HomeMy WebLinkAboutContract 54185-FP3 City Secretary 54185 FP3
Contract No.
FORTWORTH, Date Received Sep 14,2021
—Tqr,—
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Alliance Center North Litsey Road
City Project No.: 102505
Improvement Type(s): ® Paving x❑ Drainage x❑ Street Lights ❑ Traffic Signals
Original Contract Price: $2,155,757.00
Amount of Approved Change Order(s): $144,718.00
Revised Contract Amount: $2,300,475.00�
Total Cost of Work Complete: $2,300,475.00
ieremiah"Patto 202114:25 CDT' Sep 13, 2021
Contractor Date
Project Manager
Title
Conatser Construction
Company Name
GarYDeyon( e ,20 Sep 13, 2021
Project Inspector Date
a�6��. a)=� Sep 14, 2021
Project Manager Date
wz Sep 14, 2021
CFA Manager Date
P�'�:43 CDT)CDT) Sep 14, 2021
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Notice of Project Completion
Project Name:Alliance Center North Litsey Road
City Project No.: 102505
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 130 WD Days Charged: 64
Work Start Date: 8/17/2020 Work Complete Date: 8/31/2021
Completed number of Soil Lab Test: 232
Completed number of Water Test: 22
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name ALLIANCE CENTER NORTH LTPSEY ROAD
Contract Limits
Project Type DRAINAGE,PAVING,LIGHTS
City Project Numbers 102505
DOE Number 2505
Estimate Number 1 Payment Number 1 For Period Ending 8/31/2021
WD
City Secretary Contract Number Contract Time 138✓D
Contract Date 2/25/2020 Days Charged to Date 64
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors CORDOVA,R / MCFADIN,M
Friday,September 10,2021 Page 1 of 6
City Project Numbers 102505 DOE Number 2505
Contract Name ALLIANCE CENTER NORTH LITSEY ROAD Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE,PAVING,LIGHTS For Period Ending 8/31/2021
Project Funding
UNIT II:DRAINAGE IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 MEDIUM STONE RIPRAP DRY(CO#2) 1352 SY $75.00 $101,400.00 1352 $101,400.00
2 21"RCP CLASS III(CO#1) 223 LF $60.00 $13,380.00 223 $13,380.00
3 24"RCP CLASS III 186 LF $70.00 $13,020.00 186 $13,020.00
4 42"RCP CLASS III 64 LF $150.00 $9,600.00 64 $9,600.00
5 54"RCP CLASS III 239 LF $210.00 $50,190.00 239 $50,190.00
6 4X4 BOX CULVERT 400 LF $250.00 $100,000.00 400 $100,000.00
7 6X4 BOX CULVERT 643 LF $335.00 $215,405.00 643 $215,405.00
8 6'STORM JUNCTION BOX I EA $6,500.00 $6,500.00 1 $6,500.00
9 T STORM JUNCTION BOX 2 EA $7,500.00 $15,000.00 2 $15,000.00
10 HEADWALL BOX CULVERT TYPE PW 2 EA $24,500.00 $49,000.00 2 $49,000.00
11 10'CUB INLET 8 EA $3,400.00 $27,200.00 8 $27,200.00
12 (4)6'X6'MBC 192 LF $1,700.00 $326,400.00 192 $326,400.00
13 TRENCH SAFETY(CO#1) 1947 LF $1.00 $1,947.00 1947 $1,947.00
14 4'STACKED MANHOLE 2 EA $4,500.00 $9,000.00 2 $9,000.00
15 REMOVE AND REPLACE 10'CURB INLET(CO I EA $6,500.00 $6,500.00 1 $6,500.00
#1)
--------------------------------------
Sub-Total of Previous Unit $944,542.00 $944,542.00
UNIT III:PAVING IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 REMOVE RIP RAP 12519 SF $2.00 $25,038.00 12519 $25,038.00
2 REMOVEHEADWALL/SET 1 EA $1,500.00 $1,500.00 1 $1,500.00
3 UNCLASSIFIED EXCAVATION BY PLAN CUT 4682 CY $5.00 $23,410.00 4682 $23,410.00
PER PLAN
4 BORROW BY PLAN(FILL PER PLAN) 24244 CY $6.50 $157,586.00 24244 $157,586.00
5 SWPPP I ACRE I LS $18,500.00 $18,500.00 1 $18,500.00
