HomeMy WebLinkAboutContract 54171-FP1 City Secretary 54171 FP1
Contract No.
FORTWORTH.., Date Received Sep 13,2021
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Alliance Ctr North Beach Sta 50+90.37 to 59+0.42
City Project No.: 102424
Improvement Type(s): Water ❑x Sewer ❑x
Original Contract Price: $126,178.50
Amount of Approved Change Order(s): $8,950.00
Revised Contract Amount:
Total Cost of Work Complete: $135,128.50
Sep 10,2021
Jeremia— '(Sep 10,202109:37 CDT)
Contractor Date
Project Manager
Title
Conatser Construction
Company Name
Gary Deyon( ep, ,2021 09:53 CDT)
Sep 10, 2021
Project Inspector Date
� UA� Sep 10, 2021
Project Manager Date
Sep 10, 2021
CFA Manager Date
`nm&ULWE Sep 11, 2021
Dana Burghdoff(5 11,2021 :34 CDT)
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Notice of Project Completion
Project Name:Alliance Ctr North Beach Sta 50+90.37 to 59+0.42
City Project No.: 102424
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 90 WD Days Charged: 44
Work Start Date: 8/17/2020 Work Complete Date: 8/31/2021
Completed number of Soil Lab Test: 24
Completed number of Water Test: 4
Page 2 of 2
i
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WATER&SANITARY SEWER IMPROVEMENTS TO SERVE ALLIANCE
Contract Limits
Project Type WATER&SEWER
City Project Numbers 102424
DOE Number 2424
Estimate Number I Payment Number 1 For Period Ending 8/31/2021
WD
City Secretary Contract Number Contract Time 9WD
Contract Date 2/25/2020 Days Charged to Date 44
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors CORDOVA,R / MCFADIN,M
Thursday,September 9,2021 Page I of 4
City Project Numbers 102424 DOE Number 2424
Contract Name WATER&SANITARY SEWER IMPROVEMENTS TO SERVE ALLIANC Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/31/2021
Project Funding
UNIT L•WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 12"WATER PIPE 790 LF $54.00 $42,660.00 790 $42,660.00
2 12"WATER PIPE CSS BACKFILL 48 LF $62.00 $2,976.00 48 $2,976.00
3 8"WATER PIPE 90.5 LF $40.00 $3,620.00 90.5 $3,620.00
4 8"WATER PIPE CSS BACKFILL 24 LF $50.00 $1,200.00 24 $1,200.00
5 CONNECTION TO EXISTING 4"-12"WATER 1 EA $1,000.00 $1,000.00 1 $1,000.00
MAIN
6 12"GATE VALVE 2 EA $2,400.00 $4,800.00 2 $4,800.00
7 8"GATE VALVE(CO#2) 3 EA $1,250.00 $3,750.00 3 $3,750.00
8 FIRE HYDRANT 1 EA $4,500.00 $4,500.00 1 $4,500.00
9 TEMPORARY AUTOMATIC FLUSHING DEVICE 1 EA $4,500.00 $4,500.00 1 $4,500.00
10 DUCTILE IRON WATER FITTINGS W/ 2.67 TN $5,500.00 $14,685.00 2.67 $14,685.00
RESTRAINT f
11 CONCRETE BLOCKING TYPE B 2.6 CY $200.00 $520.00 2.6 $520.00
12 TRENCH SAFETY 952.5 LF $1.00 $952.50 952.5 $952.50
13 TRAFFIC CONTROL I MO $1,500.00 $1,500.00 1 $1,500.00
15 3"WATER METER&VAULT(CO#1) 1 EA $12,500.00 $12,500.00 1 $12,500.00
--------------------------------------
Sub-Total of Previous Unit $99,163.50 $99,163.50
UNIT 11:SANITARY SEWER INIPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"DIP SEWER PIPE 90 LF $90.00 $8,100.00 90 $8,100.00
2 8"DIP SEWER PIPE CSS BACKFILL 20 LF $98.00 $1,960.00 20 $1,960.00
3 4'MANHOLE 2 EA $4,200.00 $8,400.00 2 $8,400.00
4 4'EXTRA DEPTH MANHOLE 20 VF $185.00 $3,700.00 20 $3,700.00
5 EPDXY MANHOLE LINER 31 VF $385.00 $11,935.00 31 $11,935.00
