Loading...
HomeMy WebLinkAbout(0122) FY 2020 - TxDOT Green Ribbon Program Application.pdfTexas l7lepartment of Transportation DEADLINE: 5/17/2019 5:00 PM APPLICATION GREEN RIBBON PROGRAM FY2020 GREEN RIBBON PROGRAM COORDINATOR: Kimberly Phillips White, RLA ASLA PMP FTW District Landscape Architect z5U1 S.W. Loop UZU at Mccart Avenue Fort Worth, Texas 76133 City/Local Entity Name: City of Fort Worth Title: Municipality - Park and Recreation Department Address: 4200 South Freeway #2200 City: Fort Worth (Print) Agreement Signer: Clinton Wyatt Proj. Manager/Consultant: Todd Buckingham / Freese and Nichols, Inc. Address: 4055 International Plaza, Suite 200 City: Fort Worth EMAIL: KIMBERLY.PHILLIPS.WHITE(a)TXDOT.GOV Send PDF via email (Application & Attachments) AMOUNT REQUESTING: $400,000.00 Tel: 817-392-5763 Email: clinton.wyatt@fortworthtexas.gov Code: 76115 Title: District Superintendent Tel: 817-735-7517 Email: todd.buckingham@freese.com Zip Code: 76109 Will this be let as a Local Government Project Yes or No: No Is this local entity (or consultant) certified in TxDOT's Local Government Project Procedures (LGPP) Yes or No: Yes CSJ or Project #: N/A Highway:1 US 377 Project Limits From: Clayton Road Project Limits To: Horne Street SCOPE OF WORK Scope of work should be detailed enough to explain location, size and concept of the project. The scope of the work includes multi -layer landscape planting and irrigation enhancements within the TxDOT right-of-way of US 377 / Camp Bowie Boulevard in the City of Fort Worth. This historic corridor is adjacent to a 6 mile stretch of Camp Bowie that is a thoroughfare and destination for thousands of residents and home to hundreds of businesses. The enhancement areas are located (see location map) between Clayton Road and Horne Street (excluding Hilldale Road to Bryant Irvin Drive) in the median of the six -lane divided roadway. Currently, the medians between Hilldale Road to Bryant Irvin Drive contain an array of landscape improvements which the proposed improvements would extend from. The proposed median improvements would include shrubs ornamental grasses, groundcover, mulch, and supporting underground irrigation system along approximately 3,500 LF of roadway. While improving the aesthetic of the corridor, these planting improvements will also consider proper intersection site distance and clear zone requirements. These beautifications will have air quality and visual benefits, will enhance a highly sought-after residential and retail corridor, and will be a high -profile collaboration of State, Municipal, and local agencies/stakeholders. Attach a Preliminary Schedule, Location Map and Schematic Plan. TXDOT USE ONLY WED (Y or N): Project Timeline ID Task Name 1 3 4 5 6 7 s 9 10 11 12 reen Ribbon Funding Application for US 377 (Camp , owie Boulevard) Project Selection In -Field Data Collection (Topographic and Utility Survey) Environmental Documentation and Clearance 60% Plans, Specifications, and Estimates (PS&E) TxDOT Review and Approval 90% Plans, Specifications, and Estimates (PS&E) TxDOT Review and Approval 100% Plans, Specifications, and Estimates (PS&E) Project Advertisement and Letting Contract Execution Construction Duration Start Finish 335 days Mon 6/24/19 Fri 10/2/20 1 wk Mon 6/24/19 Fri 6/28/19 4 wks Mon 7/1/19 Fri 7/26/19 30 wks Mon 7/29/19 Fri 2/21/20 10 wks Mon 7/29/19 Fri 10/4/19 6 wks Mon 10/7/19 Fri 11/15/19 8 wks Mon 11/18/19 Fri 1/10/20 6 wks Mon 1/13/20 Fri 2/21/20 8 wks Mon 2/24/20 Fri 4/17/20 6 wks Mon 4/20/20 Fri 5/29/20 6 wks Mon 6/1/20 Fri 7/10/20 12 