PROFESSIONAL SERVICES AGREEMENT
This PROFESSIONAL SERVICES EN "Agreeme ') is made and
entered into by and between the CITY O T the "City"),, a home rule
municipal corporation situated in portions of Tarrant, Denton and Wise Counties, Texas, acting
by and through Fernando , its duly authorized Assistant City Manager, and CORBIN.
DESIGN, INC., ("Consultant"'),, a Michigan corporation and acting by and through Shelley
Steele, its duly authorized vice-president.
1. SCOPE OF SERVICES.
1.1 Consultant hereby agrees to provide the City with professional consulting
services for the purpose of wayfind r g design, documentation and
implementation., Attached hereto and incorporated for all purposes nc dent to
this Agreement is Attachment "A," Scope of Services and Attachment
Project Schedule, more specifically describing the services to he provided.
hereunder and the schedule to e adhered to.
1.2 Additional services, if any, will be requested in writing by the City. City shall.
not pay for any work performed by Consultant that has not been. ordered in
writing. It is specifically agreed that Consultant shall not be compensated for
any additional word resulting from oral orders of any person.
TERM.
This Agreement shall
expire on, December 31,, 20113, unless terminated earlier in accordance with the provisions of this
Agreement.,
. COMPENSATION.
The City shall pay Consultant an amount not to, exceed $128,002.,010 m accordance with
the provisions, off.this Agreement and the fee and Payment Schedule attached as Attachment
1113" Compensation, which. is incorporated for all purposes herein. Consultant shill not perform
any additional services for the City not specified by this Agreement unless the City requests and
p "rol � ire. meriting the additional costs for such services. "h City shall not he liable for any
additional expenses of Consultant not specified by this Agreement unless the City first approves
such expenses in writing. The Consultant shall provide monthly invoices, to the City. Payment
" """°� �'NPJMN194ID91DJP1 7vD IVl@ INJµ,,mp9P,K;NIDDNNf�rc�NUlUl1J91 pµlvAl nupplllllib
for services rendered shall al.l he due within thirty (30) days of the unco� to ed &ffbi rma it
VpIU I
art.c ular services so, ordered and receipt by the City of Consultant's i
same.
CITY SE
o
Ft VW)IRTN� PT14IX
r
yar,
>t i uNPlllpl ylwlN11I50;Nl QDi+WuYriIdYYNlI16dJ J1171@ I)jJYyLJV11hiS4LSA411JV(@».PIS"90V91JVdWNWM'+ivON@ SUI1NUIfGWIpdNpMYP11Ml`NNANgUNMlgplwlmprr%umFSMMNMV:mlamtAidtlsNpAkIN9Niu!
Professional e i�; SRI
Consultant Agreenie nt
Corbin Design,Inc.(wayfinding2012),
4. TERMINATION.
4.1. Written Noti.ce.,
The City or Consultant may terminate this Agreement at any time and for any
reason by providing the other party with 30 days written notice of termination.
4.2 Non-,pMrppdation,offunds.
In the event no funds or insufficient funds „ e appropriated by the City it are
fiscal period for any payments due hereunder, City 111 notify Consultant f such
occurrence and this reeme t shall terminate n the last day of the fiscal period
for which appropriations were received without penalty or expense to the City of
any kind whatsoever, except as to the portions of the ay nts herein agreed
upon for which funds shall have been appropriate!
4.3 Duties an tions of the P4,r
In the event t
City shall pay Consultant for services actually rendered up to the effective date
of termination and Consultant shall continue to provide the City with services
requestedby the City and in accordance with this, Agreement up to the effective
date of termination. All reports,, whether partial or complete, prepared under
this Agreement, including any original drawings or doc a eats whether
furnished by the City, its officers, agents employees, consultants, or contract rs
or prepared by Consultant, shall be or become the property of the City, and shall
be fern.s to the City prior to r at the time such services are completed, or
upon termination or expiration opt his, Agreement.
5. DISCLOSURE . LI S AND CONFIDENTIAL INFORMATION.
Consultant here arra is to the City that Consultant has made full di,sc suer 'n
writing f any existing or potential conflicts of interest related to Consultant's services under
this Agreement. In the event that any conflicts of interest ,arise after, the Effective Date of this
Agreement, Consultant hers agrees gees i that to make full +disc Deus to the City,
.
writing. Consultant, for self and its officers, tints employees, further agrees that it shall,
'
treat all information provided to it by the City as, confidential and shall not disclose any such
informAton to a thirct party without the rior written approval of the City. Consultant shall store
and maintain ntain C ty information it a secure a r and shall not allow unauthorized users to
access, modify, delete or otherwise corrupt City information in any way. o usultant shall notify
the City immediately of the security or .Integrity of any City information has been c,o'mpromised.
or is believed to have been oo fro ie
Professional Services
Consultant Agreement
Corbin Design,Inc.(way find in g2012)
6. RIGHT TO AUDITO
Consultant agrees that the City shall, until the expiration of three (3�) years after final
payment under thi.s co�ntract, have access to and the right to examine at reasonable times any
directly pertinent books,, documents, papers and records of the consultant involving transactions,
relating to this, C'o�ntract at no additional cost to the City. Consultant agrees that the City shall
have access during normal working hours to all necessary Consultant facilities and shall be
provided adequate and appropriate work space in order to conduct audits in compliance with
the provisions, of this, section. The City shall give Consultant reaso�nab�le advance notice of
intended audits.
Consultant further agrees, to include in all its s'ubcontractor agreements hereunder a
pr�ovision to the effect that the subcontractor agrees that the City shall, until expiration of three
(3) years, after final payment of the subcontract, have access to and the right to examine at
reasonable times any directly pertinent books, documents, papers, and records of such
subcontractor involving transactions related to the subcontract, and further that City shall have
I al working hours to all subcontractor facilities and shall be provided
access during norm I
adequate and appropriate work. space in order to conduct audits in comp�liance with the
provisions, of this paragraph. City sha,]' give subcontractor reasonable notice of intended audits.
