Loading...
HomeMy WebLinkAbout(0254) Playground Replacements at Worth Hills, Casino Beach, Hillside - Bid Tab.pdfBID TAB FOR PLAYGROUND REPLACEMENTS AT WORTH HILLS, CASINO BEACH, HILLSIDE ON APRIL 29, 2021 Guarantee: BB -Bid Bond CC -Cashiers Chk CTC-Cert Chk Addenda Acknowledged Project Manager: Patrick Vicknair BB BB BB BB BB Yes Yes Yes Yes Yes Project Item Information L J Design and Construction 6548 Peden Road Fort Worth, TX 76179 817 999-6025 North Rock Construction, LLC 525 S. Loop 288, Suite 105 Denton, TX 76205 940 220-5500 Northstar Construction, LLC 2112 Solona Street Fort Worth, TX 76117 817 244-8885 C Green Scalping, LP 2401 Handley Ederville Rd. Fort Worth, TX 76118 940 382-9691 Capko Concrete Structures LLC P.O. Box 426 Azle, TX 76098 682 247-1035 Bidlist Item Description No. Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value Unit #1 WORTH HILLS PARK - BASE BID 1-01 Install temporary project construction sign 01 5813 LS 1 $447.02 $447.02 $1,013.18 $1,013.18 $670.00 $670.00 $800.00 $800.00 $500.00 $500.00 1-02 Install temprorary tree protection 32 93 43 LS 1 $362.09 $362.09 $1,744.15 $1,744.15 $500.00 $500.00 $800.00 $800.00 $700.00 $700.00 1-03 Remove items inside limits of demolition 01 41 13 LS 1 $15,446.02 $15,446.02 $4,903.47 $4,903.47 $25,000.00 $25,000.00 $15,972.25 $15,972.25 $20,000.00 $20,000.00 1-04 Remove trees selective site demolition 0241 13 LS 1 $4.981.14 $4,981.14 $3,170.45 $3,170.45 $15,000.00 $15,000.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 1-04 Proposed concrete walk 32 13 13 SF 496 $63.30 $31,396.80 $10.00 $4,960.00 $10.12 $5,019.521 $20.00 $9,920.00 1-05 Proposed sub -drainage system (pipe,fabric,gravel) 11 6813 LS 1 $4,930.00 $4,930.00 $10,752.84 $10,752.84 $5,000.00 $5,000.00 $6,154.00 $6,154.00 $6,000.00 $6,000.00 1-06 Proposed topsoil and qradinq 3291 19 LS 1 $9,852.86 $9,852.86 $6,333.60 $6,333.601 $6,000.00 $6,000.00 $13,900.00 $13,900.00 $15,000.00 $15,000.00 1-07 Proposed playground equipment (2-5 structure) 11 6813 LS 1 $37,547.00 $37,547.00 $33,249.14 $33,249.14 $40,000.00 $40,000.00 $51,000.00 $51,000.00 $40,000.00 $40,000.00 1-08 1 Proposed playground equipment (2 bay swings) ill 6813 1 LS 1 1 $8,521.601 $8,521.60 $7,546.03 $7,546.03 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $10,000.00 $10,000.00 1-09 Proposed wood fibar safety surfacing 12 68 15 SF 2070 $1.67 $3,456.90 $2.78 $5,754.60 $4.00 $8,280.00 $2.00 $4,140.00 $3.10 $6,417.00 1-10 Proposed sod in all distrubed areas 32 92 13 LS 1 $8,183.48 $8,183.48 $12,193.23 $12,193.23 $8,000.00 $8,000-001 $5,200.00 $5,200.00 $25,000.00 $25,000.00 1-11 Proposed terraced stones SFF 410 $148.26 $60,786.60 $500.00 $205,000.00 $37.51 $15,379.10 $94.00 $38,540.00 UNIT #1 BASE BID TOTAL $93 728.11 $178 844.09 $328 410.00 $136,364.871 $182 077.00 Unit #2 CASINO BEACH PARK - BASE BID 2-01 Install temporary project construction sign 01 5813 LS 1 $447.02 $447.02 $1,013.18 $1,013.18 $670.00 $670.00 $800.00 $800.00 $500.00 Pr $500.00 2-02 Install temporary tree protection 32 93 43 LS 1 $456.92 $456.92 $1,848.54 $1,848.54 $600.00 $600.00 $1,600.00 $1,600.00 $700.00 $700.00 2-03 Remove items inside limits of demolition 01 41 13 LS 1 $30,755.38 $30,755.38 $4,995.29 $4,995.29 $20,000.00 $20,000.00 $30,213.75 $30,213.75 $25,000.00 $25,000.00 2-04 Remove concrete walk 0241 13 SF 315 $5.75 $1,811.25 $4.31 $1,357.65 $3.001 $945.00 $1.50 $472.50 $8.00 $2,520.00 2-05 Proposed concrete walk 32 13 13 SF 675 $7.75 $5,231.25 $35.83 $24,185.25 $7.60 $5,130.00 $7.70 $5,197.50 $15.00 $10,125.00 2-06 Proposed concrete mow strip 32 13 13 LF 291 $38.00 $11,058.00 $46.41 $13,505.31 $37.00 $10,767.00 $40.00 $11,640.00 $68.00 $19,788.00 2-07 Proposed ADA ramp 32 13 13 EA 1 $1,532.00 $1,532.00 $4,172.59 $4,172.59 $850.00 $850.00 $1,584.00 $1,584.001 $5,000.00 $5,000.00 2-08 Proposed sub -drainage system (pipe,fabric,gravel) 11 6813 LS 1 $12,874.341 $12,874.34 $11,374.891 $11,374.89 $4,000.00 $4,000.00 $15,740.00 $15,740.00 $7,000.00 $7,000.00 2-09 1 Proposed topsoil and qradinq 3291 19 LS 1 $12,365.80 $12,365.80 $3,619.20 $3,619.20 $3,500.00 $3,500.00 $14,800.00 $14,800.00 $15,000.00 $15,000.00 2-10 Proposed playground equipment (Prototype #2) 11 6813 LS 1 $145,574.60 $145,574.60 $128,909.12 $128,909.12 $150,000.00 $150,000.00 $165,800.00 $165,800.00 $142,500.00 $142,500.00 2-11 Proposed wood fibar safety surfacinq 12 68 15 SF 5500 $1.97 $10,835.00 $3.37 $18,535.00 $4.50 $24,750.00 $2.00 $11,000.00 $3.75 $20,625.00 2-12 Proposed sod in all distrubed areas 32 92 13 LS 1 $10,908.32 $10,908.32 $12,645.63 $12,645.63 $8,000-001 $8,000.001 $10,075.00 $10,075.00 $30,000.00 $30,000.00 2-13 Proposed benches 32 33 00 EA 2 $2,210.86 $4,421.72 $1,920.20 $3,840.40 $2,300.00 $4,600.00 $2,300.00 $4,600.00 $865.00 $1,730.00 2-14 Proposed ADA parkinq LS 1 $5,257.02 $5,257.02 $6,572.16 $6,572.16 $6,600.00 $6,600.00 $7,001.00 $7,001.00 $10,000.00 $10,000.00 2-15 Proposed road base parkinq LS 1 $3,928.91 $3,928.91 $2164.27 $2,164.27 $18,000.00 $18,000.00 $12,719.001 $12,719.001 $10,000.00 $10,000.00 UNIT #2 BASE BID TOTALI $257 457.53 $238 738.48 $258 412.00 L $293 242.75 $300 488.00 Unit #3 HILLSIDE PARK - BASE BID 3-01 Install temporary project construction sign 01 5813 LS 1 $443.06 $443.06 $1,013.18 $1,013.18 $670.00 $670.00 $800.00 $800.00 $500.00 $500.00 3-02 Install temporary tree protection 32 93 43 LS 1 $172.42 $172.42 $2,039.68 $2,039.68 $900.00 $900.00 $500.00 $500.00 $700.00 $700.00 3-03 Remove all items inside limits of demolition 0241 13 LS 1 $15,275.50 $15,275.50 $4,536.18 $4,536.18 $26,000.00 $26,000.00 $38,442.50 $38,442.50 $40,000.00 $40,000.00 3-04 Remove concrete walk 0241 15 SF 3577 $5.75 $20,567.75 $1.53 $5,472.81 $2.30 $8,227.10 $1.50 $5,365.50 $8.00 $28,616.00 3-05 Proposed concrete walk 32 13 13 SF 1385 $7.75 $10,733.75 $20.02 $27,727.70 $7.20 $9,972.00 $7.70 $10,664.50 $15.00 $20,775.00 3-06 Proposed concrete mowstrip 32 13 13 LF 298 $38.00 $11,324.00 $45.60 $13,588.80 $36.50 $10,877.00 $40.00 $11,920.00 $68.00 $20,264.00 3-07 Proposed ADA ramp 32 13 13 EA 1 $1,532.00 $1,532.00 $4,172.59 $4,172.59 $850.00 $850.00 $1,584.00 $1,584.00 $5,000.00 $5,000.00 3-08 Proposed sub -drainage system 11 6813 LS 1 $12,108.00 $12,108.00 $11,996.94 $11,996.94 $5,500.00 $5,500.00 $16,428.00 $16,428.00 $10,000.00 $10,000.00 3-09 Proposed topsoil placement 3291 19 LS 1 $29,046.97 $29,046.97 $3,958.50 $3,958.50 $10,800.00 $10,800.00 $36,520.00 $36,520.00 $40,000.00 $40,000.00 3-10 Proposed playqround equipment (Prototype #3) 11 6813 LS 1 $202,195.00 $202,195.00 $179,040.69 $179,040.69 $209,000.00 $209,000.00 $162,000.00 $162,000.00 $197,000.00 $197,000.00 3-11 Proposed wood fibar safety surfacing 126815 SF 6137 $1.47 $9,021.39 $3.09 $18,963.33 $3.70 $22,706.90 $2.00 $12,274.00 $3.50 $21,479.50 3-12 Proposed sod in all distrubed areas 329213 LS 1 $22,453.47 $22,453.47 $12,193.23 $12,193.23 $9,000.00 $9,000.00 $15,535.00 $15,535.00 $75,000.00 $75,000.00 3-13 Proposed benches 32 33 00 EA 2 $2,210.86 $4,421.72 $2,200.46 $4,400.92 $2,300.00 $4,600.00 $2,300.00 $4,600.00 $1,100.00 $2,200.00 UNIT #3 BASE BID TOTAL TOTAL BASE BID $339 295.03 $289 104.55 $319 103.00 $316 633.50 $746 241.12 $461 534.50 $690 480.67 $706 687.12 $905 925.00 $944 099.50 Unit #4 ALTERNATE BIDS 4-01 Worth Hills - electricalsystem(incl: light pole, light fixture) LS 1 $15,178.00 $15,178.00 $16,017.22 $16,017.22 $9,600.00 $9,600.00 $10,300.00 $10,300.00 $12,000.00 $12,000.00 4-02 Worth Hills- concrete pad for relocated picnic table 321313 SF 144 $7.75 $1,116.00 $14.11 $2,031.84 $8.00 $1,152.00 $7.70 $1,108.80 $20.00 $2,880.00 4-03 Worth Hills- pet waste station EA 1 $990.00 $990.00 $1,944.10 $1,944.10 $600.00 $600.00 $825.00 $825.00 $1,100.00 $1,100.00 4-04 Casino Beach- concrete walk adjacent to playground 321313 SF 1725 $7.75 $13,368.75 $4.77 $8,228.25 $8.40 $14,490.00 $7.70 $13,282.50 $15.00 $25,875.00 Ph,yg... d Improvements a 3 Park Sites: 100896, 101410 101411 BID TAB FOR PLAYGROUND REPLACEMENTS AT WORTH HILLS, CASINO BEACH, HILLSIDE ON APRIL 29, 2021 Guarantee: BB -Bid Bond CC -Cashiers Chk CTC-Cert Chk Addenda Acknowledged Project Manager: Patrick Vicknair BB Yes BB Yes BB Yes BB Yes BB Yes L J Design and Construction North Rock Construction, LLC Northstar Construction, LLC C Green Scalping, LP Capko Concrete Structures LLC Project Item Information 6548 Peden Road 525 S. Loop 288, Suite 105 2112 Solona Street 2401 Handley Ederville Rd. P.O. Box 426 Fort Worth, TX 76179 Denton, TX 76205 Fort Worth, TX 76117 Fort Worth, TX 76118 Azle, TX 76098 817 999-6025 940 220-5500 817 244-8885 940 382-9691 682 247-1035 Bidlist Item Description Specification Unit of Bid Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value Unit Price Bid Value No. Section No. Measure Quantity 4-05 Casino Beach - 2 benches 32 33 00 EA 2 $2,210.86 $4,421.72 $2,200.46 $4,400.92 $2,300.00 $4,600.00 $2,300.00 $4,600.00 $1,100.00 $2,200.00 4-06 Casino Beach-1 cooker EA 1 $1,719.13 $1,719.13 $1,748.05 $1,748.05 $725.00 $725.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 407 Hillside Park- concrete walks adjacent to playground 321313 SF 1530 $7.75 $11,857.50 $5.46 $8,353.80 $8.40 $12,852.00 $7.70 $11,781.00 $15.00 $22,950.00 4-08 Hillside Park- 1 bench 32 33 00 EA 1 $2,210.86 $2,210.86 $2,358.79 $2,358.79 $2,300.00 $2,300.00 $2,220.00 $2,220.00 $1,100.00 $1,100.00 UNIT #4 ALTERNATE BIDS TOTAL $50 861.96 ** L. J. Design and Construction did not submit Bid using the revised Proposal Form in the Addendum BASE BID + ALTERNATE BIDS TOTAL $741 342.63 $45 082.97 $46 319.00 $45 617.30 $751 770.09 $952 244.00 $791 858.42 $70 105.00 $1 014 204.50 Playground Improvem at 3 Park Sit- 100896,101410 101411