Loading...
HomeMy WebLinkAbout(0008) M&C 21-0205City of Fort Worth, Texas Mayor and Council Communication DATE: 03/23/21 M&C FILE NUMBER: M&C 21-0205 LOG NAME: 2020TEMPORARY CLOSURE OF A SECTION OF SUMMERFIELDS BOULEVARD SUBJECT (CD 4) Authorize the Temporary Closure of Summerfields Boulevard between North Riverside Drive and Carolina Entrada Street from March 24, 2021 to April 20, 2021 for Construction Activities RECOMMENDATION: It is recommended that the City Council authorize the temporary closure of Summerfields Boulevard between North Riverside Drive and Carolina Entrada Street from March 24, 2021 to April 20, 2021 for construction activities. DISCUSSION: The City of Fort Worth Transportation and Public Works Department (TPW) requests the temporary closure of a section of Summerfields Boulevard to expedite roundabout construction. The two existing eastbound lanes have long been used for both eastbound and westbound traffic operations. Westbound lanes of Summerfields Boulevard in this section are presently under construction and should be completed to coincide with the opening of the roundabout at North Riverside Drive and Summerfields Boulevard. The Thompson Road roundabout is completed with Thompson Road presently open and available for detour. Approving this closure request will expedite the completion time of the project by eliminating an entire construction sub -phase. Given the scope of work, the closure is necessitated in the interest of public safety. Traffic control plans for this project have been previously accepted. A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that approval of this recommendation will have no material effect on City funds. Submitted for City Manager's Office by. Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Tanya Brooks 7861