7. INDEPENDENT CONTRACTOR.
it is expressly understood and agreed that Consultant shall. operate as an independent
contractor as to all rights and privileges granted herein,, and not as agent,,, representative or
employee of the City., Subject, to and in accordance with the conditio�ns and p�rovisions of this
Agreement, Consultant shall have the exclusive right to control the details, of its, operations and
activities and be solely res,po�nsib�le fo�r the acts and omissions of its officers, agents, servants,,
employees, contractors, and subcontractors. Consultant, acknowledges that the doctrine of
respondeat superiot 14 shall not apply as between the City, its officers, agents,, servants and
employees, and Consultant', its offlicers, agents, employees, servants,, contractors and
subcontractors. Consultant further agrees, that nothing herein shall be construed as the creation
of apartnership or joint enterprise between City, and Consultant.
8, LIABILITY AND INDEMNIFICATION.
CONSULTANT SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL
PROPERTY LOSS, PROPERTY DAMAGE ANDIOR PERSONA LINJUR Y, INCLUDING
DEA TH, TO ANY AND ALL, PE,RSONS, OF ANY KIND OR CHARA,CTER, WHETHER
REAL OR ASSERTED, TO THE EXTENT CA USED B Y THE NEGLIGENT A CT(S) OR
OMISSION(S), MALFEASANCE OR INTENTIONAL MISCONDUCT OF CONSUL TANT
ITS OFFICERS,A GENTS,SER VANTS OR EMPL 0 YEES.,
CONSULTANT COVENANTS AND AGREES' TO, AND DOES HEREBY,
INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS,
SERVANTS AND EMPLOYEES, FROM AND AGAINST ANY AND ALL CLAIMS OR
Professional Services 3
Consultant Agreement
Corbin Design,Inc.(way find ing2012)
..............-11-������������--���-�-,�,.��,,��,-�.�,�,�l.,��,�.,-�.--".-,�,..1-�..�,�,��.--."-.--,�—��.�,�,,�,�-..-.I.........................................
LAWSUITS FOR EITHER PROPERTY DAMAGE OR BOSS (INCLUDING ALLEGED
DAMAGE OR LOSS TO CONSUL,TANT'S BUSINESS AND ANY RESULTING LOST
PROFITS) ANDIOR, PERSOAAL� INJURY, INCLUDING DEATH, TO ANY AND ALL
PERSONS I OF ANY KIND OR CHARACTER) WHETHER REAL OR ASSERTED,
ARISING OUT OF OR IN CONNECTION WITH THIS A GREEMENT, TO THE EXTENT
CA.USED BY THE NEGLIGENT A.CTS OR OMISSIONS OR MALFEASANCE OF
CONSULTANT, ITS OFFICERS,A,GENTS, SERVANTS OR EMPL,0 YEES,
91 ASSIGNMENT AND SUBCONTRACTING.
I r* r
Consultant shall not assign or subcontract any of its duties, obligations or i ghts unde
this Agreement without the prior written consent of the City. If the City grants, consent, to an
assignment, the assignee shall execute a written agreement with the City and the Consultant
under which the assignee agrees to be bound by the duties and obligations of Consultant under
this Agreement. The Consultant and Assignee shall be jointly liable for all obligati,ons under this
Agreement prior to the assignment. If the City grants consent to a subcontract, the subcontractor
shall execute a written agreement with the Consultant referencing this Agreement under which
the subcontractor shall agree tobe out by the duties, and obligations of the Consultant under
this, Agreement as such duties, and obligations may apply. The Consultant shall provide the City
with a fully executed copy of'any such subcontract.
104 INSURANCE.
Consultant shall provide the City with certificate(s) of insurance documenting policies, of
the fo�llo�wing minimum coverage lim.1ts, that are to be in effect p�r�ior to commencement of any
work pursuant to this Agreement.*
10.1 Coverage and Limits
(a) Commercial General Liability.
$1 000,0100 Each, Occurrence
$1 000,000 Aggregate
(b), Automobile Liability
$1 1100101001 Each occurrence on a combined sing,le limit basis
Coverage shall be on any vehicle used by the Consultant,., its, employees,
agents, representatives in the course of the providing, services, under this,
Agreement. Any vehic�le" shall, be any vehicle owned, hired and non-
owned
(c) W'orker's Compensation-Statutory limits
Profess ional Services
Consultant Agreenienit
Corbin Design,Inc.(wayfinding2012)
Employer's liability
$100,1000 Each accident/occurrence
1 aerie w per each employee
$500001 iseas policy lim,it
This coverage may be written as lbws
orIKers Compensation and Employers' Liability coverage with lim is consistent
with statutory benefits outlined in the Texas workers' Compensation Act (Art,
8308 — 1.01 et se . Tex. Rev. Civ. Stat.), and minimum policy limits for
Employers' Liability $100,01010, each cc dent occurrence, $5001,,0010 bodily
injury disease policy limit and $10,01,000 per disease per employee
(d) Professional i Liabilityi
1 10100,000 Each Claim Limit
1,000,000 Aggregate Limit
If coverage is written on a claims ..ode basis, the retroactive date shall be
oincid�nt it or prior to the date the contractual agreement. h
insurance all be maintained for the duration of the contractual agreement,
and for five 5 years following the completion of the service provided
under the contractual agreement. T e certificate of insurance shall etas
that the coverage s claims-made, and include the retroactive date. An
annual certificate of insurance shall be submitted to the City to evidence
coverage.
101.2 General Requirements.
...............—
(a) The commercial general liability and, automobile liability policies shall
name the City as an additional insured thereon, as its interests may
appear., The term City shall include its employees, officers, officials,,
agents, and volunteers in reset to the contracted services.
(b) The workers' compensation policy shall include a Waiver of Subirogatioln.
(Right o Recovery), in favor of the pity of Fort Worth.
(01 A minimum of irty 301 days notice of cancellation or reduction in,
limits of coverage shall be provided to the City. Ten (1, dais notice shall
be ,acceptable in the event of non-payment o f premium.ium. otice shall be
sent to the Risk Manager, pity of Fort Worth,, 10100 Throckmortoin, Fort
a t , "l ava 1 , itl caries to the pity Attorney at the same e dress.
Professional ional Services 5
Consultant Agreement
Corbin Design,Inc.(wayfindiiig2012)
(d) The insurers for all policies must be licensed and/or, approved to do
business 'in the State of Texas. All *insurers must have a minimum rating
of A- VII -in the current A.M. Best Key Rating Guide, or hav easonab�ly
equivalent financial strength and solvency to the satisfaction of C sk
Management. if the rating is below that required, written approval of Risk
Managementis required.
