HomeMy WebLinkAbout(0029) M&C 20-0539City of Fort Worth, Texas Mayor and Council Communication DATE: 08/11/20 M&C FILE NUMBER: M&C 20-0539 LOG NAME: 55FTW AVIATION GAS LEASE CAPITAL PROJECTS APPROPRIATION SUBJECT Adopt Appropriation Ordinances for a Total Amount of $9,023,293.00 in the Aviation Gas Lease Capital Projects Fund for Stage 11 of the Meacham Airport Midfield Redevelopment Project, the Meacham Airport Frontage Improvements Project and Spinks Hangar Development (COUNCIL DISTRICTS 2 and 6) RECOMMENDATION: It is recommended that the City Council 1. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Aviation Gas Lease Capital Projects Fund in the amount of $2,891,805.00 from available funds for Stage 11 of the Midfield Redevelopment Project (City Project No.101644) at Fort Worth Meacham International Airport; 2. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Aviation Gas Lease Capital Projects Fund in the amount of $1,931,488.00 from available funds for airport frontage improvements (City Project No.100602) at Fort Worth Meacham International Airport; and 3. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Aviation Gas Lease Capital Projects Fund in the amount of $4,200,000.00 from available funds for the development of hangars (City Project No.101194) at Fort Worth Spinks Airport. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to distribute and appropriate funds for eligible Aviation Department projects. Funding moved in the amount of $9,023,293.00, will be from available funds within the Aviation Gas Lease Capital Projects fund to be used for various projects at Fort Worth Meacham International Airport (Meacham Airport) and Fort Worth Spinks Airport (Spinks Airport) Meacham Airport Midfield Redevelopment Project - Stage II Stage I of the Meacham Airport Midfield Redevelopment Project consisted of removing the failed infrastructure encompassed in the closed Runway 9/27 corridor and constructing new taxiways, allowing for hangar development opportunities and increased economic viability through lease revenue and fuel flowage fees. Stage I of the Project was completed on December 11, 2019. Stage 11 of the Meacham Airport Midfield Redevelopment Project will consist of constructing a new roadway and utilities that will support the development of property in the area of the airfield that was prepared in Stage I. The preliminary cost estimate for this stage was provided by Garver, LLC. and is estimated at $3,000,000.00. Bidding documents for Stage II are currently being completed, and a separate M&C will be drafted and routed to City Council after bids are received and evaluated. Meacham Airport Frontage Improvement Project The Airport Frontage Improvement Project places an emphasis on Meacham Airport's frontage to North Main Street, which begins just south of Interstate 820 and extends south to NW 38th Street. The Airport Frontage Improvements Project will correct deficiencies, improve aesthetics and create a cleaner, more attractive entry to the airport and its businesses. The original project approach was in three phases, however based on available funding, it is now anticipated this project will be completed in one phase. This project will address three primary areas including utility relocation (burying electric delivery lines along North Main Street), perimeter frontage fencing and gate improvements, and improving landscaping, lighting, and sidewalks. The Aviation Department was recently informed about the availability of funds for this Project, and funding will be derived from multiple sources. The preliminary total cost estimate provided by Garver, LLC. is $8,800,000.00 and separate M&C's will be drafted to allocate funding from other sources. Design for the Meacham Airport Frontage Improvement Project is currently being reviewed, and a separate M&C will be presented to City Council after bids are received and evaluated. Spinks Airport Hangar Development Currently a hangar waitlist consisting of 125 aircraft exists at Spinks Airport. By constructing box hangars on the west side of the airfield, this will help alleviate the issue of limited hangar space at Spinks Airport. Design for these hangars has already been completed (M&C C-27177), and a separate M&C will be drafted and routed to City Council after bids are received and evaluated. These projects are located in COUNCIL DISTRICTS 2 and 6. A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified project within the Aviation Gas Lease Capital Projects fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Aviation Gas Lease Capital Projects fund for the Stage II of the Midfield Redevelopment Project and the Airport Frontage Improvements Project at Fort Worth Meacham International Airport, as well as the Hangar construction at Fort Worth Spinks Airport. This is an approved modification to the Aviation Department's FY2021-FY2025 Capital Improvement Plan. Prior to an expenditure being incurred, the Aviation Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office by. Fernando Costa 6122 Originating Business Unit Head: Bill Welstead 5402 Additional Information Contact: Tyler Dale 5416