HomeMy WebLinkAbout(0049) FEPA MOD. FT. WORTH. FY 2020. CORRECTION. REQUEST FOR CONTRACTOR SIGNATURE. REISSUED ON 06.10.2020.pdfAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 1 13
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. 1 app is e)
45310019CO049P00002
10/01/2019
See Schedule
6.ISSUED BY
CODE 453100
7. ADMINISTERED BY (Ifother than Item 6) CODE EE458
EEOC OCFO ASD
EEOC Dallas District Office
ATTN: Caroline A. Fowler,
Contracting Officer
207 S. Houston Street
131 M Street, N.E., 4th Floor
Dallas, TX, 75202-4726
Washington, DC, 20507
8. NAME AND ADDRESS OF CONTRACTOR
(No., street county, State and ZIP Code)
X
9A. AMENDMENT OF SOLICIATION NO.
FORT WORTH, CITY OF
200 TEXAS ST
1:19B.DATED
FORT WORTH, TX, 761026314
(SEEITEMII)
10A. MODIFICATION OF CONTRACT/ORDER NO.
45310011CO041
10B. DATED (SEE ITEM 13)
08/30/2019
CODE L00073170458 FACILITYCODE
1 1. THIS I I EIVI ONLY APPLIES TO AMEND IEN I S OF SOLICITATIONS
❑ The above numbered solicitation is amended asset forth in Item 14. The hour and date specified for receipt of Offers ❑ is extended, ❑ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer
already submitd , such changg ma� f�e mpade,b rlevrarr� or letter, rfov�ded each telegram or letter makes reference to the solicitation and this
amen ment, an is recewetl Pnor t t e o enin ou an date spe i p
12. ACCOUNTING AND APPROPIRATION DATA (Ifrequired)
See Schedule
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANTTO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office,
appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
❑
D. OTHER (Specify type o modification and authority)
Section I, 52.217-9 Option to Extend the Term of the Contract (MAR 2000).
E. IMPORTANT: Contractor ® is not, � is required to sign this document and return 2 copies to the issuing office.
14. DESCRIPTION OF AMEN DM ENT/MODI FICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MODIFICATION CONTROL NUMBER: 45310019CO049P00002
SUMMARY OF CHANGES: EXERCISE OPTION YEAR 1
PURSUANT TO SECTION I, 52.217-9 ENTITLED " OPTION TO EXTEND THE TERM OF THE CONTRACT, " THE
GOVERNMENT HEREBY EXERCISES OPTION YEAR 1 TO EXTEND CONTRACT PERFORMANCE FOR A
PERIOD OF TWELVE (12) MONTHS COMMENCING ON OCTOBER 1, 2019 THROUGH SEPTEMBER 30, 2020.
(SEE PAGE 2 AND ATTACHMENT NO. 1 FOR DETAILS).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Fowler, Caroline A
Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
45310019C0049P00002
Page 2 of 5
Summary of Changes
Listing of Incorporated Purchase Requisitions
FP200076
Accounting and Appropriation Data Changes
Item Number:0011
$71,200.00,
202010100B2020D110SLPPSIFPSLPI NA12510101999996199991SLCRINAINAINA
Item Number:0012
$4,400.00,
202010100B2020D110SLPPSIFPSLPINA12510101999996199991SLINTKINAINAINA
Item Number:0013
$1,500.00,
202010100B2020D110SLPPSIFPSLPINA12510101999996199991SLTRNGINAINAINA
Item Number:0014
$1,000.00,
202010100B2020D1 10SLPPSIFPSLPI NA12510101999996199991SLJOUTINAI NAINA
Header Information
Total Amount is increased by $78,100.00 from $84,200.00 to $162,300.00.