( Any failure on the part of the City to request required, insurance
documentation shall not constitute a waiver of the 'insurance requirement.
(f) Certificates of Insurance evidencing that the Consultant has obtained all
required insurance shall be delivered to the City prior to Consultant
proceeding, with any work pursuant to this, Agreement.
11. COMPLIANCE WITH LAWS I L N
ORD NANCES R'U' ES AND REGULATIO S.
Consultant agrees to comply with, all applicable federal, state and local laws, ordinances,
rules and regulations. If the City notifies Consultant of any violation of such laws, ordinances,
rules or regulations, Consulta,nt shall immediately desist from and correct the violation.
12. NON-DISCRIMINATION COVENANT.,
Consultant 'for itself, its personal representatives assigns, subcontractors and successors,
in interest, as part of the consideration herein, agrees, that 'in the performance, of Consultant's
duties and obligations hereunder, it shall not discriminate, in the treatment or employment of any
individual or group of 'Individuals on any basis prohibited by law. if any claim arises from an
alleged violation of this non-di scrimi nation covenant by Consultant, its personal representatives,
assigns, subcontractors or successors in interest, Consultant agrees to assume such liability and
to indemnify and defend the City and hold the City harmless from such claim.
1.3. NOTICES,
Notices required pursuant to the provisions of this, Agreement shall be conclusively
determined to have been delivered, when (1) hand-delivered to the other, party, its agents,,
employees, servants or representatives,, or(2) received by the other party by United States Mail,
registered, return receipt requested,, addressed as, follows-
To The CITY: To CONSULTANT,-
City of Fort Worth Corbin Design, INC.
Attn: Planning and Development,Department Attn Shelley Steele, Vice President
1000 roc Dorton 109 ,Ea,s,t Front, Suite 3,04
Fort Worth T'X 76102-63 I I Traverse City, MI 49684
Facsimile.- (817) 392-8016
Professional Services 6
Consultant Agreement
Corb�in Design,,Inc.(way fin d ing2012)
........ ............... ............................. ....................................
14. SOLICITATIONOF EMPLOYEES,
Neither the City nor Consultant shall, during the term of this, agreement, and additionally
for a period of one year after its termination", solicit for employment r employ, whether as
employee or independent contractor,, any person who or has been employed y the other
during
the ter of this agreement, without the o written consent of the personts, employer.
150 GOVERNMENTAL P101WERS...
It is understood and agreed that, by execution of this Agreement, the City does not waive
or surrender any of its governmental powers.
.6 WAIVER.,,
The failure of the City or Consultant to insist upon the p�erf r .sacs of any terry or
provision r of this Agreement or to exercise any right granted herein shall not constitute a waiver.
of the City's or Consultant's respective right to :insist upon appropriate performance or to assert
any such right on any future occasion.
7. GOVERNING U.
This Agreement shall be construed in accordance with the laws of the State of Tars. If
any action, whether real or asserted, at law or m equity, is brought t n the basis of this
Agreement, venue for such action shall lie in state courts located in Tarrant County, Texas or the
United States District Court for the Northern District of Texas Fort Worth Division.
18. S VERABILITY.
If any provision of this Agreement ins held by any court of competent Jurisdiction to he
invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining
provisions,ns, of this A ree ent shall not n ;any way he affecte r impaired.
19 FORCE MAJEURE.
The City and Consultant shall exercise their lest efforts, to met their respective duties
and o lig,ations as set forth in this Agreement, but shall not be bald liable for any delay or
omission in erf rmance due t force seas r other causes beyond their reasonable control
(fo�rce rna e re), including, but not limited to, compliance with any government law, ordinance
or regulation, acts, of God, acts of the public enemy, fires, strifes, lockonts, natural disasters,
ar , riot ateri,al or labor restrictions by any governmental authority, transportation problems
and/or,any other similar causes.
20. HEADINGS NOT CONTROLLING.
Headings and titles used in this, Agreement are for reference purposes only and shall not
he deemed ,a part of this Agreement.
Professional Services
Consultant Agreement
Corbin Design,Inc,(wayfinding2012)
21, REVIEW OF COUNSEL.
0,
The part,les ackno�wledge that each party and its counsel have reviewed and revised this
Agreement and that the normal rules of construction to the effect that any ambiguities are to be
I *
resolved against the drafting party shall not be emp,loyed in the interpretation of this Agreement
or exhibits hereto.
22* AMENDMENTS /MODIFICATIONS/'EXT'ENSTIONS.
No extension, modification or amendment of this Agreement shall be binding upon a
party hereto unless such extension, modification,,, or amendment i's set forth in a written
I
instrument, which is executed by an authorized representative and delivered on behalf of such
party.
23. ENTIRETY OF AGREEMENT.
This Agreement, including the schedule of exhibits, attached hereto and any documents,
i I nco�rporated herein by reference, contains the entire understanding and agreement between the
City and Consultant, their ass,igns and successors in 'interest, as to the matters contained herem.
Any prior or contemporaneous oral or written agreement is hereby declared null and void to the
extent in conflict with any provision of this Agreement.
24. SIGNATURE AUTHORITY.
The person signing this agreement hereby warrants that he/she has, the legal authority to
execute this agreement on behalf of the respective party, and that such binding authority has, been
0,
granted by proper, order, resolution, o�r�dina,nce or other authorization of the entity. The other
party is fully entitled to rely on this warranty and representation in entering into this,Agreement.
[SIGNATURE PAGE FOLLOWS]
IN WITNESS HEREOF, the parties hereto have executed this, Agreement in, multi,ples, this
day of 2 01
.............
"'R�EO t
ATTEST:
CITY OF FORT WORTH-., Ile
001k
By
Mary J. r
10 0
By: 4x�000� City Secretary 10
0
Fernando Costa a I
0
10 0*
Assistant City Manager 010
*10000C 0
<>1
Date:
OFFICIAL RECORD
Professional Services 8 Cl"rY SECRETAU
Consultant Agreement FFT. 'W,, (,')fRT Hq TX
Corbin Design,Inc.(way find ing20 12)
.....................................................................
APPROVED
LEGALITY,- CORBIN DESIGN, INC.:
Bi
L y
Melinda Ramos ,? i
Assistant City Attorney S C4.01 Steele
CONTRACT T RIZ T Date:
C: C-25574
TEST.
