WHEREAS, the City of Fort Worth (City) and DMJM Aviation, Inc (Engineer)
made and entered into City Secretary Contract No. 36316 (the Contract) which was
authorized by the City Council by M&C C- 22531 on the 27th day of November, 2007;
and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Service For:
Phase 6 Under On-Cali Engineering Services Contract for Design of Airfield
Signs, Airport Beacon Relocation, Airfield Lighting Control and Monitoring
System and Construction Phase Services for Projects at Fort Worth Alliance
Airport, Contract No. 36316.
WHEREAS, it has become necessary to execute Amendment No. 3 to said
Contract to change Engineer to AECOM USA Group, Inc.;
WHEREAS, it has become necessary to execute Amendment No. 3 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Engineer is changed from DMJM Aviation, Inc. to AECOM USA Group, Inc.
2.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated May 11, 2009, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be perfonned by Mas-
Tek Engineering & Associates, Inc. totals $ 5,846.00 with a Not To Exceed ailnotint of
$71000.00. Y-'lei.'�Y••?•J'y.11Li LJAL4R'T HY.+"R+M n '"
L'HECORD
I
I 111
9 WORTHY`T' �
tt>� r
3.
Article II of the Contract is amejided to Provide for an increase in the nnaxiinum
fee to be Paid to Engineer for all work acid services perforined under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sun of$177,998.55.
4.
All other Provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the VA� day of 3 2009
Fort worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
R
•
Kenneth L. Penny, A.A.E. T. M. Higgins
Airport System Director Assistant City Manager
AECOM USA Group, Inc. ATTEST:
ENGINEER
s
w Marty Hendri City Secretary
By:
J y e tan, P.E. Authorization:
_ Date: wu. .,..�..
F
APPROVED AS TO FORM AND LEGALITY:
{
RECORD
a
Aizy Ramsey `*�l croYSECWARY
Assistant City Attorney
TX i
F
' -.....:'x; '�'7.'�40«-s..pr{OC7t0:•WRrrnn.... t
4*1 4
i r
MAs-TEK Engineering
& Associates, Inc.
May 13, 2009
Mr. Larry Gaines, P.E.
AECOM Transportation
1200 Summit Avenue, Suite 320
Fort Worth, Texas 76102
Re: CMT Testing Proposal
Fort Worth Alliance Airport
Miscellaneous Electrical Improvements
Fort North, Texas
Mas-Tek Proposal No. 5-02-C (Rz v i_e-3)
Mas-Tek Engineering & Associates is delighted to submit this
Estimated proposal for the following Construction Material
Testing Services on the above referenced project:
• Structural Foundation and Civil backfill Testing
• Drilled Pier Inspections & Testing
• Concrete Testing & Reinforcing Inspections
Total "NTE" Amount-----------$7 , 000 . 00
We appreciate the opportunity to serve you_ If you have any
questions please contact our office.
Sincerely yours,
Mas-Tek Engineering & Assoc. , INC.
r-,
anon Cotton Jr. OFFi ,RECORD'
Director of Operations/Sr. P.M.
'"ITY% "
<.. WORTH.,TY t
Attachment: Schedule of Fees
Geotechnical Consulting & Materials Testing
5132 Sharp Street Dallas,Texas 75247 972 709-7384
1
MAS-TEK Engineering
&Associates,Inc.
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING&TESTING
Fort Worth Alliance Airport Misc.Elect Improvements,Ft Worth,Texas MTE PROPOSAL NO.:5-0_2-C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
A. STRUCTURAL FOUNDATION AND CIVIL BACK FILL TESTING&INSPECTION
- Moisture/Density Relationship of Soils(ASTM D-698) 3 @ $153.00 each $465.00
-Atterberg Limits 3 @ $45.00 each $135.00
* Field Gradations 4 @ $15.00 each $60.00
Lime Depth Test 4 @ $15.00 each $60.00
- In-Place Density Test*(ASTM D2922) 25 @ $20.00 each $500.00
-Sr.Engineering Tech to perform testing Inspection 32 @ $39.50 hour $1,264.00
- Project Manager(Qa/Qc) 4 @ $75.00 hour $300.00
-Trip Charge 8 @ $30.00 trip $240.00
Sub-Total $3024.00
B. DRILLED SHAFT INSPECTION&TESTING
* Full Time Eng.Technician for 1 days of drilling 8 @ $39.50 hour $316.00
- Concrete Test Cylinders(4 cyi.per day) 4 @ $15.00 each $60.00
- Geotechnical Project Manager(QA/QC) 4 c@ $95.00 hour $380.00
-Project Manager(Qa/Qc) 2 @ $75.00 hour $150.00
-Trip Charge 2 @ $30.00 trip $60.00
Sub-Total $966.00
C. CONCRETE&REINFORCING TESTING&INSPECTION
Sr.Engineering Tech to perform Concrete testing 20 @ $39.50 hour $790.00
Sr.Engineering Tech to perform Prepour Inspections 8 @ $39.50 hour $316.00
Concrete Cylinders(4 per set) 20 @ $15.00 each $300.00
- Project Manager(Qa/Qc) 4 @ $75.00 hour $300.00
-Trip Charge 5 @ $30.00 trip $150.00
Sub-Total $1,856.00
ESTIMATED TOTAL $5,846.00
NOTES:
1. All laboratory test fees are F.O.B.our laboratory,additional charge for sample pickup may apply.
2. Any additional tests will be billed on a hourly rate and charged at the applicable rate,portal-to-portal.
3. Additional test not specitied in this proposal will tie quoted upon request at the above unit rates.