HomeMy WebLinkAboutContract 54169-AR1 CSC No.54169-AR1
FORT WORTH City of Fort Worth
r� CMAR Construction Allowance Request
Project Name Harmon Rd improvements(US 287 to Golden Triangle Blvd./Bonds Ranch Rd.) City Sec At 54169
Client Project A(s) [IOD459 Date
8/30/2021
Hannon Rd widening from 2lanes to 4lanes divided roadway between US 287 to Golden Tdangle -�
Project Desarlption BWd./Bonds Ranch Rd.) ARAI l
Contractor McCarthy Bdldmg Companies,Inc
City Project Mgr. Alejandra Ayala City lnspeciorl0ennis Rodgers
NO. REM DESCRIPTION UNIT qty UNIT PRICE Orlginat GMP Cost Previous GMP PCO`001 PCO-002 PCCW03 PCO-0W Revised GMP
Total LocklawCont. Handrail waterline Ad Retaining Wall Total
Div.01-General
00 SUFycyAaXcwt 15 1 $390.373.00 $390,373.00 5390,37100 1 S 390,373.00
05 Erosion Control IS 1 $242,211.00 5242.211.00 5242,212.00 1 S 242.211.00
WCl:Earthwork i Walk
10 McCarthy euildiig Cam nies IS 1 SS 21 39.00 $5,921439.00 SS,921,439.00 $ 36.317.00 5 40.504.00 S 5,998 060.00
WC2:Underground Drainage
20 NgrthTexas Contractin LS 1RIM 53,020.778.00 53.020.778.00 S 3 0,771.00WC3:Water/SankarySealer30 INoithTexas Contracting IS 1 $1.938.301.00 $1,938.301.001 $ 1211600 S 1.95%417.00
WC4:Electrical40 Bean Electrical IS 1 $1.351.416.00 $1.351416.00 $ 47135.00 S 139!,SS1.00
45 Continaencv-Lockjaw Ground Boxes LS 1 S37,283.00 537.283.00 5 37 83.00 S
WCS:Paving
50 McMahon Contracting LS 1 54A69 37.00 54469.237.00 54.469,237.00 S 4,469,237.00
_ WC6:Landsca^ing _
60 Contingency-Rebid IS 1 54%000.00 $450,000.001 $450.000.00 S 450,000.00
WC7:Integral Colored Concrete
70 fort Worth Civil Construction LS 1 S868.109.00 $8 109.00 $868,109.00 $ 9W,109.00
Wm:Tralllc Corrtrd
80 lMcCarthy 8u8dm1 Companies 4.5 1 $737.549.00 5717,549.nn 1 $717,549.00 1 S 717.519.00
I
90 General Conditions 1 52,241,S3S.00 I 52,24133S. $2,241.53S.00 I S 2.241.535.00
100 Insurance LS 1 $180.432.00 9SMOOOM
2.00 Sl 432.00 5 92.00 S 336.00 5 113.00 $ 377.00 $ 111350.00
110 Fee l5 1 $1,418 863.00 $ 3.00 $1,418,863.00 $ 646.00 $ 2,370.00 S 795.00 $ 2,658.00 $ 1.4?5332.00
120 McCarthy Performance S Payment i5 1 $168 080.00 80.00 $168,060.00 $ 77.00 5 281.00 S 94.00 5 31S.00 S 168.847.00
130 Construction Contingency l5 1 51,170,7.00 $ 0.00 51,170,780.00 $ 130,667.p0 $ 139,304.001 $ (13,118.001 5 2,157.00 S 1110,04100
Owner Allowances:
140 Utility Delav Allowance LS 1 $200.000.00 0.00 5200,000.00 S t00D00.00
141 Construction LS 1 $200,000.00 0.00 5700 .00 5 146,011.00 S 153,989.00
142 Utilib LS 1 5100,000.00 0.00 $100,000.00 S 100.000.00
143 LanduapeRestoration l$ 1 SSOAl111.00 0.00 $SOA00.00 IS SOA00.00
144 Irrigation LS 1 550,000.00 0.00 SSQ000.00 S 50.000.00
145 Gates LS 1 S30A00.R O.00 $30p00.00 S 30000.00
( Total Owner Allowance 30 000.00 A00.00 I
I11
Grant Total I $2SX6,316.00 1$ 25,216,316.00 S $ - S S - S 25,218.2186.00
Original Contract Time 730
Additional Days Requested 0
Reyked Contract Tlme 730
AMTWICATMN(REAWNS)FOR CONBTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST.THE CONTRACT SHAH.: Furnish all labor and meledal as pet atlached Rogow Ca shxbon Ajb*anm Repwst(with allactimentst
PCO.001 Bean Electric will oroyide bekizw boxes as srequested by the City of Fort Worth. The monies will move from conLnflency Line Item 45 to L 1ne PeT 44
0-002 Due to ma rket circumstances odcinq for handrail escalated by 59%. McCarthyhas agreed to my the subcontractor the escalation ensL
PCO-003 Consor Don Contingency will be used to co--rnsate for held chances that occurred along the eAs0n 12'water line near STa 56+80,
PCO.004 Owners Allowance will be used to construct a retalnino wall at the CVS. The elevation chancles at the tight-of-way occurred after the Dian were desioned and bid.