Date Aipv ' : 5
............fl
,p J/l/'(d?fi�N1J Ii y1 flfl'v.�dNPK 49
uwwimrvmu ,+mrm..rw.r��i i�w�rrc�s ................T.fiPoI l61vNVVUV�t i
OF"
C r
rd,�
111
VI @kW
r�+��ari��i�lrxa�umr�w�u��wi�orc�mm�ro�aoi�uommm ,�N �
n+umu�IDmmu�d�a,�,
wJ
Professional Services
Consultant Agreement
Cram Des,ign,Inc. ayfinwd ng2012
ATTACHMENT "A"
Scope for Planai ng Related Services for e
gn:d Des�g�_._............... Wayfindinq Slqpa
A
The scope set forth herein defines the work to, be performed by the CONSULTANT in
completing the project. Both the CITY an LT
d CONSUANT have attempted to clearly define
I
the, work to be, perf I orme�d and address the needs of the Project.
OBJECTIVE
The purpose of this, contract is to complete the wayfinding signage system for Downtown,
the Cultural District,, and His,tori Stockyards. The remaining scope of work includes'.
designing the full sign, type arrays preparing deli n intent drawings- de veld p,ing sign location
plans and sign message, schedules-1 and consulting during the blid, fabrication and
installation processes.
WORK TO BE PERFORMED
'Task 2. yst mi Delsig!n
Task 3., Documentation
Task 4. Implementation
TASK 2,. SYSTE MI DESIGN.
0 Develop project schedule for Phase Two;
0 Develop, the full sign type array*
0 Present the f'uill sign type array via a WebEx conference call-,
0 Develop the map, artwork (Three non-dimensional district maps with, destination
lists and a regional inset map),
0 Revise the full sign type array and map artwork; and
0 Adjust and update the cost estimate.
Onsite Meetings.- None
ASSUMPTION
0 1
Note that we are designing a system to meet the specific wayfinidin�g! needs of the
three Fort Worth districts. Aspects of the system as designed may not meet all
applicable llocall planning or zoning codes and may reqiu,ire variances from the
local governing authority. If variances are required�, the doicu,mentat,ioln provided
by Corbin sign can, be used in the variance appilic,ation,(s).
City of Fort Worth,Texas
Attachment A
P,MIO Release Date.-06.19.21,011O
Page 1 of 8
...............
Ou"'ELIVERABLES,
A. Digital versions, (PDF and other nat,ive formats such as Word, E,xcel, Ililu�stratoir,
and/or In, Des,ign.) of the project schedule, Sign Type Array and cost estimate
B. Meeting summaries with act ion items
C. Monthly invoices
D Monthly progress reports,
E. Monthly sche�d�u�le updates with s,chediule narrative des,crribing any current or
anticipated schedule changes
F Monthly M/WB,E Report Form and Final Summary Payment Report Form
TASK 3. DOCUMENTATION.
Develop detailed sign, loc,at,ion plan!s and sign message schedules,
Develop the audit/demolition, plan;
0
Verify sign, locations and sign messaging onsite,
0
Refine sign location plans and sign message schedules;
• Add detailedl specifications to each s,ig�n type, drawiing,
• Conduct meetings with 'TXDOT;
40 Refine documentation after TXDO,T meetings;
0 Develop bid documents; and
0 Refine cost estimate and develop a phasing pilan.
Task Three Detalils
With the CITY's final approval of'thie wayfinding recommendations and des,ign�s, we beiglin
i
Task Three, Documentation. This task providesinformation necessary fir the spec,ifi�ca,tion,
p i
urchase,, fabrication and nstallation, of the approved signage system.
The resulting, Bid Package consists, of the following:
* Sign Location Plans and Sign Message Schedules;
* Design Intent Drawings for each sign, type including dimensions, letter heights,
ma,ter,ia,l splecificati�oins,, general mounting methods and colt r specifications; and
City of Fort Worth,Texas
Attachment A,
P Release Date-08.27.2010
Page 2 of 8,
.......... .................. .......................................
Bid Document consisting of the mat,erial' perfoirmisacs standards, general
conditions, 'I'bolilerpilate"' language necessary for a competitive bidding process,
and the bid form.,
The Sign Location Plans and SlIgn Message Schedules identify the, high-level public
wayfindingli signage, we have des,igrued for the proposed system, plot its location and define
its content. A Sign Location Plan is a site plan that graphically illustrates the preferred
location of each proposed s,ign from a wayfindiing standpoint, with: locations d icted as
accu�.urately as possible given the plan I s scale. A Si gn Message Schedule defines what each
sign gill say, ,identifies the sign type, and lists its location. It also notes whether any graphics
are i�ncluded on the sig!n, such as directional arrows, icons, or symbols.
The audit/demolition plan will then, be developed. This will include the addition, of existing
photo g�raphs and notes in the Slii , Message Sch dual .
We ask the CITY to review the Sign Location Plans and Sig n Message Sched�ul,es closely
for accuracy. We will modify these documents up to two times before asking for final
appr va,l.
Using the final Slign Location P'lans and Sign Message Schedules, we update the cost
estimate and develop a phasing plan for implementation of the si!gnage elements.
Onsite Meetings.- One, two-person trip to complete the site or
ASSUMPTIONS
Existing wayfinding program may have too an signs,, be unfeasible, in some
locations, or be outdated.,
DELIVERABLIES,
A. Digital versions (PDF and other native formats such as Wolrd, Excell, Illustrator,
I
and/or In Design of the Bid, Package, audit/demolition, plan, verification of the cost
estimate and phasing plan
B. Meetin,g summarhea with action items
C. Monthly invoices
D. Monthly progress reports
E. Monthly schedule updates with schedule narrative describing i any current or
anticipated schedule changes
F Monthly M/WBE Report F'olrm and Final Summary, Payment Report Form
City Fort Worth,Texas
Attachment A
PMO Release Date,:08.27.20110
Page 3 of 8
TASK 4. IMPLEMENTATION
• Manage the bid p�rocess,
• Review shop drawings, color s s stroking documents, etc.
Consult with the selected fabricator during fabrication and installation;
• Conduct a final inisplect,ion and document requir m ldiifica,tions; and
• Develop the Wayfin ing and Signa,ge Standards Manual.