6 TRENCH WATER STOPS 1 EA $250.00 $250.00 1 $250.00
7 TRENCH SAFETY 110 LF $6.00 $660.00 110 $660.00
8 POST-CCTV INSPECTION 110 LF $6.00 $660.00 110 $660.00
9 MANHOLE VACUUM TESTING 2 EA $150.00 $300.00 2 $300.00
--------------------------------------
Sub-Total of Previous Unit $35,965.00 $35,965.00
--------------------------------------
Thursday,September 9,2021 Page 2 of 4
i
I
i
City Project Numbers 102424 DOE Number 2424
Contract Name WATER&SANITARY SEWER IMPROVEMENTS TO SERVE ALLIANC Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/31/2021
Project Funding
Contract Information Summary
Original Contract Amount $126,178.50
Change Orders
Change Order Number 1 $12,500.00
Change Order Number 2 ($3,550.00)
Total Contract Price $135,128.50
Total Cost of Work Completed $135,128.50
Less %Retained $0.00
Net Earned $135,128.50
Earned This Period $135,128.50
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $135,128.50
Thursday,September 9,2021 Page 3 of
City Project Numbers 102424 DOE Number 2424
Contract Name WATER&SANITARY SEWER IMPROVEMENTS TO SERVE ALLIANC Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/31/2021
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors CORDOVA,R/ MCFADIN,M Contract Date 2/25/2020
Contractor CONATSER CONSTRUCTION TxLP Contract Time 90 WD
5327 WICHITA ST Days Charged to Date 44 WD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $135,128.50
Less %Retained $0.00
Net Earned $135,128.50
Earned This Period $135,128.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $135,128.50
Thursday,September 9,2021 Page 4 of 4
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Alliance Center North-North Beach Street-Ste 50+90,37 to 59+02.42 CHANGE
CONTRACT: Water.Sanitary Sewer Improvements ORDER No:
CFA# 19-0166 CITY PARTICIPATION: NO
CITY PROJECT# 102424 1
FID# 30114-0200431-102424-EO7685
FILE# X-26264
INSPECTOR: Riley Roberson Phone No: 682-213-1837
PROJECT MANAGER: Mitch Holmes Phone No: 817-392-6826
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT
Developer Developer Developer DAYS
Developer Cosl City Cost Cost City Cost Cost City Cost Developer Cost City Cost Cost City Cos,
ORIGINAL CONTRACT $90,213.50 $35,965.00 $D.DD 50.0D $0.00 90
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE $90,213.50 $0.00 $35,965.00 50.00 S0.00 S0.00 $0.00 50.00 S0.00 $o.00 1 90
AMOUNT OF PROP.CH41GE
ORDER 512,500.00 50.00 0
REVISED CONTRACT AMOUNT 5102,713.50 50.00 535,965.00 1 50.00 $0.00 50.00 50.00 50.00 '.0 50.00 90
TOTAL REVISED CONTRACT
AMOUNT PER UNIT 51D2,713.50 $35.965.00 50.00 50.00 50.00
REVISED COSTSRARE Dev.Cost: $138,678.50 City Cost: $0.00
TOTAL REVISED CONTRACT $138,678.50
REVIEWED
By Mitch Holmes at 2;36 pm,Mar 26, 2021
Revised:10-12-2011 Page 1
You are Caected to make the follotting changes in lie contract doaanants:
UNIT 1-VIATER IMPROVEMENTS
CITY&D RE1.1
PAY n-v.1C GUAmmy UNIT ITE1.10ESCRIPDON UNITPRICE I TOTAL
New 15 33122801 1 1 1 EA 33122$01 a Water Meter and Vault SiZ60O.Gal $12500.00
TOTAL WATER 1 $12500.00
REASONS FOR CHANGE ORDER: Added a3"d—ticv2ter—ter to-1-liine W-tbfor use on adacent site(Lot 1.Block 2).Changes correspond to Revision el on sheets C103
and C105.