OFFICIAL RECORD
CITY SECRETARY
CIMR CAifyyCOn AlOgv rregyol Papa 1 d 7
FT.WORTH,TX
Project Name Harmon Rd.Improvements SUS 287 to Golden Triangle Blvd./Bonds Ranch Rd.) City Sec 4 $4159 I
alent Pra)ect Ills) 1W454 Date $13e/2021 t
Harmon Rd.widening from 2lanes to 4lanes divided roadway between US 287to Golden Triangle 1
protect Dwalption Blvd./8onds Ranch Rd.) _J ARM
Contractor )McCarthy Building Companies.Inc.
atv project Mgr. [Ak)andra Ayala atv InspectorlDennis Rodgers
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of.or incidental to.the above Construction Allowance Request. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,Including ensuring all performance and reporting requirements.
ontracta'c Cornpwy Na ma lContradoesNum Contractor Skirmium jositic
rrs don rvlsor Doh act and Contract Compliance Manager Daft
Sep 1,2021 1141. P Sep 1,2021
Date Seri" tMlkn Doh
Sep 1,2021ww Sep 2,2021
Anhtant DMectorP11111111 Date phdorl C tD.trq AO
Lauren Prieur Sep 3,2021 Sep 3,2021
Data
Sep 3,2021 „ x Sep 5,2021
AC5c
ATTEST: � b�R
%0000D�O
�7 O O 00°tRonaldRGontalss•ActingCitySwsWy o asoO
.�p.�
�f��0 0
O
O ��I
�(0 O�y Y
* O0 0000000000 T�
�r O
a�*Xp So�A
OFFICIAL RECORD
CITY SECRETARY
CMAR G� ft .ruwKi
FT.WORTH,TX
PCCO #001
McCarthy Building Companies Inc. Project: 002200.000 - Harmon Road Improvements US 287/81 to
12001 N Central Expressway Suite 400 Golden Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone: (972)991-5500 Fort Worth,Texas 76177
Prime Contract Change Order #001 : Customer Allowance/Contingency
Request #001
TO: City of Fort Worth Transportation FROM: McCarthy Building Companies Inc
Department 12851 Manchester Rd
200 Texas Street Saint Louis, Missouri 63131-1802
Fort Worth,Texas 76102
DATE CREATED: 5/19/2021 CREATED BY: Eric Klekar(McCarthy Building Companies Inc)
CONTRACT STATUS: Ready for Review REVISION: 0
SCHEDULE IMPACT: 0 days
CONTRACT FOR: 1:Harmon Road Improvements US 287/81 to TOTAL AMOUNT: $0.00
Golden Triangle Boulevard CPN 100459
Prime Contract
DESCRIPTION:
ATTACHMENTS:
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
001 CE#001 -CE-001 -Lockjaw Ground Boxes 0 days $0.00
002 CE#002-CE-002-Handrail Pricing Escalation 0 days $0.00
003 CE 4003-CE-003-RFI 007, RFI 008, RFI 009 0 days $0.00
004 1 CE#004-CE-004-RFI 010-Sidewalk Conflict 0 days $0.00
Total: $0.00
CHANGE ORDER LINE ITEMS:
PCO#001 :CE#001 -CE-001 -Lockjaw Ground Boxes
# Cost Code Description Type Amount
1 16000-16000.0050.00.00-WC 4 ELECTRICAL CE 001-Lockjaw Ground Boxes Subcontracts $47,135.00
2 16000-16000.0050.00.01-LOCKJAW CE 001-Lockjaw Ground Boxes Material ($37,283.00)
GROUND BOXES
3 01900-01900.0955.00.00-CONTINGENCY CE 001-Lockjaw Ground Boxes Material ($10,667.00)
4 01900-01900.0910.00.00-INITIAL MARKUP CE 001-Lockjaw Ground Boxes Fee $646.00
5 01700-01700.0730.00.00-PERF&PAYMENT CE 001-Lockjaw Ground Boxes Material $77.00
BOND
6 01800-01800.0810.00.00-Cost of Risk CE 001-Lockjaw Ground Boxes Material $92.00
Subtotal: $0.00
Grand Total: $0.00
McCarthy Building Companies Inc. page 1 of 2 Printed On: 8/30/2021 11:07 AM
PCCO #001
PCO#002:CE#002-CE-002-Handrail Pricing Escalation
# Cost Code Description Type Amount
1 01900-0190C.0955.00.00-CONTINGENCY CE-002-Handrail Pricing Escalation Material ($39,104.00)
2 31010-31010.0028.00.00-WC 1 CE-002-Handrail Pricing Escalation Subcontracts $36,117.00
EARTHWORK/WALLS
3 01900-0190C.0910.00.00-INITIAL MARKUP CE-002-Handrail Pricing Escalation Fee $2,370.00
4 01700-0170C.0730.00.00-PERF&PAYMENT CE-002-Handrail Pricing Escalation Material $281.00
BOND
5 01800-01800.0810.00.00-Cost of Risk CE-002-Handrail Pricing Escalation Material $336.00
Subtotal: $0.00
Grand Total:
PCO#003:CE#003-CE-003-RFI 007,RFI 008, RFI 009
# Cost Code Description Type Amount
1 33028-33028.0054.00.00-WC 3 RFI 007,RFI 008,RFI 009 Subcontracts $12,116.00
WATE RISAN ITARY
2 01900-01900.0910.00.00-INITIAL MARKUP RFI 007,RFI 008,RFI 009 Fee $795.00
3 01900-0190C.0955.00.00-CONTINGENCY RFI 007,RFI 008,RFI 009 Material ($13,118.00)
4 01700-01700.0730.00.00-PERF&PAYMENT RFI 007,RFI 008,RFI 009 Material $94.00
BOND
5 01800-01806.0810.00.00-Cost of Risk RFI 007,RFI 008,RFI 009 Material $113.00
Subtotal: $0.00
Grand Total:
PCO#004:CE#004-CE-004-RFI 010-Sidewalk Conflict
# Cost Code Description Type Amount
1 31010-3101 C.0028.00.00-WC 1 CE-004-RFI 010-Sidewalk Conflict Subcontracts $40,504.00
EARTHWORKM/ALLS
2 019o0-01900.0910.00.00-INITIAL MARKUP CE-004-RFI 010-Sidewalk Conflict Fee $2,658.00
3 01900-01900.0955.00.00-CONTINGENCY CE-004-RFI 010-Sidewalk Conflict Material $2,157.00
10000-1000C.0141.00.00-CONSTRUCTION
4 ALLOW CE-004-RFI 010-Sidewalk Conflict Allowances ($46,011.00)
5 01700-0170C.073D.00.00-PERF&PAYMENT CE-004-RFI 010-Sidewalk Conflict Material $315.00
BOND
6 01800-0180C.081 D.00.00-Cost of Risk CE-004-RFI 010-Sidewalk Conflict Material $377.00
Subtotal: $0.00
Grand Total: $0.00
The original(Contract Sum) $25,216,386.00
Net change by previously authorized Change Orders $0.00
The contract sum prior to this Change Order was $25,216,386.00
The contract sum would be changed by this Change Order in the amount of $0.00
The new contract sum including this Change Order will be $25,216,386.00
The contract time will not be changed by this Change Order by 0 days.