Task Four Detalils
During Task Four, Implementation, we assist the CITY in an open bid process,., This
assistance includes issuing the documents for pricing, evaluating quotations or bids,for
compliance with the Bid Package, ranking the fabricators' bids, and awarding contracts for
fabrication and installation, of'the signs. Diurin g this, process we-,
0 Develop a mu�tulial�ly acs eptabile list of fabricators to include in the bid process;
0
Issue the Bid Package to the fabricators and other who request it,*
• Conduct a pre-bid conference all
• Field, bidder questions and issue any needed bid addenda during the bidding
perjod'*
I
0' Evaluu ate bid I returns, including bid samples and other submittals-,
0 Create a bid analysis spreadsheet, requesting clarification where needed- and
0 Submit the bid analysis and a summary of findings, for,the CITY I s review.
Once the CITY selects a fabricator, you hold the pirimary contractual relationship as Owner.
It is the responsibility of the awarded fabricator to work from the approved Sign Message
Schedule to create individual layouts for every sign face, in accordance with the
specifications detailed in the Design Intent Drawings.
It is Corbin Dies,i n's responsibility to protect the design intent and assuere faithful
implementation f'the sign message, schedu,le and location plans., During this process we.,
* Work w,ith the selected fabricator to issue necessary document,ation"
* Review all pre-f'abiricatin submittals (shop, drawings and color s,ampilles,),
0
Review all keystroking documents for layout and adherence to the design intent,,
0 Work with the, CITY as you verify the accuracy of the messaging in these,
documents,
City of Fort Worth,,,Texas
Attachment A
PMO Release Date,:018.27,,2010
Page 4 of 8
...............
• Answer the fabricator's queIstio,nis during the fabrication period
• Monitor the fabrication progress via i�g�ita,l photos, and conference calls;
Conduct an on-site inspect,ion, of all the sign! age 1 initially purchased as a result of
our design services frill wing the, completion of installation; and
Compile and submit a list of punch fist items from the on-site inspection to the
CITY and the fabricator for the fabricator to correct.
I
We then develop a Wayfinding and S,ignage Standard's Manual that will be used as a guide
in m�aint,a,ining and extending the signag�e program as designed. 'This document will include:
A brief review oIf'the issues and object,ives of the wayfinding systeriI
Documentation of the approved wayfinding logic,
The Wayfinding Action Plan that inc,ludes additional phases of implementation, for
the signage elements and recommendations for applying wayfinding logic to
relevant communications media;
The, finial destination list including terminology for primary and secondary
destinations,
Annotated depictions of each sign type that note the logic, behiiind its deign and
describe its intended use and recap m mend a,tions for maintenance;
Recommendations for future project expans,ioIn including general rules, of thiumib
regarding sign placement,
A list olf'c,onitacts for specific signiag:e and wayfinding u�pdating/replacement
needs;
An awarded bidder s bid form to simplify reorders and price comparisons;
A CD with the Bid Package including; the as bid Sign Location Plans and Sign
Message Schedules, and
0 Shop drawings of each sign type.
Onsite Meetings.- One,, one-pierson, trip to coImplete the final inspection
ASSUMPTIONS
01 An open, advertised bid process will be require Id.
pity of Fort Worth,,Texas,
Attachment A
RIM,Release Date:018.2 7,201101
Page 5 of 8
...........
DIELIVERABLES
A. Dligital vers,ions (PD,F and other native for such as, Wordy Excel,, Illustrator,
0
and/or In Design) of the, Wayfi'n:ding and S ignage Standards Manual
B. Meeting summaries,wan action items
C. Monithily invoices
Di. Monthly progress reports
E. Monthly schedule updates with scheduffle narrative describlinig any current,or
I
anticipated schedule changes,
F. Monthly M/WBE Report For and Final Summary Payment Report For
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCO VICES
Add*lb'onal Servi"'ces, not *includ,e.0 'In, the ex*istlng Sc
opp of Serv'i'ces — CITY and
............
CONSULTANT agree that th following services are beyond the Scope of Services
described in the tasks above. owever, CONSULTANT can: pirov,i,de these servicesy
if needed,, upon the CITY's written request. Any additional amounts paid to the
CONSULTANT as a result of any material change to the Scope of the Project shall
be agreed upon in writing by both parties, before, the services, are performed. These
addit,ional services include the following:
■10 Designing or developing.:
Custom icons or logos
■ Donor recognition, signs or,sign elements
■ Interior way it sig�nage for any parking decks/garages
Presentation materials for use, in education or promotion of the program
Electronicl interactive or'fie biased wayfindin�g applications
Mocku�p, temporary, prototype or sample signs I including:
• Produ�ctio�n,, coordination, or management
• Fabrication or installation
Determ�iniing eileictrical or s ruc urall re uiremeints for wilding-mou,nted signagie
Translating s,i!gn messaging into languages her than E,ngilish
Building the logic or providling consulting services for soliciting funding, whether
by developing formulas or, identifying potential sources for implemen'tation
funds,
S
Acquiring photography or illustration,, or providing photo direction for use in thi
project
0i Services r lated to, development of the CITY"s project f'ilnanicing and/or budget.
0 Performance, of miscellaneous and supplemental services related to the project
as requested by the CITY.
Cif y of Fort Worth,Texas
Aftachment A
P 0 Release Date:08.27.20,i0
Page 6 of 8
............... ............
JR,
F'IN�E PRINT
1) Professional Fees for seirvice�s are billed monthly according to the progress of the work
together with expenses incurred�, and are payable within 30, days,., No initial payment is,
r,equ�ire�d. For any additional services that are requested�, we first define a scope of services
sufficient to determine the amount of professional fees required, receiving approval from the
CITY before any additional services are provided., If the project is, not co�m�pletedi within 12
months from the date of th�is contract, additional professional fees may be required. The
exception will be for those items listed Force Majeure.
2�) Tra,ve�l Expenses, will be billed at the actual cost of'transploirtati:on and living expenses
incurred while perfoirming services on the project. Estimated travel expenses fo�r thiis plr,oject
i�nc,lude three si�ngle-plerson trips to Fort Worth, TX In order,to maintain cost efficiency and
stay within estimated budget guid�elines, we request that meeting dates be confirmed at
least two weeks in advance. If the project, is not co,mpileted within, 12 months from the date of
this contract, or m�eeting dates are not confirmed at least two weeks, in, advance, additional
travel expenses may be requ�ire�d., The exception, will be for those items listed Force Maj,eure.,
3), General Expenses will be blilled at actual cost plus,fifteen percent for expenses, we incur
on behalf of the project such as art materials, photo-re prod u ction, co,lor laser printing,
communication and expressage.
