HomeMy WebLinkAbout(0039) M&C 21-0559City of Fort Worth, Mayor and DATE: 08/10/21 Texas Council Communication LOG NAME: 60SSRC110-MULTATECH SUBJECT M&C FILE NUMBER: M&C 21-0559 (CD 3 and CD 4) Authorize Execution of an Engineering Agreement with Multatech Engineering Inc. in the Amount of $274,031.00 for the Sanitary Sewer Rehabilitation, Contract 110 Project and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Multatech Engineering Inc. in the amount of $274,031.00, for Sanitary Sewer Rehabilitation, Contract 110 project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $468,451.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation, Contract 110 project (City Project No. 102783). DISCUSSION: This Mayor and Council Communication (M&C) is to authorize the execution of an engineering agreement with Multatech Engineering Inc. in the amount of $274,031.00, for Sanitary Sewer Rehabilitation, Contract 110 project for the preparation of plans and specifications for sanitary sewer and water main replacements on the following streets and easements: Street From To [CD] Scope of Work Western Center Boulevard Silver Sage Drive 600 feet West 4 Sewer Poppy Court �Sunnybank Drive Watauga Road 4 Water/Sewer Easement South of SW Loop 820 Overton Ridge Boulevard 610 feet West 3 Sewer Ranch View Road [IBYeSoluthlaire Drive 67 East Sewer Easement between Arundel Avenue and Winslow Drive 220 feet East of Encanto Drive 910 feet East 3 Sewer Easement South of Arundel Avenue Arundel Avenue 19 -feet South 3 Sewer Easement West of Somerset Lane Arundel Avenue 500 feet South Sewer Somerset Lane Arundel Avenue Winslow Drive 3 Water Winslow Drive Encanto Drive Suffolk Drive Water 150 feet East of the 1,510 feet Easement East of Rainer Court Lambert Avenue/Rainer Court intersection South then 170 feet North 3 Sewer Rainer Court Lambert Avenue/Rainer Court intersection 1,155 feet North 3 Water Norwich Drive Rainer Court Lambert Drive Water Lambert Avenue Rainer Court Norwich Drive Epa�] Easement West of 11180 feet North of 1170 feet I 3 Sewer Norwich Drive Norwich Drive West �u Easement North of 150 feet West of 1542 feet Lambert Avenue �RainerCourt West 3 Sewer Easement between Sierra 130 feet West of 360 feet 3 Sewer Court and Wyndale Trail Lake Drive East Court Wyndale JTrail Lake Drive Cul-de-sac 0 Water Sierra Court ITrail Lake Drive Cul-de-sac 0 Water In addition to the contract amount, $194,420.00 (Water: $73,820.00; Sewer: $120,600.00) is required for project management, real property acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Appropriations for Sanitary Sewer Replacement, Contract 110, are as depicted below: Fund W&S Capital Projects - Fund 56002 Existing Appropriations $0.00 Additional I Appropriations $468,451.00 Project Total* $468,451.00 Project Total $0.00 $468,451.00 $468,451.00 *Numbers rounded for presentation purposes. Business Equity: Multatech Engineering is in compliance with the City's BDE Ordinance by committing to 24 percent SBE participation on this project. The City's SBE goal on this project is 10 perecent. The project is located in COUNCIL DISTRICTS 3 and 4. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the SS Rehab Contract 110 project to support the approval of the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office by. Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Suby Varughese 7803