Section B - Supplies or Services and Prices/Costs
Line Item Details:
Line Items Added:
Line Item 0011 is added as follows:
Item Number
Base Item
Number
Supplies/Services
Quantity
Unit
0011
OPTION YEAR 1-TITLE VII, ADEA,
ADA, AND GINA CHARGE
RESOLUTIONS: Processing and
Resolving, Title VII, ADEA, ADA and
GINA Charges. Each Charge must
have been filed since October 1,
2015, (or since October 1, 2014, for
each charge where a d
89
EA
Contract Type:Firm Fixed Price
Unit Price
$800.00
Extended Price
$71,200.00
Description:
Purchase Requisitions
FP200076
ACRN
Funded Amount
$71,200.00
IDC Type: Not Applicable
FSC Codes: R418 SUPPORT- PROFESSIONAL: LEGAL
45310019C0049P00002
Page 3 of 5
NAICS Code: 813311 Human Rights Organizations
Line Item 0012 is added as follows:
Item Number
Base Item
Number
Supplies/Services
Quantity
Unit
0012
OPTION YEAR 1-TITLE VII, ADEA,
ADA, AND GINA INTAKE
SERVICES: Provide Intake Services
for charges, with affidavits, filed
during the period October 1, 2019 to
September 30, 2020 at a price of $80
per charge. Period of Performance:
10/01 /2
55
EA
Contract Type:Firm Fixed Price
Unit Price
$80.00
Extended Price
$4,400.00
Description:
Purchase Requisitions
FP200076
ACRN
Funded Amount
$4,400.00
IDC Type: Not Applicable
Line Item 0013 is added as follows:
Item Number
Base Item
Number
Supplies/Services
Quantity
Unit
0013
OPTION YEAR 1-FY 2020
EEOC/FEPA TRAINING: Training to
facilitate successful completion of
contract, including EEOC-Sponsored
Annual Training. Period of
Performance: 10/01/2019 —
09/30/2020.
1
LT
Contract Type:Firm Fixed Price
Unit Price
$1,500.00
Extended Price
$1,500.00
Description:
Purchase Requisitions
FP200076
ACRN
Funded Amount
$1,500.00
IDC Type: Not Applicable
Line Item 0014 is added as follows:
Item Number Base Item Supplies/Services Quantity Unit
Number
45310019CO049P00002
Page 4 of 5
0014
OPTION YEAR 1-FY 2020 FEPA
ENGAGEMENT FUNDING:
Submission of an acceptable written
proposal detailing a joint EEOC/FEPA
enforcement, outreach, or training
activity in support of a Strategic
Enforcement Plan or District
Complement plan prio
1
LT
Contract Type:Firm Fixed Price
Unit Price
$1,000.00
Extended Price
$1,000.00
Description:
Purchase Requisitions
FP200076
ACRN
Funded Amount
$1,000.00
IDC Type: Not Applicable
Section F - Delivery or Performance
Delivery or Performances Added:
For Line Item 0011, the following has been added:
Period Of Performance Start Date
Period Of Performance End Date
Place Of Performance Address
10/1/19
9/30/20
EEC Location
131 M Street, NE
Washington
DC US 20507
For Line Item 0012, the following has been added:
Period Of Performance Start Date
Period Of Performance End Date
Place Of Performance Address
10/1/19
9/30/20
EEC Location
131 M Street, NE
Washington
DC US 20507
For Line Item 0013, the following has been added:
Period Of Performance Start Date
Period Of Performance End Date
Place Of Performance Address
10/1/19
9/30/20
EEC Location
131 M Street, NE
Washington
DC US 20507
For Line Item 0014, the following has been added:
Period Of Performance Start Date Period Of Performance End Date Place Of Performance Address
10/1/19 9/30/20 EEC Location
45310019CO049P00002
Page 5 of 5
131 M Street, NE
Washington
DC US 20507
Section G - Contract Administration Data
Distributions Added:
Distribution 1 Schedule 1 is added to the line item 0011.
Distribution 1 Schedule 1 is added to the line item 0012.
Distribution 1 Schedule 1 is added to the line item 0013.
Distribution 1 Schedule 1 is added to the line item 0014.
Modification Changes
Effective as of the date of this Modification No. 45310019CO049P00002 revised as follows:
1. Line Item Number(s):
Line Number: 0011
Item Description: OPTION YEAR 1 - Title VII, ADEA, ADA, AND GINA CHARGE RESOLUTIONS:
Extended Description: The Extended Description Processing and Resolving Title VII, ADEA, ADA and GINA
Charges. Each Charge must have been filed since October 1, 2015, (or since October 1, 2014, for each
charge where a determination of reasonable cause is issued and the charge is processed through
hearings and/or litigation) and resolved in accordance with a charge resolution plan if applicable. Period
of Performance: 10/01/2019 - 09/30/2020
Unit of Measure and Quantity: 89 ea
Unit Price: $800.00
Contract Type: Firm Fixed Price
Charge Account: 2020 1 0100B2020D 1 10SLPPS I FPSLP I NA 1 251010 1 999996 1 9999 1 SLCR I NA I NA I NA
Funded Value: $71,200.00
Line Number: 0012
Item Description: OPTION YEAR 1 - Title VII, ADEA, ADA, AND GINA INTAKE SERVICES
Extended Description: Provide Intake Services for charges, with affidavits, filed during the period
October 1, 2019 to September 30, 2020, at a price of $80 per charge. Period of Performance:
10/01/2019 - 09/30/2020
Unit of Measure and Quantity: 55 ea
Unit Price: $80.00
Charge Account: 20201010OB2020D 110SLPPS J FPSLP J NA 12510101999996199991 SLINTK I NA I NA I NA
Funded Value: $4,400.00