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth,Texas 76102 Saint Louis, Missouri 63131-1802
8/30/2021 9", SF; t5'7R 8/30/21
SIGNATURE DATE SIG'NATURE DATE SIGNATU DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:8/30/2021 11:07 AM
M � o o� n � o n o m s �n "' � NMn m �Oo orn00000 m
r t0 r 4�fA M O O_ 7 m M n M 0 O J 0 0 to Op
LU M N O r 7 4) N O IP N LIZ f•l - M I . M O O W 0 0 0 0 M
IlJ Cr a� O N N O O N T O CO n ui .6 u'J M GJ N O It O 40'1 I�M O
U7 T 7 T N LL'1 T tD LL'J O O N N N N t0 N N di to to N
U' U fA EA O O O M V fA fA lit N ffl Oi 7 M Y7 _- fA to fA N
� ,7
R
a o r lroi u-i Irni p
1•R V3 di to
:
O
a
a MQ In ro
a C M r O
M M
Q' d y N V3 kA
R
C
a
c
o N R O O O
Rax v3
o
0
a
a
U n ro
N
u
0
J
�l
-
c
c, U
` Y
cl _ Y cl tM`1
a
f s f
- -
Y
J Fy
w y D
� O
U c
o _
L L L ti L
R
l U J U � u F 3
PCO #001
Project:002200.000-Harmon Road Improvements US 287/31 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #001 : CE #001 - CE-001 - Lockjaw
Ground Boxes
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 001 /0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Eric Klekar (McCarthy Building Companies
Inc)
STATUS: Ready for Review CREATED DATE: 5/19/2021
REFERENCE: PRIME CONTRACT #001 -Customer Allowance/Contingency
CHANGE ORDER: Request#001
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT: 0 days
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#001 -CE-001 -Lockjaw Ground Boxes
CHANGE REASON:Owner Contingency
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
DESCRIPTION OF PROPOSED CHANGE:
CE-001 -Lockjaw Ground Boxes
SCOPE:
Per the City of Fort Worth Street Lights and Signals Department, Bean Electrical will be exchanging the previously proposed ground boxes with lockjaw
ground boxes to provide enhanced security to the installed conduit.
REFERENCE:
Please refer to the attached pricing from Bean Electrical
ATTACHMENTS:
Bean Electrical-Lockjaw Pricingpdf
# Cost Code Description Type Amount
1 16000-16000.0050.00.00-WC 4 ELECTRICAL CE 001-Lockjaw Ground Boxes Subcontracts $47,135.00
2 16000-16000.0050.00.01-LOCKJAW GROUND BOXES CE 001-Lockjaw Ground Boxes Material $(37,283.00)
3 01900-01900.0955.00.00-CONTINGENCY CE 001-Lockjaw Ground Boxes Material $(10,667.00)
4 01900-01900.0910.00.00-INITIAL MARKUP CE 001-Lockjaw Ground Boxes Fee $646.00
5 01700-01700.0730.00.00-PERF&PAYMENT BOND CE 001-Lockjaw Ground Boxes Material $77.00
6 01800-01800.0810.00.00-Cost of Risk CE 001-Lockjaw Ground Boxes Material $92.00
Grand Total: $0.00
McCarthy Building Companies Inc. page 1 of 2 Printed On:8/30/2021 11 :10 AM
PCO #001
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth Texas 76102 Saint Louis Missouri 63131-1802
8-30-2021 j21?( _ 0 Pf7R 8/30/21
SIGNATURE DATE SIGNATURE DATE SIGNATUW DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On: 8/30/2021 11 :10 AM
IBE A N E L E 1-'�,C 't
J TRICAL., WC
821 E. Enon Avellue P 817-561-7400 BEI
Fort Worth, Texas 76140 F 817-561-7403
vvm, v.beanelectrical.com
Friday, May 14, 2021
To: Eric Klekar
McCarthy Building Companies, Inc.
Bean Electrical, Inc. is proud to offer an estimate for the project:
Harmon Road
Lockjaw Ground Box Cost Difference CO
Scope: City of Fort Worth requested pricing for the Lockjaw ground boxes in lieu of standard City spec ground boxes
Item Qty. Unit Description Unit Price Amount
Lockjaw Cost Difference
1 -88 EA 3441.1502 Ground Box Type B, w/Apron $125.00 -$11,000.00
2 -3 EA 3441.1503 Ground Box Type D, w/Apron $200.00 -$600.00
3 88 EA PCA132418-Ul3X $594.10 $52,280.80
4 3 EA PCA173024-UT3X $722.80 $2,168.40
5 1 EA 10% Markup $4,284.92 $4,284.92
TOTAL $47,134.12
Sincerely,
Andrew L . Hawkins
Bean Electrical, Inc.
TECL17979
Regulated by The Texas Department of Licensing and Regulations,P.O.Box 12157,Austin,Texas 78711,1 800 803 9202,512 463 6599,website
www.license.state.tx.us/com Pla i nts
PCO #002
Project:002200.000-Harmon Road Improvements US 287/31 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #002: CE #002 - CE-002 - Handrail
Pricing Escalation
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 002/0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Eric Klekar (McCarthy Building Companies
Inc)
STATUS: Ready for Review CREATED DATE: 5/19/2021
REFERENCE: PRIME CONTRACT #001 -Customer Allowance/Contingency
CHANGE ORDER: Request#001
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT: 0 days
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#002-CE-002-Handrail Pricing Escalation
CHANGE REASON:Owner Contingency
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#002-CE-002-Handrail Pricing Escalation
DESCRIPTION OF PROPOSED CHANGE:
CE-002-Handrail Pricing Escalation
SCOPE:
Due to the market circumstances,during the GMP phase,contracts were unable to be executed,leading to an escalation in the steel pricing across the
market.Over the contracting period,this specific scope experienced an increase in value of 59%.
