LOG NAME: 60WS11136INWATERM-KHA
SUBJECT
M&C FILE NUMBER: M&C 20-0773
(CD 3) Authorize Execution of an Engineering Agreement in the Amount of $1,129,280.00 with Kimley-Horn and Associates, Inc., for Design of the
Westside III 36-Inch Water Transmission Main Project, Provide for Project Costs for a Total Project Amount of $2,845,105.00, Adopt Resolution
Expressing Official Intent to Reimburse Expenditures and Proceeds of Future Debt and Adopt Appropriation Ordinance
RECOMMENDATION:
Ir is recommended that the City Council:
1. Authorize execution of an engineering agreement with Kimley-Horn and Associates, Inc., in the amount of $1,129,280.00 for the Westside III
36-Inch Water Transmission Main project;
2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Westside III 36-Inch
Water Transmission Main project; and
3. Adopt the attached Appropriation Ordinance adjusting appropriations in the Water and Sewer Commercial Paper fund by increasing
appropriations in the amount of $2,845,105.00 for the Westside III 36-Inch Water Transmission Main project (City Project No. 102688) and
decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize the preparation of plans and specifications for the construction of Westside III 36-
Inch Water Transmission Main project from the Westside Water Treatment Plant to the water ground storage tank site located near Farm to Market
(FM) 1187 south of Interstate Highway (IH) 20.
The proposed scope of services include design for the transmission main, design survey, environmental permitting, easement preparation,
subsurface utility engineering, geotechnical investigation, coordination with various agencies and cathodic protection design.
Kimley-Horn and Associates, Inc., proposes to provide all the necessary design services for the transmission main for a fee of $1,129,280.00.
Staff considers the proposed fee to be fair and reasonable for the scope of services proposed.
In addition to the contract amount, $1,715,825.00 is required for project management, real property acquisition, public outreach and material
testing.
This project will have no impact on the Water Department operating budget when complete.
Funding for Westside III 36-Inch Water Transmission Main is depicted below:
Fund
Existing
Appropriations
Additional
Appropriations
Project Total*
W&S Commercial
Paper - Fund 56019
$0.00
$2,845,105.00
$2,845,105.00
Project Total 71
$0.0qJ
$2,845,105.00
$2,845,105.00
*Numbers rounded for presentation purposes.
This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer
portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used
to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to
provide interim financing, the Water & Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City
portfolio (currently approximately 2.3 percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-term
financing source, another funding source will be required, which could mean issuance of securities under the CP Program or earlier issuance of
Water and Sewer revenue bonds than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse
the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution.
The City Council approved the Water Department's Fiscal Year 2020-2024 Five -Year Capital Improvement Plan on September 17, 2019. This City
Council approved plan includes this specific project, with funding identified through the CP program to be reimbursed with future revenue bonds. In
accordance with the provisions of the Financial Management Policy Statements, staff anticipates presenting revenue -supported debt issuances to
the City Council for consideration within the next three years. This debt must be issued within approximately three years to provide reimbursement
for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to
be made whole through other budgetary methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to
reimburse the City from tax-exempt bond proceeds.
M/WBE OFFICE: Kimley-Horn and Associates, Inc., is in compliance with City's BIDE Ordinance by committing to 15 percent SBE participation.
The City's SBE goal on this project is 12 percent.
The project is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds
will be available in the W&S Commercial Paper Fund for the WS Treatment Plant III 30" WTM project. Prior to any expenditure being incurred, the
Water Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by. Dana Burghdoff 8018
Originating Business Unit Head: Chris Harder 5020
Additional Information Contact: Walter Norwood 5026