6 HYDRATED LIME(CO#1) 291 TN $185.00 $53,835.00 291 $53,835.00
7 8"LIME TREATMENT 10762 SY $4.00 $43,048.00 10762 $43,048.00
8 10"CONC PVMT 10389 SY $64.00 $664,896.00 10389 $664,896.00
9 6"CONC CURB AND GUTTER 3223 LF $2.00 $6,446.00 3223 $6,446.00
10 4"SLD PVMT MARKING HAS(W) 293 LF $2.00 $586.00 293 $586.00
Friday,September 10,2021 Page 2 of 6
I
City Project Numbers 102505 DOE Number 2505
Contract Name ALLIANCE CENTER NORTH LITSEY ROAD Estimate Number 1
Contract Limits Payment Number 1
Project Type DRAINAGE,PAVING,LIGHTS For Period Ending 8/31/2021
Project Funding
11 4"SLD PVMT MARKING HAS(Y) 4290 LF $2.00 $8,580.00 4290 $8,580.00
12 4"BRK PVMT MARKING HAS(W) 798 LF $2.00 $1,596.00 798 $1,596.00
13 4"BRK PVMT MARKING HAS(Y) 864 LF $2.00 $1,728.00 864 $1,728.00
14 8"SLD PVMT MARKING HAS(Y) 69 LF $4.00 $276.00 69 $276.00
15 LANE LEGEND DBL ARROW 10 EA $350.00 $3,500.00 10 $3,500.00
16 REFL RAISED MARKER TY II-A-A 69 EA $4.00 $276.00 69 $276.00
17 REFL RAISED MARKER TY II-C-R 80 EA $4.00 $320.00 80 $320.00
18 TOPSOIL 1296 CY $18.00 $23,328.00 1296 $23,328.00
19 SEEDING,HYDROMULCH 5832 SY $1.00 $5,832.00 5832 $5,832.00
20 MANHOLE ADJUSTMENT MINOR 3 EA $500.00 $1,500.00 3 $1,500.00
21 TRAFFIC CONTROL 3 MO $1,500.00 $4,500.00 3 $4,500.00
22 PLACE 7-STRAND BARB WIRE FENCE 4325 LF $6.00 $25,950.00 4325 $25,950.00
23 REMOVE ROAD BARRICADE 62 LF $10.00 $620.00 62 $620.00
24 CONNECT TO EX.HEADER 57 LF $30.00 $1,710.00 57 $1,710.00
25 SALVAGE RIP RAP 5791 SF $2.00 $11,582.00 5791 $11,582.00
26 CLEARING AND GRUBBING(CO#2) 82420 SF $0.50 $41,210.00 82420 $41,210.00
27 UNCLASSIFED EXCAVATION(CO#2) 726 CY $7.00 $5,082.00 726 $5,082.00
28 BORROWED BY PLAN(CO#2) 5362 CY $9.00 $48,258.00 5362 $48,258.00
---------------------------------------
Sub-Total of Previous Unit $1,180,693.00 $1,180,693.00
UNIT IV:STREET LIGHTING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 CONDT PVC SCH 80(T) 3440 LF $12.00 $41,280.00 3440 $41,280.00
2 NO 8 INSULATED ELEC CONDR 9180 LF $3.00 $27,540.00 9180 $27,540.00
3 NO 10 INSULATED ELEC COND 3290 LF $3.00 $9,870.00 3290 $9,870.00
4 RDWY ILLUM FOUNDATION TY 2,5,6,8 9 EA $1,200.00 $10,800.00 9 $10,800.00
5 FURNISH/INSTALL POWDER COAT BLACK 9 EA $3,200.00 $28,800.00 9 $28,800.00
TYPE 18 POLE
6 FURNISHANSTALL POWDER COAT BLACK 9 EA $600.00 $5,400.00 9 $5,400.00
TYPE 33A ARM
7 FURNISHANSTALL POWDER COAT BLACK 9 EA $800.00 $7,200.00 9 $7,200.00
LED LIGHTING FIXTURE 133 WATT ATB2
8 1/4 CONDT PVC SCH 80(T) 2600 LF $11.00 $28,600.00 2600 $28,600.00
9 NO 2 INSULATED ELEC CONDR 150 LF $3.00 $450.00 150 $450.00
10 NO 6 INSULATED ELEC CONDR 2600 LF $3.00 $7,800.00 2600 $7,800.00
Friday,September 10,2021 Page 3 of 6
City Project Numbers 102505 DOE Number 2505
Contract Name ALLIANCE CENTER NORTH LITSEY ROAD Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE,PAVING,LIGHTS For Period Ending 8/31/2021
Project Funding
I I ELECTRIC METER PEDESTAL WITH I EA $7,500.00 $7,500.00 1 $7,500.00
TRANSOCKET
--------------------------------------
Sub-Total of Previous Unit $175,240.00 $175,240.00
--------------------------------------
Friday,September 10,2021 Page 4 of 6
City Project Numbers 102505 DOE Number 2505
Contract Name ALLIANCE CENTER NORTH LITSEY ROAD Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE,PAVING,LIGHTS For Period Ending 8/31/2021