Line Number: 0013
Item Description: OPTION YEAR 1 - FY 2020 EEOC/FEPA TRAINING:
Extended Description: Training to facilitate successful completion of contract, which must include
attendance at EEOC
- Sponsored Annual Conference. Period of Performance: 10/01/2019 - 09/30/2020
Unit of Measure and Quantity: 1 ea
Unit Price: $1,500.00
Charge Account: 2020 1 0100B2020D 1 10SLPPS I FPSLP I NA 1 251010 1 999996 1 9999 1 SLTRNG I NA I NA I NA
Funded Value: $1,500.00
Line Number: 0014
Item Description: OPTION YEAR 1 - FY 2020 FEPA ENGAGEMENT FUNDING:
Extended Description: Submission of an acceptable written proposal detailing a joint EEOC/FEPA
enforcement, outreach, or training activity in support of a Strategic Enforcement Plan or District
Complement plan prior to 09/30/2020. Period of Performance: 10/01/2019 - 09/30/2020
Unit of Measure and Quantity: 1 LT
Unit Price: $1,000.00
Charge Account: 20201010OB2020D 110SLPPS I FPSLP I NA 12510101999996199991 SLJOUT I NA I NA I NA
Funded Value: $1,000.00
Reference Requisition No.: FP200076.
2. As a result of this modification, the grand total for the contract is increased by $78,100.00 from
$84,200.00 to $162,300.00.
In addition, listed below are the revised Sections of the contract:
Section C — DESCRIPTIONS AND SPECIFICATIONS
Section 11, Paragraph B of the Statement of Work — The last sentence is revised to read as follows:
From: Upon execution, the Worksharing Agreement dated 11/01/2018, is incorporated by reference
into this contract.
To: Upon execution, the Worksharing Agreement dated /10/23/2019, is incorporated by reference
into this contract.
Section 11, Paragraph E of the Statement of Work is revised to read as follows:
From: It is understood and expressly agreed to by both parties to this contract that all provisions of the
EEOC's Contracting Principles for State and Local FEPA for Fiscal Year 2019 are incorporated in their
entirety into this contract.
To: It is understood and expressly agreed to by both parties to this contract that all provisions of the
EEOC's Contracting Principles for State and Local FEPA for Fiscal Year 2020 are incorporated in their
entirety into this contract.
Section III, Paragraph B of the Statement of Work is revised to read as follows:
From: All charges submitted for credit under this contract shall be completed by the Contractor
between October 1, 2018 and September 30, 2019 as follows:
To: All charges submitted for credit under this contract shall be completed by the Contractor between
October 1, 2019 and September 30, 2020 as follows:
Section D — PACKAGING AND MARKING
Section D is revised to incorporate the language, "Charge/case file material and reports to be furnished
to the designated field office may be through the regular U.S. mail and should be adequately packaged
to assure safe delivery to the designated office or via electronic transmission."
2
Section F - DELIVERIES OR PERFORMANCE
F.1 PERIOD OF PERFORMANCE
Paragraph F.1 A is revised to read as follows:
From: A. The period of performance under this contract shall be from October 1, 2018 through
September 30, 2019, with two one-year options to extend the term of the contract. (See Section I,
52.217-9 "Option to Extend the Term of the Contract").
To: A. The period of performance under this contract shall be from October 1, 2019 through September
30, 2020.
F.2 TIME OF DELIVERY/DELIVERABLES
F.2.A.1—The last sentence is revised to read as follows:
From: A determination not to award contract credit made may be reversed under the procedures set
forth in Section 111.13.5.a. of the FY 2019 Contracting Principles.
To: A determination not to award contract credit made may be reversed under the procedures set forth
in Section 111.13.5.a. of the FY 2020 Contracting Principles.
Paragraph F.2.A 2 is revised to read as follows:
From: Enter basic charge data into the IMS or successor system within five business days of the
Contractor's receipt of each charge as set forth in Section I11.13.5.a of the FY 2019 Contracting Principles
in order to be eligible to receive contract credit.
To: Enter basic charge data into the IMS or successor system within five business days of the
Contractor's receipt of each charge as set forth in Section 111.13.5.a of the FY 2020 Contracting Principles
in order to be eligible to receive contract credit.
Paragraph F.2.A.3 is revised to read as follows:
From: Provide EEOC with a list of final actions within a time frame agreed upon by the COR and the
Contractor, but usually no later than 30 calendar days after the resolution of each charge to meet the
requirement of Section III. B.2 of the FY 2019 Contracting Principles. The Contractor must ensure the
timely and accurate entry of data into the IMS or successor system. The COR will generate charge data
lists and reports through the IMS or successor system to verify that this requirement is being met
throughout the term of this contract.
