Loading...
HomeMy WebLinkAboutResolution 4151-11-2012A Resolution NO. 4151 -11 -2012 A RESOLUTION AUTHORIZING EXECUTION OF A LOCAL PROJECT ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN AN AMOUNT NOT TO EXCEED $15,908,644.00 TO CONSTRUCT THE NORTH RIVERSIDE DRIVE BRIDGE OVER IH -820 WHEREAS, a Master Funding Agreement between the City of Fort Worth and the Texas Department of Transportation ( "State ") has been adopted and states the general terms and conditions for transportation projects developed through a Local Project Advance Funding Agreement ( LPAFA); and WHEREAS, the Texas Transportation Commission passed Minute Orders Numbered 111335 dated April 24, 2008, 111552 dated October 30, 2008 and 110266 dated October 27, 2005 that collectively authorize the State to undertake and complete a highway improvement generally described as an underpass bridge located at N. Riverside Drive and IH -820 comprised of two northbound lanes, two southbound lanes and sidewalks on both sides by change order to North Tarrant Express (NTE) Project CSJ: 0008 -14 -059; and WHEREAS, on September 11, 2012, the City of Fort Worth adopted Resolution No. 4125 -09- 2012 authorizing a LPAFA and funding in the amount of $13,200,000.00 with the State for design and construction of the North Riverside Drive Bridge over IH -820; and WHEREAS, the City, the State and its partners, prior to executing the LPAFA, continued negotiations for additional project related work and funding of related expenses in the amount of $2,708,644.00; and WHEREAS, the City of Fort Worth desires to enter into a Local Project Advance Funding Agreement with the Texas Department of Transportation for design, construction, and warranty of the North Riverside Bridge over IH -820 for the revised total amount of $15,908,644.00. ORT WORT Resolution No. 4151 -11 -20.12 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: The City Manager or his designee is authorized to execute a Local Project AdvanceFunding Agreement with the Texas Department of Transportation in an amount not to exceed $15,908,644.00 ($13,200,000.00 per Resolution 4125-09-2012 and $2,708,644.00 per this Resolution) for the design and construction of the N. Riverside Bridge over IH-820. Adopted this 12"' day of November, 2012, 4a eic)R ATTEST:, B y. "o 0 Mary Ka se ity Secretary 0000000 it� a--%f &T ,y .q.RJT City of Fort Worth, Texas 0�@0 ~0 �N N�Na��»�r a���� N_��0N��c0N Communication SUBJECT: COUNCIL ACTION: Approved on 11/12/2012 - Resolution No. 4151-11-2012 DATE: Monday, November 12, 2012 REFERENCE NO.: C-25978 LOG NAME: 20RIVERSIDE DRIVE BRIDGE OVER IH 820 AMEND-1 Adopt Resolution Authorizing o Local Project Advance Funding Agreement with the Texas Department of Transportation in an Amount Not to Exceed $15,908,644.00 for Design and Construction of the North Riverside Drive Bridge Over Interstate Highway 820 (COUNCIL DISTRICT 4) It is recommended that the City Council: 1. Adopt 8 Resolution authorizing local project advance funding Agreement with the Texas Department Oy Transportation iD@D amount not b]exceed $15.9O8.O44.0O for design and construction Df the North Riverside Drive Bridge over Interstate Highway 02O;and 2. Authorize an additional payment to Texas Department of Transportation in the amount not to exceed $2.708.644.00 for [8V\Sed total cost Of$15,9OR.O44.O0 for the design and construction of the North Riverside Drive Bridge over Interstate Highway 820. DISCUSSION: OO September 11.2013./M&C C-2582O\ the City Council passed Resolution No. 4125-O8-2012and authorized execution of a Local Project AdYaOceFuOdi0gAOr8eDleOt(LPAFA)VVithTX[)OTiDOOan0OuDt not k} exceed $13'2OO.0}O.OU. The LPAFA allows the Texas Department Of Transportation /Tx[J[>T\b} COnSt[ULt the four lane North Riverside Drive Bridge over Interstate Highway /|H-820\. This project VVaS included in the 2008 Bond Program and will be executed by TxDOT through its Comprehensive Development Agreement /CDA\ project Unde[contn8[tVvithNOrthT8r[aDtExpress Mobility Partners, LL{| (NTEyWP). NTEyNP is the DVer8|| developer for the |H-820 corridor improvements. In addition to design and construction, NTEMP will provide a warranty on the bridge deck through the duration of its contract with T)(0(]Tvvhich will extend for 52 years from the date of completion. Estimated start Ofconstruction is December 2012. ASaresult of further negotiations and final design development, and prior tO the LPAFA being executed, 8D additional $3.708.O44DOiS required for utility relocation, mitigating local access conflicts, and bridge warranty costs for 52 years. This increases the not iO exceed amount h}$15,9O8.O44.0O and represents 8 hJt8\ cost delivery of this project. CERTIFICATION: This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION / The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated in the Street Improvements 2008 Fund. [&gnume: 2ARlVBRSlDB DRIVE BRIDGE OVER {B020 AMEND-] Page ]of2 FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: FROM FundlAccount/Centers C204 104000 000000181200 Fernando Costa (6122) Douglas W. Wiersig (7801) Dennis Ingram (2294) $2,708,644.00 Lognarne: 20RIVERSIDE DRIVE BRIDGE OVER IH 820 AMEND-I Page 2 of 2