Project Funding
Contract Information Summary
Original Contract Amount $2,155,757.00
Change Orders
Change Order Number 1 $19,568.00
Change Order Number 2 $125,150.00
Total Contract Price $2,300,475.00
Total Cost of Work Completed $2,300,475.00
Less %Retained $0.00
Net Earned $2,300,475.00
Earned This Period $2,300,475.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $2,300,475.00
Friday,September 10,2021 Page 5 of 6
City Project Numbers 102505 DOE Number 2505
Contract Name ALLIANCE CENTER NORTH LITSEY ROAD Estimate Number 1
Contract Limits Payment Number 1
Project Type DRAINAGE,PAVING,LIGHTS For Period Ending 8/31/2021
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors CORDOVA,R / MCFADIN,M Contract Date 2/25/2020
Contractor CONATSER CONSTRUCTION TxLP Contract Time 130 WD
5327 WICHITA ST Days Charged to Date 64 WD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $2,300,475.00
Less %Retained $0.00
Net Earned $2,300,475.00
Earned This Period $2,300,475.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $2,300,475.00
Friday,September 10,2021 Page 6 of 6
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Alliance Center North-Litsev Road-Sta 4+09.45 to 20+43.62 CHANGE
CONTRACT: Storm Drain Paving,Water,&Street Li ht Improvements ORDER No:
CFA# 20-0015 CITY PARTICIPATION:1 NO
CITY PROJECT# 102505
1
FID# 30114-0200431-102505-EO7685
FILE# K-2732
INSPECTOR: Riley Roberson Phone No: 682-213-1837
PROJECT MANAGER: Mitch Holmes Phone No: 817-392-6826
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS TxDOT CONTRACT
Developer Developer Developer Develop- Developer DAYS
Cost Cary coat cost Ci Cost Developer Cosl Ci cost Cost Gty Cost cost City Cost Cost Cilycom
ORIGINAL CONTRACT 523,945.00 $1,096,063.00 5884,454,OD S175,240.00 5158,406.5D 130
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE $23.945.00 50.00 $D.OD Moo $1,096,063.00 $000 $884.454.00 50.00 S175,240.00 $0.00 S153,40&5D $0.00 130
AMOUNT OF PROP.CHANGE
ORDER $2,400.OD $12,580.00 $6,988.00 0
REVISED CONTRACT
AMOUNT $26,745.00 $0.00 $0.00 MOO $1,108,643.OD 5000 1"1,44200 $0.OD $175,240.00 $0.00 S158,406.50 1 50.00 130
TOTAL REVISED CONTRACT
AMOUNT PER UNIT $26,345.00 50.00 $1,108,643A0 $891.442-00 $175.240.00 $158,406.W
REVISED COST SHARE Dev.Cost $2,360,076.50 City Cost 50.00
TOTAL REVISED CONTRACT $2,360,076.50
Revised:10-12-2011
Page 1
You are directed to make the follmdng changes in the contact documents:
UNIT I-WATER IMPROVEMENTS
CITY BID
PAY ITEM ITEM OUANTITY UNIT ITFI.I DESCRIPTION UNR PRIiF&nk..
2 33122203 1 EA 331222032"Wztu Service $2TOTAL WATER
UNIT II-PAVING IMPROVEMENTS
CITY
BID
PAY REl.1. REI.1: OVAMITY UNITITEI.I DESCRIPTION UNITPRICE TOTAL
6 3211.0400 63 TN 3211.0400 Hydrated Urne S185.001 $12,580.00
TOTAL PAVING 1 $12.580.00
UNIT 11-DRAINAGE IMPROVEMENTS
CITY BID
PAY ITEM ITEM OUANTRY UNR REM DESCRIPTION UNITPRICE TOTAL
2 3341.0201 1 8 1 LF 1 3341.0201 21'RCP.Class III 560.00 5480.00
13 3305.010a 8 LF 3305.0109 Trench Safety
New 15 _999.0002 1 EA 1 9999.0002 Remove and Ra,ace 10'Curb Inlet I $6 500.00 56.500.00
TOTAL DRAINAGE $6,988.00
REASONS FOR CHANGE ORDER: Added 2'Water Service for irrigation to serve adjacent site(ACN Lot 1,Block 2).Changes correspond to Revision#1 as shmm on sheets C601&C602.