To: Provide EEOC with a list of final actions within a time frame agreed upon by the COR and the
Contractor, but usually no later than 30 calendar days after the resolution of each charge to meet the
requirement of Section III. B.2 of the FY 2020 Contracting Principles. The Contractor must ensure the
timely and accurate entry of data into the IMS or successor system. The COR will generate charge data
lists and reports through the IMS or successor system to verify that this requirement is being met
throughout the term of this contract.
3
Paragraph F.2.13.4 is revised to read as follows:
From: The Contractor must make timely and accurate submission to the EEOC of EEOC Form 322 and
EEOC Form 472. All reports covering the first three quarters of the FY 2019 contract must be received
by the EEOC prior to September 30, 2019.
To: The Contractor must make timely and accurate submission to the EEOC of EEOC Form 322 and EEOC
Form 472. All reports covering the first three quarters of the FY 2020 contract must be received by the
EEOC prior to September 30, 2020.
Paragraph F.2.0 is incorporated as follows:
C. Proposal for FY 2020 FEPA Engagement
From: The Contractor must submit to the Contracting Officer Representative prior to September 30,
2019, a written proposal detailing a joint enforcement, joint outreach orjoint training activity with the
EEOC District Office which (1) identifies and supports a specific priority contained in either EEOC's
Strategic Enforcement Plan or the District Office's Complement Plan, (2) contains sufficient details and
a certification that the FEPA is willing and able to perform the actions it proposes to perform, and (3)
which the EEOC finds to be feasible and acceptable.
To: The Contractor must submit to the Contracting Officer Representative prior to September 30, 2020,
a written proposal detailing a joint enforcement, joint outreach or joint training activity with the EEOC
District Office which (1) identifies and supports a specific priority contained in either EEOC's Strategic
Enforcement Plan or the District Office's Complement Plan, (2) contains sufficient details and a
certification that the FEPA is willing and able to perform the actions it proposed to perform, and (3)
which the EEOC finds to be feasible and acceptable.
Section G — CONTRACT ADMINISTRATION DATA
G.5 PAYMENT SCHEDULE
Paragraph G.5 is revised to read as follows:
From: Upon contract execution, an advance payment invoice not to exceed fifty (50) percent of the
number of charge resolutions stated in the contract, submitted by the Contractor. Subsequent
payments will be based on the Contractor's actual production of accepted charge resolutions. The
contractor can submit invoices for actual production on a quarterly basis. No payment will be made
until the contract and subsequent modifications, if any, are returned, properly executed, to the Equal
Employment Opportunity Commission, Acquisition Services Division, 131 M Street, N.E., 4th Floor,
Washington, D.C. 20507.
To: Upon contract execution, an advance payment invoice not to exceed fifty (50) percent of the
number of charge resolutions stated in the contract, must be submitted by the Contractor. Subsequent
payments will be based on the Contractor's actual production of accepted charge resolutions. The
contractor can submit invoices for actual production on a quarterly basis. No payment will be made
4
until the contract and subsequent modifications, if any, are returned, properly executed, to the Equal
Employment Opportunity Commission, Acquisition Services Division, 131 M Street, N.E., 4th Floor,
Washington, D.C. 20507 or by email to Contracting Officer, Caroline A. Fowler at:
caroline.fowler@eeoc.gov.
Section H — SPECIALCONTRACT REQUIREMENTS
Paragraph H.1 incorporate changes as follows:
H.1 TITLE VII, ADA AND GINA CONFIDENTIALITY PROVISIONS
FROM:
A. The Contractor agrees to abide by the confidentiality provisions of Title VII, ADA and the GINA as
those provisions are interpreted by the EEOC. The Contractor shall not make public in any manner
whatever the following information if said information was obtained from the EEOC:
1. The existence of a Title VII, ADA and/or GINA charge filed by a particular charging party
against a particular respondent, unless a Title VII, ADA and/or GINA lawsuit has been instituted,
2. Information obtained by the EEOC pursuant to its investigation authority (Section
709(a)), unless a Title VII, ADA and/or GINA lawsuit involving that information has been
instituted and,
3. Things said or done by the parties (i.e. charging parties and respondents, and the EEOC)
during the settlement efforts or conciliation of a charge, unless a Title VII, ADA and/or GINA
lawsuit has been instituted.