wks Mon 7/13/20 Fri 10/2/20 City of Fort Worth Green Ribbon Funding Application 2D19 2020 Jun 1 Jul 1 Aua Sao I Oct I Nov I Dec Jan I Feb Mar I Aor Mav 1 Jun Jul Aua I Sea Oct Nov Dec Green Ribbon Funding Appli ation for US 377 (Camp Bowie Boulevard) Project Selection In -Field Data Collection (Topographic and Utility Survey) Environmental Documentation and Clearance 60% Plans, Specifications, and Estimates (PS&E) TxDOT Review and Approval 90% Plans, Specifications, and Estimates (PS&E) TxDOT Review and Approval 100% Plans, Specifications, and Estimates (PS&E) Project Advertisement and Letting Contract Execution Construction Jan Feb Revised Wed 5/8/19 f ---; 1 ' —�� J 5 f j �; ��. F-Pershin y-- —' - - DOhma`Bite nrAv( ---- -- - - =1 H _30 - -- - - - - Calmont-Ave -�=----� - - - - - --_= -- -- -- • — — — - i � f y-Malvey-Ave .. a, -- ---! .-- — fi - f- TXDOT GREEN RIBBON FUNDING APPLICATION - --- osedafe= x CIT. OF -FORT O'RTH s; •= HT= US 3771 CAMP BOWIE BOULEVARD x -- iI ® END PROJECT (CLAYTON ROAD TO HORNE STREET) �L - ORN STREET) - o� .. .E wic Ken -- �L a — .r - — -- — , —_ on Aver. - - ----- _ � i \�G� N� l D on n eI1y-Ave D ru ry=Ln • o - e ve ddes --A � CRosemont-Ave ry `eNe 07- Qj O - ---- - Garland Ave Diaz Ave- .,G .. - 1 d� ��IP � _ - mom_ $�N 13usnetl'p� Haughtc R ¢ - _ • _ p-. , _ Milbun ' . Iesl l r. � ',R cvy Madoc-Fork Dr �.. Fletche �- VV-Elizabeth E'n �/ �,�� - �f �. BEGIN PROJECT (CLAYTON ROAD) C� ': b Al _ -� ❑ �� k 1.A �` P� �'� e }' �, \ �01" _ � ! u-Park Q U) a Q w - - � _ P I-- - ` ��� PQ i� '� - ° �- �- —� Ki I platri c 0 0 LL � �. �► � a'QFz vPLO Y, \ o - . -- ---Goodmafth Camp �?owfe Sloulevard- qIRK66on Vr, cfPocafion Vap 17Va2019 All information is preliminary and conceptual, FREESE ? aorl Vor 1 , 7eps subject to modification with future development. r1119NICHOLS 20 ANC ,g �.".11 A ! 411 .41 IL Ix ,' a .,'� � ..r •y. "k r:� v < � � _ 1� L �.,, k' �.',� � �' - • f ' f �' _ , r +L 1 J t � J, J dL . �\ mil. � t'�i,�- ` '.;� �'d._. _ - •.� + � 4' �..1 •I ,y�l�!• r r � .�� _, � .� �^�'"`�u-.S. - � �"` �?' v �.`."`� -- I +�'7 n► 'mac- � � /� I '� _ � �•� rG. �-� �� r - ' camp �?Owfe Sloulevard- qTi766on Zandscape Concepf 17 2019 . BOWIE All information is preliminary and conceptual, , • ICTI ? aorl Vor 1 , 7eps subject to modification with future development. r' NICHOLS City of Fort Worth, Texas TxDOT Green Ribbon Funding Applicatoin - FY 2020 Texas Department May 2019 of Transportation US 377 / Camp Bowie Boulevard - Clayton Road to Horne Street Landscape Summary Freese and Nichols, Inc. Engineer's Opinion of Probable Construction Cost Item Description Quantity Unit Unit Price Total Price 1 Mobilization and Demobilization 1 LS $40,000.00 $40,000.00 2 Right -of -Way Preparation 1 LS $15,000.00 $15,000.00 3 Unclassified Excavation 2,090 CY $8.00 $16,720.00 4 Imported Plant Soil Mix 2,090 CY $50.00 $104,500.00 5 SWPPP Plan and Implementation 1 LS $5,000.00 $5,000.00 6 Barricades, Signs and Traffic Handling 1 LS $20,000.00 $20,000.00 7 Shrubs/Ornamental Grasses (3 Gal.) 1,010 EA $30.00 $30,300.00 8 Shrubs/Ornamental Grasses (1 Gal.) 1,550 EA $15.00 $23,250.00 9 Block Sod (Including Compost) 5,410 SF $5.50 $29,755.00 10 Mulch 770 CY $35.00 $26,950.00 11 Landscape Irrigation System 6,340 SF $2.00 $12,680.00 12 12" Wide Concrete Mow Strip (4" Thick) 160 LF $20.00 $3,200.00 13 Irrigation System Operation and Maintenance 12 MO $1,000.00 $12,000.00 14 Landscape Maintenance Contract 12 MO $2,000.00 $24,000.00 PROJECT SUBTOTAL $363,355.00 CONTINGENCY 10% $36,645.00 PROJECT TOTALI $400,000.00 r--� NICH0LS