Moved slomr drain Inlet location.Changes correspond to Revision 41 as sh—on sheet C506.
Amount of hydrated lime.Ibley,increased from 41.5Iblsy to 541b1syper Terra—
NO CITY FUNDS INVOLVED IN THIS CONTRACT.DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST ANO NO
REIMBURSEMENT FROM THE CITY VOLL BESOUGHT BY THE DEVELOPER
RECOMMENDED: APPROVED: APPROVED:
Pelolon Land I�rlr�c Hillvm',',�_C}n Iiia(ncJ�rvrvices Conat e n lion TY,LP
BY J� B..JL(G ICJ G ..�� BY• .Y ✓ I /� {� 'I
Name:Kola Weber,P.E. None: Jam+ v V 5 C&-'N 194 G � Name: Ad8 Bums
Title:Project Enotneer Title: V P Title: Manager
REVIEWED
By Mitch Holmes at 2:52 pm,Apr 07,2021
Revised:1042-2011
Page 2
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Alliance Center North-Litsey Road-Ste 4+09.45 to 20+43.62 CHANGE
CONTRACT: Storrs Drain,Paving.Water,&Street Light Improvements ORDER No:
CFA# 20-0015 CITY PARTICIPATION: NO
CITY PROJECT# 102505 2
FID# 30114-0200431-1025D5-EO7685
FILE# K-2732
INSPECTOR: Riley Roberson Phone No: 682-213-1837
PROJECT MANAGER: Mitch Holmes Phone No: 817-392-6826
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREET LIGHTS T.DOT CONTRACT
Developer Developer Developer Developer Developer DAYS
Cost City Cost Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost
ORIGINAL CONTRACT $23,945.00 $1,096,063.0D $884,454.00 $175,240.01) $158,06.50 130
EXTRAS TO DATE $2,400.00 $12,580.00 $6,938.00
CREDITS TO DATE
CONTRACTTODATE $26,345.00 S0.00 $0.00 $0.00 $1,108,643,00 $0.00 $891,44700 $0.00 $175,240.00 $0.00 $158,405.50 50.00 130
AMOUNT OF PROP.CHANGE
ORDER $72,050.00 $53,100.00 0
REVISED CONTRACT
AMOUNT $26,30.00 1 S0.00 $0.00 1 $0.00 $1,180.693.00 $0.00 $944,542.00 $0.00 $175,240.DD $0.00 $158,406.50 $0.00 130
TOTAL REVISED CONTRACT
AMOUNT PER UNIT $26,345.00 $0.00 $1,180,693.00 $944,$42.DD $175,24D.DD $t 58,406.50
REVISED COST SHARE Dev.Cost: $2.485,226.50 City Cost: $0.00
TOTAL REVISED CONTRACT $2,485,226.50
Revised:10-12-2011 Page 1
You are directed to make the follmvdng changes in the contract documents.
UNIT II-PAVING IMPROVEMENTS
GIN BID
PAY ITEM C QUANTITY UNIT ITEM DESCRIPITON UNIT PRIG TOTAL 3 3123.0101 726 Cy 3123.0101 Undessifizd ExravaGon Plan(Cut Per Plan) 57.OD $5,4 3123.0103 5362 CY 3123.0103 Borrwr by Flan(Fdl Per Pun)
26 9999.0007 37420 SF 59.00 $48,256.00062A0
9999.0007 Clearing and Grubbrg
TOTAL PAVING 50.( 578,710.00
572,050.00
UNIT II-DRAINAGE IMPROVEMENTS
CITY BID
PAY ITEM# ITEA",„9 QUANTITY UNIT ITEM DESCRIPTION
1 3137.0104 703 SY UNIT PRICE
TOTAL
3137.010a Medium Stone Ripap,dry $75.00 S53.100.00
TOTAL DRAINAGE 553,1 00.00
REASONS FOR CHANGE ORDER: Extended channel grading corresponds to ReAsion"1 as sho•.m on sheets C402,C501.and C901.
