Loading...
HomeMy WebLinkAbout(0072) change order no 1.pdfDEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: SOUTHGATE OFFSITE 16"/24" WATER LINE IMPROVEMENTS CHANGE CONTRACT. Water ORDER No.- CFA# NIA CITY PARTICIPATION: YES CITY PROJECT # 101541 CITY SECRETARY CONTRACT # NtA WATER PROJECT # 56008-0600430-101541-001480 SEWER PROJECT # NIA FILE # X-26 .78 INSPECTOR: Matthew Wilson Phone No: 817-392-8306 PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 CONTRACT UNIT WATER CONTRACT DAYS Developer Cost City Cast ORIGINAL CONTRACT $1,590,794.00 $2,445,831.00 0 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $1,590,794.00 $2,445,831.00 0 AMOUNT OF PROP. CHANGE ORDER $232,822.00 $132,149.50 REVISED CONTRACT AMOUNT $1,823,616.00 $2,577,980.50 0 TOTAL REVISED CONTRACT AMOUNT PER UNIT $4,401,596.50 REVISED COST SHARE Dev. Cost: 51,823,616A0 City Cost $2,677,980.50 TOTAL REVISED CONTRACT $4,401,596.50 Revised: 12-17-2018 Page 1 You are directed to make the failoWna chances in the contract documents: PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL Unit I: Developer Items 11 3312.3003 1 EA 8" GATE VALVE $2,252.00 $2,252.00 12 3312.3C05 2 EA 12" GATE VALVE $3,735.00 $7,470.00 13 3312.3006 6 EA 16" GATE VALVE $19,757.00 $118,542.00 19 3305.1105 45 LF 30" THICK STEEL ENCASEMENT 318 WALL THICKNESS) $700.00 $31.500.00 32 -1460 LF SILT FENCE $1.50 -$2,190.00 33 -7 EA INLET PROTECTION $84.00 -$588.00 34 -1 EA ROCK CHECK DAM $500.00 -$500.00 35 -60 LF SAFETY FENCE $1.50 -$90.00 41 3292.04 1391 SY HYDROMULCH $1.00 $1,391.00 45 1.7805 LS RAILROAD Fs_AGGER AND COORDINATION ALLOWANCE $10.000.00 $17.805,00 47 -500 LF TEMPORARY ASPHALT PAVING REPAIR ALLOWANCE $15.0C -$7,500.00 Developer Water Subtotal $168,092.00 48 3213,0101 256 LF 6" CONCRETE INTEGRAL CURB AND GUTTER $40.00 $10,240.00 49 3213.0401 110 SY 6" THICK REINFORCED CONCRETE DRIVE APPROACH $122.00 $13.420.00 50 3214.0401 159 SY REINFORCED CONCRETE PARKING LOT PAVING $140.00 $22,260.00 52 3213.0311 162 SY 4" CONCRETE SIDEWALK $80.00 $12,960.00 53 3214.0311 2 EA REMOVE AND REPLACE CONCRETE BARRIER FREE RAMP $2,925.00 $5.850.00 Developer Paving Subtotal $64,730.00 DEVELOPER TOTAL $232,822.00 Unit ]I: Public Items 2 3311.0461 60 LF 12" C900 PVC DR-14 PIPE $86.00 $5.160.00 4 3311.0661 61 LF 24" C900 PVC DR-18 PIPE $130.00 $7,930.00 7 3311.0651 -61 LF 24" DUCTILE IRON PIPE $188.00 -$11,468.00 11 3312.3006 3 EA 16" GATE VALVE $20,474.00 $61,422.00 17 3305.1105 20 LF 30" THICK STEEL ENCASEMENT (318 WALL THICKNESS) $736.00 $14,720,00 22 3312.0105 1 EA CONNECTION TO EXISTING MAIN $8,130.00 $8,130.0C 25 -8845 LF SILT FENCE $1.50 1 -$13,267.50 27 -5 EA INLET PROTECTION $80.00 -S400.00 28 -6 EA ROCK CHECK DAM $500.00 -$4,000.00 29 -72 LF SAFETY FENCE $1.50 -$108.00 37 3292.04 43600 SY HYDROMULCH $1.00 $43,60C.00 39 1.7805 LS RAILROAD FLAGGER AND COORDINATION (ALLOWANCE $10.000.00 $17.805.00 41 -500 LF TEMPORARY ASPHALT PAVING REPAIR ALLOWANCE $15.00 -$7,500.00 Public Water Subtotal $122,023.50 49 83 SY 6" THICK REINFORCED CONCRETE DRIVE APPROACH $122.00 $10,126.00 Public Paving Subtotal $10,126.00 TOTAL $132,149-50 GRAND TOTAL 1 $364,971,50 .asceresx t-) inmcazes New ray iiem Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Change order to reconcile actual quantities installed in the field in accordance with modifications directed by me City during construction. RECOMMENDED: APPROVED: Consultant Developer J Contractor Name: Clint A. Bissett, PE Name: C�1u� 0144 Name: yi 5 t �y✓ Title: Project Manager Title:y1 Title: .9�- MAIL APPROVAL RECOMMENDED: APPROVED: CFW - Sponsoring Department By: Name: Title: RECOMMENDED: CFW - 'Contract Compliance Manager By: Name: Title: M&C Number: K&C Date Approved: Dec. 3, 2019 CFW - Assistant City Manager By: Name: Title: APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney Bv: Name: Title: Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. p There are NO City Funds associated with this Contract (D There are City Funds associated with this Contract Revised: 12-17-2018 Page 3