REFERENCE:
Please refer to the attached pricing from Larwel Industries.
ATTACHMENTS:
2021.05.11 -Signed Handrail Quotes.pdf PO Railing-Larwel.pdf
# Cost Code Description Type Amount
1 01900-01900.0955.00.00-CONTINGENCY CE-002-Handrail Pricing Escalation Material $(39,104.00)
2 31010-31010.0028.00.00-WC 1 EARTHWORK/WALLS CE-002-Handrail Pricing Escalation Subcontracts $36,117.00
3 01900-01900.0910.00.00-INITIAL MARKUP CE-002-Handrail Pricing Escalation Fee $2,370.00
4 01700-01700.0730.00.00-PERF&PAYMENT BOND CE-002-Handrail Pricing Escalation Material $281.00
5 01800-01800.0810.00.00-Cost of Risk CE-002-Handrail Pricing Escalation Material $336.00,
Grand Total: $0.00
McCarthy Building Companies Inc. page 1 of 2 Printed On: 8/30/2021 11 :11 AM
PCO #002
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fart Worth,Texas 76177
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth Texas 76102 Saint Louis Missouri 63131-1802
Q� 8-30-2021 8/30/21
SIGNATURE DATE SIG ATURE DATE SIGNATUFai DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:8/30/2021 11 :11 AM
_3
� Ln fn rl )o W 00 Ln
f6
> N Il O O O ri
u
u r-I l0 M N W M
+�+ ri
C
O
O O O 3 O
O 111 O o +'
00 N m 0 m
>- Ln m m ol O u
Ln 0
c W
O o 0 o O Ln O Ln
V1 rn Ln Ln l0 N m ri
m m ri 00 M
p u1 L.D 00 O
u llo Cl N Ci
O 00 n M
N N 00
bA
m
4a
C
OJ
u 'pp
i
a O
m Ln Ln Ln
aj
O u1 O
i 00 N m
u Ln m rn
C
0J
GO
m
C
0J
i
a �
0o In Ln w
ri -tt o f6
O rI u
C
co 0J
bA
u m
(A a+
W r_
ri u
Ln a
U) rn r-I N O r I
3 ;; In r1 r1 J Z o m I�
i O -i Ln Y m [V l0 m
J ,E N I� Ol E N
++ a+
W W
OJ OJ
3 3
0J N m I, 0J N Ln I,
rm-I -tt 'D C rti Ln l0
a+ a+
0 0
W W
f6 f6
C C
LL LL
H H
M M
ri ri
N N i..�
N OC OC N OC OC
U M M U a M
PCO #003
Project:002200.000-Harmon Road Improvements US 287/31 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #003: CE #003 - CE-003 - RFI 007,
RFI 008, RFI 009
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 003/0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Eric Klekar (McCarthy Building Companies
Inc)
STATUS: Ready for Review CREATED DATE: 5/26/2021
REFERENCE: PRIME CONTRACT #001 -Customer Allowance/Contingency
CHANGE ORDER: Request#001
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT: 0 days
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#003-CE-003-RFI 007, RFI 008, RFI 009
CHANGE REASON: RFI
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#003-CE-003-RFI 007, RFI 008, RFI 009
DESCRIPTION OF PROPOSED CHANGE:
CE-003-RFI 007, RFI 008, RFI 009
SCOPE:
RFI 007-After excavating the existing 12"waterline at STA 56+80, it was discovered the line was capped short of where the drawings previously
located the line.The A/E team confirmed this line should be extended and the fire hydrant to be relocated outside of the parameters of the proposed
retaining wall.
RFI 008-While evaluating the existing valves with the CoFW valve crew to determine which areas would be affected by the waterline C adjustments, it
was determined an additional valve would be needed to isolate the businesses in the area.
RFI 009-After performing a test shutdown of waterline E with the CoFW valve crew, it was determined there was not an existing isolation valve to keep
the residential area in service while performing the waterline E adjustments.The A/E team confirmed it was acceptable to add in an additional valve to
isolate this line.
REFERENCE:
Please refer to the attached pricing from North Texas Contracting.