The documents provided as part of this proposal inc,lude a version o�f'each document in
electronic (Adobe PDF') format. For the purposes of timeliness and cost effectiveness, the
Blid Package will be issued to potential blidders in e,lect,roni,c form�at only. Preparation of
add�itioinal coplies may require additional general expenses.
4) Maximum Fees: These maximum fees, and expenses apply as long as the scope of the
work, remains the same, previously approved materials are not revised, and: the work
schedule proceeds directly and efficiently without a d�e�lay that exceeds six months. If It
appears that the maximum fees and expenses, co�uld be exceeded for reasons beyond our
controly we will notify you, and agree either on new fee and expense l�imits or a new strategy
for completing the project with�in the existing fees and expenses.
5�) Reactivation Compensation- If the project is suspended for longer than six months and is
subsequently reacti�va,ted, the CITY and Corblin Design shall, prior to reactivation, agree
upon a lump sum or other basis of reimbursement to, Corbin Design for any ext,ra start-�up
costs occasioned as a result of the wo�rk having been, suspended. The exception will be for
those items listed Force Majeure.
6), Leadership Changes: Should the CITY leadership change d!urinig the course of Corbin
Design's work, or should new entities,join, the leadership teami, necessitating additiona,l
client educationly Coirbin Design may ellect to put its work on, hold until a meeting is he�ld to
d�iscuss, project progress to date and future dir�ecti�oni, to assure a smooth transition. Corbin
Des,ign's time and expenses appl�icab�le to such meetingl if any, shall be paid by the CITY as
an additional expense along with associated fees.
7) Conditions and Responsibilities: The CITY, through the suppliers identified by itself and
Corbin Des,ign, will be ultimately responsible for ordering, purchasing, receiving and
verifying, the s,ignag�e,, supervising installation and authorizing final payment. Coirbin Design,
will not directly purchase or supply any specified items unless it is agre�ed upon prior to the
pu�rchase�.,
City of Fort Worth!,Texas
Attachment'A
PMO Release Date:08�.27'.20,10
Page 7 of 8
................
In dea,ling with contractors and suppliers, Corbin Design will act only as, a consultant to the
CITY, and the CITY will be so�le�ly responsibile for payments to contractors and suppliers who
might be Involved in the work as a re�s,ult of the design services provided by, Corbin Design.
Corbin Design will not be held responsible for the failure of contractors or suppliers to
satisfactorily perform under their agreements,with, the CITY.
The Sign Location Plans provided to the CITY by Corbin Design, are general in nature and
not to scale, and reflect locations, deemed desirable for the effectiveness of'the overall
wayfinding plan. They do not include exact, locations or provide mounting,, electrical or
lands,c,aping�, specifications. The investigation of actual exte�rior site conditions such, as
u�nde�rg�rounid utilities, as well as interior conditions including ceiling heigh�ts,,, wall widths and
other encumbrances is the responsibil�ity of the CITY and the sign contractor selected to
install the signs,.
Bid Documents prepared by Corblin Design show design intent, not construction or
engineering detail�. The fabricator is r�espons,ible for fabrication, installation, and overall
product quality. We expect the more d�etalled development and en�gineer,ing of I the design-
intent drawings, and installation, detail to be shown in the �fabirica,to�r's submitted shop
drawings. Corbin Design and the, CITY will review al�l shop drawings submitted by the
fabricator.
Although we would prefer to work with signage contractors mutually selected, by the CITY
and Corbin Designy we recognize that certain conditions may require that the co�mpetit,ive
bidd�i�ng process for the signage fabrication and i,nstall�ation be open: to, all bidders, regardless
of thei!r qualifications. Because an open bid pirocess, is requiredy we reseirv,e the right to,
adjust our fees for Task Four based on our evaluation of the qualifications of the su�cces,sf'u�l
bidder and the need for additional project, management on Corbin Design's part. We will
notify the CITY be�fore issuing a change order for these services.,
The CITY' is responsible for coordinating the, provision of electrical service to sign locations
that require electricity, working with the fabricator to set up s,ign installation schedules, and
foillowing up, with the fabricator to verify that all punch list items have been corrected to the
CITY's satisfaction.
City of Fort Worth,Texas
Attachment A
PMO Release Date:,08.27.20101
Pag�e 8 of 8
............................ ............................................
ATTACKMENT B
COMPENSATION
Des"Ign Serv*lces for
Wayfinding Signage Design, Documentation and I'm pliementation Services
Cfty Project No.
Lump Sum Project
I. Cova pensafion
A. The CONSULTANT shall be compensated a total lump sum fee of $128,002.001
as summarized in Exhibit B-1 — CONSULTANT Invoice and Section 1V —
Summary of Total Project Fees., The total l�umip sum fee shall be considered full
compensation for the services described in Attachment A, including all labor
materials, suppilies, and equipment necessary to deliver the services.
B. The CONSULTANT shall be paid monthly payments as described in Section, 11 -
Method of Payment.
111. Method of Payment
A. Partial payment shall be made to the CONSULTANT monthly upon City's
approval of an invoice, prepared and submitted by the CONSULTANT in the
format and including content as present ed in Exhibilt B-1 I Progress Reports as
required In item 111. of this Attachment B,, and Schedule as required In Attachment
D to this Agreement.
Bi. The estimated current physical percent compilete as required on the iinivoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Docum nt.
C. The cumulative, sum of' such monthly partial fee pay ents shall: not exceed the
total current project, budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the CONSULTANT.
111111. Progress Reports
A. The CONSULTANT shall prepare and submit to the designated repiresentative of
the Pl�anininig and Development Department monthly progress reports and
s,chedul s in the format required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:5.19.201O
Paige 1 of 4
B-1
...............
ATTACHMENT B
COMPENSATION
Des*I erv*lces for
01
Wayfinding Sign age Design, Documentation and Implementation Services
01ilty Project No.
Lump Sum Project
1. Colmp ens ati'on
A., The CONSULTANT shalil, be compensated a total lump sum fee of $128,002.00
as su� m riz,ed in Exhibit B-1 — CONSULTANT Invoice and Section IV —
Summary of Total Project Fees., The total lump sum fee shall be considered full
compensation 'for the services, described in Attachment A,, including all labor
materials, supplies, and equipment necessary to deliver the services.
