HomeMy WebLinkAbout6. Design Review Committee for FW Convention CenterDesign Review Committee for the
Convention Center Expansion
Presented by:
Jay Chapa
January 14, 2020
1
Purpose of Today’s Presentation
•Provide details on the proposed Convention Center Design
Review Committee
•Outline the proposed strategy to phase and finance the
convention facilities expansion
2
Future Phase III
Phase II
Completed in 2003
Phase I
Completed in 2002
3
Design Review Committee
Mayor Betsy Price Mayor Pro-Tem Jungus Jordan
Councilwoman Ann Zadeh Leah King
Bob Jameson Jarred Howard
Ed Bass Sasha Bass
Jay Chapa Andy Taft
Bobby Ahdieh Richard Casarez
Glenn Forbes Johnny Campbell
Joseph DeLeon Randy Gideon
Martha Peters Adrian Parr
Annette Landeros Perry Bass
Jonathan Morris Gloria Starling
Bob Benda Lanny Lancarte 4
Design Review Committee Scope
•Participate in and approve selections for recommendation to City
Council of:
Project Management Consultant
Design Team
Construction Manager at Risk
•Provide feedback on appropriate space layout based on Customer
Focus Study
•Review and provide feedback on final design based on consultant
recommendations and available funding based on Project Finance Zone
performance
5
Need for Convention Center Expansion
Hunden Strategic Partner Team
•Peer cities have renovated/expanded their convention centers and added walkable or major headquarter hotels
•New hotels in downtown have been immediately absorbed into the market demonstrating pent-up demand
•Group planners continue to be frustrated by facilities and the number of separate hotels required to accommodate larger conventions
•Events, event days and total attendance at FWCC has remained level or decreased over the last five years
•Simultaneous development of 1,000-room convention hotel is recommended
6
Current Layout
7
Expansion Recommendation
Exhibit
Space
Ballroom(s)Meeting
Room
Space
Meeting
Room
Divisions
Board
Rooms
Conventio
n Hotel 1
(Rooms)
Conventio
n Hotel 2
(Rooms)
Current 227,613 28,160 56,961 55 1 614 0
Recommended 280,000 60,000 80,000 80 3 1,000 1,000
Net New Needed 52,387 88,160 23,039 25 2 386 1,000
Existing to be
Replaced
45,000 0 25,000 25 0 0 0
Net New to be
Constructed
97,387 60,000 48,039 50 2 386 1,000
8
Additional Recommendations
•Full Catering Kitchen
•500 Additional Underground Parking Spaces
•Straightening of Commerce Street
•New Front Door at North End
•Design should open to the street and connect better to Sundance Square
•Emphasize outdoor features including Water Gardens, Worth Square and additional terrace spaces
•Ensure flexibility of spaces and circulation to support multiple simultaneous events
•Provide a range of food and beverage choices
•Reduce costs for exhibitor set-up, utilities and decorating
9
Expected Results of Expansion over 10 Years
•Convention Center bookings expected to grow from 151 to
292 per year (94% increase) with conventions specifically
increasing from 61 to 83 (36% increase)
•Attendance would grow from 780K to 1.2M (55% increase)
•Room nights (corporate, group and leisure) would grow from
650K to 1.2M (85% increase)
10
Phased Approach to Minimize Business Loss
•Phase 3A: Annex Demo/Kitchen and Commerce St. Realignment
•Part 1: Full Design of 3A and partial design 3B not including 3B construction documents
•Part 2: Ballroom level kitchen and demo of south annex
•Part 3: Demo of north annex, straightening of Commerce and construction of new loading docks
•Phase 3B: Northern Expansion and Renovation of Existing
•Part 1: Demolish Arena
•Part 2: Build northern expansion
•Part 3: Strategic renovation of existing building & site
11
12
Public Finance Zone Map
Project Financing
PFZ Performance 2015 Projections Revised Projections
Revenue for 30 Years $472M $670M
Projected Budget: $400 million to $500 million (final cost to be based on available funding)
Project Planning and Management $ 30,000,000
Phase 3A –Part 1 & 2 Design and Construction 35,000,000
Phase 3A –Commerce Street Realignment 30,000,000
Phase 3B –New Exhibit Hall Construction 300,000,000
Phase 3B –Existing Exhibit Hall Renovation 35,000,000
Total $430,000,000*
* All numbers are preliminary estimates. Actual budgets to be based on final design and Construction Manager at Risk contract. 13
Thank you