ATTACHMENTS:
North Texas-RFI 007 R1 -Pricing.pdf NTC-Waterline C Pricing.pdf NTC-Waterline E Pricing.pdf
McCarthy Building Companies Inc. page 1 of 2 Printed On:8/30/2021 11 :12 AM
PCO #003
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
# Cost Code Description Type Amount
1 33028-33028.0054.00.00-WC 3 WATER/SANITARY RFI 007,RFI 008,RFI 009 Subcontracts $12,116.00
2 01900-01900.0910.00.00-INITIAL MARKUP RFI 007,RFI 008,RFI 009 Fee $795.00
3 01900-01900.0955.00.00-CONTINGENCY RFI 007,RFI 008,RFI 009 Material $(13,118.00)
4 01700-01700.0730.00.00-PERF&PAYMENT BOND RFI 007,RFI 008,RFI 009 Material $94.00
5 01800-01800.0810.00.00-Cost of Risk RFI 007,RFI 008,RFI 009 Material $113.00
Grand Total: $0.00
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fart Worth Texas 76102 Saint Louis Missouri 63131-1802
8-30-2021 A S p pA- pin 8/30/21
SIGNATURE DATE SIGNATURE DATE SIdNATURO DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On: 8/30/2021 11 :12 AM
RFI #007
McCarthy Building Companies Inc. Project:002200.000-Harmon Road Improvements US 287/81 to Golden
12001 N Central Expressway Suite 400 Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone:(972)991-5500 Fort Worth,Texas 76177
Fire Hydrant Adjustment Due to Existing Field Conditions at STA
56+82
TO; Dana Shumard(Kimley-Horn and Associates Inc) FROM: Eric Klekar(McCarthy Building Companies
Kullen Ritter(Kimley-Horn and Associates Inc) Inc)
Nolan Pierce(Kimley-Horn and Associates Inc)
1341 N Rock Hill Road
St Louis, Missouri 63124
DATE INITIATED: 04/28/2021 STATUS: Closed on 05/06/21
LOCATION: DUE DATE: 05/05/2021
COST CODE: REFERENCE:
COST IMPACT: Yes(Unknown) SCHEDULE IMPACT:
DRAWING NUMBER: C13.10,C3.04 SPEC SECTION:
LINKED DRAWINGS: C3.04, C13.10
CRITICAL: Yes
RECEIVED FROM: Wes Lancaster(North Texas Contracting Inc)
COPIES TO:
JT Auldridge(City of Fort Worth Transportation Depar),Alejandra Ayala(City of Fort Worth Transportation Depar), Cesar De La O(McCarthy
Building Companies Inc), Riley Seahorn(McCarthy Building Companies Inc),Alejandro Velez(McCarthy Building Companies Inc)
Question .m Eric Klekar(McCarthy Building Companiesi on 04
Please refer to sheets C13.10,C3.04,and the attached markup
The Utility Adjustments,on sheet 13.10, indicate a fire hydrant and gate valve to tie into the 12"water line at STA 56+80.After excavating the 12"
waterline, it was discovered the waterline was capped immediately after the existing fire hydrant and 6"gate valve at STA 57+00.
McCarthy proposes the following options:
1. The fire hydrant and proposed gate valve can be installed at STA 57+00
2. The fire hydrant and proposed gate valve can be installed per the drawings with a 20'extension
3. The fire hydrant and proposed gate valve can be installed Plan South past the proposed retaining wall
• Please confirm how to proceed
Attachments:
RFI-007-Fire Hydrant Adjustment Due to Existing Field Conditions at STA 56+82(To AE).pdf
Official Response: Nolan Pierce(Kimley-Horn and Associates Inc)responded on Thursday, May 6th,2021 at 2:40PM CDT
Option#3 is preferred of proposed fire hydrant and gate valve to be shifted south(approx.25—30 LF from current proposed location)outside the
limits of the proposed retaining wall.Contractor shall be required to provide GPS as-built information at proposed connection and dead end in
accordance with City specifications.
Attachments:
All Replies:
McCarthy Holdings,Inc. Page 1 of 2 Printed On: 05/14/2021 09:52 AM
RFI #007
Responsei .
Option#3 is preferred of proposed fire hydrant and gate valve to be shifted south(approx.25—30 LF from current proposed location)outside the limits
of the proposed retaining wall.Contractor shall be required to provide GPS as-built information at proposed connection and dead end in accordance
with City specifications.
Attachments:
BY DATE COPIES TO
McCarthy Building Companies Inc. Page 2 of 2 Printed On:05/14/2021 09:52 AM
NORTH TEXAS CHANGE ORDER COST
NR#p
CHANGE DESCRIPTION:HARMON RD RFI#03
FH ADJUSTMENT AT STA 56+82 PER RFI 403
LABOR BREAKDOWNS 10 HOUR DAYS REGULAR REGULAR OT OT TOTAL
QTY DESCRIPTION HOURS RATES HOURS RATES AMOUNT
1 FOREMAN-UTILITY 6.0 $ 47.45 0.0 $ 71.18 $ 284.70
1 TRACKHOE OPERATOR-UTILITY 6.0 $ 25.75 0.0 $ 38.63 $ 154.50
1 LOADER OPERATOR-UTILITY 6.0 $ 24.50 0.0 $ 36.75 $ 147.00
1 PIPELAYER 6.0 $ 24.50 0.0 $ 36.75 $ 147.00
1 SKILLED WORKER-UTILITY 6.0 $ 21.50 0.0 $ 32.25 $ 129.00
2 SEMI SKILLED WORKER-UTILITY 12.0 $ 19.75 0.0 $ 29.63 $ 237.00
LABORSUBTOTALl$ 1,099.20
EQUIPMENT UNIT REGULAR REGULAR TOTAL
QTY DESCRIPTION HOURS RATES AMOUNT
1 COMPANY TRUCK SUPT,FOREMAN HR 6.0 $ 19.65 $ 117.90
1 KOMATSU 360 TRACKHOE HR 6.0 $ 152.62 $ 915.72
1 KOMATSU 320 WHEEL LOADER HR 6.0 $ 54.76 $ 328.56
1 WALK BEHIND COMPACTOR HR 6.0 $ 15.12 $ 90.72
1 CUT OFF SAW HR 6.0 $ 3.91 $ 23.46
EQUIPMENT SUBTOTALl 1$ 1,475.36
MATERIALS/MISCELL UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
12"0900 DR18 PVC PIPE LF 40 $ 19.41 $ 776.40
EMBEDMENT MATERIAL CY 12 $ 14.30 $ 171.60
MAXIMIZER CONCRETE EA 25 $ 10.45 $ 261.15
12"MJ PLUG EA 1 $ 52.00 $ 52.00
12"RESTRAINT&BOLT PACK EA 1 $ 107.81 $ 107.81
MATERIAL SUBTOTAL $ 1,368.96
SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
SUBCONTRACTSUBTOTAL $
TOTALS&MARK UP SUMMARY QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL
AMOUNT
BARE LABOR COST 1 LS $ 1,099.20 $ 1,09920
LABOR BURDENS 45% POT $ 1,099.20 $ 494.64
LABOR MARKUP 15% POT $ 1,099.20 $ 164.88
EQUIPMENT SUBTOTAL 1 LS $ 1,476.36 $ 1,476.36
EQUIPMENT MARKUP 15% POT $ 1,476.36 $ 221.45
MATERIALS SUBTOTAL 1 LS $ 1,368.96 $ 1,368.96
MATERIALS MARKUP 15% POT $ 1,368.96 $ 205.34