NO CITY FUNDS INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER
RECOMMENDED: APPROVED: APPROVED:
Pe'otonnJLand ScWons,Inc Hill Alf lees Conater on TK LP
Nona•Tanya Warbrtton.P.E. Name: vU C �C--f I JI None: Ad Bums
Title:PMject Enain--er TNe: Title: Manaoer
Revised:10-12-2011
Page 2
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Alliance Center North-North Beach Street-Sla 50+90.37 to 59+02.42 CHANGE
CONTRACT: Water Sanitary Sewer Improvements ORDER No:
CFA# 19-0166 CITY PARTICIPATION: NO
CITY PROJECT# 102424 2
FID# 30114-0200431-102424-EO7685
FILE# X-26284
INSPECTOR: Riley Roberson Phone No: 682-213-1837
PROJECT MANAGER: Debbie Willhelm Phone No: 817-392-2481
CONTRACT UNIT
WATER SEVIER PAVING DRAINAGE STREETLIGHTS CONTRACT
Developer 0¢veloper Developer DAYS
Deveb r_1 City cost cost city cost Cost city cost Developer cost city cast Cos1 City cost
ORIGINAL CONTRACT $90,213.50 $35,965.00 $0.00 $0.00 $0.00 90
EXTRAS TO DATE S12,500.00
CREDITS TO DATE
CONTRACT TO DATE $102,713.50 S9.Oo $35,965.00 So.00 $0.00 $0.00 $0.00 S0.00 $0.00 $0.00 90
AMOUNT OF PROP.CHANGE
ORDER S3,550., $0.00 0
REVISED CONTRACT AMOUNT $99,163.50 $0.00 $35,965.00 S0.00 $0.00 30.00 $0.00 s0.0o $0.00 50.00 90
TOTAL REVISED CONTRACT
AMOUNT PER UNIT $",163.60 $35,965.00 $0.00 $0.00 $0.00
REVISED COST SHARE Dev.Cost: $135,128.50 City Cost:
TOTAL REVISED CONTRACT $135,128.50
REVIEWED
By Debbie J.Willhelm at 12:04 pm,Sep 03,2021
f
Revised:10.12-2011 Page 1
You are aireded to UNITI-WATERIMmPmk Iha feloelrq ctlengeo In Vq mnlracl documents:
RO EMENTS
CRY BID ITE1,1
PAY ITEIA>f A QUANTITY I UNIT RFJ.I DESCRIPTION r PRICE '
7 33123W3 1 EA 33IZ3003 O'Gate Volvo U11126000 S14S0.00
14 1 33IZ2203 1 1 EA 1 3312.2203 2'WalerSomice
$2400.00 ',� „a is
TO7ALWATER
REASONS FOR CHANGE ORDER: Removed2wo:orcervIces lhalaro not inducted In this project.This change[$only to the bid Proposal and does not oanespond to any plan sheets.
Added B'gate vehro to water stub,this corresponds to revision 42 as ehown on sheet C103,
NO CITY FUNDS INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
Po[olon land Solutions,In$ INI AlOaro es'L Cenatser Con coon TX,LIP
Name:Tanya Waarbrlgon,P.E• Nam: ao C v[-I.1�b�l.� Name: r
TMo:PrW,"IEnnlneer _ TIVo: _v_(�• _ TIUe:
l
Revised:W-12.2011 Page 2
i
1114)+)
DAP•1111)I-1031)SAI.
--,. P.I.l nr)
Change to 90.50
00 42 43
Change to 952.50 acts-PROPOSAL FORM
r-,
UNIT PRICE BID Bidder's Apo ication
N DEACH STREETSTA 509037 TO 74• 631YATER R SER'Elt
•1 Ih el hem Informalion Bidder's Pmpoml
Didli)1 I pneliplioo SpniFIM" Unil of U1d 'nil Pik. Did Value
Ilan No. Salion No. Almmm Qmnlily
LI I .WATER! PROVEMENTS
_
r 1 3311.0441 12"Water Pipe 331112 LF r91 $54.00 $42,660.00
2 3311.0442 12"Water Pipe,CSS Backfill 3311 12 LF $62.00 $2.976.00
3311 10.
