HomeMy WebLinkAbout(0072) change order no 1.pdfDEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
SOUTHGATE OFFSITE 16"/24" WATER LINE IMPROVEMENTS
CHANGE
CONTRACT.
Water
ORDER No.-
CFA#
NIA CITY PARTICIPATION: YES
CITY PROJECT #
101541
CITY SECRETARY CONTRACT #
NtA
WATER PROJECT #
56008-0600430-101541-001480
SEWER PROJECT #
NIA
FILE #
X-26 .78
INSPECTOR: Matthew Wilson Phone No: 817-392-8306
PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872
CONTRACT UNIT
WATER
CONTRACT
DAYS
Developer Cost
City Cast
ORIGINAL CONTRACT
$1,590,794.00
$2,445,831.00
0
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$1,590,794.00
$2,445,831.00
0
AMOUNT OF PROP. CHANGE ORDER
$232,822.00
$132,149.50
REVISED CONTRACT AMOUNT
$1,823,616.00
$2,577,980.50
0
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$4,401,596.50
REVISED COST SHARE
Dev. Cost: 51,823,616A0 City Cost $2,677,980.50
TOTAL REVISED CONTRACT
$4,401,596.50
Revised: 12-17-2018 Page 1
You are directed to make the failoWna chances in the contract documents:
PAY ITEM #
CITY BID ITEM #
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
Unit I: Developer Items
11
3312.3003
1
EA
8" GATE VALVE
$2,252.00
$2,252.00
12
3312.3C05
2
EA
12" GATE VALVE
$3,735.00
$7,470.00
13
3312.3006
6
EA
16" GATE VALVE
$19,757.00
$118,542.00
19
3305.1105
45
LF
30" THICK STEEL ENCASEMENT 318 WALL THICKNESS)
$700.00
$31.500.00
32
-1460
LF
SILT FENCE
$1.50
-$2,190.00
33
-7
EA
INLET PROTECTION
$84.00
-$588.00
34
-1
EA
ROCK CHECK DAM
$500.00
-$500.00
35
-60
LF
SAFETY FENCE
$1.50
-$90.00
41
3292.04
1391
SY
HYDROMULCH
$1.00
$1,391.00
45
1.7805
LS
RAILROAD Fs_AGGER AND COORDINATION ALLOWANCE
$10.000.00
$17.805,00
47
-500
LF
TEMPORARY ASPHALT PAVING REPAIR ALLOWANCE
$15.0C
-$7,500.00
Developer Water Subtotal
$168,092.00
48
3213,0101
256
LF
6" CONCRETE INTEGRAL CURB AND GUTTER
$40.00
$10,240.00
49
3213.0401
110
SY
6" THICK REINFORCED CONCRETE DRIVE APPROACH
$122.00
$13.420.00
50
3214.0401
159
SY
REINFORCED CONCRETE PARKING LOT PAVING
$140.00
$22,260.00
52
3213.0311
162
SY
4" CONCRETE SIDEWALK
$80.00
$12,960.00
53
3214.0311
2
EA
REMOVE AND REPLACE CONCRETE BARRIER FREE RAMP
$2,925.00
$5.850.00
Developer Paving Subtotal
$64,730.00
DEVELOPER TOTAL
$232,822.00
Unit ]I: Public Items
2
3311.0461
60
LF
12" C900 PVC DR-14 PIPE
$86.00
$5.160.00
4
3311.0661
61
LF
24" C900 PVC DR-18 PIPE
$130.00
$7,930.00
7
3311.0651
-61
LF
24" DUCTILE IRON PIPE
$188.00
-$11,468.00
11
3312.3006
3
EA
16" GATE VALVE
$20,474.00
$61,422.00
17
3305.1105
20
LF
30" THICK STEEL ENCASEMENT (318 WALL THICKNESS)
$736.00
$14,720,00
22
3312.0105
1
EA
CONNECTION TO EXISTING MAIN
$8,130.00
$8,130.0C
25
-8845
LF
SILT FENCE
$1.50
1 -$13,267.50
27
-5
EA
INLET PROTECTION
$80.00
-S400.00
28
-6
EA
ROCK CHECK DAM
$500.00
-$4,000.00
29
-72
LF
SAFETY FENCE
$1.50
-$108.00
37
3292.04
43600
SY
HYDROMULCH
$1.00
$43,60C.00
39
1.7805
LS
RAILROAD FLAGGER AND COORDINATION (ALLOWANCE
$10.000.00
$17.805.00
41
-500
LF
TEMPORARY ASPHALT PAVING REPAIR ALLOWANCE
$15.00
-$7,500.00
Public Water Subtotal
$122,023.50
49
83
SY
6" THICK REINFORCED CONCRETE DRIVE APPROACH
$122.00
$10,126.00
Public Paving Subtotal
$10,126.00
TOTAL
$132,149-50
GRAND TOTAL
1 $364,971,50
.asceresx t-) inmcazes New ray iiem
Revised: 12-17-2018 Page 2
REASONS FOR CHANGE ORDER
Change order to reconcile actual quantities installed in the field in accordance with modifications directed by me City during construction.
RECOMMENDED:
APPROVED:
Consultant Developer J Contractor
Name: Clint A. Bissett, PE Name: C�1u� 0144 Name: yi 5 t �y✓
Title: Project Manager Title:y1 Title: .9�- MAIL
APPROVAL RECOMMENDED: APPROVED:
CFW - Sponsoring Department
By:
Name:
Title:
RECOMMENDED:
CFW - 'Contract Compliance Manager
By:
Name:
Title:
M&C Number:
K&C Date Approved: Dec. 3, 2019
CFW - Assistant City Manager
By:
Name:
Title:
APPROVED AS TO FORM AND LEGALITY:
CFW - Assistant City Attorney
Bv:
Name:
Title:
Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
p There are NO City Funds associated with this Contract
(D There are City Funds associated with this Contract
Revised: 12-17-2018 Page 3