SUBCONTRACTOR SUBTOTAL 1 LS $ $
SUBCONTRACTOR MARKUP 5% POT I$ $
COSTTOTALl$ 5,030.84
NOTES
RFI #008
McCarthy Building Companies Inc. Project:002200.000-Harmon Road Improvements US 287/81 to Golden
12001 N Central Expressway Suite 400 Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone:(972)991-5500 Fort Worth,Texas 76177
Proposed Isolation Valve for Waterline C at STA 71+10
TO: Dana Shumard(Kimley-Horn and Associates Inc) FROM: Eric Klekar(McCarthy Building Companies
Kullen Ritter(Kimley-Horn and Associates Inc) Inc)
Nolan Pierce(Kimley-Horn and Associates Inc)
1341 N Rock Hill Road
St Louis, Missouri 63124
DATE INITIATED: 04/28/2021 STATUS: Closed on 05/06/21
LOCATION: DUE DATE: 05/05/2021
COST CODE: REFERENCE:
COST IMPACT: Yes(Unknown) SCHEDULE IMPACT:
DRAWING NUMBER: C13.30 SPEC SECTION:
LINKED DRAWINGS: C13.30
CRITICAL: Yes
RECEIVED FROM: Wes Lancaster(North Texas Contracting Inc)
COPIES TO:
JT Auldridge(City of Fort Worth Transportation Depar),Alejandra Ayala(City of Fort Worth Transportation Depar), Cesar De La O(McCarthy
Building Companies Inc), Riley Seahorn(McCarthy Building Companies Inc),Alejandro Velez(McCarthy Building Companies Inc)
Question from • . Companies Inc) at I 1 . PM on 04/28/2021
Please refer to C13.30 and the attached markup
After performing a test shutdown of Waterline C,the City of Fort Worth valve crew determined there is not an isolation valve in place that can be used
to isolate the line while keeping service to the affected businesses of CVS, USMD,and the Donut Shop.
North Texas Contracting proposes cutting in an isolation valve and MJ cap at STA 71+10 in order to isolate the waterline and keep service to the
businesses.
1. Please confirm this is acceptable
Attachments:
RFI-008-Proposed Isolation Valve for Waterline C at STA 71+10.pdf
Official Response: Nolan Pierce(Kimley-Horn and Associates Inc)responded on Thursday, May 6th,2021 at 2:41PM CDT
An isolation valve and MJ cap in order to in order waterline to service with businesses is acceptable.Place cut in valve further south in future central
island location approximately STA 70+75.
Attachments:
All Replies:
Response . •lan Pierce (Kimley-Horn and Associates1 on 05/06/2021
An isolation valve and MJ cap in order to in order waterline to service with businesses is acceptable. Place cut in valve further south in future central
island location approximately STA 70+75.
Attachments:
BY DATE COPIES TO
McCarthy Building Companies Inc. Page 1 of 1 Printed On:05/14/2021 09:51 AM
�V6*r NORTH TEXAS CHANGE ORDER COST
CHANGE DESCRIPTION:HARMON RD WATERLINE C VALVE ADJUSTMENT PER RFI#05
WL C VALVE ADJUSTMENT PER RFI#05
LABOR BREAKDOWNS 10 HOUR DAYS REGULAR REGULAR OT OT TOTAL
QTY DESCRIPTION HOURS RATES HOURS RATES AMOUNT
1 FOREMAN-UTILITY 4.0 $ 47.45 0.0 $ 71.18 $ 189.80
1 TRACKHOE OPERATOR-UTILITY 4.0 $ 25.75 0.0 $ 38.63 $ 103.00
1 LOADER OPERATOR-UTILITY 4.0 $ 24.50 0.0 $ 36.75 $ 98.00
1 PIPELAYER 4.0 $ 24.50 0.0 $ 36.75 $ 98.00
1 SKILLED WORKER-UTILITY 4.0 $ 21.50 0.0 $ 32.25 $ 86.00
2 SEMI SKILLED WORKER-UTILITY 8.0 $ 19.75 0.0 $ 29.63 $ 158.00
LABOR SUBTOTALI$ 732.80
EQUIPMENT UNIT REGULAR REGULAR TOTAL
QTY DESCRIPTION HOURS RATES AMOUNT
1 COMPANY TRUCK SUPT FOREMAN HR 4.0 $ 19.65 $ 78.60
0.5 KOMATSU 360 TRACKHOE HR 2.0 $ 152.62 $ 305.24
1 KOMATSU 320 WHEEL LOADER HR 4.0 $ 54.76 $ 219.04
0.5 WALK BEHIND COMPACTOR HR 2.0 $ 15.12 $ 30.24
1 POTHOLE VACTOR W/OPERATOR HR 1.0 $ 250.00 $ 250.00
EQUIPMENT SUBTOTAL $ 883.12
MATERIALS/MISCELL UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
12"MJ CAP EA 1 $ 52.00 $ 52.00
12"RESTRAINTS&BOLT PACKS EA 1 $ 107.81 $ 107.81
MATERIAL SUBTOTAL $ 159.81
SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
$
SUBCONTRACTSUBTOTAL $
TOTALS&MARK UP SUMMARY QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL
AMOUNT
BARE LABOR COST 1 LS $ 732.80 $ 732.80
LABOR BURDENS 45% POT $ 732.80 $ 329.76
LABOR MARKUP 15% POT $ 732.80 $ 109.92
EQUIPMENT SUBTOTAL 1 LS $ 883.12 $ 883.12
EQUIPMENT MARKUP 15% POT $ 883.12 $ 132.47
MATERIALS SUBTOTAL 1 LS $ 159.81 $ 159.81
MATERIALS MARKUP 15% POT $ 159.81 $ 23.97
SUBCONTRACTOR SUBTOTAL 1 LS $ $
SUBCONTRACTOR MARKUP 1 5% POT $ $
COST TOTAL $ 2,371.85
NOTES
RFI #009
McCarthy Building Companies Inc. Project:002200.000-Harmon Road Improvements US 287/81 to Golden
12001 N Central Expressway Suite 400 Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone:(972)991-5500 Fort Worth,Texas 76177
Proposed Isolation Valve for Waterline E at STA 0+10
TO: Dana Shumard(Kimley-Horn and Associates Inc) FROM: Eric Klekar(McCarthy Building Companies
Kullen Ritter(Kimley-Horn and Associates Inc) Inc)
Nolan Pierce(Kimley-Horn and Associates Inc)
1341 N Rock Hill Road
St Louis, Missouri 63124
DATE INITIATED: 04/28/2021 STATUS: Closed on 05/06/21
LOCATION: DUE DATE: 05/05/2021
COST CODE: REFERENCE:
COST IMPACT: Yes(Unknown) SCHEDULE IMPACT:
DRAWING NUMBER: C13.31 SPEC SECTION:
LINKED DRAWINGS: C13.31
CRITICAL: Yes
RECEIVED FROM: Wes Lancaster(North Texas Contracting Inc)
COPIES TO:
JT Auldridge(City of Fort Worth Transportation Depar),Alejandra Ayala(City of Fort Worth Transportation Depar), Cesar De La O(McCarthy
Building Companies Inc), Riley Seahorn(McCarthy Building Companies Inc),Alejandro Velez(McCarthy Building Companies Inc)
Question from • . Companies Inc) at I on 04/28/2021
Please refer to sheets C13.31 and the attached markup
After performing a test shut down of Waterline E,the City of Fort Worth valve crew determined there is not an isolation valve in place for the residential
area that can be used to isolate the line to keep service to the subdivision.