4. Pursuant to Paragraph 4(b) of the EEOC Memorandum of Understanding with the Office
of Federal Contract Compliance Programs (OFCCP), information compiled by OFCCP and
provided to the EEOC may be provided to an FEP Agency (i.e. the Contractor) upon its request. 11
is further understood and agreed that the Contractor will not disclose to the public any such
information without first requesting and obtaining the express written approval of the Director
of OFCCP.
B. EEOC-furnished EEO Reports may be made public by the Contractor during a hearing
conducted by the Contractor that involves the above information.
TO:
A. The Contractor agrees to abide by the confidentiality provisions of Title VII, ADA and the GINA as
those provisions are interpreted by the EEOC. The Contractor shall not make public in any manner
whatever the following information if said information was obtained from the EEOC:
1. The existence of a Title VII, ADA and/or GINA charge filed by a particular charging party
against a particular respondent, unless a Title VII, ADA and/or GINA lawsuit based on that charge
has been instituted,
5
2. Information obtained by the EEOC pursuant to its investigation authority (Section
709(a)), unless a Title VII, ADA and/or GINA lawsuit based on a charge involving that information
has been instituted and,
Things said or done by the parties (i.e. charging parties and respondents, and the EEOC)
during the settlement efforts or conciliation of a charge.
4. Pursuant to Paragraph 4(b) of the EEOC Memorandum of Understanding with the Office
of Federal Contract Compliance Programs (OFCCP), information compiled by OFCCP and
provided to the EEOC may be provided to an FEP Agency (i.e. the Contractor) upon its request. li
is further understood and agreed that the Contractor will not disclose to the public any such
information without first requesting and obtaining the express written approval of the Director
of OFCCP.
Paragraph H.10 is incorporated as follows:
H.10 FEPA ENGAGEMENT FUNDING
From: To be eligible to invoice for the funding, in the amount of $1,000, the Contractor must submit to
the Contracting Officer Representative prior to September 30, 2019, a written proposal detailing a joint
enforcement, joint outreach or joint training activity with the EEOC District Office which (1) identifies
and supports a specific priority contained in either EEOC's Strategic Enforcement Plan or the District
Office's Complement Plan, (2) contains sufficient details and a certification that the FEPA is willing and
able to perform the actions it proposes to perform, and (3) which the EEOC finds to be feasible and
acceptable.
To: To be eligible to invoice for the funding, in the amount of $1,000, the Contractor must submit to the
Contracting Officer Representative prior to September 30, 2020, a written proposal detailing a joint
enforcement, joint outreach or joint training activity with the EEOC District Office which (1) identifies
and supports a specific priority contained in either EEOC's Strategic Enforcement Plan or the District
Office's Complement Plan, (2) contains sufficient details and a certification that the FEPA is willing and
able to perform the actions it proposes to perform, and (3) which the EEOC finds to be feasible and
acceptable.
Section I— CONTRACT CLAUSES
Section I is revised as follows:
Clause Number
Clause Title
52.204-13
System for Award Management Maintenance. (OCT 2018)
52.222-50
Combating Trafficking in Persons. (JAN 2019)
52.232-33
Payment by Electronic Funds Transfer --System for Award Management. (OCT 2018)
52.244-6
Subcontracts for Commercial Items. (JAN 2019)
11
Section J — LIST OF ATTACHMENTS
Section J is revised to incorporate Attachment D as follows:
Attachment D - Worksharing Agreement for FY 2020- 1 Page
3. Except as stated above, all other terms and conditions remain unchanged.
7
FY 2020 EXTENSION OF WORKSHARING AGREEMENT
Inasmuch as there have been no substantive changes in the processes,
procedures, statutes, policies or regulations that would adversely
affect or substantially alter the work sharing arrangement between the
U.S. Equal Employment Opportunity Commission's Dallas District Office
and the City of Fort Worth Human Relations Commission, or that would
affect the processing of charges filed under the pertinent Federal,
state or local statutes, the parties agree to extend the current work
sharing agreement that was executed on November 1, 2018 through the FY
2020 Charge Resolution Contract Option Period, from October 1, 2019
through September 30, 2020. The agencies agree to work together in
furtherance of the provisions of EEOC's current Strategic Plan when
assessing the allocation of charges under this agreement and to
cooperate in compliance and enforcement efforts as well as training,
outreach and technical assistance efforts encompassed by the Plan. By
executing this extension, the parties agree to abide by the
confidentiality provisions of GINA as well as the other statutes cited
in the agreement. This agreement, as well as the attendant
Worksharing Agreement may be reopened and amended by mutual consent of
the parties.
W ► . I um kl %,-� 10/09/2019
Angela Rush, qssistant Director of Diversity and Inclusion Date
el
a McCallister, Director
/d 05 y
Date