NO CITY FUNDS INVOLVED IN THIS CONTRACT,DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY VALL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED- APPROVED: APPROVED:
P loton Land Solutions,Inc Hill Allia erfices, C Conatser C truc5on TX,LP
S)r BY• By..
r / •
Name: ole Weber,P.E. Na I aC G S( .r .' ' Name: Ada Bums
Title:Project Enaineer Tide: v Tide: Manager
REVIEWED
By Mitch Holmes at 9:19 am, Jun 11, 2021
Revised:t0-12.2011
Page 2
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
September 1,2016
Conatser Construction
5327 Wichita St.
Forest Hill,Tx 76119
RE: Acceptance Letter
Project Name:Alliance Center North Litsey Road
Project Type:Storm Drain, Paving,Water, &Street Light Improvements
City Project No.: 102505
To Whom It May Concern:
On June 15, 2021 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on September 1, 2021. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on September 1, 2021,which is the
date of the punch list completion and will extend of two (2)years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2373.
Sincerely,
ve66�� uJ�l
Yogesh Patel, Project Manager
Cc: Mark McFadin, Inspector
Ron Cordova, Inspection Supervisor
Gary Deyon, Senior Inspector
Victor Tornero, Program Manager
Peloton Land Solutions,Consultant
Conatser Construction,Contractor
Hillwood Alliance Services, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority,a Notary Public in the state and county aforesaid, on
this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP,known to me to be a credible person,who being
by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth,has been
paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
ALLIANCE CENTER NORTH—LITSEY RD.
PAVING & STORM DRAIN IMPROVEMENTS
DOE#: N/A
CFA PRJ#: 20-0015
CITY PROJCT #: 102505
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
f
Brock Hugging
Subscribed and sworn to before me this 91h day of September, 2021
KAMRA HOERIG '�VW .
*;��, Notary Public,state of Texas Notary Public in Taman County, Texas
; ✓N comm.Expires 08/1 5 12 02 3
Notary ID 13213162-8 J
-CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT El
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AEA Document 6707
Bond No 0229601
PROJECT:
(name, addreSS)Alliance Center North-Litsey Road
Fort Worth,TX
TO (Owner)
City Project
HILLWOOD ALLIANCE SERVICES,LLC AND THE ARCHITECT'S PROJECT NO: #102505
CITY OF FORT WORTH CONTRACT FOR:
Paving&Storm Drain Improvements to serve Alliance Center North-
Litsey Road Sta.4+09.45 to Sia.20+433.62
L TX ,J CONTRACT DATE:
CONTRACTOR:CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
HILLWOOD ALLIANCE SERVICES, LLC AND THE CITY OF FORT WORTH
TX , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WITEREOF,
the Surety Company has hereunto set its hand this 3rd day of September, 2021
BERKLEY INSURANCE COMPANY
Surety Company
Attest: � -
(Seal): Signature of Authorized Representative
Robbi Morales Attorney-in-Fact
Title
NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280j-el
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna;Don E. Cornell, Sophinie Hunter;
Robbi Morales;Kelly A. Westbrook; Tina McEwan,Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest,
Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
acknowledge and deliver any and all bonds and undertakings,with the exception of Financial Guaranty Insurance, providing that
no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds
had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
This Power of Attorney shall be construed and enforced in accordance with,and governed by,the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted;and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF,the Company has caused these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this 2nd day of June 2020
/�,,0Su NCp
Attest I *Ilns�urmc4eCompany
Jr
`y,+ y`��,1Ia0 Executive Price President&Secretary:�:an Jan
esident
STATE OF CONNECTICUT)
) ss:
COUNTY OF FAIltMI D )
Swom to before me, a Rotary Public in the State of Connecticut,this 2nd day of_ June 2020 ,by Ira S_Lederman
and Jeffrey M. Rafter who are sworn to me to be the Executive Vice Presiden Secretary, aZt - ior Vice President,
respectively,of Berkley Iusuraauce Company. I CRy anal IMNNOTA '
COMMISSIONIG
AR ,FteS
/laty Public.State of Connecticut
CERTIFICATE
I,the undersigned,Assistant Secretary of BERICLEY INSURANCE COMPANY,DO THEREBY CERTIFY that the foregoing is a
true,correct and complete copy of the original Power of Attorney,that said Power of Attorney has not been revoked or rescinded
and thatThe authority of the Attorney-bi Fact set forth therein, who executed The bond or twdertaking to which this Power of
URAN
nay J,l ched,is in full force and effect as ofthis date.
«i�{fi7r:�� der my hand and seal of the Company,this 3rd day of Se a 2021
3975 .,
°WPC% Vincant P.Forts