8 3311 0241 8"Water Pipe 3311 12 LF $40.00 $3.620.00
311 f0,
4 3311.0242$"Water Pipe,CSS Backfill 11 12 LF 24 $60.0D $1,200.00 -
5 3312.0117 Connection to Existing 4"-12"Water Main 00 00 EA 1 $1 000.00 $1 000.00
8 13312.3005 12"Oete Valve 3312 X EA 1 2 $2,400.001 $4 600.00
7 13312.3003 811 dale Valve 3312 20 EA 2 $1 250.00 $2 600.00
1 8 3312.0001 Flre Hydrant FA 1 $4 500.00 $4 600.00
9 9999.0000 Temporary AUlomaliC Flushing Device 000000 1 1 $4500.00 $4500.00
10 3311.0001 DUellle,Iron Water Fillings vrl Restraint 33 11 11 TO 2.67 SS 500.00 S14 606.00
11 9999,0000 Concrete Blocking,Type B 0000001 k 2.6 $200.00 $520.00
12 0305.0109 TranQh Safety 33 05 10 LF $1.00 $952.50
13 3471.0001 Trafflo Control 347113 MO 1 $1600.00 $1,600.00
14 3312,2203 2"Water Service 331210 EA 2 $2 400.00 $4 000.00
15 �
17
1e _.19
20
21
22 -- - _
23
24
25
26
27
28
20
30
31
32
33
34
35
36
37
38
39
40
41 ----------- -__-...--- __ _-.Y..--- ---- -- - --- _-.._._. j
42 ---
43 >t�
TOTAL UNIT i;WATER IMPROVEMENTS1 $90,213.5 .,
1 I
i
I
i
CITY 0P FORT WORM
SIAIIDARO COIISIRUC IION 3PECIFICA7111N DIxl161P.IRS•UI.VI'.LOrER AWARDPD 1'R011!CI S
P"Im V.W.My 21,2019 II1+)4311WAI'A11611•S<11N IJ,Wu j ),M%Is
1
i
rI
I+,41 a1
UAI'•bID 11u,1'o3N.
1'+se 1 rl l
/ 1
SECTION 00 42 43
Developer Awarded PrOjecls-PROPOSAL FORM
C I
UNIT PRICE BID Bidder's Application
N DBACII STREDT STA 5e190.37 TO 7413J.6J\YATUR k SUWC•It
Project hem Informalion Diddees Proposal
I
Didlist Descdplioo Spec lfiCali
on Unil of Did Unit Prico Did Vnluo
hem No. Scdion No hlessuro Qwnlily
Did Summary
UNIT 1:WATER IMPROVEMENTS _,_,___._,__,,_•_5801213_50
UNIT I:SANITARY SEWER IMPROVEMENTS ,........S35 866.00
Tolol Conslruciian Did $128 170.E0
I
This Did Is suhmilled by the enllly nnnled beinsv:
DIDDERI Dl't RROCK 1 :W.CS
CONIVI':1{R COSaITIt.('TI(1\'T S,1,31, ,
5(A l Wl1111T.1 1t Cf C
OII'I F \\' R 1
T If. l'7011'1 'TITLEt cL I111?N'1'
DATEt
Conlrncla—grees io complele{\'ORK for FINAL ACCEPTANCE eilhhs 90 svarldned.y-rlerlhednlev,Aen the
CONTRACTeommences to run as provided In the Cenenl Condiliom.
END OF SECTION
-•t
i
1
1
-1
i, l'IfYUF InHI hYORIll
STAM7AWH'D113II(UC11UN 31`i!('lllc'ATIrsN IXN:IR,117r15•UISVFIAI'1?Il A1YNInt:b PHo0iCI3
ynm\'mdm hl+l!l,D,IY toil al IIIYAINl1611'35 IIiJ I1,y�+u1 DN'.�Ir
I�
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Alliance Center North North Beach Sta.50+90.37 to 74+33.63
PROJECT NUMBER: 102424
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
12"PVC WL 12" PVC 790
8"PVC 8" PVC 91
FIRE HYDRANTS: 1 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES: YES
NEW SERVICES: 2" Copper 2 EA.