B. The CONSULTANT shall be paid monthly payments as deiscr'ibed in, Section II -
Method of' Payment.
Method of Payment,
A. Partial payment shall be made to, the CONSULTANT mone y upon City's
approval of an invoice prepared and, submitted by, the CONSULTANT in the
format and including content as presented in Exhiibit B-1, Progress Reports as
required in item 111. of this Attachment B, and Schedule as required in Attachment
D to this,Agreement
B. The estimated current, physical percent complete as required on the 'Invoice shall
be calculated from the progress schieldule, as required 'in Attachment D to this
Standard Agreement and according to the current version of' the City of' Fort
I
Worthis Schedule Guldiance Document.
C. The cumulative sum of' such monthily part,ial fee payments shall not exceed the
total current, project budget including all approved Amen dm nts.
D. Each invoice shall be verified as to its accuracy and compiliance with the terms of
this Agreement by an officer of the CONSULTANT'.,
111111. Progress, Reports
A. The CONSULTANT shall prepare and submit to the des,ignated representative of
the Pl�anniinig and Devello nt Die la,rtmerit rn nth,ly progress reports and
schedules in the format, required by the City.
Ciity of Fort Worth,Texas
Aftachment B
PMO,Official Release Date:,5.1�9,201,0
Pagi e 1 of 4
B-1
............... .................................................. .....................
A T'TACHMEN:T B
COMPENSATION
IV. Summary of Total Project Fees
Hr m Primary Responsimbollolty Fee Amount %
Prime Consultant
Corbin, Design, Inc. Wayfind g design, $1067802.010 83.4
documentation &
implementation
.................. .................. ........
Proposed DBE Sub,-Consultants
I I
MX2 Resources, LLC Assist with wayfinding $7,0140.00, 51.5
documentation &
implemeintatio�n field work
................................................
Nip-MIWBE, Consultants
Kimley-Horn and Assist with, wayfin ding design, $1411601.00 11.1
Associates, Inc. documentation &
implementation
TOTAL $12,181002.00
Pr9ject Number & Name Total Fee DBE Fee
Wayfinding Signage Final Desi,gni,, $7,0140.00
Documentation & Implementation ............ $128,002.00 5.5%
City, DBE Goal = 5% Consultant Committed Goal = 5%
City of Fort Worth,Texas
Attachment B
PMO Official,Release Date:5.19.20,10
Page 2 of 4,
B-2
........................ ...........
EXHIBIT "131-1
CONSULTANT INVOICE
(Supplement to, Attachment, B)
0
Insert required invoice format following this, page, i,ncl'i ud lip ng negotiated total budget and
allocations of bluidagets across work types and work phases.
City of Fort Worth,Texas
Attachment B
PMO Official,Release Date:5.19.20 11 0
Page 3 of 4
B-3
..................................------
EXHIBIT 6413-12%1
CONSULTANT LEVEL OF EFFORT'
(Supplement to Attachment B)
Insert levei of effort following this page
City of Fort Worth,Texas
Attachment B
PM 0 Off iciall RelIease Date*5.19.201 0
Page 4 of 4
B-4
IJoN
w j" y G
7
;r
Jv
to
Ix
i
1 r or
" * %
E mo N m
CL
gYNj "
U I "
W
Kr
CL
C
" M M 0)N^- CO)to 00 i
rl-61l 6r*6q 60
Is 0
„
r
��� I Mfr r,
C C C C, N f s C C N 7 o CC)C IC)C N C a C N
to CA CNN C
gg
to
f d i✓
C n'r rr✓ i
CL
f-
f/�
A C �
N� � � �%".�: � � �'" � �CN
� 'air,
a � C �
of
g fM
.. �
0 0 0 CY 0 0 0 0 NON N of
Y
r to fr'
01 V
,
7r
b
New r' Ill co ca
I."
CL LU: ,f
" ppq rm( ,0 CL
m # Wf'r�i ,. N* IN Ni 1 11
day
�" w ;(
" CLl�
I ,
l
� r
n
0 It NI C14 0 CD
N Pi
3
t,.
�;rl ft }ir
k`
,
!J
s,
r
„u1
lE cr ;iiN a
;dr, d95 E IN
d�N
E A /
f;
%7 I
j("
J, (i
CL r 0 3 N
N ?y � "� % f
Cod C c rs ,
IN 0 CL 0
rt pN ,
cz
E �5 4 0-
CL
""
� 4 + J 4 1 y �to
Q.LL u V o a.
CL CL N �� � � c
2 �ANN E NN 7'I�N� � �
. it ... 3%
�Na"
N 0 0.W N
ui
two
If(�
o,
N CN N CAN I ,N M Mi M M M M m m( r 10, 'q ;r li '
W 4P,N
i x
Li *^
ry
CL
N
CN
Attachment"D" Corbin Design October 2,3,, 2012
Wayfinding Si'gnage
Project Schedule
Design Tasks
Corbin Submits Partial Sign Type Array to Giant Te,a /
�Sundaince/Staikeholdler�s October 30, 3012
................ ................ ....................... ------------------- ..m._.....
Client Tea mi/Su nd�aince/Sta�keho�l ders Return Comments on
Partial Sign Type Array November 6, 2012
.............. ..........- .............. ......................
complete revisons,to,Partial Sign,Type Array
and develop,Complete sign'Type Array
- - ", --- '-_' 6''n"................................................ ...N.........I..o........v..embr 16, 2012
b I en t Tea m 6 6, anc e/St ak eh 61 ders Re furnCme n ts
.....................
Complete Sign Type Array Novem,bler 28, 2012
........... ........................... ............ ............ ........... ..........
Corbin,Completes Final Revisions to Complete Sign Type
Array December 14, 2012
........................-------------- ............... ............................. ...........-........................................... .............-..........
Client Team, M�ee,ts with TxDO,T to,review Sign Type
Array December,1T,2012
....................... ............................... ..........
Corbin Completes signage Design, Revisions
requested by TOOT December 31,2012
Documentation Tasks
Lorbi'n develops Sign Message Scheclule/Sign
Location Flan November 2012
................. ............... .......... ...... .....................................
Corbin performs site work December 3-7,2012
............................... ................................ .............................................
