DATE: 06/22/21 M&C FILE NUMBER: M&C 21-0474
LOG NAME: 60SWSV EST AND TRANSMISSION MAIN-HALFF
SUBJECT
(CD 3) Authorize Execution of an Engineering Agreement with Halff Associates, Inc. for $1,291,838.00 for Design of the South Westside V
Elevated Storage Tank and Water Transmission Main, Provide for Project Costs for a Total Project Amount of $1,698,798.00, Adopt Attached
Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Attached Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an Engineering Agreement with Halff Associates, Inc. in the amount of $1,291,838.00 for the South Westside V
Elevated Storage Tank and Water Transmission Main;
2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt for the South Westside V
Elevated Storage Tank and Water Transmission Main; and
3. Adopt the attached appropriation ordinance adjusting appropriations in the Water and Sewer Commercial Paper Fund by increasing
appropriations in the amount of $1,698,798.00 in the South Westside V Elevated Storage Tank and Water Transmission Main Project (City
Project No. 103428) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount.
DISCUSSION:
This Mayor and Council Communication is to authorize the preparation of plans and specifications for the construction of South Westside V
Elevated Storage Tank (EST) and Water Transmission Main.
Growth within west Fort Worth and its Extra Territorial Jurisdiction requires continuous improvements to the water distribution system in order to
provide and maintain reliable water service to existing and proposed developments within the Westside pressure planes. This EST will provide
additional storage capacity in the South Westside V Pressure Plane while Water Transmission will pump/provide the needed water to the tank.
The proposed scope of services include site selection and feasibility studies, field surveys, design for the transmission main, design survey,
environmental permitting, easement preparation, subsurface utility engineering and geotechnical investigation.
Halff Associates, Inc. proposes to provide all the necessary design and construction administration services for a fee of $1,291,838.00. Staff
considers the proposed fee to be fair and reasonable for the scope of services proposed.
In addition to the contract amount, $406,960.00 is required for project management, real property acquisitions and utility coordination. This project
will have no impact on the Water Department Operating Budget when complete.
Appropriations for the South Westside V Elevated Storage Tank and Water Transmission Main are as depicted below:
Fund
Existing
Appropriations
Additional
Appropriations
Project Total*
W&S Commercial
Paper Fund 56020
$0.00
$1,698,798.00
$1,698,798.00
Project Total =1
$0.001
$1,698,798.00
$1,698,798.00
*Numbers rounded for presentation purposes.
This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer
portfolio and the City's portfolio along with the appropriation authority authorized under the callable Commercial Paper Program (CP) will be used
to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to
reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. Under federal law,
debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not
obligate the City to sell bonds, but preserves the ability to reimburse itself from tax-exempt bond proceeds.
Business Equity: Halff Associates, Inc. is in compliance with the City's Business Equity Ordinance by committing to 10 percent participation on this
project. The City's Business Equity goal on this project is 10 percent.
The project is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the UNSPEC project within the W&S Commercial Paper Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial
Paper Fund for the WS V EST and Transmission Main project to support the approval of the above recommendations and execution of the
engineering agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by. Dana Burghdoff 8018
Originating Business Unit Head: Chris Harder 5020
Additional Information Contact: Russell Redder 4970