Loading...
HomeMy WebLinkAbout(0108) 100453 Impact Fee Request-signed.pg.pdfFORTWORTH. Routing and Transmittal Slip Transportation & Public Works Deporrtmeut DOCUMENT TITLE: N Riverside Dr — Shiver Rd L® N. Tarim, ntr Amy - Ilrl pact Pee Request M&C: NA CPN: 100453 CSO: NA DOC#: 1 Date: To: Name Department Initials Date Out l . Bradley Radovich TPW-Review B Dec 8, 2020 2. Raul Lopez TPW -initials Dec 8, 2020 3. Leo Mantey D Services -Initials Dec 8, 2020 4. Miriam Spencer D Services -Initials Dec 9, 2020 4. Lauren Prieur TPW-signature ZZF Dec 9, 2020 5. Monty Hall TPW - signature L Dec 9, 2020 6. Jennifer Roberts D. Services. —Sig. Dec 9, 2020 DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ❑YES ®No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: bradley.radovich(cr�,FortWorthTexas. ov at ext. 7817 for pick up when completed. Thank you! FORTWORTH. Transportation and Public Works Impact Fee Request Form City Project Manager: Bradley Radovich City Project # 100453 Project Name Service Project # Revenues Revenues Area Requested Approved N Riverside Drive, Shiver Rd to N. Tarrant p p_28 $2,100,000 Pkwy Project Limits Scope — Capacity Improvements North Riverside Drive from approximately Shiver Rd on Reconstruction of N Riverside Drive from the the north, extending south to and through the Roundabout at Shiver Rd to and including the intersection at N. Tarrant Pkwy. intersection of N Tarrant Pkwy, improving the asphalt two lane road to a four lane divided arterial including sidewalks and a signalized intersection with dedicated right and left turn lanes and ADA compliant facilities. TPW Capital Delivery Division Lauren Prieur, Assistant Director LGiW911 /R_/�Ay Lauren Prieur (Dec 9, 2020 09:37 CST) TPW Business Support Division Monty Hall, Assistant Director Date Dec 9, 2020 Date Dec 9, 2020 Development Services Department Jennifer Roberts - Assistant Director, Development Coordination Date .0. JOTrTer Rob is ID;, 9, 2o� Dec 9, 2020 TPW-IFRF Rev. 2.0 07Feb2020 xc: Bradley Radovich Raul Lopez TPW-IFRF Rev. 2.0 07Feb2020 FORT WORTH NNW. "'*� M 9 0 0 0 -0.60 0 mom Transportation Impact Fee Proiect Summary Date: 2/6/2020 Project Name: N Riverside Dr - Shiver Rd to N Tarrant Pkwy City Project Number: 100453 Impact Fee Service Area: D Scoper- Project Reconstruction of N Riverside Drive from the Roundabout at Shiver Road to and including the intersection of N Tarrant Pkwy, improving the asphalt two lane road to a four lane divided arterial including sidewalks and a signalized intersection with dedicated right and left turn lanes and ADA compliant crosswalks. Total Project Budget Estimate $ 7,132,000 Design Engineer $ 1,100,000 ROW $ - Construction I $ 6,487,200 Total Impact Fee Eligible Expenditures $ 7,587,200 Project Map 4-� -.: E N E Fk tA. L '.14F t=! FZ T H Cj F is1 LLI y, r Lam• I _ rZi GO QJG- LL, C} Ili J �_ r D 7 � �� G- � CC C:- LCkSSENBEF:FZY ST G 1 V c -� N C-j -- r � � G Ehl7JE non; Lu � U—i li t/J S1 1r u