Loading...
HomeMy WebLinkAbout2020/12/01-Attachments-Resolution_Las_Vegas_Trail(final11.12.20).PDFA Resolution NO. A RESOLUTION AUTHORIZING THE EXECUTION OF AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN THE APPROXIMATE AMOUNT OF $328,563.00, OF WHICH CITY PARTICIPATION IS APPROXIMATELY $315,003.00, FOR PRELIMINARY ENGINEERING AND ENVIRONMENTAL SERVICES TO WIDEN LAS VEGAS TRAIL FROM TWO LANES TO FOUR LANES FROM INTERSTATE HIGHWAY 820 TO APPROXIMATELY QUEBEC DRIVE WHEREAS, federal law establishes federally funded programs for transportation improvements to implement its public purposes, and WHEREAS, the Texas Transportation Code, Section 201.103 establishes that the State shall design, construct and operate a system of highways in cooperation with local governments, and Section 222.052 authorizes the Texas Transportation Commission to accept contributions from political subdivisions for development and construction of public roads and the state highway system within the political subdivision, and WHEREAS, federal and state laws require local governments to meet certain contract standards relating to the management and administration of State and federal funds, and WHEREAS, the Texas Transportation Commission has codified 43 TAC, Rules 15.50-15.56 that describe federal, state, and local responsibilities for cost participation in highway improvement and other transportation projects, and WHEREAS, the Texas Transportation Commission passed Minute Order Number 115814 authorizing the State to undertake and complete a highway improvement or other transportation project generally described as construct new roadway lanes; and WHEREAS, the City of Fort Worth identified the need to widen Las Vegas Trail from IH 820 to approximately Quebec Drive with intersection, traffic signal, pedestrian and stormwater channel improvements; and WHEREAS, the City of Fort Worth and Texas Department of Transportation have negotiated terms of an Advance Funding Agreement in the approximate amount of $328,563.00, of which City of Fort Worth participation is approximately $315,003.00 for preliminary engineering and environmental services to widen Las Vegas Trail from two lanes to four lanes from Interstate Highway 820 to approximately Quebec Drive, to include intersection, traffic signal, sidewalk, and stormwater channel improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: The City Manager is hereby authorized to execute an Advance Funding Agreement with the Texas Department of Transportation (CSJ: 0902-90-176) in the approximate amount of $328,563.00, of which City participation is approximately $315,003.00, for preliminary engineering and environmental services to widen Las Vegas Trail from two lanes to four lanes from Interstate Highway 820 to approximately Quebec Drive, to include intersection, traffic signal, sidewalk, and stormwater channel improvements. Adopted this ______day of ATTEST: Mary Kayser, City Secretary 2020.