Corbin revises SMS/SLP after site work and develops
Bid Package for Client Team rev�iew December 10-3,1,,2012
...............................................................................................I................................ ..........-...................................
Client Team review of Bid Package January 2-18,2013
............................................... ............. .................................
Corbin revises Bid Paickage(Design Intent Drawings,Sign
Message Schedule and sign Location Plan) J�anuilary 21-31,2013
DOT'Revielw
TXDO,T Review of idl Package(Design Intent Draiwi ngs,
Sign Location Plan and Sign Message,Schedule) February-June,,2013
................ ....... ..............................................................
Revisions to Bid Package as requested by TOOT July 1-12,2013
Sid
Bid Issue July 15,, 2013
...................... --------- .................................................................................................................................................. ----------- ----------------- .................. ............ .....................................................
Bids Due August 5,,2 13
.................................... ........................._.............. ........ .................................................................................................--------- .......................................................................................................... ......
Bid Evaluation and Recommendations August 6-16,, 20,13
---------- ........................... ............... ........... -------------..........................................................................................................
Bid Award August 191,,2013
Fabrication;and installation
Awarded B,idder Submits Shop Drawins/P�aiint& N Material
,Samples September 6,2013
..................................111............ .................................................................------ ............ .................................................................................................. .......................
Awarded Bidder Subm,its Keystroke Proofs September 13,,,2013
........................................................................................ ...........................................................----
Deaidl�in,e for Approval of Shop Drawings/Paint&Material
Samples,and Keystrokes, September 27,20,13
............................................ ....................................................................... .......
Fabrication (9 weeks) September 30-Novembler 29,20,13
............................ .........-
_tilfi o u-'n 6a't_i6_n_w_6'r`k.......b''e"...gi�n s b6'"f-ors re-�-e-ni-d o f...........................
fabrication) Novem,bler 11- mbler 20, 2013
�M&C'Review Page 1of2
Official site of smile City of or Worth,T as
FoRTWovn
CITY COUNCIL AGENDA
...... 'lye"
COUNCIL ACTION, Approved on 5/1/2012
ADMOM,M61/
AT 5/1/2012 REFERENCE NO.io' **C l-25574 LOG NAME., 06WAYFI IN'G
PROJECT
PIUBlLI
CODE*- C TYPE: CONSENT C NO
HEARING:
SUBJECT:, Authorize Execution with Corbin Design, Inc.,, of a Professional Services,Agreement in
the Amount of$180,0010.010 for Redesign and Implementation of the Wayfinding Project
for Downtown, the Cultural District, and the H�i�storic, Stockyards (COUNCIL DISTRICTS 2,
7' and 91)
RECOMMENDATION.ol
It is recommended that the, City Council authorize execution of al Professional Services Agreement
with Corbin: Design Inc., in an a,mr ou�nt of$1810,01001.00 for redesign and implementation of the
wayfinding project for Downtown,, the Cultural District, and the Historic Stockyards.
0
DISCUSS110l.l
On November 261, 2002, CM&C C-1 93615)the City C,olu�ncil approved the creation of a coloirdin�ateld
e Cult ural Dis trict, and the
wayfinding program in partnership,with stakeholders,from Downtown,, 'th
Historic Stockyards. The program includes the following activities,*.
1. Dielsign� and implement a signia,ge system to direct vehicular and pedestrian traffic within the three
visiltor districts,. The signiage system will provide information about,attractions, parking facilities, bus,
routes, and rail stations (to, ble redesigned),- and
2. Develop and maintains an interactive welbisitel wilith information ablout plarkingl, transit,, and piolin�ts of
interest interest in the three visitor districts (completed': vmw.fortvviorthpg[����).
i
The project is funded wilthl a $556,300.00 relimblursement grant through the federal Congestion
Mitigation and Air Quality Improvement Program (CMAQ)administered by the North Central Texas
Council of Govern,menlits., 'The grant is, matched by locals funds and iin-lkind services of$3,86,5811.00
from Downtown Fort Worth, Inc.,, t'hel Cultural District Committeley Stockyards Station,, and the City, for
total project funding of$9142,881.00.
The attached project history describes the activities that,have occurred since the project bleigan�.
Given changes in federal sign design standards, concerns about ploltential sign clutter, new
devellopment, and changes in wayfinding best practices, and technology, the project partners have
determined the need to hii�re a wayfinding consultant,to redesign and implement the wayfinding
project,. The consultant fee will come from existing project funding.
'The scope of services, has been divided into two phases.: 1) evaluation oflexisting conditions, revlised
0 1
signage pillan, and preferred approach; and 2),final sign design, sign standards manual,, bid
documents and process, and oversight of sign fabrication and installation.
The recommended wayfinding consultantl Corblin Design, Inc., has pro posed to provide the
necessary Phase 1 services,for a lump sum fee of$49,9157.00. Staff considers this fee to be fair and
reasonable for the scope of services proposed., Phase 2 is not expected to exceed
1.
$130,043.010 Notice to proceed,for Phase 2 will be issued upon satisfactory completion of Phase 1
httpl-*Hfortworthtexas.golv/counc'l"lr—PaCket/mc—revi'ew.asp.?ID=1 67201&co,unc,l 12l/07/2012
-tM&C Review Page 2 of 2
BID,ADVERTISEMENT—This bid was advertised in the Fort Worth S r le-qra,m on June 151,, 20111
June 22, 20111, June 29, 2011, July 6, 2011 and, Ju�ly 13, 2011.
Corbin Design Inc, is in compliance with the City's, Disadvantaged Busi�ness Enterprise
Ordinance by committing to five percent DBE participation on this project., The City's DBE goal on the
project is five percent.
This project is located in COUNCIL DISTRICTS 2,17, and 9.
1
FISCAL INFORMATIONXERTIFICATION:
The Financial Management Services Director certifies,that funds are available in the current budget,
as appropriated, of the Grants Project Fund.
TO F rani d/Account/Centern F'R,OM F'und's ccoun rt r
GR76 531120101 022302 25 30, $180,0010.00 GR76 5391201 02230,28250,10 $j_80,,00000
Sub mitted ngger r fo Ci Feo Cosa (6122)
........ ly Ma, S offi icy rnand� t
O,r*l,g,'I',n,at'l'n�gDepartment Head: Randle Harwood (6101)