Irvin Drive contain an array of landscape
improvements which the proposed improvements would extend from. The proposed median improvements would include shrubs
ornamental grasses, groundcover, mulch, and supporting underground irrigation system along approximately 3,500 LF of roadway.
While improving the aesthetic of the corridor, these planting improvements will also consider proper intersection site distance and
clear zone requirements. These beautifications will have air quality and visual benefits, will enhance a highly sought-after residential
and retail corridor, and will be a high -profile collaboration of State, Municipal, and local agencies/stakeholders.
Attach a Preliminary Schedule, Location Map and Schematic Plan.
TXDOT USE ONLY
WED (Y or N):
Project Timeline
ID Task Name
1
3
4
5
6
7
s
9
10
11
12
reen Ribbon Funding Application for US 377 (Camp
, owie Boulevard)
Project Selection
In -Field Data Collection (Topographic and Utility Survey)
Environmental Documentation and Clearance
60% Plans, Specifications, and Estimates (PS&E)
TxDOT Review and Approval
90% Plans, Specifications, and Estimates (PS&E)
TxDOT Review and Approval
100% Plans, Specifications, and Estimates (PS&E)
Project Advertisement and Letting
Contract Execution
Construction
Duration Start Finish
335 days
Mon 6/24/19 Fri 10/2/20
1 wk Mon 6/24/19 Fri 6/28/19
4 wks Mon 7/1/19 Fri 7/26/19
30 wks Mon 7/29/19 Fri 2/21/20
10 wks Mon 7/29/19 Fri 10/4/19
6 wks Mon 10/7/19 Fri 11/15/19
8 wks Mon 11/18/19 Fri 1/10/20
6 wks Mon 1/13/20 Fri 2/21/20
8 wks Mon 2/24/20 Fri 4/17/20
6 wks Mon 4/20/20 Fri 5/29/20
6 wks Mon 6/1/20 Fri 7/10/20
12 wks Mon 7/13/20 Fri 10/2/20
City of Fort Worth
Green Ribbon Funding Application
2D19 2020
Jun 1 Jul 1 Aua Sao I Oct I Nov I Dec Jan I Feb Mar I Aor Mav 1 Jun Jul Aua I Sea Oct Nov Dec
Green Ribbon Funding Appli ation for US 377 (Camp Bowie Boulevard)
Project Selection
In -Field Data Collection (Topographic and Utility Survey)
Environmental Documentation and Clearance
60% Plans, Specifications, and Estimates (PS&E)
TxDOT Review and Approval
90% Plans, Specifications, and Estimates (PS&E)
TxDOT Review and Approval
100% Plans, Specifications, and Estimates (PS&E)
Project Advertisement and Letting
Contract Execution
Construction
Jan Feb
Revised Wed 5/8/19
f ---; 1 ' —�� J
5 f j �; ��. F-Pershin
y-- —' - -
DOhma`Bite nrAv(
---- -- - - =1 H _30 - -- - - - -
Calmont-Ave -�=----� - - - - - --_= -- -- --
• — — — -
i
� f
y-Malvey-Ave .. a,
-- ---! .-- — fi - f-
TXDOT GREEN RIBBON FUNDING APPLICATION - ---
osedafe=
x
CIT. OF -FORT
O'RTH s; •= HT=
US 3771 CAMP BOWIE BOULEVARD
x -- iI ® END PROJECT
(CLAYTON ROAD TO HORNE STREET)
�L
- ORN STREET)
-
o�
.. .E
wic
Ken
-- �L
a — .r - — -- — , —_
on Aver. - - ----- _ �
i
\�G� N� l D on n eI1y-Ave
D ru ry=Ln
•
o - e ve ddes --A �
CRosemont-Ave ry `eNe
07-
Qj O - ----
-
Garland Ave Diaz Ave-
.,G .. -
1 d� ��IP
� _ -
mom_ $�N 13usnetl'p� Haughtc
R ¢ - _ •
_
p-. ,
_
Milbun '
. Iesl
l r. �
',R cvy Madoc-Fork Dr �.. Fletche
�-
VV-Elizabeth E'n �/ �,�� - �f �.
BEGIN PROJECT
(CLAYTON ROAD) C� ': b Al _ -� ❑ �� k
1.A �` P� �'� e }' �,
\ �01" _ � ! u-Park Q U)
a Q w - - � _
P I-- - ` ��� PQ i� '� - ° �- �- —� Ki I platri c
0 0
LL
� �. �► � a'QFz vPLO
Y, \
o
- . -- ---Goodmafth
Camp �?owfe Sloulevard- qIRK66on Vr, cfPocafion Vap 17Va2019
All information is preliminary and conceptual, FREESE
? aorl Vor 1 , 7eps subject to modification with future development. r1119NICHOLS
20
ANC ,g �.".11 A
! 411
.41
IL
Ix ,' a .,'� � ..r •y. "k r:� v < � � _ 1� L �.,, k' �.',� � �' - • f ' f �' _ ,
r +L
1 J t � J, J
dL
. �\ mil. � t'�i,�- ` '.;� �'d._. _ - •.� + � 4' �..1 •I ,y�l�!• r
r � .�� _, � .� �^�'"`�u-.S. - � �"` �?' v �.`."`� -- I +�'7 n► 'mac- � � /� I '� _ � �•� rG. �-� �� r - '
camp �?Owfe Sloulevard- qTi766on Zandscape Concepf 17 2019 .
BOWIE
All information is preliminary and conceptual, , •
ICTI
? aorl Vor 1 , 7eps subject to modification with future development. r' NICHOLS
City of Fort Worth, Texas
TxDOT Green Ribbon Funding Applicatoin - FY 2020
Texas
Department May 2019
of Transportation
US 377 / Camp Bowie Boulevard - Clayton Road to Horne Street
Landscape Summary
Freese and Nichols, Inc.
Engineer's Opinion of
Probable Construction Cost
Item
Description
Quantity
Unit
Unit Price
Total Price
1
Mobilization and Demobilization
1
LS
$40,000.00
$40,000.00
2
Right -of -Way Preparation
1
LS
$15,000.00
$15,000.00
3
Unclassified Excavation
2,090
CY
$8.00
$16,720.00
4
Imported Plant Soil Mix
2,090
CY
$50.00
$104,500.00
5
SWPPP Plan and Implementation
1
LS
$5,000.00
$5,000.00
6
Barricades, Signs and Traffic Handling
1
LS
$20,000.00
$20,000.00
7
Shrubs/Ornamental Grasses (3 Gal.)
1,010
EA
$30.00
$30,300.00
8
Shrubs/Ornamental Grasses (1 Gal.)
1,550
EA
$15.00
$23,250.00
9
Block Sod (Including Compost)
5,410
SF
$5.50
$29,755.00
10
Mulch
770
CY
$35.00
$26,950.00
11
Landscape Irrigation System
6,340
SF
$2.00
$12,680.00
12
12" Wide Concrete Mow Strip (4" Thick)
160
LF
$20.00
$3,200.00
13
Irrigation System Operation and Maintenance
12
MO
$1,000.00
$12,000.00
14
Landscape Maintenance Contract
12
MO
$2,000.00
$24,000.00
PROJECT SUBTOTAL
$363,355.00
CONTINGENCY
10%
$36,645.00
PROJECT TOTALI
$400,000.00