North Texas Contracting has proposed to cut an isolation valve per the attached markup, relocated from STA 00+10 in order to isolate Waterline E.
1. Please confirm this is acceptable
Attachments:
RFI-009-Proposed Isolation Valve for Waterline E at STA 0+10.pdf
Official Response: Nolan Pierce(Kimley-Horn and Associates Inc)responded on Thursday, May 6th,2021 at 2:39PM CDT
The relocation of proposed valve,as described, is acceptable.
Attachments:
All Replies:
Response . .lan Pierce (Kimley-Horn and Associates Inc) at 1 on 05/06/2021
The relocation of proposed valve,as described, is acceptable.
Attachments:
BY DATE COPIES TO
McCarthy Building Companies Inc. Page 1 of 1 Printed On:05/14/2021 09:50 AM
�V6*r NORTH TEXAS CHANGE ORDER COST
CHANGE DESCRIPTION:HARMON RD WATERLINE E VALVE ADJUSTMENT PER RFI#04
WL E VALVE ADJUSTMENT PER RFI#04
LABOR BREAKDOWNS 10 HOUR DAYS REGULAR REGULAR OT OT TOTAL
QTY DESCRIPTION HOURS RATES HOURS RATES AMOUNT
1 FOREMAN-UTILITY 8.0 $ 47.45 0.0 $ 71.18 $ 379.60
1 TRACKHOE OPERATOR-UTILITY 8.0 $ 25.75 0.0 $ 38.63 $ 206.00
1 LOADER OPERATOR-UTILITY 8.0 $ 24.50 0.0 $ 36.75 $ 196.00
1 PIPELAYER 8.0 $ 24.50 0.0 $ 36.75 $ 196.00
1 SKILLED WORKER-UTILITY 8.0 $ 21.50 0.0 $ 32.25 $ 172.00
2 SEMI SKILLED WORKER-UTILITY 16.0 $ 19.75 0.0 $ 29.63 $ 316.00
LABOR SUBTOTALI$ 1,465.60
EQUIPMENT UNIT REGULAR REGULAR TOTAL
QTY DESCRIPTION HOURS RATES AMOUNT
1 COMPANY TRUCK SUPT FOREMAN HR 8.0 $ 19.65 $ 157.20
0.5 KOMATSU 360 TRACKHOE HR 4.0 $ 152.62 $ 610.48
1 KOMATSU 320 WHEEL LOADER HR 8.0 $ 54.76 $ 438.08
0.5 WALK BEHIND COMPACTOR HR 4.0 $ 15.12 $ 60.48
1 POTHOLE VACTOR W/OPERATOR HR 2.5 $ 250.00 $ 625.00
EQUIPMENT SUBTOTAL $ 1,891.24
MATERIALS/MISCELL UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
8"SOLID SLEEVE EA 1 $ 95.01 $ 95.01
8"RESTRAINTS&BOLT PACKS EA 1 $ 73.07 $ 73.07
MATERIAL SUBTOTAL $ 168.08
SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
$
SUBCONTRACTSUBTOTAL $
TOTALS&MARK UP SUMMARY QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL
AMOUNT
BARE LABOR COST 1 LS $ 11465.60 $ 1,465.60
LABOR BURDENS 45% POT $ 1,465.60 $ 659.52
LABOR MARKUP 15% POT $ 1,465.60 $ 219.84
EQUIPMENT SUBTOTAL 1 LS $ 1,891.24 $ 1,891.24
EQUIPMENT MARKUP 15% POT $ 1,891.24 $ 283.69
MATERIALS SUBTOTAL 1 LS $ 168.08 $ 168.08
MATERIALS MARKUP 15% POT $ 168.08 $ 25.21
SUBCONTRACTOR SUBTOTAL 1 LS $ $
SUBCONTRACTOR MARKUP 5% POT $ $
COST TOTAL $ 4,713.18
NOTES
PCO #004
Project:002200.000-Harmon Road Improvements US 287/31 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #004: CE #004 - CE-004 - RFI 010 -
Sidewalk Conflict
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 004/0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Eric Klekar (McCarthy Building Companies
Inc)
STATUS: Ready for Review CREATED DATE: 5/26/2021
REFERENCE: PRIME CONTRACT #001 -Customer Allowance/Contingency
CHANGE ORDER: Request#001
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT: 0 days
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#004-CE-004-RFI 010-Sidewalk Conflict
CHANGE REASON: Field Condition
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#004-CE-004-RFI 010-Sidewalk Conflict
DESCRIPTION OF PROPOSED CHANGE:
CE-004-RFI 010-Sidewalk Conflict
SCOPE:
While laying out the proposed sidewalk at the north end of Heritage Trace Parkway, it was discovered the elevation change at the existing landscaping
would require a retaining wall for the earthwork in this area.The A/E team confirmed a 71'x 3'retaining wall would be built in this area due to the
elevation change.