3" PVC 1 EA
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8"DIP 8" DIP 90
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
i
it
TRANSPORTATION AND PUBLIC' WORKS _
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
i
FORTWORTH®
TRANSPORTATION AND PUBLIC WORKS
September 1, 2016
Conatser Construction
5327 Wichita St.
Forest Hill,Tx 76119
RE: Acceptance Letter
Project Name:Alliance Center North, North Beach St.
Project Type:Water,Sanitary Sewer Improvements
City Project No.: 102424
To Whom It May Concern:
On August 31, 2021 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on August 31, 2021,
which is the date of the final inspection and will extend of two (2)years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2481.
Sincerely,
Debbie Willhelm, Project Manager
Cc: Mark McFadin, Inspector
Ron Cordova, Inspection Supervisor
Gary Deyon,Senior Inspector
Victor Tornero, Program Manager
Peloton Land Solutions, Consultant
Conatser Construction, Contractor
Hillwood Alliance Services, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a Notary Public in the state and county aforesaid, on
this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX, LP,known to me to be a credible person,who being
by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth,has been
paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
ALLIANCE CENTER NORTH—NORTH BEACH ST.
WATER& SANITARY SEWER IMPROVEMENTS
DOE#: N/A
CFA PRJ#: 19-0166
CITY PROJCT #: 102424
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
lC�
Brock Huggmsv
Subscribed and sworn to before me this 91h day of September, 2021
�(Go
HOERIG Notary Public in Tarrant 'ounty, Texas
RM
,State of Texasres O8/15/202313213162-8
CONSENT OF OWNER ❑
ARCHITECT ❑
SURETY COMPANY CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document G707
Bond No 0229602
PROJECT:
(name, addreSS)Alliance Center North-North Beach Street
Fort Worth,TX
TO (Owner)
HILLWOOD ALLIANCE SERVICES, LLC AND THE ARCHITECT'S PROJECT NO: CFA#19-0166
CITY OF FORT WORTH CONTRACT FOR:
Fort Worth,TX Water&Sanitary Sewer Alliance Center North-North Beach Street
L_ --J CONTRACT DATE:
CONTRACTOR:CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St,
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
HILLWOOD ALLIANCE SERVICES, LLC AND THE CITY OF FORT WORTH
Fort Worth,TX
OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this 3rd day of September, 2021
BERKLEY INSURANCE COMPANY
Surety Company
Attest:
(Seal): Signature of Authorized Representative
Robb[Morales .,.__,_. Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No.BI-7280j-el
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
• WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna;Don E. Cornell, Sophinie Hunter;
Robbi Morales;Kelly A. Westbrook; Tina McEwan; Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest,
Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that
no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds
had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted;and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond,undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF,the Company has caused these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this 2nd day of .tune 2020
`a use c Attest: Berid Insurance Company
Ft
By By -�
1975 derman 3e after
Executive Vice President&Secretary S resident
STATE OF CONNECTICUT)
) ss:
COUNTY OF FAIRFIELD )
Sworn to before me, a Notary Public in the State of Connecticut,this 2nd day of ,rune , _2020 ,by Ira S.Lederman
and Jeffrey M. Hafrca who are sworn to me to be the Executive Vice Pre si Secretary, and - Senior Vice President,
respectively,of Berkley Insurance Company. I�RY PURIAK
NECTICUT
MY COMMISSION EXPIRES
. otary Public,State of Connecticut
CERTIFICATE
I,the undersigned,Assistant Secretary of BERKLEY DSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a
true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
an N authority of the Attorney-in Fact set forth therein, who executed the bond or undertaking to which this Power of
A,tt�e� ched,is in full force and effect as of this date.
' 7�7 °++"L�**n der my hand and seal of the Company,this 3rd day of Se to 2021
s�SIAL
ID 1975 Y
Vincent P.Fora