REFERENCE:
Please refer to the attached pricing from MBC.
ATTACHMENTS:
RFI-010 Sidewalk Conflict Pricing.pdf
# Cost Code Description Type Amount
1 31010-31010.0028.00.00-WC 1 EARTHWORKANALLS CE-004-RFI 010-Sidewalk Conflict Subcontracts $40,504.00
2 01900-01900.0910.00.00-INITIAL MARKUP CE-004-RFI 010-Sidewalk Conflict Fee $2,658.00
3 01900-01900.0955.00.00-CONTINGENCY CE-004-RFI 010-Sidewalk Conflict Material $2,157.00
4 10000-10000.0141.00.00-CONSTRUCTION ALLOW CE-004-RFI 010-Sidewalk Conflict Allowances $(46,011.00)
5 01700-01700.0730.00.00-PERF&PAYMENT BOND CE-004-RFI 010-Sidewalk Conflict Material $315.00
McCarthy Building Companies Inc. page 1 of 2 Printed On:8/30/2021 11 :12 AM
PCO #003
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fart Worth,Texas 76177
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth Texas 76102 Saint Louis Missouri 63131-1802
8-30-2021 SQOI tP7-7R 8/30/21
SIGNATURE DATE SIGNATURE DATE SIGNATUF#i DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:5/26/2021 08:32 AM
RFI #010
McCarthy Building Companies Inc. Project:002200.000-Harmon Road Improvements US 287/81 to Golden
12001 N Central Expressway Suite 400 Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone:(972)991-5500 Fort Worth,Texas 76177
Sidewalk Conflict with Existing Landscaping at NE Corner of Heritage
Trace
TO; Dana Shumard(Kimley-Horn and Associates Inc) FROM: Eric Klekar(McCarthy Building Companies
Kullen Ritter(Kimley-Horn and Associates Inc) Inc)
Nolan Pierce(Kimley-Horn and Associates Inc)
1341 N Rock Hill Road
St Louis, Missouri 63124
DATE INITIATED: 04/29/2021 STATUS: Closed on 05/11/21
LOCATION: DUE DATE: 05/06/2021
COST CODE: REFERENCE:
COST IMPACT: TBD SCHEDULE IMPACT:
DRAWING NUMBER: C8.03 SPEC SECTION:
LINKED DRAWINGS: C8.03
CRITICAL: No
RECEIVED FROM:
COPIES TO:
JT Auldridge(City of Fort Worth Transportation Depar),Alejandra Ayala(City of Fort Worth Transportation Depar), Cesar De La O(McCarthy
Building Companies Inc), Riley Seahorn(McCarthy Building Companies Inc),Alejandro Velez(McCarthy Building Companies Inc)
Question .m Eric Klekar(McCarthy Building Companiesi - on 04
Please refer to the attached markup for additional information
The Heritage Trace Paving Plan,on sheet C8.03, indicates 10'sidewalks to be installed on the Northeast corner of Heritage Trace Parkway.
The MBC team laid out the future sidewalk and discovered at STA 403+00 the sidewalk would be in conflict with existing landscaping. Due to elevation
changes,this area will also require a retaining wall.
1. Please confirm how to proceed
Attachments:
RFI-010-Sidewalk Conflict with Existing Landscaping at NE Corner of Heritage Trace(To AE).pdf
Official Response: Nolan Pierce(Kimley-Horn and Associates Inc)responded on Tuesday, May 11th, 2021 at 10:55AM CDT
The landscaping that will need to be re-established due to the sidewalk and grading and will be covered under the Landscaping Restoration Allowance
Bid item.
Agree, a wall is needed due to the elevation difference from the proposed sidewalk to existing ground at ROW adjacent to the monument and
landscaping.See attached Revised Sheet C8.03 for the wall limits and typical section.
Attachments:
CPN 100459-Harmon Road Improvements-C8.03-Revised.pdf
All Replies:
McCarthy Holdings,Inc. Page 1 of 2 Printed On: 05/14/2021 09:47 AM
RFI #010
The landscaping that will need to be re-established due to the sidewalk and grading and will be covered under the Landscaping Restoration Allowance
Bid item.
Agree, a wall is needed due to the elevation difference from the proposed sidewalk to existing ground at ROW adjacent to the monument and
landscaping.See attached Revised Sheet C8.03 for the wall limits and typical section.
Attachments:
CPN 100459-Harman Road Improvements-C8.03-Revised.pdf
BY DATE COPIES TO
McCarthy Building Companies Inc. Page 2 of 2 Printed On:05/14/2021 09:47 AM
f0 f0 N
N N N LO
M � O
J F �
N---
J
H
H
w w E
U � `
— c a
r Z m
- N
�w
N
U ———————————————
w p m m a r o o r
F m�
LL' N
�y
W� ti ti ti ti ti ��
O
U N
O O O O m 0 0
JJJ1 J—JJJJJJ— J n
ti ti ti .ti ti
O O O O m 0 0
N n
e e e e m e e
w
F
� m Q
O O N
O J
O
F
2
0 U Q J U J N Q Q Q Q Q Q Q Q Q O Q a N Q Q
T
Q
E
m N n m
c o o c v 3 m e
w U
E Y Y
W — v v -
v m u U o.
U
10o `x
^+ V'o� E qn E,x
!`S• C7'u ii y n A � � � U y F LL rc w 0